Letting Schedule for Fort Worth District (FY 2011)

 
 
Last Update: Tuesday, September 6, 2011
Fort Worth District (FY 2011)
Brown | Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Tarrant | Wise

Brown County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0054-06-093 US 67 Actual NOV 2010 $3,965,323 1 SEAL COAT

Erath County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0259-01-034 US 67 Actual APR 2011 $1,464,177 8 RESURFACE ROADWAY
0550-02-035 FM 8 Actual JUL 2011 $1,010,836 1 RESURFACE ROADWAY - SEAL COAT ENTIRE ROADWAY

Hood County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0902-51-018 CR Actual MAR 2011 $386,723 6 REPLACE BRIDGE
0902-51-023 VA Actual SEP 2010 $18,000 1 INSTALLATION OF RADIOS AT INTERSECTIONS TO IMPROVE SIGNAL
1513-01-013 FM 167 Actual SEP 2010 $389,857 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
1601-03-012 FM 2580 Actual MAY 2011 $1,137,525 6 REPLACE BRIDGE AND APPROACHES
3524-01-003 SL 567 Actual JUN 2011 $4,564,897 11 CONSTRUCT TWO LANE RURAL ROAD ON NEW LOCATION

Jack County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0249-07-058 US 281 Actual JUL 2011 $2,210,770 11 REPLACE BRIDGE
0902-40-024 CR Actual AUG 2011 $931,549 6 REPLACE BRIDGE AND APPROACHES

Johnson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0172-03-016 BU 287P Actual AUG 2011 $495,312 8 INSTALL SIGNAL AND ADD LEFT TURN LANE
0259-06-006 US 67 Actual AUG 2011 $378,723 8 INSTALL TRAFFIC SIGNAL AND ADD LEFT TURN LANE
0712-02-013 FM 916 Actual AUG 2011 $1,800,641 11 REPLACE BRIDGE AND APPROACHES
1181-03-029 FM 917 Actual APR 2011 $1,411,753 8 MICROSURFACE ROADWAY
3123-02-009 FM 4 Actual APR 2011 $923,918 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH

Palo Pinto County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-01-045 US 180 Actual MAY 2011 $555,000 1 MILL AND OVERLAY
0539-04-034 SH 254 Actual MAY 2011 $2,015,925 1 CEMENT TREAT EXISTING BASE AND HMAC OVERLAY
0902-39-026 CR Actual AUG 2011 $276,960 6 REPLACE BRIDGE AND APPROACHES

Parker County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-02-070 US 180 Actual OCT 2010 $7,357,577 1 SEAL COAT MAIN LANES AND SHOULDERS
0008-03-097 US 180 Actual APR 2011 $91,879 10 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0313-02-016 FM 51 Actual APR 2011 $234,570 8 CONSTRUCT CENTERLINE RUMBLE STRIPS
0313-02-050 FM 51 Actual JUL 2011 $140,000 1 INSTALLATION OF A FULLY TRAFFIC - ACTUATED TRAFFIC SIGNAL
0313-02-051 FM 51 Actual MAR 2011 $405,000 10 INSTALL TRAFFIC SIGNAL
0314-07-041 IH 20 Actual DEC 2010 $2,192,053 1 2" HMAC MILL AND OVERLAY MAINLANES AND SHOULDERS
1601-01-018 FM 730 Actual AUG 2011 $2,502,494 1 REPLACE BRIDGE

