Letting Schedule for September, 2005 (FY 2006)
Letting Schedule for September, 2005 (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
September, 2005 (FY 2006) | (see Links) |
SEP 2005 | OCT 2005 | NOV 2005 | DEC 2005 | JAN 2006 | FEB 2006 | MAR 2006 | APR 2006 | MAY 2006 | JUN 2006 | JUL 2006 | AUG 2006 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0206-01-043 | Anderson/ Tyler |
US 79 | Actual | $5,494,142 | 1 | RESURFACE ROADWAY |
0017-03-058 | Bexar/ San Antonio |
IH 35 | Actual | $1,943,932 | 8 | INTERSECTION ILLUMINATION |
0253-04-114 | Bexar/ San Antonio |
US 281 | Actual | $83,653,101 | ROW | EXPAND TO 6 LN EXPY W / 4 LN FR (TOLL 6 NEW ML'S) & INIT TMS |
0915-00-117 | Bexar/ San Antonio |
VA | Actual | $526,940 | 1 | SPOT BASE REPAIR AND LEVEL - UP |
0915-00-119 | Bexar/ San Antonio |
VA | Actual | $779,733 | 1 | SPOT BASE, REPAIR, AND LEVEL - UP |
0258-06-035 | Bosque/ Waco |
SH 6 | Actual | $148,610 | 10 | CONSTRUCTION OF SCENIC ENHANCEMENT CONSISTING OF LANDSCAPE |
0398-01-035 | Bosque/ Waco |
FM 56 | Actual | $3,552,008 | 1 | REPLACE BRIDGE AND APPROACHES |
2523-02-057 | Brazoria/ Houston |
FM 2004 | Actual | $314,231 | 1 | REPAIR BOAT RAMP |
0152-02-064 | Caldwell/ Austin |
US 183 | Actual | $772,429 | 1 | INSTALL LTL |
0152-03-039 | Caldwell/ Austin |
US 183 | Actual | $4,545,536 | 6 | REPLACE BRIDGE & APPROACHES |
0914-22-047 | Caldwell/ Austin |
CR | Actual | $644,942 | 6 | REPLACE BRIDGE & APPROACHES |
0974-01-023 | Callahan/ Abilene |
FM 604 | Actual | $6,428,274 | 11 | CONSTRUCT RAILROAD OVERPASS AND APPROACHES AND REROUTE |
0039-07-194 | Cameron/ Pharr |
US 77 | Actual | $9,163,040 | 6 | REPLACE BRIDGE AND RESCONSTRUCT APPROACHES |
1801-01-038 | Cameron/ Pharr |
FM 1847 | Actual | $4,191,614 | 11 | WIDEN TO 4 LANES & WIDEN UPRR OP |
0925-00-053 | Childress/ Childress |
VA | Actual | $339,289 | 1 | CRACK SEAL |
0224-02-040 | Clay/ Wichita Falls |
US 287 | Actual | $5,502,827 | 1 | HEAVY HOT MIX OVERLAY |
0681-03-009 | Clay/ Wichita Falls |
FM 171 | Actual | $743,582 | 1 | IMPROVE VERTICAL AND HORIZONTAL ALIGNMENT |
0047-06-130 | Collin/ Dallas |
US 75 | Actual | $355,998 | 11 | ADD SB AUXILIARY LANE BETWEEN ENTRANCE RAMP FROM ELDORADO |
0918-24-121 | Collin/ Dallas |
VA | Actual | $1,162,308 | 1 | HMAC OVERLAY |
0016-05-102 | Comal/ San Antonio |
IH 35 | Actual | $457,580 | 10 | INSTALL IRRIGATION AND LANDSCAPING |
0194-02-084 | Cooke/ Wichita Falls |
IH 35 | Actual | $416,753 | 1 | INTALL DYNAMIC MESSAGE SIGNS |
0032-03-036 | Cottle/ Childress |
US 62 | Actual | $7,118,833 | 1 | DISTRICTWIDE SEAL COAT |
0002-11-053 | Culberson/ El Paso |
IH 10 | Actual | $7,547,063 | 1 | MILL PAVEMENT, ASPHALTIC CONCRETE INLAY, STRIPING AND |
0009-11-204 | Dallas/ Dallas |
IH 30 | Actual | $1,497,966 | 5 | INSTALL SENSOR STATIONS WITH COMPRESSED CCTV CAMERAS, |
0906-00-108 | Ector/ Odessa |
VA | Actual | $355,378 | 11 | SIGNING |
0001-02-045 | El Paso/ El Paso |
SH 20 | Actual | $4,891,729 | 1 | REPLACE & REWORK BASE, NEW SURFACING |
0924-06-214 | El Paso/ El Paso |
CS | Actual | $1,732,956 | 10 | RECONSTRUCTION OF EXISTING ROADWAY FROM TWO LANE TO |
