Letting Schedule for May, 2006 (FY 2006)

 
 
Last Update: Monday, August 28, 2006
May, 2006 (FY 2006) (see Links)
SEP 2005 | OCT 2005 | NOV 2005 | DEC 2005 | JAN 2006 | FEB 2006 | MAR 2006 | APR 2006 | MAY 2006 | JUN 2006 | JUL 2006 | AUG 2006
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0576-02-058 Angelina/
Lufkin
FM 1818 Actual $5,087,826 11 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0911-00-058 Angelina/
Lufkin
VA Actual $165,015 11 CONSTRUCT CURB RAMPS TO MEET THE TEXAS ACCESSIBILITY AND ADA
0156-06-046 Baylor/
Wichita Falls
US 82 Actual $5,197,446 1 HOT MIX OVERLAY
0100-08-085 Bee/
Corpus Christi
US 181 Actual $128,050 11 LANDSCAPE
0752-02-014 Bell/
Waco
FM 1237 Actual $1,641,853 1 SAFETY TREAT FIXED OBJECTS
0909-36-105 Bell/
Waco
CS Actual $2,532,758 9 CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0017-10-200 Bexar/
San Antonio
IH 35 Actual $2,546,995 6 WIDEN BRIDGE AND APPROACHES
0521-04-187 Bexar/
San Antonio
IH 410 Actual 116,819,051 ROW EXPAND TO 10 LN FRWY & TMS
0398-01-032 Bosque/
Waco
FM 56 Actual $1,223,624 1 REPLACE BRIDGE AND APPROACHES
0598-02-043 Brazoria/
Houston
SH 288 Actual $6,712,532 1 ONE COURSE SURFACE TREATMENT, ASHPALT OVERLAY AND
0912-31-158 Brazoria/
Houston
CR Actual $21,176,953 10 WIDEN TO 4 LANES
0917-29-093 Brazos/
Bryan
VA Actual $968,188 10 UPGRADE & INTEGRATE THE COMMUNICATIONS NETWORK OF THE CITIES
0700-01-030 Burnet/
Austin
SH 71 Actual $1,818,003 8 ADD LTL
0775-01-017 Cameron/
Pharr
FM 510 Actual $1,399,990 1 REHABILITATION OF DRAINAGE STRUCTURES, ACP OVERLAY, TRAFFIC
0921-06-200 Cameron/
Pharr
CS Actual $74,475 11 LANDSCAPING AND IRRIGATION IMPROVEMENTS
0248-02-053 Camp/
Atlanta
US 271 Actual $14,554,145 10 WIDEN EXISTING 4 - LANE RURAL HIGHWAY TO PROVIDE CONTINOUS
1024-02-038 Chambers/
Beaumont
FM 1405 Actual $6,969,743 1 CONSTRUCTION OF UPGRADE TO STANDARDS OF NON - FREEWAY FACILITY
0910-36-119 Cherokee/
Tyler
CR Actual $258,355 6 REPLACE BRIDGE AND APPROACHES
1124-01-008 Cherokee/
Tyler
FM 768 Actual $514,324 11 REPLACE BRIDGE AND APPROACHES
0047-06-115 Collin/
Dallas
US 75 Actual $18,075,774 5 CONSTRUCT 2 CONCURRENT HOV LANES
0091-05-049 Collin/
Dallas
SH 289 Actual $1,124,832 7 WIDEN FROM 6 LANE DIVIDED TO 8 LANE DIVIDED
0918-24-117 Collin/
Dallas
CS Actual $1,476,155 5 TEXAS U - TURNS AT EACH INTERSECTION
0211-10-035 Colorado/
Yoakum
FM 155 Actual $8,904,192 1 RESTORE ROADWAY
0048-01-059 Dallas/
Dallas
SH 342 Actual $2,622,638 1 FULL DEPTH CONCRETE REPAIR, NOVACHIP, BASE REPAIR
0092-07-053 Dallas/
Dallas
SH 356 Actual $827,975 1 BRIDGE DECK REPAIR
