Detail Letting Schedule for Bexar County (FY 2006)
Detail Letting Schedule for Bexar County (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
Bexar County (FY 2006) |
CCSJ: 0016-07-123 | |||
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(311) | CSJ: | 0016-07-123 |
Description: | INSTALLATION OF A TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | @ TOEPPERWEIN | Fund Cat: | 1 |
Limits To: | . | Estimate: | $140,699 |
Length: | 0.0 Miles | Actual: | $157,839 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | STP 2006(143) | CSJ: | 0025-09-071 |
Description: | TRAFFIC SIGNAL AT FIRESTONE AND OPERATIONAL IMPROVEMENTS | Handling Code: |
|
Limits From: | WOODLAKE PARKWAY | Fund Cat: | 1 |
Limits To: | FIRESTONE PARKWAY | Estimate: | $154,794 |
Length: | 0.7 Miles | Actual: | $180,236 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(344) | CSJ: | 0072-07-055 |
Description: | INSTALLATION OF TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | @ FM 3351 AND BOERNE STAGE RD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $367,552 |
Length: | 0.0 Miles | Actual: | $412,142 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | FM 725 | Let Status: | Actual |
Project ID: | STP 2006(142)SFT | CSJ: | 0215-09-023 |
Description: | INSTALL TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | @KLEIN | Fund Cat: | 8 |
Limits To: | . | Estimate: | $88,886 |
Length: | 0.0 Miles | Actual: | $100,012 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | FM 725 | Let Status: | Actual |
Project ID: | STP 2006(224) | CSJ: | 0215-09-024 |
Description: | REALIGN KLEIN ROAD APPROACHES TO FM 725 | Handling Code: |
|
Limits From: | @ KLEIN ROAD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $153,031 |
Length: | 0.0 Miles | Actual: | $192,903 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | SP 536 | Let Status: | Actual |
Project ID: | STP 2006(144) | CSJ: | 0253-06-033 |
Description: | INSTALL MIDBLOCK PED CROSSING W / OVERHEAD WARNING FLASHERS | Handling Code: |
|
Limits From: | 400 FT S OF MCDONALD AVENUE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $66,346 |
Length: | 0.0 Miles | Actual: | $70,305 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | BS 123B | Let Status: | Actual |
Project ID: | STP 2006(141)SFT | CSJ: | 0366-12-020 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | @ BS 123B & IH 10 FRONTAGE ROADS | Fund Cat: | 8 |
Limits To: | . | Estimate: | $114,685 |
Length: | 0.0 Miles | Actual: | $126,522 |
Back... |
Totals for 0016-07-123 | ||
---|---|---|---|
Length: | 0.7 Miles | ||
Estimate: | $1,085,993 | ||
Actual: | $1,239,959 | ||
CCSJ: 0016-08-027 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | LP 368 | Let Status: | Actual |
Project ID: | STP 2005(798)SFT | CSJ: | 0016-08-027 |
Description: | INSTALL RAISED MEDIAN & BRIDGE RAIL RETROFIT @ HARRY | Handling Code: |
NC |
Limits From: | EISENHAUER ROAD | Fund Cat: | 8 |
Limits To: | RITTIMAN ROAD | Estimate: | $370,735 |
Length: | 1.7 Miles | Actual: | $377,242 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | LP 368 | Let Status: | Actual |
Project ID: | CPM 16-8-28 | CSJ: | 0016-08-028 |
Description: | PLANE, SEAL COAT, OV & PAV MRK | Handling Code: |
NC |
Limits From: | N OF RITTIMAN RD (EAST) | Fund Cat: | 1 |
Limits To: | N OF WALZEM RD | Estimate: | $1,639,727 |
Length: | 3.3 Miles | Actual: | $1,581,354 |
Back... |
Totals for 0016-08-027 | ||
Length: | 5.0 Miles | ||
Estimate: | $2,010,462 | ||
Actual: | $1,958,596 | ||
CCSJ: 0016-08-029 | |||
District: | San Antonio | Let Date: | APR 2006 |
Highway: | LP 368 | Let Status: | Actual |
Project ID: | CPM 16-8-29 | CSJ: | 0016-08-029 |
Description: | BASE REPAIR, PLANE, SEAL COAT, OV & PAV MRK | Handling Code: |
|
Limits From: | CASA BLANCA | Fund Cat: | 1 |
Limits To: | RITTIMAN ROAD(EAST) | Estimate: | $2,579,182 |
Length: | 3.6 Miles | Actual: | $2,550,808 |
Back... |
Totals for 0016-08-029 | ||
Length: | 3.6 Miles | ||
Estimate: | $2,579,182 | ||
Actual: | $2,550,808 | ||
CCSJ: 0017-02-064 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-2-64 | CSJ: | 0017-02-064 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | 0.178 MI N OF IH 410 INTERSECTION | Fund Cat: | 1 |
Limits To: | 0.589 MI SOUTH OF MEDINA RIVER | Estimate: | $137,523 |
Length: | 2.9 Miles | Actual: | $196,777 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-3-55 | CSJ: | 0017-03-055 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | 0.589 MI SOUTH OF MEDINA RIVER | Fund Cat: | 1 |
Limits To: | BEXAR/ATASCOSA COUNTY LINE | Estimate: | $159,516 |
Length: | 8.8 Miles | Actual: | $150,712 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-4-33 | CSJ: | 0017-04-033 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | BEXAR/ATASCOSA COUNTY LINE | Fund Cat: | 1 |
Limits To: | ATASCOSA/MEDINA COUNTY LINE | Estimate: | $61,745 |
Length: | 2.5 Miles | Actual: | $56,858 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-5-84 | CSJ: | 0017-05-084 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | ATASCOSA/MEDINA COUNTY LINE | Fund Cat: | 1 |
Limits To: | MEDINA/FRIO COUNTY LINE | Estimate: | $171,253 |
Length: | 12.6 Miles | Actual: | $155,159 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-6-70 | CSJ: | 0017-06-070 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | MEDINA/FRIO COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.02 MI SOUTH OF FM 140 | Estimate: | $149,914 |
Length: | 17.0 Miles | Actual: | $142,726 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-7-82 | CSJ: | 0017-07-082 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | 0.02 MI SOUTH OF FM 140 | Fund Cat: | 1 |
Limits To: | FRIO/LA SALLE COUNTY LINE | Estimate: | $221,062 |
Length: | 18.8 Miles | Actual: | $203,901 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-9-84 | CSJ: | 0017-09-084 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | PRUITT STREET CENTER LINE | Fund Cat: | 1 |
Limits To: | 0.178 MI N OF IH 410 INTERSECTION | Estimate: | $307,157 |
Length: | 8.6 Miles | Actual: | $264,133 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-10-220 | CSJ: | 0017-10-220 |
Description: | SIGN REFURBISHMENT | Handling Code: |
NC |
Limits From: | W. COMMERCE ST. CENTER LINE | Fund Cat: | 1 |
Limits To: | PRUITT ST. CENTER LINE | Estimate: | $466,402 |
Length: | 2.1 Miles | Actual: | $391,076 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-121 | CSJ: | 0915-00-121 |
Description: | OVERHEAD SIGN BRIDGE REPAIR - VARIOUS LOCATIONS DISTRICTWIDE | Handling Code: |
NC |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $61,443 |
Length: | 0.0 Miles | Actual: | $89,301 |
Back... |
Totals for 0017-02-064 | ||
Length: | 73.3 Miles | ||
Estimate: | $1,736,015 | ||
Actual: | $1,650,643 | ||
CCSJ: 0017-02-067 | |||
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-2-67 | CSJ: | 0017-02-067 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | VON ORMY | Fund Cat: | 1 |
Limits To: | IH 410 | Estimate: | $681,545 |
Length: | 3.1 Miles | Actual: | $329,259 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-3-60 | CSJ: | 0017-03-060 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | BEXAR/ATASCOSA COUNTY LINE | Fund Cat: | 1 |
Limits To: | VON ORMY | Estimate: | $501,944 |
Length: | 8.5 Miles | Actual: | $415,767 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-5-89 | CSJ: | 0017-05-089 |
Description: | SEAL COAT & PAVEMENT MARKINGS (FRONTAGE ROAD) | Handling Code: |
|
Limits From: | ON FRONTAGE ROAD FROM FRIO C/L | Fund Cat: | 1 |
Limits To: | SH 132 | Estimate: | $139,707 |
Length: | 2.9 Miles | Actual: | $115,589 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-9-89 | CSJ: | 0017-09-089 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | IH 410 | Fund Cat: | 1 |
Limits To: | PALO ALTO ROAD | Estimate: | $250,082 |
Length: | 3.0 Miles | Actual: | $203,917 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 25-2-171 | CSJ: | 0025-02-171 |
Description: | SEAL COAT AND PAVEMENT MARKINGS (NORTH FRONTAGE RD) | Handling Code: |
|
Limits From: | ON WESTBOUND FR FROM CIBOLO CREEK | Fund Cat: | 1 |
Limits To: | IH 410 | Estimate: | $440,177 |
Length: | 13.0 Miles | Actual: | $348,266 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 72-5-80 | CSJ: | 0072-05-080 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | RANGER CREEK ROAD | Fund Cat: | 1 |
Limits To: | FM 289 | Estimate: | $111,457 |
Length: | 4.6 Miles | Actual: | $92,068 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 289 | Let Status: | Actual |
Project ID: | CPM 72-10-5 | CSJ: | 0072-10-005 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.04 MI W OF IH 10 | Fund Cat: | 1 |
Limits To: | 1.35 MI SE OF IH 10 | Estimate: | $264,454 |
Length: | 6.5 Miles | Actual: | $225,742 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | SH 39 | Let Status: | Actual |
Project ID: | CPM 193-2-37 | CSJ: | 0193-02-037 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 1.38 MI EAST OF RM 440 | Fund Cat: | 1 |
Limits To: | SH 27 | Estimate: | $393,541 |
Length: | 11.8 Miles | Actual: | $348,116 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | CPM 291-3-53 | CSJ: | 0291-03-053 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1273 | Fund Cat: | 1 |
Limits To: | BANDERA COUNTY LINE | Estimate: | $172,970 |
Length: | 6.3 Miles | Actual: | $152,154 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | CPM 291-8-21 | CSJ: | 0291-08-021 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BANDERA/MEDINA COUNTY LINE | Fund Cat: | 1 |
Limits To: | MEDINA/BEXAR COUNTY LINE | Estimate: | $213,519 |
Length: | 2.7 Miles | Actual: | $208,402 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | SH 127 | Let Status: | Actual |
Project ID: | CPM 369-1-31 | CSJ: | 0369-01-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | 0.3 MI NW OF FM 2690 | Estimate: | $124,680 |
Length: | 4.7 Miles | Actual: | $113,376 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | CPM 421-5-26 | CSJ: | 0421-05-026 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2771 | Fund Cat: | 1 |
Limits To: | BANDERA COUNTY LINE | Estimate: | $369,785 |
Length: | 7.2 Miles | Actual: | $299,002 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | CPM 521-5-133 | CSJ: | 0521-05-133 |
Description: | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | PEARSALL ROAD | Fund Cat: | 1 |
Limits To: | SOMERSET ROAD | Estimate: | $153,232 |
Length: | 3.0 Miles | Actual: | $128,219 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | PR 29 | Let Status: | Actual |
Project ID: | CPM 624-1-2 | CSJ: | 0624-01-002 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IN GARNER STATE PARK | Fund Cat: | 1 |
Limits To: | . | Estimate: | $384,404 |
Length: | 10.2 Miles | Actual: | $301,957 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 1023 | Let Status: | Actual |
Project ID: | CPM 678-3-13 | CSJ: | 0678-03-013 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.2 MI EAST OF FM 1574 | Fund Cat: | 1 |
Limits To: | FM 1049 | Estimate: | $180,224 |
Length: | 8.3 Miles | Actual: | $147,089 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | RM 783 | Let Status: | Actual |
Project ID: | CPM 1135-2-22 | CSJ: | 1135-02-022 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | GILLESPIE COUNTY LINE | Estimate: | $142,666 |
Length: | 3.3 Miles | Actual: | $126,714 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 1052 | Let Status: | Actual |
Project ID: | CPM 1167-1-9 | CSJ: | 1167-01-009 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | FM 1435 | Estimate: | $40,946 |
Length: | 0.7 Miles | Actual: | $146,773 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | RM 1051 | Let Status: | Actual |
Project ID: | CPM 1170-2-16 | CSJ: | 1170-02-016 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 4.8 MILES NORTH OF US 83 | Fund Cat: | 1 |
Limits To: | 11.1 MILES NORTH OF US 83 | Estimate: | $143,228 |
Length: | 6.3 Miles | Actual: | $120,619 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 1346 | Let Status: | Actual |
Project ID: | CPM 1437-1-34 | CSJ: | 1437-01-034 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ROSILLO CREEK | Fund Cat: | 1 |
Limits To: | FM 1516 | Estimate: | $93,206 |
Length: | 2.2 Miles | Actual: | $78,413 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 1516 | Let Status: | Actual |
Project ID: | CPM 1477-1-34 | CSJ: | 1477-01-034 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1346 | Fund Cat: | 1 |
Limits To: | US 87 | Estimate: | $82,045 |
Length: | 2.2 Miles | Actual: | $70,707 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 311 | Let Status: | Actual |
Project ID: | CPM 1541-1-13 | CSJ: | 1541-01-013 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | SH 46 | Estimate: | $289,606 |
Length: | 7.9 Miles | Actual: | $260,311 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | CPM 1547-1-41 | CSJ: | 1547-01-041 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2790 | Fund Cat: | 1 |
Limits To: | SH 132 | Estimate: | $408,334 |
Length: | 10.5 Miles | Actual: | $332,098 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 3447 | Let Status: | Actual |
Project ID: | CPM 2175-4-3 | CSJ: | 2175-04-003 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | FM 2369 | Estimate: | $31,036 |
Length: | 1.3 Miles | Actual: | $24,776 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 2537 | Let Status: | Actual |
Project ID: | CPM 2441-1-11 | CSJ: | 2441-01-011 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | PLEASANTON ROAD | Fund Cat: | 1 |
Limits To: | US 281 | Estimate: | $62,765 |
Length: | 1.5 Miles | Actual: | $53,391 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 2200 | Let Status: | Actual |
Project ID: | CPM 2520-1-11 | CSJ: | 2520-01-011 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 1.7 MI N OF SH 173 | Fund Cat: | 1 |
Limits To: | SH 173 | Estimate: | $55,208 |
Length: | 1.7 Miles | Actual: | $90,538 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 2690 | Let Status: | Actual |
Project ID: | CPM 2661-1-12 | CSJ: | 2661-01-012 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 127 | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $248,028 |
Length: | 11.4 Miles | Actual: | $203,602 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 2790 | Let Status: | Actual |
Project ID: | CPM 2883-1-2 | CSJ: | 2883-01-002 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 471 | Fund Cat: | 1 |
Limits To: | MEDINA/ATASCOSA COUNTY LINE | Estimate: | $149,026 |
Length: | 5.5 Miles | Actual: | $122,499 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 3009 | Let Status: | Actual |
Project ID: | CPM 3107-1-33 | CSJ: | 3107-01-033 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 46 | Fund Cat: | 1 |
Limits To: | 0.12 MI N OF BAT CAVE ROAD | Estimate: | $294,324 |
Length: | 8.8 Miles | Actual: | $252,413 |
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | FM 3159 | Let Status: | Actual |
Project ID: | CPM 3213-1-8 | CSJ: | 3213-01-008 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2673 | Fund Cat: | 1 |
Limits To: | SH 46 | Estimate: | $391,875 |
Length: | 6.1 Miles | Actual: | $332,132 |
Back... |
Totals for 0017-02-067 | ||
Length: | 165.2 Miles | ||
Estimate: | $6,814,014 | ||
Actual: | $5,643,909 | ||
CCSJ: 0017-03-058 | |||
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-03-054 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | NEAR LYTLE CITY LIMIT @ SH 132 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $88,147 |
Length: | 0.0 Miles | Actual: | $73,540 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-03-056 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | 0.65 MI NORTH OF LUCKEY RD | Fund Cat: | 1 |
Limits To: | 0.34 MI SOUTH OF LUCKEY RD | Estimate: | $115,974 |
Length: | 0.7 Miles | Actual: | $95,767 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-03-057 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | 0.324 MI NORTH OF SHEPHERD RD | Fund Cat: | 1 |
Limits To: | 0.472 MI SOUTH OF SHEPHERD | Estimate: | $107,686 |