2121-01-060 | El Paso/ El Paso |
IH 10 | Actual | $1,386,871 | 1 | IH - 10 MICROMILL AND MICROSURFACING TO INCLUDE STRIPING AND |
0260-02-039 | Ellis/ Dallas |
US 67 | Actual | $2,109,555 | 1 | INSTALL MEDIAN BARRIER |
0918-22-097 | Ellis/ Dallas |
CR | Actual | $170,000 | 10 | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES |
0027-08-144 | Fort Bend/ Houston |
US 90A | Actual | $21,881,454 | 10 | WIDEN TO 8 - LANE DIVIDED WITH DIAMOND INTERCHANGE AT DULLES / |
0294-01-034 | Gaines/ Lubbock |
US 180 | Actual | $248,008 | 8 | HAZARD ELIMINATION AND SAFETY |
0051-07-004 | Galveston/ Houston |
FM 188 | Actual | $167,897 | 1 | BASE REPAIR AND OVERLAY |
0051-08-016 | Galveston/ Houston |
SP 342 | Actual | $1,111,388 | 1 | BASE REPAIR MILL AND OVERLAY |
0367-06-057 | Galveston/ Houston |
SH 87 | Actual | $291,890 | 1 | BASE REPAIR AND OVERLAY |
0978-02-056 | Galveston/ Houston |
FM 3436 | Actual | $1,328,068 | 1 | ROADWAY RECONSTRUCTION |
1002-02-009 | Galveston/ Houston |
FM 517 | Actual | $715,403 | 1 | ADD 10 FT SHOULDER BOTH SIDES |
1844-02-019 | Galveston/ Houston |
FM 2351 | Actual | $297,349 | 1 | REINFORCED CONCRETE PIPE WITH INLETS, REMOVE SECTION OF |
1844-02-020 | Galveston/ Houston |
FM 2351 | Actual | $296,548 | 1 | TRAFFIC SIGNAL IMPROVEMENTS AND LEFT TURN LANE |
0047-13-027 | Grayson/ Paris |
US 75 | Actual | $156,966 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0311-02-027 | Hall/ Childress |
SH 70 | Actual | $2,590,295 | 11 | CONSISTING OF SUBGRADE WIDENING, BASE, MBGF, AND 2 CST |
0043-02-065 | Hardeman/ Childress |
US 287 | Actual | $1,755,556 | 1 | OVERLAY |
0389-05-089 | Harris/ Houston |
SH 146 | Actual | $161,959 | 5 | ADD RIGHT TURN LANE |
0500-03-475 | Harris/ Houston |
IH 45 | Actual | $54,459,256 | ROW | CONSTR 3 - LEVEL INTRCHNG @ NASA 1 BYPASS, WDN FRONTAGE_ROADS |
0912-00-300 | Harris/ Houston |
VA | Actual | $2,434,673 | 1 | INSTALL HIGH MAST LIGHTING |
0157-03-042 | Haskell/ Abilene |
US 277 | Actual | $3,845,983 | 1 | REHABILITATION, SIDEWALK, CURB & GUTTER |
0669-03-012 | Hidalgo/ Pharr |
FM 2221 | Actual | $8,617,493 | 1 | REHABILITATE PAVEMENT AND ADD SHOULDERS |
0656-01-033 | Hill/ Waco |
FM 67 | Actual | $81,295 | 8 | REMOVE TREES |
1290-05-007 | Hunt/ Paris |
SH 276 | Actual | $8,248,207 | 8 | WIDEN TO 5 - LN W / SHOULDERS |
1181-04-030 | Johnson/ Fort Worth |
FM 917 | Actual | $2,636,775 | 1 | REALIGN FM ROAD AT LILLIAN |
0908-24-039 | Jones/ Abilene |
CR | Actual | $552,680 | 6 | REPLACE BRIDGE AND APPROACHES |
0909-40-046 | Limestone/ Waco |
CS | Actual | $402,516 | 9 | STREETSCAPE IMPROVEMENTS AT LIMESTONE COUNTY COURTHOUSE |
0299-03-044 | Maverick/ Laredo |
US 277 | Actual | $6,440,832 | 10 | REHABILITATION OF EXISTING ROADWAY |
0024-05-079 | Medina/ San Antonio |
US 90 | Actual | $4,570,061 | 11 | RECONSTRUCT & EXPAND 2 TO 4 LANE W / CLTL |
0090-02-048 | Oldham/ Amarillo |
IH 40 | Actual | $20,453,889 | 1 | CONCRETE UPGRADE_AND BRIDGE REPLACEMENT |
0784-05-030 | Orange/ Beaumont |
FM 1132 | Actual | $2,292,350 | 1 | ADD SHOULDERS AND OVERLAY ROADWAY |
0920-30-050 | Orange/ Beaumont |
