Monthly State Let Construction Report For Fort Worth District As Of Jul 13, 2015 Page 3 Of 7

Last Update: Monday, July 13, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyJOHNSON
Highway US 67
From PPROX. SH 174
To 0.72 MI WEST OF SPUR 102
CSJ 0259-06-001
Proj ID NH 2013(835)
Work Type GRADING, STRUCTURES, BASE, & SURF
 
3.860 28488425.86 730343.77 11507548.53 40.3
Work Order 12-17-13
Work Began 04-30-14
Work Completed  
Time Computed 04-17-14
Contract Working Days 606
Addl Days Granted 0
Working Days Charged 308
Percent Time Used 50
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0259-06-001
COWTOWN TRAFFIC CONTROL, INC.(0.10%)
A.M.S. COMPANY, INC. ( 23.62%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.51%)
RUSSO CORPORATION(1.73%)
AR DANIEL CONSTRUCTION SERVICES, INC.(0.69%)
W.O.E. CONSTRUCTION(0.21%)
BANDA TRUCKING COMPANY (0.66%)
DUSTIN ALLEN, INC. (1.00%)
INDUS CONSTRUCTION, L.P. (0.89%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.78%)
TEX OP CONSTRUCTION, LP(0.11%)
HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, INC (1.53%)
PREMIER PAVING, LTD. (8.34%)
PEAK COMMUNICATIONS LLC(0.05%)
DOUBLE S CONSTRUCTION(0.05%)
A+ GRANITE AND STONE DCOR (0.05%)
Contract # 09133004
Totals 28488425.86 730343.77 11507548.53 40.3

CountyJOHNSON
Highway US 67
From EAST OF CHAMBER CREEK
To ELLIS COUNTY LINE
CSJ 0260-01-053
Proj ID NH 2013(670)
Work Type HMAC OVERLAY
 
9.348 4238722.21 0.00 4271907.97 99.9
Work Order 07-24-13
Work Began 10-23-13
Work Completed  
Time Computed 08-09-13
Contract Working Days 128
Addl Days Granted 15
Working Days Charged 156
Percent Time Used 109
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0260-01-053
VANN/ELLI, INC.(1.39%)
DUSTROL, INC.(0.69%)
INDEPENDENT UTILITY CONSTRUCTION INCORPORATED(1.00%)
STRIPING TECHNOLOGY, L.P.(4.47%)
ALTUS TRAFFIC MANAGEMENT LLC (0.30%)
Contract # 05133224
Totals 4238722.21 0.00 4271907.97 99.9

CountyWISE
Highway FM 730 ETC
From HALE ST
To SH 114
CSJ 0312-04-032
Proj ID STP 2014(069)
Work Type SEAL COAT
 
191.308 6971231.21 0.00 8274723.22 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-03-14
Work Began 08-07-14
Work Completed 12-01-14
Time Computed 06-09-14
Contract Working Days 52
Addl Days Granted 11
Working Days Charged 89
Percent Time Used 141
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0312-04-032
STRIPING TECHNOLOGY, L.P.(4.39%)
FLASHER EQUIPMENT COMPANY(1.76%)
BRYDL CONTRACTING, INC.(0.72%)
Contract # 10133005
Totals 6971231.21 0.00 8274723.22 100.0

CountyWISE
Highway FM 51
From SH 114
To PARKER COUNTY LINE
CSJ 0313-01-051
Proj ID STP 2013(671)
Work Type HMAC OVERLAY
 
6.936 1118566.90 0.00 1169313.10 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-19-13
Work Began 09-16-13
Work Completed 01-06-15
Time Computed 09-04-13
Contract Working Days 42
Addl Days Granted 2
Working Days Charged 44
Percent Time Used 100
Contractor(s)
THE LANE CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0313-01-051
CROSSROADS, L.P. (0.46%)
TRP CONSTRUCTION GROUP, LLC(3.75%)
EAGLE AGGREGATE TRANSPORTATION, LLC. (3.84%)
SOUTHEAST GRINDING & GROOVING, LLC (1.08%)
Contract # 05133239
Totals 1118566.90 0.00 1169313.10 100.0

CountyPARKER
Highway FM 51
From WISE COUNTY LINE
To SH 199
CSJ 0313-02-055
Proj ID STP 1402(033)
Work Type PLANING, HMAC, AND PAV MARKS
 
