Letting Schedule for El Paso District (FY 2006)

 
 
Last Update: Monday, August 28, 2006
El Paso District (FY 2006)
Brewster | Culberson | El Paso | Hudspeth | Jeff Davis | Presidio

Brewster County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0075-01-020 US 67 Actual APR 2006 $12,164,264 1 ADDITION OF PASSING LANES AND CULVERT WIDENING

Culberson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0002-11-053 IH 10 Actual SEP 2005 $7,547,063 1 MILL PAVEMENT, ASPHALTIC CONCRETE INLAY, STRIPING AND
0002-20-007 BI 10-D Actual NOV 2005 $7,464,039 1 2006 SEAL COAT PROGRAM
0233-01-039 US 62 Actual AUG 2006 $159,299 8 TEXTURIZED SHOULDERS

El Paso County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0001-02-045 SH 20 Actual SEP 2005 $4,891,729 1 REPLACE & REWORK BASE, NEW SURFACING
0001-02-046 SH 20 Actual OCT 2005 $1,234,271 10 LANDSCAPE WORK
0002-14-028 FM 258 Actual JUL 2006 $658,509 1 INTERSECTION SIGNALIZATION
0167-01-081 US 54 Actual APR 2006 $32,478,828 7 WIDEN ROADWAY BY ADDING TWO INSIDE LANES
0167-02-044 BU 54-A Actual JUL 2006 $2,273,000 7 TRANSIT ENHANCEMENTS
0674-01-061 FM 76 Actual JUL 2006 $1,225,400 7 TRANSIT ENHANCEMENTS
0924-06-166 CS Actual OCT 2005 $8,922,000 10 REHABILITATION OF INTERNATIONAL BRIDGES - SIB LOAN
0924-06-191 CS Actual OCT 2005 $11,704,122 7 RECONSTRUCT 6 DOWNTOWN STREETS
0924-06-214 CS Actual SEP 2005 $1,732,956 10 RECONSTRUCTION OF EXISTING ROADWAY FROM TWO LANE TO
0924-06-229 CS Actual JUL 2006 $3,000,000 5 FTA TRANSFER PROJECT CONSISTS OF INTERNATIONAL SERVICE
0924-06-258 CS Actual OCT 2005 $25,608,709 10 CONSTRUCT INTERSECTION IMPROVEMENTS BETWEEN BIGGS ARMY
0924-06-260 VA Actual FEB 2006 $1,316,681 10 ADA CURB RAMP
0924-06-261 VA Actual MAY 2006 $350,000 1 TRAFFIC MANAGEMENT_MAINTENANCE
0924-06-266 VA Actual FEB 2006 $1,475,239 1 2006 STRIPING
0924-06-274 CS Actual APR 2006 $2,340,272 5 EXPRESS BUS SERVICE FROM SUN METRO EASTSIDE TERMINAL TO OREG
0924-06-278 VA Actual JUL 2006 $250,000 5 OZONE ACTION DAY AND PUBLIC AWARENESS PROGRAM
2121-01-060 IH 10 Actual SEP 2005 $1,386,871 1 IH - 10 MICROMILL AND MICROSURFACING TO INCLUDE STRIPING AND
2121-01-072 IH 10 Actual APR 2006 $609,510 1 BRIDGE JOINT REPAIR
2121-01-073 IH 10 Actual APR 2006 $9,963,261 1 OVERLAY ON FRONTAGE ROADS
2552-01-047 LP 375 Actual APR 2006 $3,940,800 1 REPAIR AND OVERLAY

Hudspeth County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0002-10-021 IH 10 Actual MAY 2006 $3,053,615 1 CONSTRUCT FRONTAGE ROADS

Jeff Davis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0924-10-005 PW Actual JUL 2006 $1,885,078 10 CONST 0.5 MI LOOP ROAD TO CONNECT ACCESS ROAD & PARKING AREA

Presidio County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0020-08-039 US 67 Actual MAR 2006 $12,203,449 1 ADDITION OF PASSING LANES AND


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract