Letting Schedule for Houston District (FY 2002)
![]() |
![]() |
![]() |
![]() |
![]() |
Letting Schedule for Houston District (FY 2002) | ||||
Last Update: Thursday, September 5, 2002 | ||||
Updated from Design & Construction Information System (DCIS) on: August 30, 2002 |
Houston District (FY 2002) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0111-09-035 | BS 288B | Actual | DEC 2001 | $823,333 | 1 | ACP OVERLAY WITH PAVEMENT MARKINGS |
0192-02-047 | SH 6 | Actual | JAN 2002 | $9,634,058 | 11 | WIDEN TO 6 - LANE DIVIDED RURAL SECTION |
0598-02-037 | SH 288 | Actual | AUG 2002 | $1,775,801 | 1 | CONSTRUCTION OF ACCELERATION AND DECELERATION LANES AT |
0598-03-019 | SH 288 | Actual | DEC 2001 | $3,774,598 | 12 | GRADE SEPARATION |
0598-04-017 | SH 288 | Actual | NOV 2001 | $7,144,443 | 11 | GRADE SEPARATION OF MAIN LANES ON SH 288 OVER FM 2004 |
0598-04-019 | SH 288 | Actual | JUL 2002 | $4,399,049 | 12 | GRADE SEPARATION |
0847-03-030 | FM 521 | Actual | AUG 2002 | $2,577,736 | 1 | ACP OVERLAY, WIDEN SHOULDERS AND LENGTHEN STRUCTURES |
0912-31-128 | VA | Actual | JAN 2002 | $375,000 | 9 | HISTORIC RAILROAD DEPOT |
1003-01-082 | FM 523 | Actual | FEB 2002 | $2,007,326 | 1 | ACP OVERLAY, STRUCTURE AND PAVEMENT |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-12-107 | US 59 | Actual | NOV 2001 | $2,176,151 | 11 | CONSTRUCT FRONTAGE ROADS FOR ACCESS TO RIVER PARK |
0027-12-112 | US 59 | Actual | AUG 2002 | $2,234,665 | 1 | REALIGN SB MAINLANES |
0027-12-117 | US 59 | Actual | JUN 2002 | $979,283 | 1 | REHABILITATE PAVEMENT SHOULDERS, ACP OVERLAY, SIGNING AND |
0111-03-039 | FM 521 | Actual | OCT 2001 | $1,176,436 | 4 | RAISE ROADWAY ELEVATION |
0111-03-045 | FM 521 | Actual | APR 2002 | $38,738 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0187-05-046 | SP 10 | Actual | JUN 2002 | $16,589,355 | 4 | CONSTRUCT GRADE SEPARATION |
0188-02-033 | SH 36 | Actual | DEC 2001 | $7,325,697 | 1 | SPOT BASE REPAIR, SURFACE REPAIR, PLANING, ACP OVERLAY & |
0192-01-063 | SH 6 | Actual | FEB 2002 | $16,091,646 | 4 | WIDEN TO 6 - LANE DIVIDED RURAL SECTION |
0192-01-078 | SH 6 | Actual | MAR 2002 | $15,197,718 | 1 | WIDEN TO 6 - LANE DIVIDED RURAL SECTION |
0912-34-080 | CS | Actual | MAR 2002 | $7,234,105 | 7 | CONSTRUCT 4 LANE DIVIDED ROADWAY ON NEW LOCATION |
0912-34-086 | CS | Actual | OCT 2001 | $1,267,977 | 5 | CONSTRUCT PARK AND RIDE |
0912-34-101 | CS | Actual | AUG 2002 | $143,426 | 5 | SYNCHRONIZATION AND INTERCONNECTION OF TRAFFIC SIGNALS |
1685-06-025 | SH 6 | Actual | JUN 2002 | $1,653,820 | 1 | CONSTRUCT CROSS DRAINAGE STRUCTURE, STORM SEWER & CLEAN DITCH |
3510-04-018 | SH 99 | Actual | SEP 2001 | $216,900 | 1 | INSTALLATION OF A FULL - ACTUATED TRAFFIC SIGNAL WITH SAFETY |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0051-03-088 | SH 3 | Actual | AUG 2002 | $648,953 | 1 | CRACK SEAL AND BASE REPAIR |
0192-04-093 | SH 6 | Actual | AUG 2002 | $5,595,387 | 1 | FULL DEPTH REPAIR, BASE REPAIR, RAISE MBGF RAIL, |
0389-07-031 | SH 146 | Actual | SEP 2001 | $159,224 | 11 | REHABILITATE HIGH MAST |
0500-04-109 | IH 45 | Actual | AUG 2002 | $916,963 | 1 | FULL DEPTH CONCRETE REPAIR, SLOPE REPAIR AND REPAIR BRIDGE |
0912-73-066 | CR | Actual | JUL 2002 | $445,858 | 6 | REPLACE BRIDGE |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-13-171 | US 59 | Actual | AUG 2002 | $71,109,488 | 2 | RECONSTRUCT ROADWAY AND EXTEND HOV LANE |
0027-13-174 | US 59 | Actual | JUL 2002 | $988,975 | 7 | CONSTRUCT NORTHBOUND EXIT RAMP |
0027-13-176 | US 59 | Actual | NOV 2001 | $6,200 | 10 | LANDSCAPE DEVELOPMENT |
0027-13-177 | US 59 | Actual | APR 2002 | $60,160 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0027-13-178 | US 59 | Actual | APR 2002 | $60,160 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0028-01-086 | BU 90-U | Actual | AUG 2002 | $802,646 | 5 | INSTALL ATMS |
0028-01-089 | US 90 | Actual | JUN 2002 | $16,800 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0050-09-060 | US 290 | Actual | AUG 2002 | $1,189,856 | 1 | CRACK & SPALL REPAIR, CTB ALIGNMENT, FULL DEPTH CONCRETE |
0051-02-080 | SH 3 | Actual | AUG 2002 | $155,197 | 5 | INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM |
0177-11-138 | US 59 | Actual | JUN 2002 | $35,000 | 11 | FRENCHTOWN HISTORICAL MARKER AND LANDSCAPING |
0177-11-140 | US 59 | Actual | JUN 2002 | $5,000 | 10 | REPAIR COLLAPSED PUMPHOUSE BASKET TO ORIGINAL CONDITION |
0271-07-223 | IH 10 | Actual | OCT 2001 | $1,162,101 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0271-07-256 | IH 10 | Actual | JAN 2002 | $4,693,966 | 1 | FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT OVERLAY |
0271-07-259 | IH 10 | Actual | MAR 2002 | $97,119 | 11 | CONSTRUCT SECURITY BARRIER |
0271-07-267 | IH 10 | Actual | JUN 2002 | $70,276 | 10 | REMOVE BROKEN AND RELAID ASPHALT PAVEMENT ON TRANSITION TO |
0271-07-268 | IH 10 | Actual | JUN 2002 | $57,124 | 10 | RESTORE FILL AND REPLACE ERODED CONCRETE RIPRAP AROUND |
0271-07-269 | IH 10 | Actual | JUN 2002 | $17,048 | 10 | FILL IN EROSION UNDER CONCRETE RIPRAP AND REPAIR DAMAGED |
0271-16-113 | IH 610 | Actual | OCT 2001 | $5,753,388 | 1 | REPLACE BRIDGE RAIL |
0271-16-115 | IH 610 | Actual | JUL 2002 | $5,373,276 | 1 | GRIND EXIST PAVEMENT, ADD BONDED CONC OVERLAY, RECONSTR 5 |
0271-16-116 | IH 610 | Actual | DEC 2001 | $4,860,447 | 1 | GRIND EXIST PAVEMENT ADD BONDED CONC OVERLAY F.R.'S |
0271-16-117 | IH 610 | Actual | APR 2002 | $5,434,594 | 1 | GRIND EXIST PAVEMENT ADD BONDED CONCRETE O / L, RECONSTRUCT |
0271-17-126 | IH 610 | Actual | JUL 2002 | $80,946,695 | 1 | TSM, RECONSTRUCT 8 - LANE FREEWAY, TMS AND PROVISION FOR |
0271-17-132 | IH 610 | Actual | SEP 2001 | $1,046,245 | 10 | LANDSCAPING AND SIDEWALKS |
0271-17-140 | IH 610 | Actual | FEB 2002 | $869,884 | 1 | HIGH MAST LIGHTING |
0389-05-090 | SH 146 | Actual | APR 2002 | $165,440 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0389-05-093 | SH 146 | Actual | JUN 2002 | $562,907 | 1 | ACP REHABILITATION MEDIAN AND SHOULDER |
0389-12-084 | SH 146 | Actual | MAR 2002 | $465,000 | 11 | INSTALL ACOUSTIC MONITORING SYSTEM FOR CABLE STAYED BRIDGE |
0389-15-013 | BS 146D | Actual | SEP 2001 | $362,610 | 1 | JT SEP REP, MILL & ACP O / L, SURF TREATMENT OF ML CENT MED, |
0500-03-482 | IH 45 | Actual | DEC 2001 | $2,709,173 | 6 | WIDEN BRIDGE |
0500-03-501 | IH 45 | Actual | SEP 2001 | $202,677 | 11 | CONSTRUCT NOISE WALL |
0500-03-507 | IH 45 | Actual | SEP 2001 | $190,903 | 1 | REPAIR AND ENCAPSULATE SUPPORT COLUMNS AT STR. # 89 & 337 |
0500-03-509 | IH 45 | Actual | AUG 2002 | $1,447,813 | 1 | SHOULDER REPLACEMENT |
0508-01-306 | IH 10 | Actual | JUN 2002 | $13,685 | 10 | REMOVE BROKEN ASPHALT PAVEMENT ON SHOULDER AND RELAY WITH |
0508-07-021 | SP 330 | Actual | MAR 2002 | $23,293,364 | 12 | CONSTRUCT 6 MAIN LANES (PHASE 2) |
0598-01-067 | SH 288 | Actual | APR 2002 | $1,863,939 | 1 | FULL DEPTH CONCRETE REPAIR AND CRACK & JOINT SEAL MAINLANES |
0598-01-068 | SH 288 | Actual | JUN 2002 | $78,830 | 10 | FILL ERODED CONCRETE RIPRAP SLOPE AREAS AND REPLACE CONCRETE |
0720-03-110 | SH 249 | Actual | AUG 2002 | $27,268,003 | 12 | CONSTRUCT 3 DC'S (EB - NB, WB - NB, SB - EB) AND RELOCATE EXISTING |
0912-00-179 | VA | Actual | SEP 2001 | $1,861,192 | 11 | INSTALL OVERHEAD SIGNS W / HIGH INTENSITY SHEETING |
0912-00-219 | VA | Actual | OCT 2001 | $453,105 | 1 | FOR WORK CONSISTING OF TRAFFIC SIGNALS (NON - SITE SPECIFIC) |
0912-00-221 | VA | Actual | AUG 2002 | $749,412 | 1 | TRAFFIC SIGNALS (NON - SITE SPECIFIC) |
0912-00-222 | VA | Actual | OCT 2001 | $200,000 | 1 | UPGRADE SCHOOL ZONE FLASHERS (250 LOCATIONS) |
0912-00-225 | VA | Actual | MAY 2002 | $1,696,550 | 1 | REPLACE RAISED REFLECTIVE PAVEMENT MARKERS AND BUTTONS |
0912-00-226 | VA | Actual | MAY 2002 | $887,933 | 1 | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-00-230 | VA | Actual | MAY 2002 | $898,114 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-00-231 | VA | Actual | JUL 2002 | $555,962 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-00-232 | VA | Actual | JAN 2002 | $1,500,000 | 5 | 55 MPH SIGNAGE INSTALLATION (TXDOT & HCTRA) |
0912-00-234 | VA | Actual | JUN 2002 | $168,500 | 10 | PROVIDE TRAFFIC CONTROL AND DEBRIS REMOVAL |
0912-00-235 | VA | Actual | JUN 2002 | $27,288 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-00-236 | VA | Actual | JUN 2002 | $13,311 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-00-239 | VA | Actual | JUL 2002 | $2,247,000 | 7 | FY 2003 CAPITAL UPGRADE (FUNDING FOR PURCHASE OF SOFTWARE / |
0912-71-549 | VA | Actual | NOV 2001 | $1,688,000 | 9 | SAN JACINTO MONUNENT RESTORATION PHASE 2 |
0912-71-650 | VA | Actual | MAY 2002 | $1,599,372 | 9 | ACCESS ON - STREET BIKEWAY NETWORK - PHASE 2 |
0912-71-652 | CR | Actual | NOV 2001 | $407,867 | 10 | REMOVE DEBRIS, EROSION REPAIR, REBUILD ROADWAY AND RAISE |
0912-71-765 | VA | Actual | JUL 2002 | $295,175 | 1 | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-71-771 | VA | Actual | JUL 2002 | $707,628 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-71-772 | VA | Actual | JUL 2002 | $1,019,955 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-71-774 | CS | Actual | JAN 2002 | $240,000 | 8 | RR SIGNAL AND WARNIFN DEVICES |
0912-71-775 | CS | Actual | JAN 2002 | $240,000 | 8 | SIGNAL AND WAINING DEVICES |
0912-71-776 | CS | Actual | JAN 2002 | $170,000 | 8 | RR SIGNALS AND WARNING DEVICES |
0912-71-777 | CS | Actual | JAN 2002 | $240,000 | 8 | RR SIGNAL AND WARNING DEVICES |
0912-71-778 | CS | Actual | JAN 2002 | $240,000 | 8 | RR SIGNAL AND WARNING DEVICES |
0912-71-779 | CR | Actual | JUN 2002 | $65,000 | 10 | REMOVE DEBRIS, REPLACE WASHED OUT ASPHALT PAVED ROADWAY, |
0912-71-780 | VA | Actual | JUN 2002 | $6,264 | 10 | REPLACE ASPHALT PAVEMENT |
0912-71-784 | VA | Actual | JUN 2002 | $20,612 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-71-785 | VA | Actual | JUN 2002 | $33,600 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-71-786 | VA | Actual | JUN 2002 | $16,800 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-71-787 | VA | Actual | JUN 2002 | $58,544 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-71-788 | VA | Actual | JUN 2002 | $11,200 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-71-813 | VA | Actual | JUN 2002 | $317,117 | 10 | REPAIR TRAFFIC SIGNAL CONTROLLERS AND ELECTRONIC COMPONENTS |
0912-71-815 | VA | Actual | JUN 2002 | $31,096 | 10 | REPAIR CONCRETE RIPRAP ON SLOPES |
0912-71-816 | VA | Actual | AUG 2002 | $1,486,812 | 5 | FY 2002: TROLLEY / ACTIVITY CENTER SHUTTLES |
0912-71-817 | VA | Actual | AUG 2002 | $3,957,533 | 5 | FY 2002: ADDITION OF 8 NEW SERVICE ROUTES (OP ASSISTANCE - YR1) |
0912-71-818 | VA | Actual | AUG 2002 | $551,516 | 5 | FY 2002: 2ND YR FUNDING FOR OP ASSIST. OF THE 11 SERVICE |
0981-01-098 | NASA 1 | Actual | MAY 2002 | $200,000 | 10 | LANDSCAPE DEVELOPMENT |
1258-04-051 | FM 1093 | Actual | JAN 2002 | $3,075,575 | 1 | PLANING, FULL DEPTH CONCRETE REPAIR, ACP O / L, PAVE MARKS AND |
1685-02-035 | FM 1960 | Actual | MAR 2002 | $22,885,623 | 2 | WIDEN TO 6 - LANE DIVIDED, FLUSH MEDIAN, SHOULDERS AND OPEN |
1743-01-007 | FM 1876 | Actual | SEP 2001 | $785,917 | 1 | REPAIR EXISTING FLEX PAV STRCT, FULL DEPTH CONCRETE REPAIR, |
2941-02-039 | FM 2920 | Actual | AUG 2002 | $899,246 | 5 | INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM |
3256-01-080 | BW 8 | Actual | MAY 2002 | $60,000 | 10 | LANDSCAPE DEVELOPMENT |
3256-02-062 | BW 8 | Actual | SEP 2001 | $900,864 | 11 | INSTALL CONTINUOUS LIGHTING |
3256-02-065 | BW 8 | Actual | MAY 2002 | $1,669,661 | 1 | THIN BONDED CONCRETE OVERLAY AND PAVEMENT MARKINGS |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0110-03-048 | SH 75 | Actual | MAY 2002 | $1,945,392 | 1 | PLANE, O.C.S.T., AND ACP OVERLAY |
0110-04-156 | IH 45 | Actual | JUN 2002 | $2,044,286 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0110-04-172 | IH 45 | Actual | MAR 2002 | $450,000 | 10 | LANDSCAPE DEVELOPMENT |
0110-04-173 | IH 45 | Actual | MAY 2002 | $8,000 | 10 | REPAIR WASHOUT AT SHOULDER AND RESET OVERTURNED CTB |
0110-04-174 | IH 45 | Actual | JUN 2002 | $16,800 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0177-14-021 | LP 494 | Actual | APR 2002 | $615,029 | 11 | ADD LEFT TURN LANES |
0338-03-085 | SH 105 | Actual | OCT 2001 | $134,170 | 1 | FOR WORK CONSISTING OF INSTALLATION OF A FULL - ACTUATED |
0675-08-087 | IH 45 | Actual | AUG 2002 | $1,516,232 | 8 | INSTALL MEDIAN BARRIER |
0912-37-114 | VA | Actual | SEP 2001 | $1,558,979 | 1 | RETROFIT BRIDGE RAIL, MILLING AND ACP OVERLAY |
0912-37-136 | CS | Actual | JAN 2002 | $160,000 | 8 | RR SIGNALS AND WARNING DEVICES |
0912-37-137 | VA | Actual | JUN 2002 | $25,843 | 10 | REP SHOULDER WASHOUTS, GUARDRAIL & ASPHALT PAVEMENT, REPAIR |
0912-37-139 | VA | Actual | JUN 2002 | $16,240 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-37-142 | CR | Actual | AUG 2002 | $2,280,000 | 9 | WOODLANDS TOWN CENTER PEDESTRIAN CORRIDOR SOUTH SIDE - |
0912-37-143 | CS | Actual | AUG 2002 | $250,000 | 5 | PRELIMINARY ENGINEERING & ENVIRONMENTAL ANALYSIS |
0912-37-144 | CS | Actual | AUG 2002 | $1,150,000 | 5 | CONSTRUCT RESEARCH FOREST P & R EXPANSION |
1416-03-010 | FM 1486 | Actual | JUN 2002 | $22,136 | 10 | RAILROAD GRADE CROSSING REPLANKING |
1986-01-048 | FM 1314 | Actual | JUL 2002 | $1,000 | 11 | ENVIRONMENTAL CLEARANCE AND INTERSECTION IMPROVEMENT PERMIT |
3538-01-025 | SH 242 | Actual | OCT 2001 | $181,116 | 1 | FOR WORK CONSISTING OF THE INSTALLATION OF AN EMER FIRE RUN |
3538-01-028 | SH 242 | Actual | MAR 2002 | $750,000 | 10 | LANDSCAPE DEVELOPMENT FOR MATERIALS ONLY |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0271-04-076 | IH 10 | Actual | AUG 2002 | $1,174,809 | 1 | PLANING, ACP REHAB AND OVERLAY AND PAVEMENT MARKINGS |
0271-09-014 | US 90 | Actual | AUG 2002 | $224,195 | 5 | INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM |
0409-03-009 | FM 1488 | Actual | AUG 2002 | $824,012 | 1 | BASE REPAIR, PLANING, SURF REHAB, ACP OVERLAY AND |
0523-01-023 | FM 1488 | Actual | JAN 2002 | $608,649 | 1 | BASE REPAIR, PLANING, ASPHALTIC CONCRET REMIX, OVERLAY AND |
0523-04-014 | FM 1488 | Actual | JAN 2002 | $2,447,478 | 1 | BASE REPAIR, PLANING, ASPHALTIC CONCRET REMIX, OVERLAY AND |
0543-01-056 | FM 359 | Actual | JUL 2002 | $3,978,137 | 1 | BASE REPAIR, PLANING, ASPHALTIC CONCRETE REHAB AND OVERLAY |
Top... Back... Letting Schedule Houston District Contractor Information Doing Business with TxDOT |