Letting Schedule for Fort Worth District (FY 2006)
| Letting Schedule for Fort Worth District (FY 2006) | ||||
| Last Update: Monday, August 28, 2006 | 
| Fort Worth District (FY 2006) | 
| Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Tarrant | Wise | ||||||
| Erath County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
|---|---|---|---|---|---|---|
| 0250-04-039 | US 281 | Actual | OCT 2005 | $6,522,936 | 1 | SEAL COAT | 
| 0774-04-012 | FM 219 | Actual | AUG 2006 | $4,757,669 | 1 | ADD PAVED SURFACE, CEMENT TREAT AND OVERLY | 
| 0902-49-033 | VA | Approved | AUG 2006 | $1,093,596 | 9 | DUBLIN PEDESTRIAN PARKWAY - CONSTRUCT WALKWAY AND SIDEWALKS | 
| 0902-49-049 | CR | Actual | DEC 2005 | $796,779 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1180-01-010 | FM 913 | Actual | APR 2006 | $342,450 | 6 | REPLACE BRIDGE AND APPROACHES | 
| Hood County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0080-03-047 | US 377 | Actual | JUN 2006 | $68,000 | 8 | INSTALL TRAFFIC SIGNAL AND CLOSE CROSSOVER | 
| 0385-04-037 | SH 144 | Actual | DEC 2005 | $9,756,747 | 11 | WIDEN TWO LANE TO FOUR LANE DIVIDED | 
| Jack County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0171-01-025 | SH 199 | Actual | AUG 2006 | $2,212,199 | 1 | REPLACE BRIDGE | 
| 0902-40-018 | CR | Actual | MAR 2006 | $648,118 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1333-02-012 | FM 1191 | Actual | APR 2006 | $269,530 | 6 | REPLACE THE METAL ARCH SECTION | 
| Johnson County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0014-03-075 | IH 35W | Actual | JUN 2006 | $973,188 | 6 | REPLACE BRIDGE | 
| 0014-03-081 | IH 35W | Actual | APR 2006 | $6,418,739 | 7 | RAMP RELOCATION DUE TO CONVERSION TO ONE - WAY FRONTAGE | 
| 0014-03-083 | IH 35W | Actual | FEB 2006 | $2,051,969 | 8 | INSTALL MEDIAN BARRIER | 
| 0019-01-128 | SH 174 | Actual | JUL 2006 | $98,000 | 8 | INSTALL TRAFFIC SIGNAL | 
| 0019-01-129 | SH 174 | Actual | JUL 2006 | $55,400 | 10 | WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED | 
| 0172-10-010 | US 287 | Actual | JUL 2006 | $5,049,000 | 10 | CONSTRUCT GRADE SEPARATION, RAMPS AND FRONTAGE ROADS | 
| 0712-01-037 | FM 4 | Actual | JUN 2006 | $571,135 | 8 | ADD LEFT TURN LANE | 
| 0747-05-022 | FM 157 | Actual | AUG 2006 | $2,522,245 | 1 | REPLACE BRIDGE | 
| 0747-05-036 | FM 157 | Actual | JUL 2006 | $13,956,702 | 1 | REPAIR BASE FAILURES AT VARIOUS LOCATIONS AS NEEDED | 
| 1181-04-030 | FM 917 | Actual | SEP 2005 | $2,636,775 | 1 | REALIGN FM ROAD AT LILLIAN | 
| 1599-03-012 | FM 2258 | Actual | APR 2006 | $1,584,163 | 1 | REPLACE BRIDGE AND APPROACHES | 
| 2118-02-012 | FM 1902 | Actual | JUL 2006 | $248,126 | 8 | ADD LEFT TURN LANE | 
| 2417-02-015 | FM 2331 | Actual | AUG 2006 | $7,845,770 | 11 | ADD PAVED SURFACE., TREAT SUBGRADE, REHAB BASE AND ADD 2" | 
| Palo Pinto County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0362-04-032 | SH 16 | Actual | JUL 2006 | $7,957,708 | 1 | WIDEN EXISTING ROADWAY | 
| 0385-01-018 | FM 4 | Actual | AUG 2006 | $5,350,444 | 11 | ADD PAVED SURFACE, CEMENT TREAT AND 2 CST | 
| 0902-39-015 | CR | Actual | MAR 2006 | $688,654 | 6 | REPLACE BRIDGE | 
| 0902-39-017 | CS | Actual | MAR 2006 | $251,116 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0902-39-019 | CR | Actual | MAR 2006 | $527,127 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1993-01-013 | FM 2201 | Actual | APR 2006 | $729,784 | 6 | REPLACE BRIDGE | 
| Parker County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0008-09-030 | FM 5 | Actual | AUG 2006 | $8,056,100 | 1 | ADD PAVED SURFACE, CEMENT TREAT AND OVERLAY | 
| 0171-03-059 | SH 199 | Actual | OCT 2005 | $97,400 | 1 | INSTALL TRAFFIC SIGNAL | 
| 0902-38-048 | VA | Approved | AUG 2006 | $1,485,778 | 9 | RECONSTRUCT SIDEWALKS AND ADD LANDSCAPING IN DOWNTOWN | 
| 0902-38-058 | CR | Actual | MAR 2006 | $964,804 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1179-02-030 | FM 920 | Actual | JUN 2006 | $9,545,820 | 8 | ADD PAVED SURFACE, CEMENT TREAT AND OVERLAY | 
| 1601-01-023 | FM 730 | Actual | MAR 2006 | $93,431 | 8 | ADD LEFT TURN LANE | 
| Tarrant County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0008-04-043 | SP 580 | Tentative | AUG 2006 | $651,735 | 10 | MEDIAN LANDSCAPE IMPROVEMENTS | 
| 0008-13-203 | IH 820 | Actual | AUG 2006 | $5,188,884 | 8 | INSTALL MEDIAN BARRIER | 
| 0008-13-208 | IH 20 | Actual | AUG 2006 | $1,472,710 | 10 | RECONSTRUCT FRONTAGE ROAD FROM FLEXIBLE PAVEMNT TO REINFORCE | 
| 0013-10-068 | BU 287P | Actual | JUL 2006 | $108,677 | 8 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL | 
| 0014-02-014 | IH 35W | Actual | MAR 2006 | $12,986,147 | 1 | INTERSECTION IMPROVEMENTS | 
| 0014-02-039 | IH 35W | Actual | DEC 2005 | $5,476,866 | 1 | RAMP RELOCATION, PAVEMENT WIDENING AND INTERSECTION | 
| 0080-07-082 | US 377 | Actual | DEC 2005 | $96,247 | 8 | INSTALL TRAFFIC SIGNAL | 
| 0081-02-045 | US 377 | Actual | DEC 2005 | $12,983,276 | 7 | RECONSTRUCT TO 4 LANE DIVIDED URBAN | 
| 0081-12-039 | IH 35W | Tentative | AUG 2006 | $1,193,313 | 10 | INSTALL TURNAROUND BRIDGE FOR IH35W SB; ON NORTH SIDE FOR | 
| 0094-02-111 | SH 10 | Actual | JUL 2006 | $104,325 | 5 | SIGNAL TIMING OPTIMIZATION AND UPGRADES | 
| 0094-05-058 | SH 183 | Actual | MAY 2006 | $1,122,763 | 8 | INSTALL RAISED MEDIAN | 
| 0171-04-065 | SH 199 | Actual | MAY 2006 | $1,311,113 | 6 | REPLACE BRIDGE | 
| 0171-04-066 | SH 199 | Actual | MAY 2006 | $174,940 | 8 | TEXTURIZE SHOULDERS (MILLED) | 
| 0312-05-025 | FM 730 | Actual | MAY 2006 | $72,383 | 8 | INSTALL TRAFFIC SIGNAL | 
| 0363-01-123 | SH 26 | Actual | SEP 2005 | $14,625,000 | 7 | RIGHT OF WAY ACQUISITION, UTILITIES AND RELOCATION | 
| 0363-03-043 | SH 121 | Actual | DEC 2005 | $6,798,604 | 1 | REMOVE MICROSURFACING_AND OVERLAY | 
| 0363-03-044 | SH 121 | Actual | JAN 2006 | $1,780,240 | 5 | ITS PROJECT INCLUDING CCTV, MESSAGE SIGNS, FIBER OPTICS, ETC | 
| 0718-02-025 | FM 156 | Actual | AUG 2006 | $7,502,998 | 7 | WIDEN TO 4 LANE WITH CONTINUOUS LEFT TURN LANE | 
| 0718-02-054 | FM 156 | Actual | DEC 2005 | $1,502,978 | 1 | 2" OVERLAY | 
| 0747-04-058 | FM 157 | Actual | AUG 2006 | $2,596,494 | 8 | INSTALL RAISED MEDIAN | 
| 0902-00-102 | VA | Actual | AUG 2006 | $143,800 | 7 | UPGRADE LED HEADS, GPS CLOCKS AND SIGNAL TIMING OPTIMIZATION | 
| 0902-48-289 | CS | Actual | JUN 2006 | $558,925 | 5 | BIKEWAY | 
| 0902-48-433 | VA | Actual | MAR 2006 | $1,182,336 | 1 | ATMS_______ (ON - SYSTEM) | 
| 0902-48-454 | VA | Tentative | AUG 2006 | $1,904,804 | 5 | CONSTRUCT TRAIL TO CONNECT LINKS BETWEEN ENTITIES | 
| 0902-48-481 | CS | Actual | FEB 2006 | $849,445 | 6 | REPLACE BRIDGE | 
| 0902-48-491 | VA | Actual | DEC 2005 | $19,368 | 9 | PROVIDE SIDEWALKS TO CONNECT NEW YORK AND GREEN OAKS BLVD TO | 
| 0902-48-493 | CR | Actual | FEB 2006 | $421,459 | 6 | REPLACE BRIDGE | 
| 0902-48-556 | CS | Approved | AUG 2006 | $1,649,133 | 5 | CORRIDOR IMPROVEMENTS ON GLADE ROAD FROM MARTIN TO HERITAGE | 
| 0902-48-618 | VA | Actual | MAY 2006 | $1,327,520 | 1 | UPGRADE 1ST GENERATION LED SIGNS | 
| 0902-48-619 | VA | Actual | JAN 2006 | $484,877 | 1 | UPGRADE INDUCIVE DETECTORS TO SIDEFIRE RADAR ON ROADWAYS | 
| 0902-48-658 | VA | Actual | AUG 2006 | $374,695 | 7 | SIGNAL IMPROVESMENTS ON SYSTEM VIA THOROUGHFARE ASSESSMENT | 
| 1068-02-119 | IH 30 | Actual | MAR 2006 | $3,821,630 | 1 | MILL MICROSURFACE AND OVERLAY WITH 2" | 
| 1330-02-036 | FM 1187 | Actual | DEC 2005 | $59,813 | 1 | INSTALL TRAFFIC SIGNAL | 
| 1330-02-039 | FM 1187 | Actual | APR 2006 | $51,506 | 8 | INSTALL TRAFFIC SIGNAL | 
| 1603-03-028 | FM 1709 | Actual | MAR 2006 | $3,821,387 | 1 | MILL AND OVERLAY WITH SOME FULL DEPTH REPAIRS | 
| 1605-02-016 | FM 1886 | Tentative | AUG 2006 | $1,358,584 | 10 | REPLACE BRIDGE | 
| 2266-02-120 | SH 360 | Actual | JUL 2006 | $119,832 | 1 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL | 
| 2681-02-003 | FM 2499 | Actual | MAR 2006 | $525,505 | 1 | RECONSTRUCT DAMAGED CONCRETE RIPRAP, PLACE ROCK CHANNEL | 
| Wise County | ||||||
| CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | 
| 0013-07-072 | US 81 | Actual | JUL 2006 | $1,686,550 | 11 | RECONFIGURE INTERSECTION; PROVIDE DIRECT CONNECT. FROM US380 | 
| 0013-08-109 | US 81 | Actual | JUN 2006 | $556,661 | 11 | CONSTRUCT TURNAROUND BENEATH EXISTING BRIDGES AND CLOSE | 
| 0134-11-026 | US 380 | Tentative | AUG 2006 | $5,957,985 | 6 | REPLACE RAILROAD UNDERPASS | 
| 0902-20-071 | CR | Actual | AUG 2006 | $567,270 | 6 | REPLACE BRIDGE | 
| 0902-20-079 | CR | Actual | JUL 2006 | $1,107,328 | 6 | REPLACE BRIDGE AND APPROACHS | 
| 1098-01-016 | FM 718 | Actual | AUG 2006 | $2,016,889 | 1 | BRIDGE REPL | 
| 
 | 
|  |