Detail Letting Schedule for Bexar County (FY 2011)
Detail Letting Schedule for Bexar County (FY 2011) | ||||
Last Update: Tuesday, September 6, 2011 |
Bexar County (FY 2011) |
CCSJ: 0016-07-128 | |||
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0353(278) | CSJ: | 0016-07-128 |
Description: | SEAL COAT & PAVEMENT MARKINGS (NB FRONTAGE ROAD) | Handling Code: |
|
Limits From: | SHIN OAK RD | Fund Cat: | 1 |
Limits To: | SH 218 | Estimate: | $30,446 |
Length: | 0.4 Miles | Actual: | $28,363 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SP 371 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0024-09-023 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | PORT OF SAN ANTONIO (POSA) | Estimate: | $173,757 |
Length: | 1.8 Miles | Actual: | $130,388 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(370) | CSJ: | 0072-08-130 |
Description: | SEAL COAT & PAVEMENT MARKINGS (FRONTAGE ROADS) | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | LP 53 (UTSA BLVD) | Estimate: | $93,753 |
Length: | 1.0 Miles | Actual: | $80,437 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0073-04-046 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 97 | Fund Cat: | 1 |
Limits To: | IH 37 | Estimate: | $348,870 |
Length: | 5.0 Miles | Actual: | $273,376 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 85 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0301-07-011 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1582 | Fund Cat: | 1 |
Limits To: | ATASCOSA COUNTY LINE | Estimate: | $431,711 |
Length: | 12.6 Miles | Actual: | $383,324 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 85 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0301-08-010 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FRIO C/L | Fund Cat: | 1 |
Limits To: | FM 140 | Estimate: | $37,297 |
Length: | 0.9 Miles | Actual: | $37,143 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 97 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0328-03-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | 1.5 MILES E OF US 281 | Estimate: | $113,027 |
Length: | 1.5 Miles | Actual: | $95,816 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 97 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0328-06-026 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | MCMULLEN COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.2 MI E OF SH 85 | Estimate: | $493,965 |
Length: | 15.3 Miles | Actual: | $428,405 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SP 242 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0328-10-020 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 476 | Fund Cat: | 1 |
Limits To: | SH 97 | Estimate: | $72,027 |
Length: | 1.3 Miles | Actual: | $63,519 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0421-02-028 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.1 MI S OF IH 35 NBFR | Fund Cat: | 1 |
Limits To: | MEDINA/FRIO COUNTY LINE | Estimate: | $116,144 |
Length: | 3.4 Miles | Actual: | $97,582 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0421-08-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BANDERA/MEDINA COUNTY LINE | Fund Cat: | 1 |
Limits To: | 1.25 MI N OF FM 2676 | Estimate: | $535,438 |
Length: | 17.6 Miles | Actual: | $460,970 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0465-02-023 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 78 | Fund Cat: | 1 |
Limits To: | FM 1346 | Estimate: | $331,512 |
Length: | 10.1 Miles | Actual: | $273,038 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0517-03-028 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.7 MI S. OF SH 72 | Fund Cat: | 1 |
Limits To: | 1.0 MI N OF FM 624 | Estimate: | $298,063 |
Length: | 21.4 Miles | Actual: | $269,219 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 4104(368) | CSJ: | 0521-06-133 |
