Monthly State Let Construction Report For Austin District As Of Jan 13, 2015 Page 5 Of 8

Last Update: Tuesday, January 13, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyWILLIAMSON
Highway SH 130
From 252 FT NORTH OF US 79 CENTERLINE
To 2748 FT SOUTH OF US 79 CENTERLINE
CSJ 0440-05-008
Proj ID NH 2012(481)
Work Type LANDSCAPING
 
0.568 155600.10 400.00 162875.63 99.9
Work Order 05-15-12
Work Began 06-18-12
Work Completed  
Time Computed 06-18-12
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 37
Percent Time Used 82
Contractor(s)
NALLE LANDSCAPE LLC
SUBCONTRACTOR(S) FOR CCSJ: 0440-05-008
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04123233
Totals 155600.10 400.00 162875.63 99.9

CountyHAYS
Highway SH 21
From AT INTERSECTION OF RM 150
To .
CSJ 0471-02-067
Proj ID STP 2013(286)MM
Work Type CONSTR LEFT TURN LANE ON SH 21 NB
 
0.100 862311.69 4344.29 896011.16 99.9
Work Order 04-11-14
Work Began 04-28-14
Work Completed  
Time Computed 04-27-14
Contract Working Days 150
Addl Days Granted 0
Working Days Charged 140
Percent Time Used 93
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0471-02-067
ROADWAY SPECIALTIES, INC.(3.56%)
THE LEVY COMPANY, L.P. (1.55%)
FUQUAY, INC. (1.13%)
FLASHER EQUIPMENT COMPANY(4.77%)
RAMMING PAVING COMPANY ( 29.55%)
AARON CONCRETE CONTRACTORS, L.P. (0.57%)
Contract # 02143219
Totals 862311.69 4344.29 896011.16 99.9

CountyBASTROP
Highway SH 304
From 0.043 MI. SOUTH OF SH 71
To 2.677 MI. SOUTH OF SH 71
CSJ 0573-01-029
Proj ID STP 2013(703)
Work Type UPGRD TO 3 LN SEC WITH SHOULDERS
 
2.634 6181473.52 61896.57 6177593.11 99.9
Work Order 07-11-13
Work Began 08-05-13
Work Completed  
Time Computed 07-27-13
Contract Working Days 144
Addl Days Granted 75
Working Days Charged 228
Percent Time Used 104
Contractor(s)
DAN WILLIAMS COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0573-01-029
FLASHER EQUIPMENT COMPANY(0.16%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.86%)
D. I. J. CONSTRUCTION, INC.(0.41%)
THE LEVY COMPANY, L.P. (0.14%)
APAC-TEXAS, INC. ( 33.04%)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.(1.27%)
Contract # 05133207
Totals 6181473.52 61896.57 6177593.11 99.9

CountyBASTROP
Highway SH 304
From FM 2571
To CALDWELL COUNTY LINE
CSJ 0573-01-031
Proj ID STP 2014(721)HES
Work Type IMPRV GUARDRAIL & SFTY TRT FXD OBJS
 
22.194 1160129.99 183080.35 642742.09 55.4
Work Order 08-08-14
Work Began 10-07-14
Work Completed  
Time Computed 10-07-14
Contract Working Days 158
Addl Days Granted 0
Working Days Charged 44
Percent Time Used 27
Contractor(s)
3LW MANAGEMENT, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0573-01-031
D. I. J. CONSTRUCTION, INC.(1.31%)
R K STEPHENS CONSTRUCTION, LLC (8.02%)
Contract # 06143050
Totals 1160129.99 183080.35 642742.09 55.4

CountyLLANO
Highway SH 71 ETC
From MASON COUNTY LINE
To SH 29
CSJ 0577-04-021
Proj ID STP 2014(531)HESG
Work Type TEXTURIZE SHOULDERS - PROFILE MARKERS
 
101.943 566990.25 0.00 526606.85 92.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-11-14
Work Began 04-23-14
Work Completed  
Time Computed 04-23-14
Contract Working Days 42
Addl Days Granted 0
Working Days Charged 20
Percent Time Used 47
Contractor(s)
D. I. J. CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0577-04-021
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03143219
Totals 566990.25 0.00 526606.85 92.8

CountyTRAVIS
Highway RM 620
From RM 2222
To RM 2769
CSJ 0683-02-057
Proj ID STP 2014(532)
Work Type UNDERSEAL & OVERLAY
 
3.872 1640913.50 0.00 1740817.49 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-17-14
Work Began 07-14-14
Work Completed  
Time Computed 06-16-14
Contract Working Days 44
Addl Days Granted 0
Working Days Charged 44
Percent Time Used 100
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0683-02-057
ENVIRONMENTAL SAFETY SERVICES, INC.(0.06%)
TEX OP CONSTRUCTION, LP(6.89%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (5.03%)
TRP CONSTRUCTION GROUP, LLC(6.25%)
Contract # 03143027
Totals 1640913.50 0.00 1740817.49 99.9

CountyTRAVIS
Highway RM 620
From SH 71
To COLORADO RIVER(MANSFIELD DAM)
CSJ 0683-02-058
Proj ID STP 2014(304)
Work Type SEAL & OVERLAY
 
8.589 2734590.56 1456.40 2761706.88 99.9
Work Order 01-17-14
Work Began 06-25-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 59
Addl Days Granted 0
Working Days Charged 66
Percent Time Used 111
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0683-02-058
R K STEPHENS CONSTRUCTION, LLC (0.69%)
TEX OP CONSTRUCTION, LP(1.81%)
D. I. J. CONSTRUCTION, INC.(6.00%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (2.04%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.25%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.24%)
Contract # 12133222
Totals 2734590.56 1456.40 2761706.88 99.9

CountyWILLIAMSON
Highway SH 45
From WEST OF RATTAN CRK
To MCNEIL ROAD
CSJ 0683-06-027
Proj ID C 683-6-27
Work Type GR, BASE, STRUC, ACP, SGN & PVMT MK
 
1.256 24729960.53 37967.49 27006013.52 99.9
Work Order 09-27-11
Work Began 11-08-11
Work Completed  
Time Computed 11-08-11
Contract Working Days 495
Addl Days Granted 59
Working Days Charged 676
Percent Time Used 122
Contractor(s)
LIBERTY MUTUAL INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0683-06-027
AUSTIN TRAFFIC SIGNAL CONSTRUCTION (OLD PRIME) (3.26%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.30%)
AUSTIN WOOD RECYCLING(0.04%)
BEAIRD DRILLING(2.06%)
CARTEL PLACERS, LLC(0.00%)
FLASHER EQUIPMENT COMPANY(0.36%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.27%)
PRIMATE CONSTRUCTION, INC. (0.16%)
SITE-SAFE PRODUCTS OF TEXAS, L.P.(0.80%)
H. L. CHAPMAN PIPELINE CONSTRUCTION, INC.(0.49%)
VALLEY PLACERS, LLC(0.10%)
ROADWAY SPECIALTIES, INC.(0.76%)
TEXAS HIGHWAY WALLS(3.26%)
ZACHRY CONSTRUCTION CORPORATION( 89.37%)
HIGHWAY TECHNOLOGIES, INC. (0.00%)
APAC-TEXAS, INC. (0.62%)
AARON CONCRETE CONTRACTORS, L.P. (1.04%)
KELLYSTONE, INC(0.12%)
NORTH TEXAS REBAR, LLC (2.79%)
Contract # 07113013
Totals 24729960.53 37967.49 27006013.52 99.9

CountyTRAVIS
Highway SH 71
From 0.55 MILES W OF SOUTHWEST PKWY
To 0.14 MILES E OF SOUTHWEST PKWY
CSJ 0700-03-114
Proj ID STP 2011(949)HES
Work Type INSTALL CTL, ACCEL LN & SHLDRS
 
0.697 5035450.53 0.00 5814345.07 100.0
CountyTRAVIS
Highway SH 71
From 0.55 MILES W OF SOUTHWEST PKWY
To 0.14 MILES E OF SOUTHWEST PKWY
CSJ 0700-03-120
Proj ID RW 700-3-120
Work Type UTILITY ADJUSTMENTS
 