Length: | 0.8 Miles | Actual: | $88,623 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-03-058 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | 0.479 MI NORTH OF KINNEY RD | Fund Cat: | 1 |
Limits To: | 0.43 MI SOUTH OF KINNEY RD | Estimate: | $159,788 |
Length: | 0.9 Miles | Actual: | $132,589 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-04-031 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN LYTLE @ FM 2790 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $98,388 |
Length: | 0.0 Miles | Actual: | $82,115 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-04-032 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN LYTLE @ FM 3175 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $68,709 |
Length: | 0.0 Miles | Actual: | $56,552 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-05-079 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN NATALIA @ FM 471 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $138,658 |
Length: | 0.0 Miles | Actual: | $112,988 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-05-080 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | NEAR DEVINE CITY LIMIT @ FM 463 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $99,201 |
Length: | 0.0 Miles | Actual: | $81,643 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-05-081 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN DEVINE @ SH 173 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $45,685 |
Length: | 0.0 Miles | Actual: | $37,524 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-05-082 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN DEVINE @ FM 3176 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $79,267 |
Length: | 0.0 Miles | Actual: | $65,913 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-05-083 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | NEAR DEVINE CITY LIMIT @ SH 132 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $129,071 |
Length: | 0.0 Miles | Actual: | $106,443 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-06-066 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN MOORE @ FM 462 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $125,566 |
Length: | 0.0 Miles | Actual: | $104,243 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-06-068 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | NEAR PEARSALL CITY LIMIT @ B 35 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $201,551 |
Length: | 0.0 Miles | Actual: | $168,208 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-06-069 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN PEARSALL @ FM 140 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $111,221 |
Length: | 0.0 Miles | Actual: | $91,961 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-07-076 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | IN PEARSALL @ FM 1581 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $116,560 |
Length: | 0.0 Miles | Actual: | $95,433 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-07-077 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | SOUTH OF DERBY @ FM 1583 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $155,685 |
Length: | 0.0 Miles | Actual: | $127,185 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-07-078 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | 2 MI N OF DILLEY @ B 35 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $118,487 |
Length: | 0.0 Miles | Actual: | $97,594 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-07-079 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | NEAR DILLEY CITY LIMIT @ SH 85 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $133,573 |
Length: | 0.0 Miles | Actual: | $110,738 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(308) | CSJ: | 0017-07-080 |
Description: | INTERSECTION ILLUMINATION | Handling Code: |
NC |
Limits From: | VIC OF LA SALLE COUNTY LINE @ B 35 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $65,228 |
Length: | 0.0 Miles | Actual: | $52,762 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2005(448)SFT | CSJ: | 0024-08-117 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
NC |
Limits From: | AT HUNT LANE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $77,301 |
Length: | 0.4 Miles | Actual: | $63,649 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | FM 117 | Let Status: | Actual |
Project ID: | STP 2005(448)SFT | CSJ: | 0236-04-019 |
Description: | INSTALLING SAFETY LIGHTING | Handling Code: |
NC |
Limits From: | AT IH 35 FRONTAGE ROADS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $103,366 |
Length: | 0.1 Miles | Actual: | $85,216 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2005(448)SFT | CSJ: | 0291-10-087 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
NC |
Limits From: | AT FM 1517 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $15,539 |
Length: | 0.0 Miles | Actual: | $13,246 |
Back... |
Totals for 0017-03-058 | ||
Length: | 2.9 Miles | ||
Estimate: | $2,354,651 | ||
Actual: | $1,943,932 | ||
CCSJ: 0017-09-072 | |||
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | BR 2006(590) | CSJ: | 0017-09-072 |
Description: | REHABILITATE BRIDGES & APPROACHES | Handling Code: |
|
Limits From: | @ THEO AND MALONE, DIVISION AVE | Fund Cat: | 6 |
Limits To: | AND SOUTHCROSS BLVD | Estimate: | $5,690,039 |
Length: | 0.0 Miles | Actual: | $6,049,302 |
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-9-85 | CSJ: | 0017-09-085 |
Description: | RECONFIGURE ENTR & EXIT RAMPS AND EXPAND FRONTAGE ROAD | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 2 |
Limits To: | ZARZAMORA STREET | Estimate: | $19,592,254 |
Length: | 3.6 Miles | Actual: | $23,041,451 |
Bid Tabulations Back... |
Totals for 0017-09-072 | ||
Length: | 3.6 Miles | ||
Estimate: | $25,282,293 | ||
Actual: | $29,090,753 | ||
CCSJ: 0017-09-087 | |||
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-9-87 | CSJ: | 0017-09-087 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | AT SP 422 | Fund Cat: | 10 |
Limits To: | . | Estimate: | $624,269 |
Length: | 0.0 Miles | Actual: | $565,172 |
Back... |
Totals for 0017-09-087 | ||
Length: | 0.0 Miles | ||
Estimate: | $624,269 | ||
Actual: | $565,172 | ||
CCSJ: 0017-10-200 | |||
District: | San Antonio | Let Date: | MAY 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | BR 2006(490) | CSJ: | 0017-10-200 |
Description: | WIDEN BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | NB AND SB MAINLANES AT SALADO CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,643,444 |
Length: | 0.2 Miles | Actual: | $2,546,995 |
Back... |
Totals for 0017-10-200 | ||
Length: | 0.2 Miles | ||
Estimate: | $2,643,444 | ||
Actual: | $2,546,995 | ||
CCSJ: 0017-10-224 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-10-224 | CSJ: | 0017-10-224 |
Description: | BRIDGE RAIL RETROFIT @ RITTIMAN, EISENHAUER & WALZEM | Handling Code: |
NC |
Limits From: | RITTIMAN ROAD | Fund Cat: | 1 |
Limits To: | WALZEM ROAD | Estimate: | $501,348 |
Length: | 1.9 Miles | Actual: | $630,932 |
Back... |
Totals for 0017-10-224 | ||
Length: | 1.9 Miles | ||
Estimate: | $501,348 | ||
Actual: | $630,932 | ||
CCSJ: 0017-10-228 | |||
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(312) | CSJ: | 0017-10-228 |
Description: | BARRIER REPAIR / REPLACEMENT | Handling Code: |
NC |
Limits From: | AT US 281 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $3,979,248 |
Length: | 0.5 Miles | Actual: | $3,978,994 |
Bid Tabulations Back... |
Totals for 0017-10-228 | ||
Length: | 0.5 Miles | ||
Estimate: | $3,979,248 | ||
Actual: | $3,978,994 | ||
CCSJ: 0017-10-230 | |||
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(314) | CSJ: | 0017-10-230 |
Description: | INSTALL CONCRETE MEDIAN BARRIER AND ILLUMINATION | Handling Code: |
NC |
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | GEORGE BEACH AVENUE | Estimate: | $2,982,420 |
Length: | 4.7 Miles | Actual: | $3,034,756 |
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0352(314) | CSJ: | 0025-02-169 |
Description: | INSTALL CONCRETE MEDIAN BARRIER AND ILLUMINATION | Handling Code: |
NC |
Limits From: | LP 353 | Fund Cat: | 1 |
Limits To: | 0.4 MI W OF IH 410 | Estimate: | $2,724,189 |
Length: | 8.2 Miles | Actual: | $2,551,626 |
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 0352(314) | CSJ: | 0073-08-151 |
Description: | INSTALL CONCRETE MEDIAN BARRIER AND ILLUMINATION | Handling Code: |
NC |
Limits From: | 0.1 MI S OF IH 410 | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $6,406,022 |
Length: | 9.3 Miles | Actual: | $6,489,376 |
Bid Tabulations Back... |
Totals for 0017-10-230 | ||
Length: | 22.2 Miles | ||
Estimate: | $12,112,631 | ||
Actual: | $12,075,758 | ||
CCSJ: 0025-02-164 | |||
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 25-2-164 | CSJ: | 0025-02-164 |
Description: | RECONFIGURING RAMPS & INTERSECTION (EAST - & WEST - BOUND) | Handling Code: |
|
Limits From: | IH 10 FROM IH 410 SOUTH | Fund Cat: | 2 |
Limits To: | FOSTER ROAD | Estimate: | $15,766,410 |
Length: | 2.0 Miles | Actual: | $17,980,758 |
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | RW 25-2-184 | CSJ: | 0025-02-184 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITIES | Handling Code: |
|
Limits From: | IH 410 SOUTH | Fund Cat: | ROW |
Limits To: | FOSTER RD | Estimate: | $256,497 |
Length: | 1.9 Miles | Actual: | $289,043 |
Bid Tabulations Award Status Back... |
Totals for 0025-02-164 | ||
Length: | 3.9 Miles | ||
Estimate: | $16,022,907 | ||
Actual: | $18,269,801 | ||
CCSJ: 0025-02-173 | |||
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(349) | CSJ: | 0025-02-173 |
Description: | CONSTRUCT TRAFFIC SIGNALS AND PEDESTRIAN RAMPS | Handling Code: |
|
Limits From: | IN SAN ANTONIO AT PROBANDT,GEVERS | Fund Cat: | 1 |
Limits To: | PECAN VALLEY DR AND MLK DRIVE | Estimate: | $719,316 |
Length: | 4.5 Miles | Actual: | $680,819 |
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 0372(82) | CSJ: | 0073-08-154 |
Description: | CONSTRUCT TRAFFIC SGNLA AND PEDESTRIAN RAMPS | Handling Code: |
|
Limits From: | IN SAN ANTONIO @ NEW BRAUNFELS | Fund Cat: | 1 |
Limits To: | PECAN VALLEY DRIVE | Estimate: | $369,791 |
Length: | 1.5 Miles | Actual: | $370,121 |
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | FM 1516 | Let Status: | Actual |
Project ID: | STP 2006(676) | CSJ: | 1477-01-035 |
Description: | CONSTRUCT TRAFFIC SGNLS AND PEDESTRIAN RAMPS | Handling Code: |
|
Limits From: | IN SAN ANTONIO FROM SCHAEFER ROAD | Fund Cat: | 1 |
Limits To: | ROCKET LANE | Estimate: | $131,396 |
Length: | 0.0 Miles | Actual: | $133,426 |
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | FM 1976 | Let Status: | Actual |
Project ID: | STP 2006(676) | CSJ: | 1890-01-043 |
Description: | CONSTRUCT TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | @ TOEPPERWEIN ROAD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $123,540 |
Length: | 0.0 Miles | Actual: | $116,830 |
Bid Tabulations Award Status Back... |
Totals for 0025-02-173 | ||
Length: | 6.0 Miles | ||
Estimate: | $1,344,043 | ||
Actual: | $1,301,196 | ||
CCSJ: 0072-07-048 | |||
District: | San Antonio | Let Date: | APR 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2006(247)MM | CSJ: | 0072-07-048 |
Description: | RECONFIGURE INTERCHANGE | Handling Code: |
|
Limits From: | 0.464 MI S OF BOERNE STAGE ROAD | Fund Cat: | 7 |
Limits To: | AT DOMINION DRIVE | Estimate: | $9,268,350 |
Length: | 0.6 Miles | Actual: | $10,188,025 |
District: | San Antonio | Let Date: | APR 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2003(202)MM | CSJ: | 0072-07-052 |
Description: | ACQUISITION, RELOCATION AND UTILITIES | Handling Code: |
|
Limits From: | 0.464 MI. SOUTH OF BOERNE STAGE RD | Fund Cat: | 7 |
Limits To: | CAMP BULLIS ROAD | Estimate: | $590,507 |
Length: | 2.7 Miles | Actual: | $509,282 |
District: | San Antonio | Let Date: | APR 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2006(247)MM | CSJ: | 0072-08-115 |
Description: | RECONFIGURE INTERCHANGE AT DOMINION | Handling Code: |
|
Limits From: | AT DOMINION DRIVE | Fund Cat: | 7 |
Limits To: | CAMP BULLIS ROAD | Estimate: | $9,981,228 |
Length: | 1.8 Miles | Actual: | $9,598,149 |
Back... |
Totals for 0072-07-048 | ||
Length: | 5.1 Miles | ||
Estimate: | $19,840,085 | ||
Actual: | $20,295,456 | ||
CCSJ: 0072-07-054 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CL 72-7-54 | CSJ: | 0072-07-054 |
Description: | LANDSCAPING AND IRRIGATION | Handling Code: |
|
Limits From: | 0.2 MI S OF FM 3351 | Fund Cat: | 10 |
Limits To: | 0.1 MI S OF AUE ROAD | Estimate: | $79,578 |
Length: | 0.3 Miles | Actual: | $122,508 |
Back... |
Totals for 0072-07-054 | ||
Length: | 0.3 Miles | ||
Estimate: | $79,578 | ||
Actual: | $122,508 | ||
CCSJ: 0072-12-176 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 72-12-176 | CSJ: | 0072-12-176 |
Description: | RECONFIGURING INTERSECTION (N'BD RT TURN LN & S'BD ACCEL LN | Handling Code: |
NC |
Limits From: | HUEBNER ROAD | Fund Cat: | 1 |
Limits To: | 1660 FT. WEST OF WURBACH RD | Estimate: | $846,711 |
Length: | 1.1 Miles | Actual: | $1,103,155 |
Back... |
Totals for 0072-12-176 | ||
Length: | 1.1 Miles | ||
Estimate: | $846,711 | ||
Actual: | $1,103,155 | ||
CCSJ: 0253-04-114 | |||
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | MG 2005(735) | CSJ: | 0253-04-114 |
Description: | EXPAND TO 6 LN EXPY W / 4 LN FR (TOLL 6 NEW ML'S) & INIT TMS | Handling Code: |
|
Limits From: | 0.4 MI N OF LP 1604 | Fund Cat: | 2 |
Limits To: | 0.7 MI N OF STONE OAK | Estimate: | $76,895,768 |
Length: | 3.3 Miles | Actual: | $78,624,042 |
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | MG 2003(373) | CSJ: | 0253-04-132 |
Description: | UTILITIES IN CONSTRUCTION CONTRACT | Handling Code: |
|
Limits From: | US 281: 0.7 MI S OF STONE OAK PKWY | Fund Cat: | ROW |
Limits To: | 0.6 MI N OF STONE OAK PKWY | Estimate: | $6,482,665 |
Length: | 0.0 Miles | Actual: | $5,029,059 |
Back... |
Totals for 0253-04-114 | ||
Length: | 3.3 Miles | ||
Estimate: | $83,378,433 | ||
Actual: | $83,653,101 | ||
CCSJ: 0253-04-134 | |||
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2006(782) | CSJ: | 0253-03-064 |
Description: | UPGRADE FLASHING BEACON TO TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT FM 306 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $108,184 |
Length: | 0.0 Miles | Actual: | $119,849 |
District: | San Antonio | Let Date: | AUG 2006 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2006(783) | CSJ: | 0253-04-134 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT MARSHALL RD AND OVERLOOK PKWY | Fund Cat: | 11 |
Limits To: | . | Estimate: | $305,850 |
Length: | 1.2 Miles | Actual: | $337,158 |
Bid Tabulations Award Status Back... |
Totals for 0253-04-134 | ||
Length: | 1.2 Miles | ||
Estimate: | $414,034 | ||
Actual: | $457,007 | ||
CCSJ: 0291-10-088 | |||
District: | San Antonio | Let Date: | DEC 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | C 291-10-88 | CSJ: | 0291-10-088 |
Description: | DRAINAGE STRUCTURE IMPROVEMENTS | Handling Code: |
|
Limits From: | AT HUEBNER CREEK IN LEON VALLEY | Fund Cat: | 11 |
Limits To: | . | Estimate: | $608,211 |
Length: | 0.0 Miles | Actual: | $718,679 |
District: | San Antonio | Let Date: | DEC 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | RW 291-10-92 | CSJ: | 0291-10-092 |
Description: | UTILITIES | Handling Code: |
|
Limits From: | AT HUEBNER CREEK IN LEON VALLEY | Fund Cat: | 11 |
Limits To: | . | Estimate: | $760,537 |
Length: | 0.0 Miles | Actual: | $851,132 |
Back... |
Totals for 0291-10-088 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,368,748 | ||
Actual: | $1,569,811 | ||
CCSJ: 0465-01-055 | |||
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | SH 218 | Let Status: | Actual |
Project ID: | CPM 465-1-55 | CSJ: | 0465-01-055 |
Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: |
NC |
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | FM 78 | Estimate: | $1,642,857 |
Length: | 2.7 Miles | Actual: | $1,501,683 |
Bid Tabulations Back... |
Totals for 0465-01-055 | ||
Length: | 2.7 Miles | ||
Estimate: | $1,642,857 | ||
Actual: | $1,501,683 | ||
CCSJ: 0521-01-043 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | LP 13 | Let Status: | Actual |
Project ID: | CPM 521-1-43 | CSJ: | 0521-01-043 |
Description: | BASE REPAIR, PLANING, SEALCOAT, OVERLAY & PAV MARK, MEDIANS | Handling Code: |
|
Limits From: | 0.2 MI W OF CITY BASE LANDING | Fund Cat: | 1 |
Limits To: | IH 10 | Estimate: | $2,201,666 |
Length: | 6.2 Miles | Actual: | $2,406,452 |
Back... |
Totals for 0521-01-043 | ||
Length: | 6.2 Miles | ||
Estimate: | $2,201,666 | ||
Actual: | $2,406,452 | ||
CCSJ: 0521-04-187 | |||
District: | San Antonio | Let Date: | MAY 2006 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | STP 2006(457)MM | CSJ: | 0521-04-187 |
Description: | EXPAND TO 10 LN FRWY & TMS | Handling Code: |
|
Limits From: | 0.2 MI E. OF BROADWAY | Fund Cat: | 7 |
Limits To: | BEITEL CREEK, W OF LP 368 | Estimate: | 104,794,004 |
Length: | 3.3 Miles | Actual: | 111,713,758 |
District: | San Antonio | Let Date: | MAY 2006 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 99(436) | CSJ: | 0521-04-246 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENT | Handling Code: |
|
Limits From: | IN SAN ANTONIO FR NACOGDOCHES RD | Fund Cat: | ROW |
Limits To: | LP 368 (AUSTIN HWY) | Estimate: | $4,580,268 |
Length: | 4.3 Miles | Actual: | $5,105,293 |
Back... |
Totals for 0521-04-187 | ||
Length: | 7.6 Miles | ||
Estimate: | 109,374,272 | ||
Actual: | 116,819,051 | ||
CCSJ: 0521-04-264 | |||
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | C 521-4-264 | CSJ: | 0521-04-264 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | FM 1535 (NW MILITARY HWY) | Fund Cat: | 10 |
Limits To: | . | Estimate: | $443,709 |
Length: | 0.0 Miles | Actual: | $409,262 |
Back... |
Totals for 0521-04-264 | ||
Length: | 0.0 Miles | ||
Estimate: | $443,709 | ||
Actual: | $409,262 | ||
CCSJ: 0521-05-128 | |||
District: | San Antonio | Let Date: | FEB 2006 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | C 521-5-128 | CSJ: | 0521-05-128 |
Description: | INSTALL CONTINUOUS FREEWAY ILLUMINATION | Handling Code: |
|
Limits From: | US 281 SOUTH | Fund Cat: | 2 |
Limits To: | MEDINA BASE RD | Estimate: | $1,984,409 |
Length: | 9.8 Miles | Actual: | $1,836,026 |
District: | San Antonio | Let Date: | FEB 2006 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | C 521-6-125 | CSJ: | 0521-06-125 |
Description: | INSTALL CONTINUOUS FREEWAY ILLUMINATION | Handling Code: |
|
Limits From: | IH 37 SOUTH | Fund Cat: | 2 |
Limits To: | US 281 SOUTH | Estimate: | $360,766 |
Length: | 2.8 Miles | Actual: | $340,947 |
Back... |
Totals for 0521-05-128 | ||
Length: | 12.6 Miles | ||
Estimate: | $2,345,175 | ||
Actual: | $2,176,973 | ||
CCSJ: 0521-06-124 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 4104(343) | CSJ: | 0521-06-124 |
Description: | REHAB EXISTING MAINLANES AND RECONSTRUCT SHOULDERS | Handling Code: |
|
Limits From: | 0.48 MI N OF FM 1346 | Fund Cat: | 1 |
Limits To: | IH 35 NB CONNECTOR | Estimate: | $10,339,642 |
Length: | 3.7 Miles | Actual: | $12,388,367 |
Back... |
Totals for 0521-06-124 | ||
Length: | 3.7 Miles | ||
Estimate: | $10,339,642 | ||
Actual: | $12,388,367 | ||
CCSJ: 0521-06-126 | |||
District: | San Antonio | Let Date: | DEC 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | CL 521-6-126 | CSJ: | 0521-06-126 |
Description: | LANDSCAPE_DEVELOPMENT | Handling Code: |
|
Limits From: | @ IH410 / LP 13 INTERCHANGE | Fund Cat: | 10 |
Limits To: | . | Estimate: | $793,218 |
Length: | 0.0 Miles | Actual: | $733,756 |
Back... |
Totals for 0521-06-126 | ||
Length: | 0.0 Miles | ||
Estimate: | $793,218 | ||
Actual: | $733,756 | ||
CCSJ: 0658-01-034 | |||
District: | San Antonio | Let Date: | JUL 2006 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | C 658-1-34 | CSJ: | 0658-01-034 |
Description: | EXPAND 4 TO 6 LANES W / CLTL & BIKE LANE | Handling Code: |
|
Limits From: | IN SAN ANTONIO FROM BRAESVIEW | Fund Cat: | 7 |
Limits To: | 0.2 MI NORTH OF HUEBNER RD | Estimate: | $16,106,853 |
Length: | 2.4 Miles | Actual: | $20,097,876 |
District: | San Antonio | Let Date: | JUL 2006 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | RW 658-1-37 | CSJ: | 0658-01-037 |
Description: | UTILITY ADJUSTMENTS IN THE CONSTRUCTION CONTRACT | Handling Code: |
|
Limits From: | IN SAN ANTONIO FROM BRAESVIEW | Fund Cat: | ROW |
Limits To: | 0.2 MI NORTH OF HUEBNER RD | Estimate: | $2,591,344 |
Length: | 2.4 Miles | Actual: | $3,567,651 |
Bid Tabulations Back... |
Totals for 0658-01-034 | ||
Length: | 4.8 Miles | ||
Estimate: | $18,698,197 | ||
Actual: | $23,665,527 | ||
CCSJ: 0849-01-033 | |||
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | STP 2002(317)MM | CSJ: | 0849-01-033 |
Description: | RECONSTRUCT & EXPAND 2 TO 4 LN W / CLTL (CURB, DRAINAGE) | Handling Code: |
|
Limits From: | FM 1560 | Fund Cat: | 7 |
Limits To: | LP 1604 | Estimate: | $8,304,813 |
Length: | 1.6 Miles | Actual: | $7,753,228 |
District: | San Antonio | Let Date: | JAN 2006 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | STP 2006(218) | CSJ: | 0849-01-043 |
Description: | RIGHT OF WAY UTILITY ADJUSTMENT | Handling Code: |
|
Limits From: | FM 1560 | Fund Cat: | ROW |
Limits To: | LP 1604 | Estimate: | $3,499,678 |
Length: | 1.6 Miles | Actual: | $4,336,515 |
Back... |
Totals for 0849-01-033 | ||
Length: | 3.2 Miles | ||
Estimate: | $11,804,491 | ||
Actual: | $12,089,743 | ||
CCSJ: 0915-00-117 | |||
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(883) | CSJ: | 0915-00-117 |
Description: | SPOT BASE REPAIR AND LEVEL - UP | Handling Code: |
|
Limits From: | AT VARIOUS LOCATIONS-DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $403,365 |
Length: | 0.0 Miles | Actual: | $526,940 |
Back... |
Totals for 0915-00-117 | ||
Length: | 0.0 Miles | ||
Estimate: | $403,365 | ||
Actual: | $526,940 | ||
CCSJ: 0915-00-119 | |||
District: | San Antonio | Let Date: | SEP 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(884) | CSJ: | 0915-00-119 |
Description: | SPOT BASE, REPAIR, AND LEVEL - UP | Handling Code: |
|
Limits From: | @ VARIOUS LOCATIONS-DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $799,766 |
Length: | 0.0 Miles | Actual: | $779,733 |
Back... |
Totals for 0915-00-119 | ||
Length: | 0.0 Miles | ||
Estimate: | $799,766 | ||
Actual: | $779,733 | ||
CCSJ: 0915-12-363 | |||
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 99(797)MM | CSJ: | 0915-12-363 |
Description: | REHAB & WIDEN NARROW PAVEMENT (CURB, SDWK, DRAINAGE) | Handling Code: |
NC |
Limits From: | IN SAN ANTONIO ON MAYFIELD | Fund Cat: | 7 |
Limits To: | FROM COMMERCIAL TO ZARZAMORA | Estimate: | $2,984,717 |
Length: | 1.0 Miles | Actual: | $3,662,172 |
District: | San Antonio | Let Date: | OCT 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | RW 915-12-432 | CSJ: | 0915-12-432 |
Description: | UTILITIES IN THE CONSTRUCTION CONTRACT | Handling Code: |
NC |
Limits From: | COMMERCIAL | Fund Cat: | ROW |
Limits To: | ZARZAMORA | Estimate: | $619,373 |
Length: | 0.0 Miles | Actual: | $446,241 |
Back... |
Totals for 0915-12-363 | ||
Length: | 1.0 Miles | ||
Estimate: | $3,604,090 | ||
Actual: | $4,108,413 | ||
CCSJ: 0915-12-414 | |||
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(722)MM | CSJ: | 0915-12-414 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2006 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $242,000 |
Length: | 0.0 Miles | Actual: | $242,440 |
Back... |
Totals for 0915-12-414 | ||
Length: | 0.0 Miles | ||
Estimate: | $242,000 | ||
Actual: | $242,440 | ||
CCSJ: 0915-12-415 | |||
District: | San Antonio | Let Date: | MAR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(601)SFT | CSJ: | 0915-12-415 |
Description: | CROSSWALKS, SCHOOL ZONE FLASHERS, SCHOOL ZONE SIGNS | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 9 |
Limits To: | . | Estimate: | $484,626 |
Length: | 0.0 Miles | Actual: | $551,422 |
Back... |
Totals for 0915-12-415 | ||
Length: | 0.0 Miles | ||
Estimate: | $484,626 | ||
Actual: | $551,422 | ||
CCSJ: 0915-12-431 | |||
District: | San Antonio | Let Date: | NOV 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(021) | CSJ: | 0915-12-431 |
Description: | CONSTRUCT ADA CURB RAMPS | Handling Code: |
|
Limits From: | LP 345(IH 10 N TO IH 10 S) | Fund Cat: | 10 |
Limits To: | & IH 10(LP 345 TO CALLAGHAN) | Estimate: | $1,390,540 |
Length: | 0.0 Miles | Actual: | $1,410,548 |
Back... |
Totals for 0915-12-431 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,390,540 | ||
Actual: | $1,410,548 | ||
CCSJ: 0915-12-435 | |||
District: | San Antonio | Let Date: | APR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-12-435 | CSJ: | 0915-12-435 |
Description: | INSTALL TRAFFIC MONITORING DEVICES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 1 |
Limits To: | VARIOUS LOCATIONS IN BEXAR COUNTY | Estimate: | $446,589 |
Length: | 0.0 Miles | Actual: | $286,396 |
Back... |
Totals for 0915-12-435 | ||
Length: | 0.0 Miles | ||
Estimate: | $446,589 | ||
Actual: | $286,396 | ||
CCSJ: 2442-01-007 | |||
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | FM 2538 | Let Status: | Actual |
Project ID: | SFT 2442-1-7 | CSJ: | 2442-01-007 |
Description: | WIDEN NARROW ROADWAY AND ADD SHOULDERS | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | GUADALUPE COUNTY LINE | Estimate: | $2,444,208 |
Length: | 6.3 Miles | Actual: | $2,257,071 |
District: | San Antonio | Let Date: | JUN 2006 |
Highway: | FM 2538 | Let Status: | Actual |
Project ID: | SFT 2442-2-6 | CSJ: | 2442-02-006 |
Description: | WIDEN NARROW ROADWAY AND ADD SHOULDERS | Handling Code: |
|
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 775 | Estimate: | $657,377 |
Length: | 1.6 Miles | Actual: | $640,720 |
Bid Tabulations Back... |
Totals for 2442-01-007 | ||
Length: | 7.9 Miles | ||
Estimate: | $3,101,585 | ||
Actual: | $2,897,791 | ||
CCSJ: 2452-02-073 | |||
District: | San Antonio | Let Date: | JUL 2006 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | SFT 2452-2-73 | CSJ: | 2452-02-073 |
Description: | CONSTRUCT TURNAROUNDS | Handling Code: |
|
Limits From: | ON FRONTAGE ROADS | Fund Cat: | 11 |
Limits To: | AT STONE OAK/VOIGT | Estimate: | $1,028,334 |
Length: | 0.2 Miles | Actual: | $1,038,267 |
District: | San Antonio | Let Date: | JUL 2006 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | SFT 2452-3-94 | CSJ: | 2452-03-094 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
|
Limits From: | AT GOLD CANYON ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $43,230 |
Length: | 0.1 Miles | Actual: | $49,060 |
Bid Tabulations Back... |
Totals for 2452-02-073 | ||
Length: | 0.3 Miles | ||
Estimate: | $1,071,564 | ||
Actual: | $1,087,327 |
|
|