Description: | SEAL COAT & PAVEMENT MARKINGS (FRONTAGE ROADS) | Handling Code: |
|
Limits From: | FM 1346 | Fund Cat: | 1 |
Limits To: | FM 78 | Estimate: | $264,859 |
Length: | 2.8 Miles | Actual: | $220,205 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0658-01-040 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CAMP BULLIS | Fund Cat: | 1 |
Limits To: | LOOP 1604 | Estimate: | $52,226 |
Length: | 1.7 Miles | Actual: | $49,508 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | SH 85 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0748-02-020 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 140 | Fund Cat: | 1 |
Limits To: | SH 97 | Estimate: | $138,472 |
Length: | 4.6 Miles | Actual: | $122,651 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 140 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0748-03-002 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 85 | Fund Cat: | 1 |
Limits To: | 0.7 MI N OF SH 85 | Estimate: | $14,385 |
Length: | 0.5 Miles | Actual: | $16,545 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 140 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0748-05-038 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 3.6 MI E OF SH 97 | Fund Cat: | 1 |
Limits To: | SH 16 | Estimate: | $246,216 |
Length: | 9.9 Miles | Actual: | $242,936 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 462 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0848-04-045 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CASTRO AVE. | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $110,332 |
Length: | 3.0 Miles | Actual: | $93,787 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 0915-00-153 |
Description: | THERMOPLASTIC PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN ATASCOSA, | Fund Cat: | 1 |
Limits To: | BEXAR, FRIO, MCMULLEN & MEDINA | Estimate: | $470,242 |
Length: | 0.0 Miles | Actual: | $485,071 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 140 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 1431-02-015 |
Description: | SEAL COAT & PAVMENT MARKINGS | Handling Code: |
|
Limits From: | 1.0 MI SOUTH OF SH 97 | Fund Cat: | 1 |
Limits To: | 3.6 MI SOUTH OF SH 97 | Estimate: | $66,355 |
Length: | 2.6 Miles | Actual: | $75,303 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 2790 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 1741-01-011 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 132 | Fund Cat: | 1 |
Limits To: | 0.5 MI EAST OF IH 35 NBFR | Estimate: | $54,778 |
Length: | 1.0 Miles | Actual: | $49,580 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 2020-02-029 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | MORIN RD | Estimate: | $51,663 |
Length: | 1.0 Miles | Actual: | $48,006 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | NH 2011(534) | CSJ: | 2452-03-109 |
Description: | SEAL COAT & PAVEMENT MARKINGS (FRONTAGE ROADS) | Handling Code: |
|
Limits From: | FM 2252 | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $108,600 |
Length: | 2.0 Miles | Actual: | $90,660 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 2676 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 2649-01-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 173 | Fund Cat: | 1 |
Limits To: | 6 MI E OF SH 173 | Estimate: | $202,067 |
Length: | 6.0 Miles | Actual: | $173,599 |
District: | San Antonio | Let Date: | NOV 2010 |
Highway: | FM 2676 | Let Status: | Actual |
Project ID: | STP 2011(535) | CSJ: | 2649-01-032 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 6 MI OF SH 173 (QUIHI) | Fund Cat: | 1 |
Limits To: | 12 MI EAST OF SH 173 | Estimate: | $150,296 |
Length: | 5.6 Miles | Actual: | $141,010 |
Back... |
Totals for 0016-07-128 | ||
---|---|---|---|
Length: | 133.0 Miles | ||
Estimate: | $5,006,501 | ||
Actual: | $4,430,441 | ||
CCSJ: 0017-02-072 | |||
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(334) | CSJ: | 0017-02-072 |
Description: | CONTINUOUS ILLUMINATION | Handling Code: |
|
Limits From: | MEDINA RIVER | Fund Cat: | 1 |
Limits To: | BENTON CITY RD | Estimate: | $103,681 |
Length: | 0.5 Miles | Actual: | $137,449 |
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(334) | CSJ: | 0017-03-062 |
Description: | CONTINUOUS ILLUMINATION | Handling Code: |
|
Limits From: | BENTON CITY RD. | Fund Cat: | 1 |
Limits To: | 0.5 MI S OF LP 1604 | Estimate: | $165,284 |
Length: | 1.8 Miles | Actual: | $155,834 |
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 1102(264)HES | CSJ: | 0025-02-191 |
Description: | SAFETY ILLUMINATION AT INTERSECTION | Handling Code: |
|
Limits From: | AT LP 1604 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $150,240 |
Length: | 0.8 Miles | Actual: | $151,158 |
Award Status Bid Tabulations Back... |
Totals for 0017-02-072 | ||
Length: | 3.1 Miles | ||
Estimate: | $419,205 | ||
Actual: | $444,441 | ||
CCSJ: 0017-10-248 | |||
District: | San Antonio | Let Date: | SEP 2010 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(333) | CSJ: | 0017-10-248 |
Description: | PLANING, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | MARTIN STREET | Fund Cat: | 1 |
Limits To: | BROADWAY | Estimate: | $1,583,520 |
Length: | 1.8 Miles | Actual: | $1,369,575 |
District: | San Antonio | Let Date: | SEP 2010 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(333) | CSJ: | 0017-10-249 |
Description: | PLANING, OVERLAY AND PAVMENT MARKINGS | Handling Code: |
|
Limits From: | LAREDO STREET | Fund Cat: | 1 |
Limits To: | MARTIN STREET | Estimate: | $1,831,061 |
Length: | 1.6 Miles | Actual: | $1,527,597 |
Back... |
Totals for 0017-10-248 | ||
Length: | 3.4 Miles | ||
Estimate: | $3,414,581 | ||
Actual: | $2,897,172 | ||
CCSJ: 0072-07-056 | |||
District: | San Antonio | Let Date: | JUL 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(375) | CSJ: | 0072-07-056 |
Description: | SEAL COAT, PFC OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BEXAR/KENDALL COUNTY LINE | Fund Cat: | 1 |
Limits To: | 6.07 MI E OF BEXAR KENDALL C/L | Estimate: | $2,800,299 |
Length: | 6.1 Miles | Actual: | $2,433,364 |
Bid Tabulations Back... |
Totals for 0072-07-056 | ||
Length: | 6.1 Miles | ||
Estimate: | $2,800,299 | ||
Actual: | $2,433,364 | ||
CCSJ: 0072-08-120 | |||
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 1102(442)MM | CSJ: | 0072-08-120 |
Description: | EXPAND 6 TO 8 LANE EXPRESSWAY AND OPERATIONAL IMPROVEMENTS | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 7 |
Limits To: | 1.0 MI N OF HUEBNER RD | Estimate: | $25,803,028 |
Length: | 2.5 Miles | Actual: | $25,923,457 |
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 1102(524) | CSJ: | 0072-08-125 |
Description: | UTILITIES AND UTILITIES IN THE CONSTRUCTION CONTRACT | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | ROW |
Limits To: | 1.0 MI N OF HUEBNER RD | Estimate: | $274,068 |
Length: | 4.0 Miles | Actual: | $408,972 |
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 1102(442)MM | CSJ: | 0072-12-179 |
Description: | EXPAND 6 TO 8 LANE EXPRESSWAY AND OPERATIONAL IMPROVEMENTS | Handling Code: |
|
Limits From: | 1.0 MI N OF HUEBNER RD | Fund Cat: | 7 |
Limits To: | S. OF HUEBNER RD | Estimate: | $9,653,222 |
Length: | 1.5 Miles | Actual: | $9,635,856 |
Award Status Bid Tabulations Back... |
Totals for 0072-08-120 | ||
Length: | 8.0 Miles | ||
Estimate: | $35,730,318 | ||
Actual: | $35,968,285 | ||
CCSJ: 0072-08-122 | |||
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | LP 345 | Let Status: | Actual |
Project ID: | HP 1102(265) | CSJ: | 0072-08-122 |
Description: | GRADE SEPARATION @ MEDICAL & OPERATIONAL IMPVMNTS ON MEDICAL | Handling Code: |
|
Limits From: | AT MEDICAL DRIVE | Fund Cat: | 7 |
Limits To: | . | Estimate: | $16,188,597 |
Length: | 0.2 Miles | Actual: | $10,850,899 |
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | LP 345 | Let Status: | Actual |
Project ID: | RW 72-8-134 | CSJ: | 0072-08-134 |
Description: | UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | AT MEDICAL DRIVE | Fund Cat: | ROW |
Limits To: | . | Estimate: | $739,338 |
Length: | 0.2 Miles | Actual: | $1,291,148 |
Award Status Bid Tabulations Back... |
Totals for 0072-08-122 | ||
Length: | 0.4 Miles | ||
Estimate: | $16,927,935 | ||
Actual: | $12,142,047 | ||
CCSJ: 0073-08-167 | |||
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 0372(085) | CSJ: | 0073-08-167 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | 0.4 MI N OF LP 13 | Fund Cat: | 10 |
Limits To: | 0.4 MI S OF LP 13 | Estimate: | $555,017 |
Length: | 0.9 Miles | Actual: | $520,750 |
Award Status Bid Tabulations Back... |
Totals for 0073-08-167 | ||
Length: | 0.9 Miles | ||
Estimate: | $555,017 | ||
Actual: | $520,750 | ||
CCSJ: 0253-04-142 | |||
District: | San Antonio | Let Date: | JUN 2011 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 1102(073)HES | CSJ: | 0253-04-142 |
Description: | INSTALL TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT SONTERRA BLVD(EAST INTERSECTION) | Fund Cat: | 8 |
Limits To: | . | Estimate: | $67,407 |
Length: | 0.0 Miles | Actual: | $68,218 |
District: | San Antonio | Let Date: | JUN 2011 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 1102(073)HES | CSJ: | 0291-06-050 |
Description: | INSTALL TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT KINGS RANCH/POLLY PEAK RD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $136,412 |
Length: | 0.0 Miles | Actual: | $137,096 |
Bid Tabulations Back... |
Totals for 0253-04-142 | ||
Length: | 0.0 Miles | ||
Estimate: | $203,819 | ||
Actual: | $205,314 | ||
CCSJ: 0465-02-025 | |||
District: | San Antonio | Let Date: | JUN 2011 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | STP 1102(074) | CSJ: | 0465-02-025 |
Description: | CONSTRUCT LEFT TURN LANE | Handling Code: |
|
Limits From: | AT RAY CORBETT DRIVE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $126,707 |
Length: | 0.0 Miles | Actual: | $134,893 |
Bid Tabulations Back... |
Totals for 0465-02-025 | ||
Length: | 0.0 Miles | ||
Estimate: | $126,707 | ||
Actual: | $134,893 | ||
CCSJ: 0521-04-174 | |||
District: | San Antonio | Let Date: | JAN 2011 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 4104(372) | CSJ: | 0521-04-174 |
Description: | MILL, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | SH 151 | Estimate: | $1,437,023 |
Length: | 2.5 Miles | Actual: | $1,281,553 |
District: | San Antonio | Let Date: | JAN 2011 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 4104(372) | CSJ: | 0521-04-175 |
Description: | MILL, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 151 NORTH | Fund Cat: | 1 |
Limits To: | FM 3487 | Estimate: | $1,125,867 |
Length: | 1.6 Miles | Actual: | $1,007,995 |
Back... |
Totals for 0521-04-174 | ||
Length: | 4.1 Miles | ||
Estimate: | $2,562,890 | ||
Actual: | $2,289,548 | ||
CCSJ: 0613-01-058 | |||
District: | San Antonio | Let Date: | JUN 2011 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 1102(098) | CSJ: | 0613-01-058 |
Description: | INSTALL TRAFFIC SIGNAL AND WIDEN TO CONSTRUCT LEFT TURN LANE | Handling Code: |
|
Limits From: | AT ZARZAMORA | Fund Cat: | 1 |
Limits To: | . | Estimate: | $345,254 |
Length: | 0.2 Miles | Actual: | $379,533 |
Bid Tabulations Back... |
Totals for 0613-01-058 | ||
Length: | 0.2 Miles | ||
Estimate: | $345,254 | ||
Actual: | $379,533 | ||
CCSJ: 0915-00-152 | |||
District: | San Antonio | Let Date: | DEC 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(589)G | CSJ: | 0915-00-152 |
Description: | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 1) | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2011 | Fund Cat: | 1 |
Limits To: | (PROJECT 1) | Estimate: | $912,862 |
Length: | 0.0 Miles | Actual: | $886,524 |
Back... |
Totals for 0915-00-152 | ||
Length: | 0.0 Miles | ||
Estimate: | $912,862 | ||
Actual: | $886,524 | ||
CCSJ: 0915-00-162 | |||
District: | San Antonio | Let Date: | DEC 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(590)G | CSJ: | 0915-00-162 |
Description: | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 2) | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2011 | Fund Cat: | 1 |
Limits To: | (PROJECT 2) | Estimate: | $912,862 |
Length: | 0.0 Miles | Actual: | $898,524 |
Back... |
Totals for 0915-00-162 | ||
Length: | 0.0 Miles | ||
Estimate: | $912,862 | ||
Actual: | $898,524 | ||
CCSJ: 0915-12-324 | |||
District: | San Antonio | Let Date: | FEB 2011 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2010(356)MM | CSJ: | 0915-12-324 |
Description: | WIDEN EXIST FOR LEFT TURN LANES (ALL LOCATIONS) | Handling Code: |
LC |
Limits From: | BULVERDE RD AT EVANS | Fund Cat: | 7 |
Limits To: | . | Estimate: | $3,275,400 |
Length: | 0.1 Miles | Actual: | $2,980,961 |
Back... |
Totals for 0915-12-324 | ||
Length: | 0.1 Miles | ||
Estimate: | $3,275,400 | ||
Actual: | $2,980,961 | ||
CCSJ: 0915-12-472 | |||
District: | San Antonio | Let Date: | MAR 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(694)MM | CSJ: | 0915-12-472 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
LC |
Limits From: | VARIOUS LOCATIONS IN SAN ANTONIO | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,190,000 |
Length: | 0.0 Miles | Actual: | $418,494 |
Back... |
Totals for 0915-12-472 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,190,000 | ||
Actual: | $418,494 | ||
CCSJ: 0915-12-478 | |||
District: | San Antonio | Let Date: | MAY 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(978) | CSJ: | 0915-12-478 |
Description: | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN SAN ANTONIO | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 10 |
Limits To: | . | Estimate: | $2,094,289 |
Length: | 0.0 Miles | Actual: | $2,030,157 |
Back... |
Totals for 0915-12-478 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,094,289 | ||
Actual: | $2,030,157 | ||
CCSJ: 0915-12-479 | |||
District: | San Antonio | Let Date: | MAR 2011 |
Highway: | PW | Let Status: | Actual |
Project ID: | C 915-12-479 | CSJ: | 0915-12-479 |
Description: | RESURFACE PAVED RDS AND PARKING LOTS IN THE FACILITY | Handling Code: |
|
Limits From: | AT GOVERNMENT CANYON WMA | Fund Cat: | 10 |
Limits To: | . | Estimate: | $328,879 |
Length: | 0.0 Miles | Actual: | $512,412 |
Back... |
Totals for 0915-12-479 | ||
Length: | 0.0 Miles | ||
Estimate: | $328,879 | ||
Actual: | $512,412 | ||
CCSJ: 0915-12-482 | |||
District: | San Antonio | Let Date: | MAY 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1102(267)MM | CSJ: | 0915-12-482 |
Description: | FURNISH & INSTALL DETECTION EQUIPMENT ALONG MAJOR CORRIDORS | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN SAN ANTONIO | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,000,000 |
Length: | 0.0 Miles | Actual: | $1,000,000 |
Back... |
Totals for 0915-12-482 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0915-12-483 | |||
District: | San Antonio | Let Date: | APR 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(506)MM | CSJ: | 0915-12-483 |
Description: | COSTS ASSOCIATED WITH DESIGN, BUS PURCHASES, ROW, STATIONS & | Handling Code: |
TR |
