Monthly State Let Construction Report For Austin District As Of Apr 11, 2016 Page 5 Of 10

Last Update: Monday, April 11, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyWILLIAMSON
Highway SH 95
From AT WILLIS CREEK
To (STR 0320-03-032)
CSJ 0320-03-083
Proj ID BR 1502(592)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.105 2497365.80 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-10-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 180
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CHASCO CONSTRUCTORS
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-083
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08153253
Totals 2497365.80 0.00 0.00 0.0

CountyWILLIAMSON
Highway SH 95
From BELL COUNTY LINE
To FM 971 WEST
CSJ 0320-03-091
Proj ID STP 2012(307)
Work Type UPGRADE TO SUPER 2
 
5.590 3350557.08 0.00 3652490.24 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-26-12
Work Began 06-11-12
Work Completed  
Time Computed 06-15-12
Contract Working Days 281
Addl Days Granted 0
Working Days Charged 281
Percent Time Used 100
Contractor(s)
JAMES CONSTRUCTION GROUP, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-091
ENVIRONMENTAL SAFETY SERVICES, INC.(0.18%)
J.D. RAMMING PAVING CO., LTD.( 50.21%)
D. I. J. CONSTRUCTION, INC.(1.99%)
N-LINE TRAFFIC MAINTENANCE, L.P. (1.39%)
JCS LOGISTICS, LLC (3.17%)
J.E.D. TRUCKING, INC.(0.00%)
FRANK PRASIFKA & SONS, INC.(0.41%)
EDGAR GALAVAN DBA TRISA TRUCKING (0.39%)
TIM ARMSTRONG TRUCKING, INC. (0.14%)
JUAN MALDONADO DBA KRUNC TRANSPORTATION(0.29%)
CTBX, INC. (1.35%)
TEXAS TRUCKING COMPANY, INC. (0.00%)
PENNTEX MILLING, LLC (0.25%)
PANTHER CREEK TRANSPORTATION, INC. (0.00%)
BLACKTOPPER TECHNOLOGY, INC. (4.18%)
Contract # 03123226
Totals 3350557.08 0.00 3652490.24 99.9

CountyWILLIAMSON
Highway SH 95
From FM 971
To 0.1 MI S OF CHANDLER RD
CSJ 0320-03-095
Proj ID STP 2016(303)
Work Type LEVEL UP & SEAL COAT
 
7.393 861567.42 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-29-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 39
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-095
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12153231
Totals 861567.42 0.00 0.00 0.0

CountyWILLIAMSON
Highway SH 95
From OLD COUPLAND ROAD
To TRAVIS C/L
CSJ 0321-01-054
Proj ID STP 1502(593)
Work Type CONVERT SUPER 2
 
14.826 13427785.21 1338827.24 3901495.72 29.0
Work Order 11-10-15
Work Began 01-04-16
Work Completed  
Time Computed 12-10-15
Contract Working Days 263
Addl Days Granted 0
Working Days Charged 59
Percent Time Used 22
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0321-01-054
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (1.02%)
CHEROKEE SERVICES(0.19%)
ROADWAY SPECIALTIES, INC.(3.28%)
JORDAN FOSTER CONSTRUCTION, LLC( 22.59%)
S & S BRIDGE PAINTING, INC.(2.41%)
TEXAS TRUCKING COMPANY, INC. (0.00%)
TEX OP CONSTRUCTION, LP(3.30%)
TRP CONSTRUCTION GROUP, LLC(2.80%)
AUSTIN WOOD RECYCLING(0.49%)
PHILLIPS TRAFFIC CONTROL (0.05%)
AREA WIDE PROTECTIVE, INC. (0.06%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.05%)
Contract # 08153009
Totals 13427785.21 1338827.24 3901495.72 29.0

CountyWILLIAMSON
Highway FM 112
From SH 95
To MILAM C/L
CSJ 0334-01-042
Proj ID STP 1402(056)
Work Type DEPTH REPAIR, UNDERSEAL & THIN OV
 
18.059 1682489.00 0.00 1789456.48 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-05-15
Work Began 06-15-15
Work Completed  
Time Computed 01-21-15
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 83
Percent Time Used 150
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0334-01-042
CANTU CONSTRUCTION, INC. (1.60%)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.( 31.31%)
D. I. J. CONSTRUCTION, INC.(7.96%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.54%)
Contract # 08143026
Totals 1682489.00 0.00 1789456.48 99.9

CountyWILLIAMSON
Highway FM 112
From AT DRAW 1.0 MI E OF US 79
To STR 0334-01-003
CSJ 0334-01-043
Proj ID BR 1502(594)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.317 1052935.48 172858.40 590651.79 56.0
Work Order 10-30-15
Work Began 02-08-16
Work Completed  
Time Computed 11-29-15
Contract Working Days 92
Addl Days Granted 0
Working Days Charged 36
Percent Time Used 39
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0334-01-043
LONE STAR PAVING ( 17.98%)
FLASHER EQUIPMENT COMPANY(1.51%)
ENVIRONMENTAL SAFETY SERVICES, INC.(5.44%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.82%)
AUSTIN WOOD RECYCLING(1.66%)
Contract # 08153245
Totals 1052935.48 172858.40 590651.79 56.0

CountyLEE
Highway FM 448
From US 77
To FM 2239
CSJ 0334-06-026
Proj ID STP 1502(595)
Work Type LEVEL - UP, OVERLAY, WIDEN & SEAL
 
4.850 3138496.55 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-06-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 95
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0334-06-026
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08153040
Totals 3138496.55 0.00 0.00 0.0

CountyWILLIAMSON
Highway SH 29
From US 183
To CEDAR HOLLOW ROAD
CSJ 0337-01-035
Proj ID STP 2014(519)
Work Type PAVEMENT REPAIR & OVERLAY
 
6.924 3556401.05 0.00 3258511.61 91.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-22-14
Work Began 08-25-14
Work Completed  
Time Computed 05-08-14
Contract Working Days 71
Addl Days Granted 0
Working Days Charged 71
Percent Time Used 100
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-035
ALTUS TRAFFIC MANAGEMENT LLC (0.17%)
D. I. J. CONSTRUCTION, INC.(2.45%)
ROADWAY SPECIALTIES, INC.( 10.09%)
TEX OP CONSTRUCTION, LP(4.47%)
BRYDL CONTRACTING, INC.(0.25%)
Contract # 03143033
Totals 3556401.05 0.00 3258511.61 91.6

CountyWILLIAMSON
Highway SH 29
From RIVER CHASE BLVD.
To IH 35 NBFR
CSJ 0337-01-036
Proj ID STP 2016(897)
Work Type OVERLAY
 
0.964 662749.49 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 35
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-036
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04163035
Totals 662749.49 0.00 0.00 0.0

CountyWILLIAMSON
Highway SH 29
From CEDAR HOLLOW ROAD
To RIVER CHASE BOULEVARD
CSJ 0337-01-038
Proj ID STP 2016(575)
Work Type UNDERSEAL & THIN OVERLAY
 
3.506 2014970.43 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RAMMING PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-038
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163021
Totals 2014970.43 0.00 0.00 0.0

CountyWILLIAMSON
Highway SH 29
From INNER LOOP
To MILEHAM CREEK BRIDGE
CSJ 0337-02-041
Proj ID STP 2016(576)
Work Type UNDERSEAL & THIN OVERLAY
 
6.286 1499000.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-28-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 40
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RAMMING PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0337-02-041
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163208
Totals 1499000.00 0.00 0.00 0.0

CountyHAYS
Highway SH 123
From 3500 FT NORTH OF RM 12
To 3500 FT SOUTH OF RM 12
CSJ 0366-01-066
Proj ID C 366-1-66
Work Type CONST GRADE SEPARATION
 
1.326 11596550.48 220817.05 5503881.97 47.4
Work Order 08-27-14
Work Began 03-31-15
Work Completed  
Time Computed 02-23-15
Contract Working Days 465
Addl Days Granted 116
Working Days Charged 246
Percent Time Used 42
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0366-01-066
BMP SPECIALIST, LLC(1.56%)
FLASHER EQUIPMENT COMPANY(1.80%)
HOUSTON SAWING & DRILLING(0.04%)
THE LEVY COMPANY, L.P. (3.95%)
MCL CONTRACTING, LLC (0.24%)
MURRAY CONSTRUCTION(0.22%)
R K STEPHENS CONSTRUCTION, LLC (1.77%)
VEGETATION MANAGEMENT SPECIALIST, INC. (0.06%)
VOGES DRILLING CO. (0.73%)
Contract # 06143202
Totals 11596550.48 220817.05 5503881.97 47.4

CountyWILLIAMSON
Highway SH 195
From 4.987 MI SOUTH OF SH 138
To 8.486 MI SOUTH OF SH 138
CSJ 0440-01-039
Proj ID NH 2013(792)
Work Type WIDEN GR, STRS & SURF
 
3.499 17429949.35 154333.39 17168464.91 98.4
CountyWILLIAMSON
Highway SH 195
From 8.486 MI SOUTH OF SH 138
To 9.793 MI SOUTH OF SH 138
CSJ 0440-02-014
Proj ID C 440-2-14
Work Type GR, STRS, SURF / WIDEN TO FOUR LANE DIV
 
3.310 15881161.65 5114.20 15906009.83 99.9
Work Order 07-16-13
Work Began 12-18-13
Work Completed  
Time Computed 11-14-13
Contract Working Days 510
Addl Days Granted 0
Working Days Charged 509
Percent Time Used 99
Contractor(s)
SEMA CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0440-01-039
RAMMING PAVING COMPANY ( 13.10%)
ROYAL VISTA INC. (2.10%)
TEXAS HIGHWAY WALLS(4.51%)
WEBBER BARRIER SERVICES, LLC.(0.73%)
D. I. J. CONSTRUCTION, INC.(0.27%)
AUSTIN WOOD RECYCLING(0.59%)
BEAIRD DRILLING(0.39%)
ROADWAY SPECIALTIES, INC.(0.10%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.29%)
TEXAS OPERATIONS (0.16%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.16%)
PERFORMANCE EQUIPMENT(0.00%)
GK CONSTRUCTION, LLC (0.06%)
COWBELL TRAFFIC SERVICES, INC. (0.02%)
HOUSTON SAWING & DRILLING(0.01%)
TOM ARNOLD DRILLING CONTRACTOR II, LLC (0.00%)
BMP SPECIALIST, LLC(0.73%)
INDUS CONSTRUCTION, L.P. (0.55%)
Contract # 06133201
Totals 33311111.00 159447.59 33074474.74 99.2

CountyWILLIAMSON
Highway SH 195
From 9.271 MI S OF SH 138
To IH 35
CSJ 0440-02-010
Proj ID HP 2013(023)
Work Type WIDEN GR, STRS & SURF
 
5.179 18778887.62 116410.00 18465874.23 98.3
Work Order 11-16-12
Work Began 01-10-13
Work Completed  
Time Computed 12-02-12
Contract Working Days 368
Addl Days Granted 145
Working Days Charged 520
Percent Time Used 101
Contractor(s)
SEMA CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0440-02-010
G. CARTER CONSTRUCTION COMPANY, INC. (2.15%)
PERFORMANCE EQUIPMENT(0.46%)
AUSTIN WOOD RECYCLING(0.62%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.33%)
ROYAL VISTA INC. (5.40%)
AARON CONCRETE CONTRACTORS, L.P. (0.25%)
BMP SPECIALIST, LLC(1.37%)
D. I. J. CONSTRUCTION, INC.(1.02%)
RAMMING PAVING COMPANY ( 42.87%)
ROADWAY SPECIALTIES, INC.(0.69%)
TOM ARNOLD DRILLING CONTRACTOR II, LLC (0.02%)
TEXAS TRUCKING COMPANY, INC. (2.43%)
DOWN UNDER CONSTRUCTION(0.09%)
Contract # 09123203
Totals 18778887.62 116410.00 18465874.23 98.3

CountyWILLIAMSON
Highway SH 195
From 0.11 MI EAST OF SUN CITY BLVD.
To 0.51 MI EAST OF SUN CITY BLVD.
CSJ 0440-02-015
Proj ID CC 440-2-15
Work Type CONST MEDIAN AND LEFT TURN LANES
 