0092-07-054 Dallas/
Dallas
SH 356 Actual $2,730,709 1 REHABILITATION OF EXISTING ROADWAY
0094-03-093 Dallas/
Dallas
SH 183 Actual $218,725 1 REHABILITATE VIDEO CAMERA
0095-10-042 Dallas/
Dallas
US 80 Actual $9,871,785 1 RECONFIGURATION, FRONTAGE ROADS, FLOOD RELIEF AND
0581-02-126 Dallas/
Dallas
LP 12 Actual $1,560,920 1 REHABILITATION OF EXISTING ROADWAY
0918-00-106 Dallas/
Dallas
VA Actual $375,000 7 PARKING CASH - OUT PILOT PROGRAM
0918-45-540 Dallas/
Dallas
VA Actual $357,533 5 ITS ARCHITECTURE DEVELOPMENT
0918-45-749 Dallas/
Dallas
VA Actual $2,788,358 5 INTERSECTION IMPROVEMENTS
0918-45-784 Dallas/
Dallas
VA Actual $64,546 5 RETROFIT SIGNALS WITH LED LENSES
0918-45-785 Dallas/
Dallas
CS Actual $72,888 7 RIGHT OF WAY ACQUISITION
2208-02-019 Dallas/
Dallas
SP 303 Actual $1,349,366 1 REHABILITATION OF EXISTING ROADWAY
2374-07-053 Dallas/
Dallas
IH 635 Actual $4,034,163 10 CONSTRUCT WESTBOUND FRONTAGE ROAD AND RAMP REVERSALS
0816-02-063 Denton/
Dallas
FM 455 Actual $1,025,399 6 REPLACE BRIDGE AND APPROACHES
0906-00-117 Ector/
Odessa
VA Actual $403,860 1 BRIDGE CONCRETE AND JOINT REPAIR
0924-06-261 El Paso/
El Paso
VA Actual $350,000 1 TRAFFIC MANAGEMENT_MAINTENANCE
3600-01-003 Fannin/
Paris
FM 87 Actual $1,036,140 11 CONSTRUCT NEW ROADWAY
0146-06-020 Foard/
Childress
US 70 Actual $4,816,689 1 REHABILITATION OF ROADWAY
0686-02-023 Galveston/
Houston
FM 1765 Actual $872,389 1 ADD LEFT TURN LANES (SAFETY BOND PROGRAM)
0978-02-063 Galveston/
Houston
FM 517 Actual $389,977 1 ADD LEFT TURN LANES (SAFETY BOND PROGRAM)
1607-01-048 Galveston/
Houston
FM 1764 Actual $2,418,580 1 OVERLAY FRONTAGE ROADS WITH CRUMB RUBBER SEAL COAT AND 1 1 / 2
0216-02-051 Guadalupe/
San Antonio
SH 46 Actual $1,205,106 11 PLAN BS REPAIR, STRS, ACP OVERLAY & PAV MARKINGS
1542-01-015 Guadalupe/
San Antonio
FM 1518 Actual $697,164 1 PLANE, SEAL COAT, OVERLAY, PAVEMENT MARKING
0251-01-050 Hamilton/
Waco
US 281 Actual $6,442,160 1 RECONSTRUCT ROADWAY FROM TWO - LANE TO FOUR - LANE WITH
0703-02-051 Hardin/
Beaumont
FM 92 Actual $2,281,540 1 OVERLAY EXISTING ROADWAY
0271-07-295 Harris/
Houston
IH 10 Actual $204,600 2 LANDSCAPING FOR SPRING VALLEY GREEN SPACES_ (TOLL)
0912-00-214 Harris/
Houston
VA Actual $112,255 11 PRODUCTION OF A DIGITIZED WETLANDS PHOTO - INTERPRETATION
0912-00-315 Harris/
Houston
VA Actual $637,375 1 REPLACE RAISED REFLECTIVE PAVEMENT MARKERS
0912-00-316 Harris/
Houston
VA Actual $851,776 1 RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0912-00-317 Harris/
Houston