0.697 322251.00 0.00 250715.00 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-27-11
Work Began 01-23-12
Work Completed 11-04-14
Time Computed 08-12-11
Contract Working Days 244
Addl Days Granted 108
Working Days Charged 513
Percent Time Used 145
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0700-03-114
AUSTIN WOOD RECYCLING(0.54%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (0.87%)
FLASHER EQUIPMENT COMPANY(2.03%)
J & M CONTRACTING, COMPANY ( 13.54%)
MENADE, INC. ( 22.85%)
ROADWAY SPECIALTIES, INC.(2.04%)
WEBBER BARRIER SERVICES, INC.(1.35%)
J.A. ROAD BORING, INC. (2.03%)
FARR FOUNDATION, INC.(2.78%)
KEN-WAY, INCORPORATED(4.19%)
VOGES DRILLING CO. (0.25%)
DRILL TECH DRILLING & SHORING, INC.(3.15%)
CHLOR-SERV, INC. (0.06%)
DESERT STEEL CO., INC. (0.17%)
Contract # 05113226
Totals 5357701.53 0.00 6065060.07 100.0

CountyTRAVIS
Highway SH 71
From 1.49 MI. EAST OF BEE CREEK ROAD
To 0.2 MI. WEST OF VAIL DIVIDE
CSJ 0700-03-122
Proj ID C 700-3-122
Work Type ADD LEFT TURN LANE & SHOULDERS
 
0.449 1633474.93 68434.36 739349.64 45.2
CountyTRAVIS
Highway SH 71
From 0.15 MI. EAST OF VAIL DIVIDE
To 0.2 MI. WEST OF RM 3238
CSJ 0700-03-123
Proj ID C 700-3-123
Work Type ADD LEFT TURN LANE & SHOULDERS
 
1.533 6535849.48 235721.90 4371418.52 66.8
CountyTRAVIS
Highway SH 71
From 0.15 MI. EAST OF VAIL DIVIDE
To 0.2 MI. WEST OF RM 3238
CSJ 0700-03-132
Proj ID RW 700-3-132
Work Type ROW UTL. ADJ.
 
1.536 76681.00 0.00 76681.00 99.9
Work Order 12-05-13
Work Began 02-17-14
Work Completed  
Time Computed 02-03-14
Contract Working Days 161
Addl Days Granted 65
Working Days Charged 211
Percent Time Used 93
Contractor(s)
JORDAN FOSTER CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0700-03-123
ROADWAY SPECIALTIES, INC.(3.25%)
AUSTIN WOOD RECYCLING(0.27%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.12%)
TEX OP CONSTRUCTION, LP(0.21%)
PANTHER CREEK TRANSPORTATION, INC. (2.15%)
BRYANT & FREY CONSTRUCTION (0.26%)
TEXAS HIGHWAY WALLS(5.50%)
RAMMING PAVING COMPANY ( 35.78%)
FLASHER EQUIPMENT COMPANY(1.98%)
Contract # 08133049
Totals 8246005.41 304156.26 5187449.16 62.9

CountyTRAVIS
Highway SH 71
From WEST OF THOMAS SPRINGS ROAD
To WEST OF COVERED BRIDGE ROAD
CSJ 0700-03-125
Proj ID C 700-3-125
Work Type ADD LEFT TURN LANE & SHOULDERS
 
5.702 15965613.32 192999.76 3797564.36 23.7
Work Order 03-18-14
Work Began 06-16-14
Work Completed  
Time Computed 05-17-14
Contract Working Days 289
Addl Days Granted 0
Working Days Charged 85
Percent Time Used 29
Contractor(s)
JOE BLAND CONSTRUCTION, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0700-03-125
PANTHER CREEK TRANSPORTATION, INC. (4.57%)
BRYANT & FREY CONSTRUCTION (2.07%)
ROADWAY SPECIALTIES, INC.(1.42%)
FLASHER EQUIPMENT COMPANY(1.12%)
SCOTT DERR PAINTING CO, LLC(0.00%)
TEXAS HIGHWAY WALLS(0.63%)
THE LEVY COMPANY, L.P. (2.36%)
HAEGELIN CONSTRUCTION CO., LTD.(8.02%)
SCOTT DERR PAINTING CO, LLC(0.08%)
AUSTIN WOOD RECYCLING(0.45%)
RAMI MATERIALS TRANSPORT, LLC(1.25%)
BREDA COMPANY, INC.(0.00%)
Contract # 11133027
Totals 15965613.32 192999.76 3797564.36 23.7

