Monthly State Let Construction Report For Fort Worth District As Of Apr 10, 2015 Page 2 Of 7

Last Update: Friday, April 10, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyTARRANT
Highway US 377
From AT EAST BELKNAP STREET
To IN HALTOM CITY
CSJ 0081-01-046
Proj ID CM 1102(122)
Work Type GR, DR, SIGNAL AND PAVEMENT
 
0.451 4198919.20 67633.50 862098.47 20.5
Work Order 07-25-14
Work Began 11-06-14
Work Completed  
Time Computed 11-06-14
Contract Working Days 236
Addl Days Granted 16
Working Days Charged 92
Percent Time Used 36
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0081-01-046
PLACIDO CONSTRUCTION COMPANY (1.88%)
PEACHTREE CONSTRUCTION, LTD. (8.68%)
EROSION CONTROL MANAGEMENT SERVICES(0.53%)
A BROTHERS MILLING, LLC(2.09%)
BUYERS BARRICADES, INC.(0.72%)
BRADCO, LLC(2.07%)
ABC EROSION CONTROL, INC.(0.79%)
MCL CONTRACTING, LLC (0.98%)
VENUS CONSTRUCTION (6.74%)
W.O.E. CONSTRUCTION(0.20%)
A & A CONSTRUCTION (0.08%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.29%)
COWBOY TRUCKING(3.28%)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.(8.56%)
Contract # 04143224
Totals 4198919.20 67633.50 862098.47 20.5

CountyTARRANT
Highway SH 183
From COMMERCE ST.
To NICHOLS ST.
CSJ 0094-01-030
Proj ID BR 2011(705)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.459 10591980.89 51384.74 4557835.72 42.5
Work Order 12-20-11
Work Began 12-03-13
Work Completed  
Time Computed 06-18-12
Contract Working Days 524
Addl Days Granted 80
Working Days Charged 299
Percent Time Used 49
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0094-01-030
1 PRIORITY ENVIRONMENTAL SERVICES, INC.(2.21%)
BREDA COMPANY, INC.(0.92%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.25%)
ATS DRILLING, INC. (3.07%)
CONCRETE CUTTING BY BOND (0.06%)
COWTOWN TRAFFIC CONTROL, INC.(0.23%)
DUSTROL, INC.(0.16%)
FARR FOUNDATION, INC.(0.59%)
HOUSTON SAWING & DRILLING(0.08%)
K & S UTILITY CONTRACTORS, INC.(4.32%)
MELS ELECTRIC, L.P.(1.26%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(2.14%)
SCOTT DERR PAINTING CO, LLC(0.32%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.60%)
J.L. STEEL REINFORCING, LLC(0.14%)
C.B. SERVICES, INC.(0.51%)
Contract # 08113203
Totals 10591980.89 51384.74 4557835.72 42.5

CountyJACK
Highway US 380
From YOUNG COUNTY LINE
To 9TH STREET-JACKSBORO
CSJ 0134-04-036
Proj ID STP 1402(031)
Work Type MILL AND OVERLAY
 
15.601 3736711.69 0.00 0.00 0.0
Work Order 09-12-14
Work Began 00-00-00
Work Completed  
Time Computed 09-28-14
Contract Working Days 102
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0134-04-036
ALTUS TRAFFIC MANAGEMENT LLC (0.42%)
TRP CONSTRUCTION GROUP, LLC(3.62%)
Contract # 08143224
Totals 3736711.69 0.00 0.00 0.0

CountyTARRANT
Highway SH 199
From AT BYPASS CHANNEL; IN FORT WORTH
To NEAR CBD & TRINITY RIVER
CSJ 0171-05-081
Proj ID HP 2008(345)
Work Type GRADING, DRAINAGE AND STRUCTURE
 
0.300 65461507.43 507212.37 5185996.73 7.9
Work Order 08-04-14
Work Began 10-28-14
Work Completed  
Time Computed 10-28-14
Contract Working Days 919
Addl Days Granted 0
Working Days Charged 99
Percent Time Used 10
Contractor(s)
STERLING DELAWARE HOLDING COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0171-05-081
A BROTHERS MILLING, LLC(0.31%)
BANDA TRUCKING COMPANY (0.01%)
MICA CORPORATION (5.94%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.40%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.10%)
STRAIGHT LINE SAWING & SEALING (0.12%)
TEXAS SHAFTS, INC. (3.19%)
TRAC-WORK, INC.(0.04%)
DYWIDAG-SYSTEMS INTERNATIONAL_USA,INC. (4.92%)
INDUS CONSTRUCTION, L.P. (1.95%)
INLET STRUCTURE SPECIALTIES LTD. (0.41%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(1.95%)
SCOTT DERR PAINTING CO (0.27%)
MCL CONTRACTING, LLC (0.18%)
CONCRETE PRESERVATION(0.12%)
CHUBBS CONSTRUCTION, LLC (2.35%)
Contract # 05143201
Totals 65461507.43 507212.37 5185996.73 7.9

CountyTARRANT
Highway SH 199
From ROBERT CUTTOFF; VARIOUS LOCATIONS
To SKYLINE; IN SANSOM PARK
CSJ 0171-05-092
Proj ID NH 2013(668)
Work Type LANDSCAPING
 
0.988 161237.75 0.00 179686.61 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-26-13
Work Began 02-10-14
Work Completed  
Time Computed 09-11-13
Contract Working Days 56
Addl Days Granted 60
Working Days Charged 120
Percent Time Used 103
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0171-05-092
HIGHWAY BARRICADES AND SERVICES, LLC (4.18%)
AQUA BORE(0.00%)
ED BELL CONSTRUCTION COMPANY (0.00%)
Contract # 05133215
Totals 161237.75 0.00 179686.61 99.9

CountyTARRANT
Highway BU 287P
From VILLAGE CREEK
To EDEN ROAD; IN KENNEDALE
CSJ 0172-02-071
Proj ID STP 2012(497)
Work Type LANDSCAPE ENHANCEMENT
 
3.364 628000.00 0.00 847125.28 99.9
Work Order 06-21-12
Work Began 08-20-12
Work Completed  
Time Computed 07-07-12
Contract Working Days 107
Addl Days Granted 75
Working Days Charged 175
Percent Time Used 96
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0172-02-071
HIGHWAY TECHNOLOGIES, INC. (0.51%)
AQUA BORE(3.37%)
TEJAS COMMERCIAL CONSTRUCTION, LLC (1.89%)
Contract # 05123047
Totals 628000.00 0.00 847125.28 99.9

CountyTARRANT
Highway US 287
From OVER SYCAMORE CREEK/COBB PARK ROAD
To IN FORT WORTH
CSJ 0172-06-081
Proj ID BR 2013(011)
Work Type BRIDGE REPLACEMENT
 
0.178 3466498.55 35107.32 3829948.82 100.0
Work Order 05-13-13
Work Began 07-11-13
Work Completed 12-19-14
Time Computed 05-29-13
Contract Working Days 256
Addl Days Granted 43
Working Days Charged 306
Percent Time Used 102
Contractor(s)
INTERSTATE HIGHWAY CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0172-06-081
BREDA COMPANY, INC.(1.16%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.30%)
STRIPING TECHNOLOGY, L.P.(1.09%)
TEXAS STAR TRANSPORT, LP (0.00%)
HOUSTON SAWING & DRILLING(0.14%)
CHRISTINE"S CONCERTE SAWING & SEALING LLC(0.29%)
FORTSON CONTRACTING, INC.(2.37%)
MEL"S ELECTRIC SERVICE, INC. (1.83%)
PEACHTREE CONSTRUCTION, LTD. (9.10%)
SCOTT DERR PAINTING CO, LLC(0.38%)
STORM WATER MANAGEMENT, INC. (0.30%)
TEX OP CONSTRUCTION, LP(0.66%)
WEBBER BARRIER SERVICES, LLC.(2.77%)
WYLIE DRILLING & DRAINAGE, INC.(2.74%)
DALLAS LITE AND BARRICADE INC. (0.62%)
TEXAS SHAFTS, INC. (3.03%)
FOUNDATION DRILLERS, INC.(0.16%)
Contract # 02133225
Totals 3466498.55 35107.32 3829948.82 100.0

CountyTARRANT
Highway US 287
From APPROX .10 MI S OF CHAMBERS ST
To ROSEDALE ST
CSJ 0172-06-090
Proj ID NH 2014(477)
Work Type MILL, PAVT REPAIR AND OVERLAY
 
1.675 1971511.20 0.00 1895410.42 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-01-14
Work Began 07-16-14
Work Completed 02-25-15
Time Computed 05-17-14
Contract Working Days 107
Addl Days Granted 0
Working Days Charged 122
Percent Time Used 114
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0172-06-090
ALTUS TRAFFIC MANAGEMENT LLC (0.27%)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.(1.04%)
O. TREVINO CONSTRUCTION, LLC ( 39.99%)
RICE ENVIRONMENTAL SERVICES(0.41%)
TRP CONSTRUCTION GROUP, LLC(2.60%)
Contract # 03143224
Totals 1971511.20 0.00 1895410.42 100.0

CountyTARRANT
Highway US 287
From WALNUT CREEK DRIVE
To BROAD STREET; IN MANSFIELD
CSJ 0172-09-031
Proj ID STP 2010(624)MM
Work Type GR, DR, STR, PAVEMENT AND SIGNING
 
1.440 10839704.21 0.00 10622456.38 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-05-10
Work Began 05-24-10
Work Completed 07-28-14
Time Computed 05-21-10
Contract Working Days 417
Addl Days Granted 166
Working Days Charged 632
Percent Time Used 108
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0172-09-031
INDUS CONSTRUCTION, L.P. (5.10%)
UNDERGROUND COALITION, INC.(2.15%)
ATS DRILLING, L.P. (1.78%)
S & V CONSTRUCTION LLC (1.54%)
SITE-SAFE PRODUCTS OF TEXAS, L.P.(0.89%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 10.61%)
MELS ELECTRIC, L.P.(2.77%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.63%)
A BROTHERS (0.49%)
INLET STRUCTURE SPECIALTIES LTD. (1.68%)
FORTSON CONTRACTING, INC.(0.00%)
BANDA TRUCKING COMPANY (0.04%)
CENTRAL NORTH CONSTRUCTION, LLC(2.42%)
J.H. PAINTING COMPANY(0.18%)
RATLIFF HARDSCAPE, LTD.(1.15%)
SOUTHEAST GRINDING & GROOVING, LLC (0.11%)
Contract # 03103205
Totals 10839704.21 0.00 10622456.38 100.0

CountyJACK
Highway US 281 ETC
From ARCHER COUNTY LINE
To LYNN CREEK
CSJ 0249-05-028
Proj ID STP 2015(853)HES
Work Type PROFILE PAVEMENT MARKERS
 
57.557 428016.01 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 107
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TRP CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0249-05-028
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153020
Totals 428016.01 0.00 0.00 0.0

CountyPALO PINTO
Highway US 281
From AT BRAZOS RIVER
To .
CSJ 0250-02-039
Proj ID BR 1402(032)
Work Type GR, BS, HMAC, DR, STR, BR, SIGN, PVT MK
 
1.082 5829658.60 0.00 211539.84 3.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-02-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 273
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ELLIS-MCGINNIS CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0250-02-039
PREMIER PAVING, LTD. ( 10.91%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.17%)
MCL CONTRACTING, LLC (0.58%)
SCOTT DERR PAINTING CO (0.30%)
PRIMATE CONSTRUCTION, INC. (0.16%)
DUSTROL, INC.(0.15%)
TEXAS SHAFTS, INC. (5.84%)
STRIPING TECHNOLOGY, L.P.(0.55%)
FORTSON CONTRACTING, INC.(1.31%)
STORM WATER MANAGEMENT, INC. (0.80%)
SAN-ANN-CO., INC.(0.48%)
JAY MILLS CONTRACTING, INCORPORATED( 12.64%)
Contract # 08143236
Totals 5829658.60 0.00 211539.84 3.6

CountyERATH
Highway US 281
From FM 8
To BU 377J
CSJ 0250-03-044
Proj ID STP 2015(657)
Work Type BS REPAIR AND HMAC OVERLAY
 
3.081 1119943.56 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 20
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
PEACHTREE CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0250-03-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03153214
Totals 1119943.56 0.00 0.00 0.0

CountyERATH
Highway US 281 ETC
From PALO PINTO COUNTY LINE
To FM 8
CSJ 0250-03-045
Proj ID STP 2015(658)HES
Work Type PROFILE PAVEMENT MARKERS
 
118.513 587762.65 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-09-15
Work Began 00-00-00
Work Completed  
Time Computed 05-10-15
Contract Working Days 32
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0250-03-045
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03153012
Totals 587762.65 0.00 0.00 0.0

CountyERATH
Highway SH 6
From COMANCHE COUNTY LINE
To WEST CITY LIMITS DUBLIN
CSJ 0257-06-026
Proj ID STP 2014(549)
Work Type BS REPAIR, MILL AND OVERLAY
 
4.680 1433849.50 0.00 1306899.46 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-13-14
Work Began 08-25-14
Work Completed 10-30-14
Time Computed 05-29-14
Contract Working Days 34
Addl Days Granted 0
Working Days Charged 24
Percent Time Used 70
Contractor(s)
BICK'S CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0257-06-026
JAY MILLS CONTRACTING, INCORPORATED(3.53%)
DUSTROL, INC.(3.45%)
D. I. J. CONSTRUCTION, INC.(2.02%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.45%)
Contract # 04143221
Totals 1433849.50 0.00 1306899.46 100.0

CountyJOHNSON
Highway US 67
From WEST OF FM 2331
To SOMERVELL COUNTY LINE
CSJ 0259-04-039
Proj ID NH 2014(440)
Work Type HOTMIX OVERLAY
 
7.289 3149398.90 0.00 3155390.26 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-19-14
Work Began 05-05-14
Work Completed 10-24-14
Time Computed 03-07-14
Contract Working Days 64
Addl Days Granted 0
Working Days Charged 106
Percent Time Used 165
Contractor(s)
PEACHTREE CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0259-04-039
DUSTROL, INC.(2.20%)
CROSSROADS, L.P. (0.16%)
VANN/ELLI, INC.(1.95%)
TRP CONSTRUCTION GROUP, LLC(1.28%)
Contract # 01143026
Totals 3149398.90 0.00 3155390.26 100.0

CountyJOHNSON
Highway US 67
From SPUR 102
To WEST OF CHAMBER CREEK
CSJ 0259-05-070
Proj ID NH 2014(045)
Work Type HMAC OVERLAY
 
5.389 2820910.61 0.00 2876383.58 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-15-13
Work Began 03-24-14
Work Completed 10-02-14
Time Computed 10-31-13
Contract Working Days 86
Addl Days Granted 0
Working Days Charged 96
Percent Time Used 111
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0259-05-070
ALTUS TRAFFIC MANAGEMENT LLC (0.27%)
STRIPING TECHNOLOGY, L.P.(3.80%)
VANN/ELLI, INC.( 10.34%)
DUSTROL, INC.(0.38%)
Contract # 09133224
Totals 2820910.61 0.00 2876383.58 100.0

CountyJOHNSON
Highway US 67
From PPROX. SH 174
To 0.72 MI WEST OF SPUR 102
CSJ 0259-06-001
Proj ID NH 2013(835)
Work Type GRADING, STRUCTURES, BASE, & SURF
 
3.860 28488425.86 246987.64 10266607.77 36.0
Work Order 12-17-13
Work Began 04-30-14
Work Completed  
Time Computed 04-17-14
Contract Working Days 606
Addl Days Granted 0
Working Days Charged 243
Percent Time Used 40
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0259-06-001
COWTOWN TRAFFIC CONTROL, INC.(0.10%)
A.M.S. COMPANY, INC. ( 23.62%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.51%)
RUSSO CORPORATION(1.73%)
AR DANIEL CONSTRUCTION SERVICES, INC.(0.69%)
W.O.E. CONSTRUCTION(0.21%)
BANDA TRUCKING COMPANY (0.66%)
DUSTIN ALLEN, INC. (1.00%)
INDUS CONSTRUCTION, L.P. (0.89%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.78%)
TEX OP CONSTRUCTION, LP(0.11%)
HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, INC (1.53%)
PREMIER PAVING, LTD. (8.34%)
PEAK COMMUNICATIONS LLC(0.05%)
DOUBLE S CONSTRUCTION(0.05%)
A+ GRANITE AND STONE DCOR (0.05%)
Contract # 09133004
Totals 28488425.86 246987.64 10266607.77 36.0

CountyJOHNSON
Highway US 67
From EAST OF CHAMBER CREEK
To ELLIS COUNTY LINE
CSJ 0260-01-053
Proj ID NH 2013(670)
Work Type HMAC OVERLAY
 
9.348 4238722.21 0.00 4234137.91 99.9
Work Order 07-24-13
Work Began 10-23-13
Work Completed  
Time Computed 08-09-13
Contract Working Days 128
Addl Days Granted 15
Working Days Charged 156
Percent Time Used 109
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0260-01-053
VANN/ELLI, INC.(1.39%)
DUSTROL, INC.(0.69%)
INDEPENDENT UTILITY CONSTRUCTION INCORPORATED(1.00%)
STRIPING TECHNOLOGY, L.P.(4.47%)
ALTUS TRAFFIC MANAGEMENT LLC (0.30%)
Contract # 05133224
Totals 4238722.21 0.00 4234137.91 99.9

CountyWISE
Highway FM 730 ETC
From HALE ST
To SH 114
CSJ 0312-04-032
Proj ID STP 2014(069)
Work Type SEAL COAT
 
191.308 6971231.21 0.00 8274723.22 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-03-14
Work Began 08-07-14
Work Completed 12-01-14
Time Computed 06-09-14
Contract Working Days 52
Addl Days Granted 11
Working Days Charged 89
Percent Time Used 141
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0312-04-032
STRIPING TECHNOLOGY, L.P.(4.39%)
FLASHER EQUIPMENT COMPANY(1.76%)
BRYDL CONTRACTING, INC.(0.72%)
Contract # 10133005
Totals 6971231.21 0.00 8274723.22 100.0

CountyWISE
Highway FM 51
From SH 114
To PARKER COUNTY LINE
CSJ 0313-01-051
Proj ID STP 2013(671)
Work Type HMAC OVERLAY
 
6.936 1118566.90 0.00 1169313.10 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-19-13
Work Began 09-16-13
Work Completed 01-06-15
Time Computed 09-04-13
Contract Working Days 42
Addl Days Granted 2
Working Days Charged 44
Percent Time Used 100
Contractor(s)
THE LANE CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0313-01-051
CROSSROADS, L.P. (0.46%)
TRP CONSTRUCTION GROUP, LLC(3.75%)
EAGLE AGGREGATE TRANSPORTATION, LLC. (3.84%)
SOUTHEAST GRINDING & GROOVING, LLC (1.08%)
Contract # 05133239
Totals 1118566.90 0.00 1169313.10 100.0