0.398 520094.50 0.00 101770.00 19.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-29-16
Work Began 03-21-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 25
Addl Days Granted 0
Working Days Charged 5
Percent Time Used 20
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0440-02-015
LONE STAR PAVING CO. ( 41.02%)
N-LINE TRAFFIC MAINTENANCE, L.P. (2.88%)
ROADWAY SPECIALTIES, INC.(3.48%)
TRP CONSTRUCTION GROUP, LLC(1.90%)
Contract # 09153030
Totals 520094.50 0.00 101770.00 19.5

CountyBURNET
Highway RM 243
From SH 29
To WILLIAMSON C/L
CSJ 0440-04-013
Proj ID STP 2014(719)HES
Work Type GUARDRAIL & SAFETY TREAT FIXED OBJCTS
 
12.534 622587.90 4841.16 684002.32 99.9
CountyBURNET
Highway RM 243
From 0.609 MI N OF SH 29
To 7.923 MI N OF SH 29
CSJ 0440-04-014
Proj ID STP 2014(720)HES
Work Type PROVIDE ADDITIONAL PAVED SURFACE WI
 
7.314 3173322.49 133131.11 3488322.07 99.9
Work Order 08-04-14
Work Began 09-02-14
Work Completed  
Time Computed 08-20-14
Contract Working Days 247
Addl Days Granted 4
Working Days Charged 235
Percent Time Used 93
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0440-04-013
N-LINE TRAFFIC MAINTENANCE, L.P. (0.94%)
ROADWAY SPECIALTIES, INC.(6.58%)
LONE STAR PAVING, INC. ( 13.34%)
D. I. J. CONSTRUCTION, INC.(3.36%)
MPB, INC.( 15.66%)
BRYDL CONTRACTING, INC.(0.05%)
Contract # 06143207
Totals 3795910.39 137972.27 4172324.39 99.9

CountyWILLIAMSON
Highway SH 130
From 252 FT NORTH OF US 79 CENTERLINE
To 2748 FT SOUTH OF US 79 CENTERLINE
CSJ 0440-05-008
Proj ID NH 2012(481)
Work Type LANDSCAPING
 
0.568 155600.10 0.00 163275.63 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-15-12
Work Began 06-18-12
Work Completed  
Time Computed 06-18-12
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 37
Percent Time Used 82
Contractor(s)
NALLE LANDSCAPE LLC
SUBCONTRACTOR(S) FOR CCSJ: 0440-05-008
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04123233
Totals 155600.10 0.00 163275.63 99.9

CountyTRAVIS
Highway SH 130
From SH 130 @ FM 812
To .
CSJ 0440-06-014
Proj ID NH 1502(385)
Work Type LANDSCAPING AND IRRIGATION
 
0.100 642322.00 74397.00 438940.00 68.3
Work Order 08-31-15
Work Began 10-26-15
Work Completed  
Time Computed 10-26-15
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 59
Percent Time Used 98
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0440-06-014
N-LINE TRAFFIC MAINTENANCE, L.P. (0.70%)
CLASSIC TEJAS CONSTRUCTION, INC. ( 12.85%)
M & M UNDERGROUND CONSTRUCTION (1.08%)
Contract # 07153257
Totals 642322.00 74397.00 438940.00 68.3

CountyCALDWELL
Highway SH 21
From HAYS COUNTY LINE
To BASTROP COUNTY LINE
CSJ 0471-04-029
Proj ID STP 2016(852)
Work Type REPAIR, LEVEL - UP, WIDEN AND OVERLAY
 
5.190 2356387.98 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 36
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0471-04-029
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163214
Totals 2356387.98 0.00 0.00 0.0

CountyBASTROP
Highway SH 21
From 0.363 MI W OF MARTINS CROSSING
To 0.223 MI E OF MARTINS CROSSING
CSJ 0471-05-039
Proj ID STP 1502(386)HES
Work Type INSTALL CONTINUOUS TURN LANE
 
0.651 790877.19 276499.70 577967.92 73.0
Work Order 10-05-15
Work Began 12-04-15
Work Completed  
Time Computed 12-04-15
Contract Working Days 59
Addl Days Granted 5
Working Days Charged 39
Percent Time Used 60
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0471-05-039
ROADWAY SPECIALTIES, INC.(2.98%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.48%)
MURRAY CONSTRUCTION(0.55%)
CANTU CONSTRUCTION, INC. (0.50%)
Contract # 07153011
Totals 790877.19 276499.70 577967.92 73.0

page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10