CountyLLANO
Highway SH 71
From 0.1 MILES EAST OF CR 308
To 1.8 MILES EAST OF CR 309
CSJ 0700-04-045
Proj ID STP 2013(928)
Work Type UPGRADE TO SUPER 2 & ADD LTL'S
 
4.784 4402628.35 76974.53 4530268.41 99.9
Work Order 11-19-13
Work Began 12-05-13
Work Completed  
Time Computed 12-05-13
Contract Working Days 200
Addl Days Granted 0
Working Days Charged 203
Percent Time Used 101
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0700-04-045
D. I. J. CONSTRUCTION, INC.(2.75%)
AUSTIN WOOD RECYCLING(1.24%)
ROADWAY SPECIALTIES, INC.(8.10%)
LONE STAR PAVING CO. (9.63%)
ERFURT BLASTING COMPANY, INC.(0.90%)
Contract # 09133225
Totals 4402628.35 76974.53 4530268.41 99.9

CountyLLANO
Highway SH 71
From 0.2 MILES WEST OF CR 303
To 0.1 MILES WEST OF CR 307
CSJ 0700-04-046
Proj ID STP 2013(704)
Work Type UPGRADE TO SUPER 2 & ADD LTL'S
 
7.350 6036480.35 16040.60 6399180.30 99.9
Work Order 08-06-13
Work Began 08-26-13
Work Completed  
Time Computed 08-22-13
Contract Working Days 227
Addl Days Granted 14
Working Days Charged 241
Percent Time Used 100
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0700-04-046
AUSTIN WOOD RECYCLING(0.78%)
D. I. J. CONSTRUCTION, INC.(2.15%)
FLASHER EQUIPMENT COMPANY(0.39%)
ROADWAY SPECIALTIES, INC.(4.41%)
Contract # 05133229
Totals 6036480.35 16040.60 6399180.30 99.9

CountyWILLIAMSON
Highway FM 685
From US 79
To SH 130
CSJ 0757-01-020
Proj ID C 757-1-20
Work Type RECONSTRUCT TO 4 - LANE DIVIDED RDWY
 
1.820 10553004.78 194278.98 1739401.76 16.4
CountyWILLIAMSON
Highway FM 685
From US 79
To SH 130
CSJ 0757-01-021
Proj ID RW 757-1-21
Work Type ROW ACQ, RELOC ASSIST. & UTL. ADJ.
 
1.820 464544.39 61626.77 117704.83 25.3
Work Order 08-27-14
Work Began 10-20-14
Work Completed  
Time Computed 10-20-14
Contract Working Days 441
Addl Days Granted 0
Working Days Charged 38
Percent Time Used 8
Contractor(s)
OHL USA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0757-01-020
ABC EROSION CONTROL, INC.(0.61%)
AUSTIN WOOD RECYCLING(0.49%)
TRP CONSTRUCTION GROUP, LLC( 50.52%)
GUERRA UNDERGROUND, LLC(2.61%)
BEAIRD DRILLING(1.78%)
Contract # 02143003
Totals 11017549.17 255905.75 1857106.59 16.8

CountyCALDWELL
Highway FM 713
From 0.569 MI. EAST OF FM 86
To 0.698 MI. EAST OF FM 86
CSJ 0805-03-020
Proj ID BR 2014(893)
Work Type REPLACE BRIDGE & APPROACHES
 
0.129 562719.11 1500.00 7800.00 1.3
Work Order 09-09-14
Work Began 01-06-15
Work Completed  
Time Computed 11-08-14
Contract Working Days 130
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0805-03-020
O & S TRAFFIC SUPPLIES (2.11%)
VOGES DRILLING (4.25%)
FLASHER EQUIPMENT COMPANY(2.21%)
Contract # 07143013
Totals 562719.11 1500.00 7800.00 1.3

CountyBASTROP
Highway FM 535
From FM 20
To MAIN ST
CSJ 0807-01-027
Proj ID STP 2014(014)HES
Work Type PROVIDE ADDITIONAL PAVED SURFACE WI
 
10.546 3806543.90 0.00 3568058.92 93.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-05-13
Work Began 01-15-14
Work Completed  
Time Computed 01-15-14
Contract Working Days 115
Addl Days Granted 9
Working Days Charged 129
Percent Time Used 104
Contractor(s)
SBBI, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0807-01-027
N-LINE TRAFFIC MAINTENANCE, L.P. (0.58%)
ROADWAY SPECIALTIES, INC.(1.77%)
RAMI MATERIALS TRANSPORT, LLC(4.55%)
ADAM MEUTH CONSTRUCTION CO.(3.97%)
RAMMING PAVING COMPANY ( 27.30%)
D. I. J. CONSTRUCTION, INC.(3.10%)
NEWMAN & KENG PAVING COMPANY, INC. (6.65%)
Contract # 09133007
Totals 3806543.90 0.00 3568058.92 93.8

CountyBASTROP
Highway FM 535
From SH 21
To FM 20
CSJ 0807-05-019
Proj ID STP 2013(025)HES
Work Type PROVIDE ADDITIONAL PAVED SURFACE WI
 
7.286 4348946.83 0.00 4256474.76 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-28-12
Work Began 02-25-13
Work Completed 08-22-14
Time Computed 01-27-13
Contract Working Days 121
Addl Days Granted 1
Working Days Charged 213
Percent Time Used 174
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0807-05-019
AUSTIN WOOD RECYCLING(1.75%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.63%)
RELMCO, INC. ( 13.62%)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (3.75%)
MURRAY CONSTRUCTION(0.50%)
D. I. J. CONSTRUCTION, INC.(2.23%)
HIGHWAY TECHNOLOGIES, INC. (0.41%)
RICE ENVIRONMENTAL SERVICES(0.11%)
G. CARTER CONSTRUCTION COMPANY, INC. (0.29%)
FLASHER EQUIPMENT COMPANY(0.45%)
Contract # 09123007
Totals 4348946.83 0.00 4256474.76 100.0

CountyTRAVIS
Highway VA
From VARIOUS
To .
CSJ 0914-00-301
Proj ID NH 2012(007)
Work Type FY 2012 NON - SITE SPECIFIC ITS MAINT
 
0.100 4204759.50 65150.00 3097464.84 73.6
Work Order 10-25-11
Work Began 02-21-12
Work Completed  
Time Computed 11-10-11
Contract Working Days 508
Addl Days Granted 0
Working Days Charged 401
Percent Time Used 78
Contractor(s)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0914-00-301
ROADWAY SPECIALTIES, INC.(2.80%)
AUSTIN UNDERGROUND INCORPORATED(2.05%)
M.G. DRILLING(0.62%)
Contract # 09113230
Totals 4204759.50 65150.00 3097464.84 73.6

CountyTRAVIS
Highway VA
From VARIOUS
To (ON-SYSTEM)
CSJ 0914-00-314
Proj ID NH 2013(027)
Work Type FY 2013 NON - SITE SPECIFIC ITS MAINT
 
0.100 2958819.25 0.00 10000.00 0.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-12-12
Work Began 00-00-00
Work Completed  
Time Computed 10-28-12
Contract Working Days 508
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0914-00-314
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09123244
Totals 2958819.25 0.00 10000.00 0.3

CountyTRAVIS
Highway VA
From AT VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0914-00-319
Proj ID NH 1402(057)
Work Type FY 2014 SITE - SPECIFIC SIGNALS
 
0.100 1113486.77 11858.00 11858.00 1.0
Work Order 11-04-14
Work Began 00-00-00
Work Completed  
Time Computed 11-20-14
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0914-00-319
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08143029
Totals 1113486.77 11858.00 11858.00 1.0