CR | Actual | $398,936 | 10 | REPLACE BRIDGE AND APPROACHES |
0063-03-056 | Panola/ Atlanta |
US 59 | Actual | $315,588 | 1 | INSTALL NEW TRAFFIC SIGNAL |
0246-02-039 | Panola/ Atlanta |
US 79 | Actual | $1,848,554 | 8 | SAFETY TREAT FIXED OBJECTS |
0176-05-135 | Polk/ Lufkin |
US 59 | Actual | $7,774,900 | 11 | RENOVATION OF SAFETY REST AREA |
0904-00-054 | Potter/ Amarillo |
VA | Actual | $2,650,980 | 1 | EXCAVATION, GRADING, BASE, C & G, STORM SEWER & ACP SURFACE |
0904-00-094 | Potter/ Amarillo |
VA | Actual | $152,000 | 1 | UPGRADE SIGNAL SYSTEM |
0904-00-097 | Potter/ Amarillo |
VA | Actual | $177,249 | 11 | SAFETY LIGHTING |
0904-00-101 | Potter/ Childress |
VA | Actual | $1,986,295 | 11 | SIGN UPGRADE |
0904-00-107 | Potter/ Amarillo |
VA | Actual | $479,906 | 1 | CRACK POURING |
0904-00-114 | Potter/ Amarillo |
VA | Actual | $1,496,483 | 1 | MICROSURFACING |
0738-01-050 | Refugio/ Corpus Christi |
FM 136 | Actual | $3,634,235 | 6 | BRIDGE REPLACEMENT |
0119-04-027 | Sabine/ Lufkin |
SH 21 | Actual | $169,411 | 10 | LANDSCAPE IMPROVEMENTS AT HISTORICAL MARKER TURNOUT |
0910-00-061 | Smith/ Tyler |
VA | Actual | $382,135 | 1 | DISTRICT - WIDE NON - SITE SPECIFIC SIGNAL UPGRADE |
0910-00-066 | Smith/ Tyler |
VA | Actual | $547,650 | 1 | DISTRICT - WIDE THERMO - PLASTIC PAVEMENT MARKINGS PROGRAM |
0910-00-071 | Smith/ Tyler |
VA | Actual | $1,574,739 | 1 | DISTRICT - WIDE METAL BEAM GUARD FENCE UPGRADE |
3487-02-008 | Smith/ Tyler |
LP 49 | Actual | $3,204,000 | ROW | ACQUISITION, RELOCATION & UTILITIES |
0033-01-035 | Stonewall/ Abilene |
US 83 | Actual | $83,244 | 10 | INSTALLATION OF TREES, SHRUBS, IRRIGATION SYSTEMS, HARDSCAPE |
0363-01-123 | Tarrant/ Fort Worth |
SH 26 | Actual | $14,625,000 | 7 | RIGHT OF WAY ACQUISITION, UTILITIES AND RELOCATION |
0113-09-062 | Travis/ Austin |
US 290 | Actual | $28,074 | 1 | UPGRADE SIGNAL EQUIPMENT |
0683-02-048 | Travis/ Austin |
RM 620 | Actual | $130,040 | 10 | CONSTRUCT RIGHT TURN LANE |
1754-01-015 | Travis/ Austin |
RM 1826 | Actual | $322,373 | 10 | CONSTRUCT LEFT TURN LANE |
0024-02-071 | Uvalde/ San Antonio |
US 90 | Actual | $310,952 | 1 | WIDEN RDWY TO ADD TURN LANES AT FM 1049 & AT MIYAKAWA ROAD |
0915-20-012 | Uvalde/ San Antonio |
VA | Actual | $658,048 | 1 | BASE REPAIR AND RESURFACING |
0271-04-067 | Waller/ Houston |
IH 10 | Actual | $3,726,901 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0271-04-080 | Waller/ Houston |
IH 10 | Actual | $531,989 | 11 | CONCRETE PAVEMENT, CONCRETE TRAFFIC BARRIER AND PAVEMENT |
0038-01-033 | Webb/ Laredo |
US 83 | Actual | $29,556,535 | 3 | REALLIGN AND GRADE SEPARATE INTERSECTION |
0837-01-013 | Wharton/ Yoakum |
FM 441 | Actual | $4,156,359 | 1 | REPLACE BRIDGE AND APPROACHES |
0913-09-033 | Wharton/ Yoakum |
CR | Actual | $1,424,762 | 6 | REPLACE BRIDGE AND APPROACHES |
0043-06-076 | Wilbarger/ Wichita Falls |
US 287 | Actual | $285,823 | 8 | INSTALL MEDIAN BARRIER |
0043-07-103 | Wilbarger/ Wichita Falls |
US 287 | Actual | $229,491 | 1 | INSTALL INTERSECTION FLASHING BEACONS |
0124-02-027 | Wilbarger/ Wichita Falls |
US 283 | Actual | $12,528,656 | 1 | WIDEN PAVEMENT AND STRUCTURES |
|
|