Tarrant County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-13-222 IH 820 Actual MAY 2011 $369,480 1 SCOUR AND EROSION PROTECTION AND DEBRIS REMOVAL
0008-13-223 IH 820 Actual DEC 2010 $1,243,622 1 REPAIR FAILURES AND OVERLAY WITH 2 INCHES
0008-14-112 IH 820 Actual JUL 2011 $2,131,548 1 PAVEMENT AND BRIDGE JOINT REPAIR WITH 2" HMAC OVERLAY
0008-14-113 IH 820 Actual JUL 2011 $185,000 8 WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED
0008-15-044 IH 820 Actual SEP 2010 $96,000 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0080-07-089 US 377 Actual AUG 2011 $644,261 10 LANDSCAPE DEVELOPMENT, TREE AND SHRUB PLANTING & IRRIGATION
0081-01-040 SP 347 Actual SEP 2010 $6,582,744 6 REPLACE BRIDGES AND APPROACHES
0081-12-042 IH 35W Actual NOV 2010 $145,903 1 INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL
0081-12-044 IH 35W Actual OCT 2010 $116,400 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0094-01-030 SH 183 Actual AUG 2011 $10,591,981 6 REPLACE BRIDGE AND APPROACHES
0094-02-119 SH 10 Actual JUL 2011 $1,652,000 1 REPAIR PAVEMENT AT VARIOUS LOCATIONS, MILL 2", OVERLAY 2",
0094-08-006 SP 97 Actual MAR 2011 $314,680 1 REPAIR EROSION CONTROL DROP STRUCTURES
0171-05-087 SH 199 Actual JUN 2011 $112,000 8 INSTALL TRAFFIC SIGNAL
0171-05-088 SH 199 Actual FEB 2011 $1,934,942 1 REPAIR BASE, MILL AND OVERLAY
0171-05-089 SH 199 Actual APR 2011 $520,088 8 MILL, PAVEMENT REPAIR, PAVEMENT MARKINGS AND HMAC OVERLAY
0172-02-068 BU 287P Actual JAN 2011 $90,600 1 INSTALLATION OF A FULLY TRAFFIC - ACTUATED TRAFFIC SIGNAL
0172-06-088 US 287 Actual JUL 2011 $3,498,068 1 CONCRETE PAVEMENT REPAIRS AND OVERLAY
0363-01-135 SH 26 Actual MAY 2011 $1,085,355 1 MILL, BASE REPAIR, 2" HMAC OVERLAY, PAVEMENT MARKINGS
0363-01-136 SH 26 Actual AUG 2011 $11,469,298 7 WIDEN FROM 4 LANES TO 6 LANES INCLUDING C & G, STORM SEWER,
0504-02-008 SH 121 Actual JAN 2011 122,560,413 10 CONSTRUCT 6 LANE TOLLWAY WITH INTERCHANGE AT IH 30 /
0504-02-013 SH 121 Actual JUL 2011 $61,952,017 10 CONSTRUCT 4 LANE TOLLWAY
0504-02-024 SH 121 Actual DEC 2010 $56,237,606 10 CONSTRUCT SIX LANE TOLLWAY ON NEW LOCATION, CONSISTS OF GR.
0504-02-025 SH 121 Actual JAN 2011 $59,959,713 10 CONSTRUCT 6 LANE TOLLWAY ON NEW LOCATION
0504-02-026 SH 121 Actual DEC 2010 $91,241,537 10 CONSTRUCT SIX LANE TOLLWAY MAIN LANES ON NEW LOCATION AND
0504-02-027 SH 121 Actual FEB 2011 $77,782,579 10 CONSTRUCTION NEW LOCATION TOLLWAY FACILITY
0747-04-063 FM 157 Actual NOV 2010 $88,400 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0902-00-120 VA Actual NOV 2010 $971,037 1 INSTALLATION OF PERMANENT PAVEMENT MARKINGS FOR FY10
0902-00-122 VA Actual MAY 2011 $1,291,394 1 FULL DEPTH CONCRETE PAVEMENT REPAIR ON VARIOUS ROADWAYS
0902-48-381 CR Actual AUG 2011 $1,896,430 6 REPLACE BRIDGE
0902-48-505 CS Actual JUN 2011 $24,150,158 6 REPLACE BRIDGE AND APPROACHES
0902-48-647 CS Actual MAY 2011 $42,216 7 INSTALL WAYSIDE HORN AND CONSTANT WARNING TIME DEVICE
0902-48-685 VA Actual SEP 2010 $124,000 7 INSTALL / IMPROVE MEDIANS, INSTALL SIDEWALK SURFACE, UPGRADE
0902-48-686 VA Actual MAR 2011 $258,438 7 CLOSE CAPPS AND JENNINGS CROSSINGS; INSTALL ADDITIONAL GATES
0902-48-687 VA Actual SEP 2010 $150,000 7 CLOSE BOTH CROSSINGS ON MAGNOLIA AVENUE AND BUILD ALTERNATE
0902-48-758 VA Actual JAN 2011 $178,200 5 PROVIDE HARDWARE (AND INTEGRATION) FOR CENTER
0902-48-760 VA Actual OCT 2010 $3,333,333 7 ADM OF LOCAL AIR QUALITY INITIATIVES TO IMPLEMENT SIP, TERM,