2.449 1041758.76 0.00 1034805.20 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-11-14
Work Began 10-15-14
Work Completed 01-28-15
Time Computed 09-27-14
Contract Working Days 35
Addl Days Granted 0
Working Days Charged 26
Percent Time Used 74
Contractor(s)
BICK'S CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0313-02-055
VANN/ELLI, INC.( 14.07%)
TOTAL HIGHWAY MAINTENANCE, LLC (2.77%)
INDEPENDENT UTILITY CONSTRUCTION INCORPORATED(0.62%)
DUSTROL, INC.(5.90%)
Contract # 08143022
Totals 1041758.76 0.00 1034805.20 100.0

CountyPARKER
Highway IH 20
From PATRICK CREEK
To SP 312
CSJ 0314-01-076
Proj ID IM 0204(283)
Work Type MILL AND OVERLAY
 
0.266 336985.59 0.00 489655.06 100.0
CountyPARKER
Highway IH 20
From SP 312
To RIC WILLIAMSON MEMORIAL HIGHWAY
CSJ 0314-07-044
Proj ID IM 0204(283)
Work Type RESURFACE ROADWAY
 
2.947 1748885.30 0.00 1728759.94 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-25-14
Work Began 09-30-14
Work Completed 02-06-15
Time Computed 05-11-14
Contract Working Days 53
Addl Days Granted 0
Working Days Charged 53
Percent Time Used 100
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0314-01-076
O. TREVINO CONSTRUCTION, LLC (8.99%)
DUSTROL, INC.(2.66%)
TRP CONSTRUCTION GROUP, LLC(2.04%)
COWBELL TRAFFIC SERVICES, INC. (0.50%)
VANN/ELLI, INC.( 22.16%)
ALTUS TRAFFIC MANAGEMENT LLC (0.25%)
Contract # 03143024
Totals 2085870.89 0.00 2218415.00 100.0

CountyPARKER
Highway IH 20
From IH20 WB FR AT PATRICK CREEK
To .
CSJ 0314-01-077
Proj ID BR 2015(563)
Work Type GR, DR, STRUC, AND PAVEMENT
 
0.100 1309705.35 0.00 16900.00 1.2
Work Order 03-23-15
Work Began 00-00-00
Work Completed  
Time Computed 04-08-15
Contract Working Days 148
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
IEA INC.
SUBCONTRACTOR(S) FOR CCSJ: 0314-01-077
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02153218
Totals 1309705.35 0.00 16900.00 1.2

CountyPARKER
Highway IH 20 ETC
From PALO PINTO COUNTY LINE
To OLD DENNIS ROAD
CSJ 0314-01-081
Proj ID NH 2015(266)
Work Type SEAL COAT
 
152.838 8460305.70 4866125.73 6962749.25 82.2
Work Order 11-17-14
Work Began 06-03-15
Work Completed  
Time Computed 06-01-15
Contract Working Days 88
Addl Days Granted 0
Working Days Charged 14
Percent Time Used 15
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0314-01-081
FLASHER EQUIPMENT COMPANY(0.98%)
TOTAL HIGHWAY MAINTENANCE, LLC ( 13.04%)
Contract # 10143216
Totals 8460305.70 4866125.73 6962749.25 82.2

CountyWISE
Highway SH 114
From LP 373
To FM 51
CSJ 0352-01-060
Proj ID STP 2015(675)
Work Type HMAC OVERLAY
 
10.188 2625651.06 0.00 0.00 0.0
Work Order 04-10-15
Work Began 00-00-00
Work Completed  
Time Computed 05-11-15
Contract Working Days 85
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0352-01-060
ALTUS TRAFFIC MANAGEMENT LLC (0.31%)
Contract # 03153030
Totals 2625651.06 0.00 0.00 0.0

CountyTARRANT
Highway SH 114
From DOVE
To KIMBALL
CSJ 0353-03-090
Proj ID NH 2012(065)
Work Type LANDSCAPING
 
1.888 204430.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-11-13
Work Began 00-00-00
Work Completed  
Time Computed 09-01-13
Contract Working Days 80
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DENALI CONSTRUCTION SERVICES, LLC (INACTIVE)
SUBCONTRACTOR(S) FOR CCSJ: 0353-03-090
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12123013
Totals 204430.00 0.00 0.00 0.0

CountyTARRANT
Highway SH 114
From AT N CARROLL AVENUE
To IN SOUTHLAKE
CSJ 0353-03-091
Proj ID CM 2013(672)
Work Type GR, BS, STRUCT AND PAVEMENT
 
0.129 1663794.25 0.00 1737133.51 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-30-13
Work Began 01-24-14
Work Completed  
Time Computed 10-16-13
Contract Working Days 123
Addl Days Granted 0
Working Days Charged 123
Percent Time Used 100
Contractor(s)
MCMAHON CONTRACTING, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0353-03-091
MICA CORPORATION (0.84%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(2.78%)
TEXAS SHAFTS, INC. (1.79%)
S & S BRIDGE PAINTING, INC.(6.40%)
FARR FOUNDATION, INC.(3.02%)
GJ SEEDING, LLC(1.10%)
FORTSON CONTRACTING, INC.(1.49%)
BTA SERVICES, LTD. (0.19%)
BUYERS BARRICADES, INC.(2.64%)
LONE STAR HIGHWAY PRODUCTS, INC. (3.40%)
Contract # 07133033
Totals 1663794.25 0.00 1737133.51 99.9

CountyTARRANT
Highway SH 114
From DOVE ROAD
To KIMBALL AVE
CSJ 0353-03-095
Proj ID NH 2012(065)
Work Type LANDSCAPING
 
2.537 410000.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 85
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AALC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0353-03-095
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07153265
Totals 410000.00 0.00 0.00 0.0

CountyPALO PINTO
Highway SH 16
From SH-337
To SH-254
CSJ 0362-04-040
Proj ID STP 2014(937)
Work Type PAVEMENT REPAIR AND SEAL COAT
 
6.717 4193583.00 177367.46 1380573.30 32.9
Work Order 10-29-14
Work Began 01-06-15
Work Completed  
Time Computed 11-14-14
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 24
Percent Time Used 26
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0362-04-040
ALTUS TRAFFIC MANAGEMENT LLC (0.24%)
WEST TEXAS RUMBLE STRIP(0.17%)
STRIPING TECHNOLOGY, L.P.(1.18%)
Contract # 06143248
Totals 4193583.00 177367.46 1380573.30 32.9

CountyTARRANT
Highway SH 26
From BRUMLOW ROAD (GRAPEVINE SECTION)
To 0.5 MILES SOUTH OF SH 114
CSJ 0363-01-111
Proj ID STP 2011(208)ES
Work Type RECONST GR, ACP, CONC PVMT, BRDGS
 
1.482 11897196.21 0.00 12019519.63 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-15-10
Work Began 04-27-11
Work Completed  
Time Computed 10-01-10
Contract Working Days 491
Addl Days Granted 108
Working Days Charged 599
Percent Time Used 100
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0363-01-111
DALLAS LITE AND BARRICADE INC. (0.43%)
FORTSON CONTRACTING, INC.(0.36%)
HIGHWAY TECHNOLOGIES, INC. (1.59%)
INLET STRUCTURE SPECIALTIES LTD. (2.87%)
NORTH TEXAS BOMANITE, INC. (2.08%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 16.56%)
W.O.E. CONSTRUCTION(4.98%)
BREDA COMPANY, INC.(0.80%)
LIRA ELECTRIC(2.39%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.75%)
THELIN RECYCLING COMPANY, L.P. (0.06%)
DUSTROL, INC. (ROANOKE)(2.35%)
METRO CUTTING AND SEALING, INC.(0.03%)
P & C INLETS, INC. (0.24%)
RAMBO CONTRACTING, INC.(0.24%)
PRESERVATION...A TREE SERVICE, INC.(0.00%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.59%)
BIG DOG DRILLING, LLC(0.08%)
NORTHEAST SERVICE, INC.(0.11%)
C.T. AND S. METALWORKS, INC. (0.32%)
JAGOE-PUBLIC COMPANY (0.31%)
SCOTT DERR PAINTING CO (0.13%)
BENCHMARK GARDENS, LLC (3.40%)
IRRI-TECH CORPORATION(0.78%)
ILLUMINATIONS BY GREENLEE(0.29%)
URBANOVSKY ADVANCED CONSTRUCTION, LLC(0.08%)
AQUA BORE(0.04%)
DOWAGER CONSTRUCTION, INC. (0.12%)
ARLINGTON PAVERS, INC. (0.06%)
Contract # 07103228
Totals 11897196.21 0.00 12019519.63 99.9

CountyTARRANT
Highway SH 26
From BRUMLOW/POOL
To JOHN MCCAIN
CSJ 0363-01-136
Proj ID STP 1102(295)MM
Work Type GRADING, BASE, DRAINAGE AND PAVEMENT
 
0.909 11469297.64 553563.06 11069818.12 96.5
Work Order 10-21-11
Work Began 07-16-12
Work Completed  
Time Computed 04-19-12
Contract Working Days 394
Addl Days Granted 397
Working Days Charged 797
Percent Time Used 100
Contractor(s)
AUI CONTRACTORS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0363-01-136
TOTAL HIGHWAY MAINTENANCE, LLC (1.18%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(8.28%)
DUSTIN ALLEN, INC. (0.20%)
THELIN RECYCLING COMPANY, L.P. (0.29%)
DUSTROL, INC.(0.87%)
DURABLE SPECIALTIES, INC.(3.99%)
TEXAS STAR SAWING & SEALING(0.02%)
LINDAMOOD DEMOLITION, INC. (0.75%)
USA SWPPP INSPECTIONS, INC.(0.60%)
J/M MATERIALS, INC.(0.37%)
TEXAS INLETS, INC. (1.87%)
NORTH TEXAS REBAR, LLC (0.00%)
HAYDEN CAPITAL CORPORATION (0.98%)
ATS DRILLING, INC. (2.63%)
FOUNDATION DRILLERS, INC.(0.08%)
HAYWARD BAKER, INC.(0.30%)
J.L. STEEL REINFORCING, LLC(0.12%)
MCL CONTRACTING, LLC (3.79%)
SCOTT DERR PAINTING CO, LLC(0.10%)
TEXAS BOMANITE (2.06%)
FORTSON CONTRACTING, INC.(0.13%)
MOBLEY-SPEEDY CEMENT CONTRACTORS, LLC(0.08%)
CONCRETE PAVER SYSTEMS, INC. (0.06%)
Contract # 08113208
Totals 11469297.64 553563.06 11069818.12 96.5

CountyTARRANT
Highway SH 121
From WESTERN OAKS DRIVE
To APPROX.1.2 MI N OF STONE MYERS PKWY
CSJ 0364-01-140
Proj ID CC 364-1-140
Work Type GR, BS, DR AND PAVEMENT
 
0.123 366150.05 32982.20 268508.78 83.3
Work Order 09-30-14
Work Began 12-02-14
Work Completed  
Time Computed 10-16-14
Contract Working Days 76
Addl Days Granted 0
Working Days Charged 138
Percent Time Used 181
Contractor(s)
3I CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0364-01-140
OMEGA CONSTRUCTION GROUP, LLC( 55.29%)
TEXOP CONSTRUCTION (4.49%)
Contract # 08143046
Totals 366150.05 32982.20 268508.78 83.3

CountyTARRANT
Highway SH 26
From GAYLORD TRAIL DRIVE
To GRAPEVINE MILLS BOULEVARD SOUTH
CSJ 0364-06-011
Proj ID STP 2011(227)TE
Work Type CROSSWALKS, ADA RAMPS & IMPROVEMENTS
 
1.360 1240195.30 92261.20 321635.46 31.6
CountyTARRANT
Highway VA
From GAYLORD TEXAN; IN GRAPEVINE
To NORTH OF GRAPEVINE MILLS MALL
CSJ 0902-48-663
Proj ID HP 2013(083)
Work Type GR, DR, STRUCTURE AND PAVEMENT
 
1.000 308901.54 266.00 8649.48 2.8
Work Order 01-17-14
Work Began 05-20-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 179
Addl Days Granted 0
Working Days Charged 270
Percent Time Used 150
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0364-06-011
PORTER INTERNATIONAL CONSTRUCTION LLC(0.00%)
COWTOWN REDI MIX, INC. (0.00%)
ED BELL CONSTRUCTION COMPANY (0.00%)
GLS MASONRY, INC.(0.00%)
MELS ELECTRIC, L.P.(0.00%)
Contract # 08133257
Totals 1549096.84 92527.20 330284.94 25.9

CountyTARRANT
Highway SH 121
From SOUTH OF ARBORLAWN DRIVE
To SOUTH OF OVERTON RIDGE BLVD
CSJ 0504-02-022
Proj ID STP 2009(485)ES
Work Type GR, DR, STRUCTURES AND PAVEMENT
 
0.100 116646468.88 73347.55 112154100.32 97.6
Work Order 02-01-10
Work Began 03-15-10
Work Completed  
Time Computed 02-17-10
Contract Working Days 896
Addl Days Granted 0
Working Days Charged 1,537
Percent Time Used 171
Contractor(s)
W.W. WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0504-02-022
COWTOWN TRAFFIC CONTROL, INC.(0.08%)
S & S BRIDGE PAINTING, INC.(0.04%)
INTERSTATE FOUNDATION, LLC (3.14%)
W.O.E. CONSTRUCTION(1.75%)
MARIO SINACOLA & SONS EXCAVATING, INC. ( 23.31%)
ODUM SERVICES, L.P.(0.67%)
ARLINGTON PAVERS, INC. (0.06%)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.(2.64%)
MICA CORPORATION (0.34%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(2.98%)
STRIPE-A-ZONE, INC.(0.23%)
MUSTANG TURF & LANDSCAPE, LLC(0.60%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.00%)
CRAIG OLDEN, INC.(5.50%)
RAMBO CONTRACTING, INC.(1.18%)
NORTH TEXAS CONTRACTING, INC.(5.20%)
INDUS CONSTRUCTION, L.P. (5.32%)
JONA CONTRACTING, INC. (0.00%)
SOUTHWEST CONSTRUCTION SERVICES(0.04%)
RMI WORLDWIDE, LLC (0.11%)
GUIDO'S TRUCKS (1.28%)
A R DANIEL CONSTRUCTION SERVICES, INC. (0.21%)
STOMPER DEMOLITION COMPANY, INC. (0.00%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.02%)
SCOTT DERR PAINTING CO, LLC(0.14%)
BRENDA PRICE TRUCKING(0.08%)
GUIDO CONSTRUCTION, INC. DBA GUIDO"S TRUCKS(0.08%)
SHEA SERVICES, INC (0.46%)
TEXAS CONSTRUCTION SUPPLY, INC.(1.01%)
NORTH TEXAS TRUCKING, INC. (0.17%)
WEBBER BARRIER SERVICES, INC.(0.43%)
BIG DOG DRILLING, LLC(0.01%)
TX DOWN UNDER CONSTRUCTION LLC (0.02%)
FOUNDATION DRILLERS, INC.(0.04%)
RIVER CITIES SAWING, LLC (0.10%)
FORTSON CONTRACTING, INC.(0.00%)
RELIABLE TRUCKING(0.04%)
TEXAS MANHOLES COMPANY, INC. (0.00%)
KD SERVICES(0.38%)
GAMCOR, INC. (0.07%)
EROSION PREVENTION PRODUCTS(0.00%)
J.A. MANNING CONSTRUCTION CO., INC.(1.24%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.01%)
Contract # 11093001
Totals 116646468.88 73347.55 112154100.32 97.6

CountyJOHNSON
Highway SH 174
From AT FM 916 WB & EB INTER
To IN RIO VISTA
CSJ 0519-01-023
Proj ID STP 2013(673)
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.100 315236.00 0.00 306482.42 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-05-13
Work Began 06-02-14
Work Completed 01-05-15
Time Computed 06-02-14
Contract Working Days 64
Addl Days Granted 16
Working Days Charged 122
Percent Time Used 152
Contractor(s)
SIEMENS INDUSTRY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0519-01-023
AAA DRILLING FOUNDATION CO., INC.(3.96%)
BUYERS BARRICADES, INC.(0.52%)
GJ SEEDING, LLC(2.31%)
ROAD MASTER STRIPING LLC (0.94%)
DOWN UNDER CONSTRUCTION(1.75%)
SOUTH TEXAS ILLUMINATION, LLC( 42.08%)
BICK"S CONSTRUCTION, INC.( 14.88%)
HAROS BROS. CO.(3.96%)
Contract # 05133022
Totals 315236.00 0.00 306482.42 100.0

CountyJOHNSON
Highway SH 174
From HILL COUNTY LINE
To FOX RUN
CSJ 0519-01-028
Proj ID STP 2015(676)
Work Type OVERLAY
 
5.252 2642926.14 679.00 679.00 0.0
Work Order 05-13-15
Work Began 00-00-00
Work Completed  
Time Computed 06-13-15
Contract Working Days 107
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0519-01-028
ODUM SERVICES, L.P.(1.34%)
J & M CONTRACTING, COMPANY (3.22%)
STRIPE-A-ZONE, INC.(2.11%)
ALTUS TRAFFIC MANAGEMENT LLC (0.22%)
TEXOP CONSTRUCTION (4.58%)
Contract # 03153020
Totals 2642926.14 679.00 679.00 0.0

page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7