Limits From: | MEDICAL CENTER | Fund Cat: | 7 |
Limits To: | DOWNTOWN- VIA FREDRICKSBURG RD | Estimate: | $5,000,000 |
Length: | 0.0 Miles | Actual: | $5,000,000 |
Back... |
Totals for 0915-12-483 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,000,000 | ||
Actual: | $5,000,000 | ||
CCSJ: 0915-12-484 | |||
District: | San Antonio | Let Date: | APR 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(507)MM | CSJ: | 0915-12-484 |
Description: | COSTS ASSOCIATED WITH DESIGN, BUS PURCHASES, ROW, STATIONS & | Handling Code: |
TR |
Limits From: | MEDICAL CENTER | Fund Cat: | 7 |
Limits To: | DOWNTOWN- VIA FREDRICKSBURG RD | Estimate: | $3,200,000 |
Length: | 0.0 Miles | Actual: | $3,200,000 |
Back... |
Totals for 0915-12-484 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,200,000 | ||
Actual: | $3,200,000 | ||
CCSJ: 0915-12-488 | |||
District: | San Antonio | Let Date: | JUN 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(244)TE | CSJ: | 0915-12-488 |
Description: | "SAME ROAD, SAME RULES, SAME RIGHTS" PUBLIC SAFETY CAMPAIGN | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN SAN ANTONIO | Fund Cat: | 9 |
Limits To: | . | Estimate: | $300,000 |
Length: | 0.0 Miles | Actual: | $345,000 |
Back... |
Totals for 0915-12-488 | ||
Length: | 0.0 Miles | ||
Estimate: | $300,000 | ||
Actual: | $345,000 | ||
CCSJ: 0915-12-489 | |||
District: | San Antonio | Let Date: | AUG 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1102(269)MM | CSJ: | 0915-12-489 |
Description: | COSTS ASSOCIATED WITH BUS PURCHASES, ROW, CONSTRUCTION, | Handling Code: |
TR |
Limits From: | MEDICAL CENTER | Fund Cat: | 7 |
Limits To: | DOWNTOWN- VIA FREDRICKSBURG RD | Estimate: | $5,400,000 |
Length: | 0.0 Miles | Actual: | $5,400,000 |
Back... |
Totals for 0915-12-489 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,400,000 | ||
Actual: | $5,400,000 | ||
CCSJ: 2104-02-029 | |||
District: | San Antonio | Let Date: | JUN 2011 |
Highway: | FM 1957 | Let Status: | Actual |
Project ID: | STP 1102(099)HES | CSJ: | 2104-02-029 |
Description: | OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 211 | Fund Cat: | 8 |
Limits To: | LP 1604 | Estimate: | $767,452 |
Length: | 4.6 Miles | Actual: | $903,456 |
Bid Tabulations Back... |
Totals for 2104-02-029 | ||
Length: | 4.6 Miles | ||
Estimate: | $767,452 | ||
Actual: | $903,456 | ||
CCSJ: 2452-01-050 | |||
District: | San Antonio | Let Date: | OCT 2010 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | STP 2011(210)ES | CSJ: | 2452-01-050 |
Description: | OPERATIONAL IMPROVEMENTS AND RECONFIGURE INTERSECTIONS | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 7 |
Limits To: | 0.4 MI S OF SH 151 | Estimate: | $6,324,208 |
Length: | 2.8 Miles | Actual: | $5,706,393 |
Back... |
Totals for 2452-01-050 | ||
Length: | 2.8 Miles | ||
Estimate: | $6,324,208 | ||
Actual: | $5,706,393 | ||
CCSJ: 8000-15-015 | |||
District: | San Antonio | Let Date: | APR 2011 |
Highway: | MH | Let Status: | Actual |
Project ID: | NH 2011(837) | CSJ: | 8000-15-015 |
Description: | CONSTRUCT 4 LANE DIVIDED ROADWAY ON NEW LOCATION | Handling Code: |
|
Limits From: | WURZBACH PARKWAY ON NEW LOCATION | Fund Cat: | 12 |
Limits To: | WEST AVE TO JONES MALTSBERGER | Estimate: | $59,664,997 |
Length: | 1.7 Miles | Actual: | $48,594,617 |
District: | San Antonio | Let Date: | APR 2011 |
Highway: | MH | Let Status: | Actual |
Project ID: | RW 8000-15-17 | CSJ: | 8000-15-017 |
Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | WURZBACH PARKWAY ON NEW LOCATION | Fund Cat: | ROW |
Limits To: | WEST AVE TO JONES MALTSBERGER | Estimate: | |
Length: | 1.1 Miles | Actual: | $839,700 |
Back... |
Totals for 8000-15-015 | ||
Length: | 2.8 Miles | ||
Estimate: | $59,664,997 | ||
Actual: | $49,434,317 |
|
|