0902-48-784 VA Actual OCT 2010 $1,800,000 7 REGIONAL MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE
0902-48-787 VA Actual AUG 2011 $464,001 7 INSTALL WARNING DEVICES AND HIGH INTENSITY LED AT BOWEN RD;
0902-48-788 VA Actual APR 2011 $125,000 7 PLANNING / OVERSIGHT / ADMINISTRATION OF ITS, REGIONAL MOBILITY
0902-48-794 VA Actual MAR 2011 $881,540 5 CONSTRUCT TRAIL TO CONNECT LINKS BETWEEN ENTITIES
0902-48-798 CS Actual AUG 2011 $50,000 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING; PRELIMINARY
0902-48-800 VA Actual AUG 2011 $1,000,000 7 VANPOOL PROGRAM FY11; OPER VANPOOL SUBSIDY INITIATIVE FOR
0902-48-801 CS Actual AUG 2011 $277,375 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING
0902-48-805 CS Actual AUG 2011 $50,000 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING
0902-48-806 CS Actual AUG 2011 $32,500 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING
0902-48-807 CS Actual AUG 2011 $50,000 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING; PRELIMINARY
0902-48-808 CS Actual AUG 2011 $112,225 7 UPGRADE TO QUAD GATES, RESURFACE CROSSING
0902-48-809 CS Actual AUG 2011 $93,600 7 UPGRADE TO QUAD GATE AND RESURFACE CROSSING
0902-48-810 CS Actual AUG 2011 $232,000 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING
0902-48-811 CS Actual AUG 2011 $349,513 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING
0902-48-812 CS Actual AUG 2011 $338,233 7 UPGRADE TO QUAD GATES AND RESURFACE CROSSING
0902-48-813 CS Actual AUG 2011 $292,000 7 UPGRADE TO QUAD GATES
0902-48-814 VA Actual AUG 2011 $400,000 5 CONSTRUCT ADDITIONAL 80 SPACES; PARK AND RIDE / RAIL STATION
0902-48-815 VA Actual AUG 2011 $2,258,000 5 CONSTRUCT SOUTH TO WEST Y RAIL CONNECTION AT UPRR GRADE
0902-48-816 VA Actual AUG 2011 $547,063 5 PE FOR CONSTRUCTION OF STRUCTURES, TRACK AND SIGNAL
0902-48-819 VA Actual AUG 2011 $8,700,063 5 CONSTRUCT STRUCTURES, TRACK AND SIGNALS FOR NEW BRIDGE OVER
1068-01-199 IH 30 Actual NOV 2010 $3,234,078 1 MILL, REPAIR FAILURES, 2" HMAC OVERLAY AND PAV MARKERS ON WB
1330-01-058 BF1187C Actual MAY 2011 $766,145 6 REPLACE BRIDGE
1330-01-061 FM 1187 Actual OCT 2010 $91,730 1 INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
1330-02-041 FM 1187 Actual JUN 2011 $3,679,268 1 WIDEN FROM 2 LANE TO 4 LANE FACILITY
1330-02-044 FM 1187 Actual OCT 2010 $77,680 8 CONSTRUCT CENTERLINE RUMBLE STRIPS / INSTALL REFLECTORIZED
1978-01-054 FM 1938 Actual AUG 2011 $180,708 10 LANDSCAPING
2266-02-137 SH 360 Actual MAY 2011 $131,124 8 IMPROVE TRAFFIC SIGNAL AND LENGTHEN LEFT TURN LANE
2855-01-016 RM 2871 Actual AUG 2011 $1,796,479 1 REHABILITATE AND WIDEN BRIDGE AND APPROACHES

Wise County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0013-08-122 US 81 Actual JAN 2011 $761,737 1 2 INCH HMAC OVERLAY
0134-07-068 US 380 Actual JUN 2011 $122,535 8 WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED
0134-11-031 US 380 Actual JUL 2011 $430,855 1 CONSTRUCT INTERSECTION IMPROVEMENTS CONSISTING OF THE
0352-01-055 SH 114 Actual AUG 2011 $2,884,900 8 CONSTRUCT GRADE SEPARATION
0352-02-048 SH 114 Actual JUL 2011 $140,863 1 INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
1606-02-013 FM 2123 Actual AUG 2011 $1,968,338 6 REPL BRIDGES
1751-01-017 FM 1655 Actual JUN 2011 $3,479,076 1 REPLACE 2 BRIDGES WITH ONE BRIDGE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract