Letting Schedule for March, 2002 (FY 2002)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Thursday, September 5, 2002
 
Updated from Design & Construction Information System (DCIS) on: August 30, 2002
March, 2002 (FY 2002) (see Links)
SEP 2001 | OCT 2001 | NOV 2001 | DEC 2001 | JAN 2002 | FEB 2002 | MAR 2002 | APR 2002 | MAY 2002 | JUN 2002 | JUL 2002 | AUG 2002
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0319-04-069 Angelina/
Lufkin
SH 94 Actual $1,813,526 1 GRADING, CEMT TRT SUBGR, FLEX BASE, HMA AND SAFETY TREAT
0517-01-037 Atascosa/
San Antonio
SH 16 Actual $2,893,474 1 SEAL COAT & PAVEMENT MARKINGS
0114-05-035 Bastrop/
Austin
US 290 Actual $450,465 1 INCREASE SUPERELEVATION
0916-25-013 Bee/
Corpus Christi
CS Actual $874,769 11 CONSTRUCT TWO LANE CURB AND GUTTER SECTION WITH CONTINUOUS
0015-04-070 Bell/
Waco
IH 35 Actual $878,422 1 UPGRADE ILLUMINATION SYSTEM
0915-12-276 Bexar/
San Antonio
CS Actual $5,427,166 7 RECONS & WDN RDWY W / CTL: MARBACH - DEMYA & RECON REMDR W / SWDKS
0010-13-076 Bowie/
Atlanta
US 67 Actual $604,661 1 RESTORE PAVEMENT DAMAGED BY MOISTURE INFILTRATION
0255-04-079 Brooks/
Pharr
US 281 Actual $118,722 8 TEXTURIZING SHOULDERS (MILLED)
0914-22-036 Caldwell/
Austin
CR Actual $103,477 6 REPLACE BRIDGE & APPROACHES
0921-06-129 Cameron/
Pharr
CS Actual $546,164 11 CONSTRUCT FOUR LANE URBAN SECTION
0378-06-016 Cherokee/
Tyler
SH 135 Actual $682,308 6 REPLACE BRIDGE AND APPROACHES
0008-08-060 Dallas/
Dallas
SH 180 Actual $992,618 5 4 INTERSECTION IMPROVEMENTS
0918-00-059 Dallas/
Dallas
VA Actual $4,375,000 5 ALTERNATIVE FUELS
2374-01-125 Dallas/
Dallas
IH 635 Actual $342,347 7 CONSTRUCT AUXILIARY LANE
0925-10-020 Donley/
Childress
CR Actual $2,311,214 6 REPLACE BRIDGE AND APPROACHES
0007-03-078 Eastland/
Brownwood
IH 20 Actual $4,747,105 1 PLANING, UNDERSEAL, ACP, BASE REPAIR, AND STRIPING
0048-04-066 Ellis/
Dallas
US 77 Actual $607,617 6 REPLACE BRIDGE AND APPROACHES
0596-02-027 Ellis/
Dallas
FM 66 Actual $688,282 6 REPLACE BRIDGE AND APPROAHCES
0192-01-078 Fort Bend/
Houston
SH 6 Actual $15,197,718 1 WIDEN TO 6 - LANE DIVIDED RURAL SECTION
0912-34-080 Fort Bend/
Houston
CS Actual $7,234,105 7 CONSTRUCT 4 LANE DIVIDED ROADWAY ON NEW LOCATION
0271-07-259 Harris/
Houston
IH 10 Actual $97,119 11 CONSTRUCT SECURITY BARRIER
0389-12-084 Harris/
Houston
SH 146 Actual $465,000 11 INSTALL ACOUSTIC MONITORING SYSTEM FOR CABLE STAYED BRIDGE
0508-07-021 Harris/
Houston
SP 330 Actual $23,293,364 12 CONSTRUCT 6 MAIN LANES (PHASE 2)
1685-02-035 Harris/
Houston
FM 1960 Actual $22,885,623 2 WIDEN TO 6 - LANE DIVIDED, FLUSH MEDIAN, SHOULDERS AND OPEN
0016-02-096 Hays/
Austin
IH 35 Actual $198,515 1 CONVERT TO ONE WAY FRONTAGE ROADS
0864-01-047 Hidalgo/
Pharr
FM 494 Actual $1,448,026 11 WIDEN TO 4 LANE W / CONT LT TURN LN URBAN
0739-02-120 Jefferson/
Beaumont
IH 10 Actual $2,730,505 1 OVERLAY THE EXISTING ROADWAY WITH ASPHALT
0829-04-026 Kerr/
San Antonio
FM 1340 Actual $3,871,955 1 SEAL COAT & PAVEMENT MARKINGS
0389-01-035 Liberty/
Beaumont
SH 146 Actual $1,059,362 1 REHABILITATE EXISTING ROADWAY
0005-03-057 Midland/
Odessa
BI 20-E Actual $163,663 8 SAFETY TREAT DRAINAGE STRUCTURE, WIDEN STRUCTURE TO CLEAR
0110-04-172 Montgomery/
Houston
IH 45 Actual $450,000 10 LANDSCAPE DEVELOPMENT
3538-01-028 Montgomery/
Houston
SH 242 Actual $750,000 10 LANDSCAPE DEVELOPMENT FOR MATERIALS ONLY
0085-01-037 Morris/
Atlanta
US 259 Actual $1,231,356 1 RESTORE PAVEMENT DAMAGED BY MOISTURE INFILTRATION
0450-04-035 Nacogdoches/
Lufkin
SH 204 Actual $4,176,261 1 WIDENING, STRUCTURES, BASE, SURFACING, PAVEMENT MARKINGS AND
0140-03-039 Pecos/
Odessa
IH 10 Actual $964,422 1 PLANE, SURFACE, AND RESEAL MAINLANES
0364-01-118 Tarrant/
Fort Worth
SH 121 Actual $812,343 7 FREEWAY BOTTLENECK REMVAL; EXTEND EB THIRD LANE BEYOND EXIT
0902-00-084 Tarrant/
Fort Worth
VA Actual $784,846 1 INTERSTATE SIGNING
0902-48-315 Tarrant/
Fort Worth
CR Actual $2,140,809 6 REPLACE BRIDGE AND APPROACHES
3136-01-129 Travis/
Austin
LP 1 Actual $1,346,923 1 MILL, SEAL, OV, FULL DEPTH SPOT REPAIR
0931-04-024 Trinity/
Lufkin
FM 357 Actual $2,217,972 1 SAFETY TREAT FIXED OBJECTS & WIDEN LANES
3417-02-017 Williamson/
Austin
FM 734 Actual $1,279,905 1 MILL, OVERLAY & STRIPE
0902-20-049 Wise/
Fort Worth
CR Actual $610,857 6 REPLACE BRIDGE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...