VA Actual $1,519,339 1 REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0016-02-115 Hays/
Austin
IH 35 Actual $1,772,891 1 LVL UP, OV ON FR & RAMPS, + BRIDGE JOINT REPAIR ON ML
0083-03-043 Hopkins/
Paris
SH 11 Actual $6,515,212 1 REHAB EXISTING ROAD
0109-04-025 Houston/
Lufkin
US 287 Actual $4,824,045 11 BASE AND PAVEMENT REPAIR
0002-10-021 Hudspeth/
El Paso
IH 10 Actual $3,053,615 1 CONSTRUCT FRONTAGE ROADS
0213-08-083 Jasper/
Beaumont
US 190 Actual $3,115,347 1 MILL AND INLAY EXISTING ROADWAY
0307-01-135 Jefferson/
Beaumont
SH 87 Actual $1,273,590 1 MILL AND INLAY EXISTING ROADWAY
0033-05-081 Jones/
Abilene
US 83 Actual $2,596,988 1 ACP OVERLAY, PVMNT MRKNGS
0095-03-078 Kaufman/
Dallas
US 80 Actual $469,725 10 RELOCATE EXISTING EXIT RAMP
0197-03-057 Kaufman/
Dallas
US 175 Actual $510,707 1 REFURBISHING GUIDE SIGNS
0561-01-018 Kaufman/
Dallas
SH 274 Actual $4,069,000 1 REPLACE BRIDGE AND APPROACHES
0142-10-020 Kendall/
San Antonio
RM 473 Actual $8,401,490 1 WIDEN NARROW ROADWAY AND ADD SHOULDERS
0142-02-025 Kerr/
San Antonio
IH 10 Actual $7,987,939 1 MILL, SC, OV, MBGF, PM, MILL RUMBLE STRIPS, PAV MRKS
0925-17-010 Knox/
Childress
VA Actual $63,670 10 LANDSCAPE
0018-02-050 La Salle/
Laredo
IH 35 Actual $3,984,719 1 MILL & OVERLAY HOTMIX ON NORTHBOUND & SOUTHBOUND LANES
0922-20-008 La Salle/
Laredo
CR Actual $481,828 6 FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING
0445-02-044 Lavaca/
Yoakum
US 90A Actual $7,968,446 1 REHABILITATE ROADWAY
0028-03-097 Liberty/
Beaumont
US 90 Actual $5,611,627 1 MILL AND INLAY EXISTING ROADWAY
0905-06-063 Lubbock/
Lubbock
VA Actual $262,759 1 MISCELLANEOUS CONSTRUCTION
0055-08-105 McLennan/
Waco
US 84 Actual $616,814 1 CULVERT EXTENSION
0909-22-121 McLennan/
Waco
CS Actual $249,431 9 CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0909-22-134 McLennan/
Waco
VA Actual $748,526 10 CONSTRUCT / RECONSTRUCT ADA RAMPS
0483-02-019 McMullen/
San Antonio
SH 72 Actual $6,284,648 1 RESTORATION OF EXISTING ROADWAY
0421-01-038 Medina/
San Antonio
SH 173 Actual $1,147,399 1 BASE REPAIR, SEAL COAT, OVERLAY & PAVEMENT MARKINGS
0421-08-030 Medina/
San Antonio
SH 173 Actual $304,442 1 WIDEN ROADWAY TO ADD LEFT TURN LANES
0906-32-039 Midland/
Odessa
VA Actual $1,747,770 9 CONSTRUCT OLD RANKIN HWY VISITORS CENTER
0059-01-055 Nacogdoches/
Lufkin
SH 7 Actual $2,015,114 1 MICROSURFACING
0118-06-058 Nacogdoches/
Lufkin
SH 21 Actual $570,496 1 SAFETY TREAT FIXED OBJECTS
0090-03-053 Oldham/
Amarillo
IH 40 Actual $27,687,114 1 CONCRETE UPGRADE
0028-14-099 Orange/
Beaumont
IH 10 Actual $1,520,928 1 OVERLAY EXISTING ROADWAY
0041-07-091 Potter/
Amarillo
US 287 Actual $1,685,305 1 OVERLAY & THERMOPLASTIC STRIPING
2081-01-006 Potter/
Amarillo
FM 2176 Actual $3,318,949 1 OVERLAY AND REHAB
0155-06-016 Refugio/
Corpus Christi
FM 2678 Actual $4,508,573 1 OVERLAY ROADWAY
2025-01-011 Refugio/
Corpus Christi
FM 1684 Actual $1,290,386 6 BRIDGE REPLACEMENT
0797-02-010 Roberts/
Amarillo
FM 748 Actual $4,610,295 11 REHAB EXISTING ROADWAY
0009-12-071 Rockwall/
Dallas
IH 30 Actual $297,724 1 REHABILITATE DYNAMIC MESSAGE SIGN
1582-01-020 San Jacinto/
Lufkin
FM 1725 Actual $6,184,183 11 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0492-04-020 Smith/
Tyler
FM 346 Actual $17,639,481 10 RECONSTRUCT AS 4 LANE DIVIDED URBAN STREET WITH FLUSH MEDIAN
0094-05-058 Tarrant/
Fort Worth
SH 183 Actual $1,122,763 8 INSTALL RAISED MEDIAN
0171-04-065 Tarrant/
Fort Worth
SH 199 Actual $1,311,113 6 REPLACE BRIDGE
0171-04-066 Tarrant/
Fort Worth
SH 199 Actual $174,940 8 TEXTURIZE SHOULDERS (MILLED)
0312-05-025 Tarrant/
Fort Worth
FM 730 Actual $72,383 8 INSTALL TRAFFIC SIGNAL
0902-48-618 Tarrant/
Fort Worth
VA Actual $1,327,520 1 UPGRADE 1ST GENERATION LED SIGNS
0015-13-333 Travis/
Austin
IH 35 Actual $18,131,757 1 MILL SC & OV NB & SB MAIN LANES AND FRONTAGE ROADS
0321-02-012 Travis/
Austin
SH 95 Actual $3,017,562 1 REHAB & OVERLAY
0914-00-204 Travis/
Austin
VA Actual $658,556 1 FY 2006 NON - SITE SPECIFIC SIGNAL
0914-00-230 Travis/
Austin
VA Actual $1,412,547 1 VARIOUS ON - SYSTEM PAVEMENT MARKINGS
0920-13-022 Tyler/
Beaumont
CR Actual $406,907 6 REPLACE BRIDGE AND APPROACHES
0095-06-057 Van Zandt/
Tyler
US 80 Actual $2,934,427 1 RESURFACE ROADWAY
0095-07-052 Van Zandt/
Tyler
US 80 Actual $2,477,889 6 REPLACE BRIDGES AND APPROACHES
0910-12-050 Van Zandt/
Tyler
CR Actual $550,371 6 REPLACE BRIDGE AND APPROACHES
0109-09-055 Walker/
Bryan
SH 19 Actual $418,498 8 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF A LEFT
0038-01-049 Webb/
Laredo
US 83 Actual $5,205,144 1 FOR THE CONSTRUCTION OF HAZARD ELIM AND SAFETY
0922-00-042 Webb/
Laredo
VA Actual $250,000 11 UPGRADE FLASHING BEACONS
0043-06-077 Wilbarger/
Wichita Falls
US 287 Actual $1,711,258 1 HMAC OVERLAY
0273-04-025 Williamson/
Austin
US 183 Actual $432,175 8 ADD LTL
1378-06-009 Williamson/
Austin
FM 3406 Actual $509,022 8 ADD LTL & CONSTRUCT PAVED SHOULDERS
1566-02-017 Williamson/
Austin
FM 1660 Actual $1,467,792 1 ADD CONTINUOUS LEFT TURN LANE
2103-01-024 Williamson/
Austin
RM 2243 Actual $5,803,769 1 PROVIDE ADDTL PAVED SURFACE WIDTH


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract