Detail Letting Schedule for Dallas County (FY 2006)
Detail Letting Schedule for Dallas County (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
Dallas County (FY 2006) |
CCSJ: 0009-03-042 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | SH 66 | Let Status: | Actual |
Project ID: | C 9-3-42 | CSJ: | 0009-03-042 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | ANTIOCH ROAD | Fund Cat: | 10 |
Limits To: | DALLAS/ROCKWALL COUNTY LINE | Estimate: | $97,075 |
Length: | 4.4 Miles | Actual: | $52,675 |
District: | Dallas | Let Date: | OCT 2005 |
Highway: | SH 66 | Let Status: | Actual |
Project ID: | C 9-4-58 | CSJ: | 0009-04-058 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | DALLAS/ROCKWALL COUNTY LINE | Fund Cat: | 10 |
Limits To: | LAKE RAY HUBBARD | Estimate: | $97,617 |
Length: | 0.8 Miles | Actual: | $111,580 |
District: | Dallas | Let Date: | OCT 2005 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-211 | CSJ: | 0009-11-211 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | 0.2 MI W OF DALLAS/ROCKWALL CO LINE | Fund Cat: | 10 |
Limits To: | DALLAS/ROCKWALL COUNTY LINE | Estimate: | $32,070 |
Length: | 0.2 Miles | Actual: | $27,470 |
Back... |
Totals for 0009-03-042 | ||
---|---|---|---|
Length: | 5.4 Miles | ||
Estimate: | $226,762 | ||
Actual: | $191,725 | ||
CCSJ: 0009-11-202 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CM 2006(202) | CSJ: | 0009-11-202 |
Description: | EXTEND CONTRAFLOW HOV LANE WITH MOVABLE BARRIERS | Handling Code: |
|
Limits From: | 250' EAST OF HUNNICUT | Fund Cat: | 5 |
Limits To: | 900' EAST OF NORTHWEST DR. | Estimate: | $11,889,039 |
Length: | 6.6 Miles | Actual: | $13,478,706 |
Back... |
Totals for 0009-11-202 | ||
Length: | 6.6 Miles | ||
Estimate: | $11,889,039 | ||
Actual: | $13,478,706 | ||
CCSJ: 0009-11-204 | |||
District: | Dallas | Let Date: | SEP 2005 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CM 2005(986) | CSJ: | 0009-11-204 |
Description: | INSTALL SENSOR STATIONS WITH COMPRESSED CCTV CAMERAS, | Handling Code: |
|
Limits From: | US 80 | Fund Cat: | 5 |
Limits To: | IH 635 | Estimate: | $1,673,554 |
Length: | 3.3 Miles | Actual: | $1,497,966 |
Back... |
Totals for 0009-11-204 | ||
Length: | 3.3 Miles | ||
Estimate: | $1,673,554 | ||
Actual: | $1,497,966 | ||
CCSJ: 0009-11-206 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | BR 2006(763) | CSJ: | 0009-11-206 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | AT BIG TOWN BLVD. (NB) | Fund Cat: | 6 |
Limits To: | . | Estimate: | $1,433,011 |
Length: | 0.1 Miles | Actual: | $1,378,904 |
District: | Dallas | Let Date: | AUG 2006 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | BR 2006(763) | CSJ: | 0009-11-207 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | AT BIG TOWN BLVD (SB) | Fund Cat: | 6 |
Limits To: | . | Estimate: | $812,418 |
Length: | 0.1 Miles | Actual: | $744,011 |
Bid Tabulations Award Status Back... |
Totals for 0009-11-206 | ||
Length: | 0.2 Miles | ||
Estimate: | $2,245,429 | ||
Actual: | $2,122,915 | ||
CCSJ: 0009-11-209 | |||
District: | Dallas | Let Date: | DEC 2005 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-209 | CSJ: | 0009-11-209 |
Description: | REHAB BRIDGE, REPLACE BRIDGE DECK | Handling Code: |
|
Limits From: | AT JIM MILLER RD. | Fund Cat: | 1 |
Limits To: | . | Estimate: | $513,307 |
Length: | 0.0 Miles | Actual: | $1,176,910 |
Back... |
Totals for 0009-11-209 | ||
Length: | 0.0 Miles | ||
Estimate: | $513,307 | ||
Actual: | $1,176,910 | ||
CCSJ: 0009-11-213 | |||
District: | Dallas | Let Date: | NOV 2005 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CL 9-11-213 | CSJ: | 0009-11-213 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | 0.2 MILES EAST OF LOOP 12 | Fund Cat: | 10 |
Limits To: | MESQUITE CITY LIMITS | Estimate: | $263,345 |
Length: | 0.4 Miles | Actual: | $223,833 |
Back... |
Totals for 0009-11-213 | ||
Length: | 0.4 Miles | ||
Estimate: | $263,345 | ||
Actual: | $223,833 | ||
CCSJ: 0047-07-181 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | US 75 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0047-07-181 |
Description: | REMOVE OVERPASS AND RECONSTRUCT INTERCHANGE AT GRADE | Handling Code: |
TR |
Limits From: | AT BRYAN STREET | Fund Cat: | 7 |
Limits To: | . | Estimate: | $14,670,000 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0047-07-181 | ||
Length: | 0.0 Miles | ||
Estimate: | $14,670,000 | ||
Actual: | |||
CCSJ: 0047-07-202 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | C 47-7-202 | CSJ: | 0047-07-202 |
Description: | REHABILITATE VEHICLE DETECTION SYSTEM AND DYNAMIC MESSAGE | Handling Code: |
|
Limits From: | SP 366 TO IH 635 IN DALLAS AND | Fund Cat: | 1 |
Limits To: | @ COLLIN BLVD IN CITY OF RICHARDSON | Estimate: | $2,193,408 |
Length: | 9.2 Miles | Actual: | $314,305 |
Bid Tabulations Back... |
Totals for 0047-07-202 | ||
Length: | 9.2 Miles | ||
Estimate: | $2,193,408 | ||
Actual: | $314,305 | ||
CCSJ: 0048-01-057 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | STP 2006(259) | CSJ: | 0048-01-057 |
Description: | RECONSTRUCT EXISTING PAVEMENT | Handling Code: |
|
Limits From: | BELT LINE ROAD | Fund Cat: | 1 |
Limits To: | PLEASANT RUN ROAD | Estimate: | $3,780,876 |
Length: | 1.4 Miles | Actual: | $3,746,298 |
Back... |
Totals for 0048-01-057 | ||
Length: | 1.4 Miles | ||
Estimate: | $3,780,876 | ||
Actual: | $3,746,298 | ||
CCSJ: 0048-01-059 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | NH 2006(512) | CSJ: | 0048-01-059 |
Description: | FULL DEPTH CONCRETE REPAIR, NOVACHIP, BASE REPAIR | Handling Code: |
|
Limits From: | PLEASANT RUN | Fund Cat: | 1 |
Limits To: | SOUTH OF FIVE MILE CREEK | Estimate: | $2,465,636 |
Length: | 5.6 Miles | Actual: | $2,622,638 |
Back... |
Totals for 0048-01-059 | ||
Length: | 5.6 Miles | ||
Estimate: | $2,465,636 | ||
Actual: | $2,622,638 | ||
CCSJ: 0092-07-053 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2006(514) | CSJ: | 0047-07-210 |
Description: | BRIDGE DECK REPAIR | Handling Code: |
|
Limits From: | N ABUTMENT OF WHITE ROCK CRK BRIDGE | Fund Cat: | 1 |
Limits To: | S ABUTMENT OF WHITE ROCK CRK BRIDGE | Estimate: | $37,996 |
Length: | 0.1 Miles | Actual: | $17,877 |
District: | Dallas | Let Date: | MAY 2006 |
Highway: | SH 356 | Let Status: | Actual |
Project ID: | NH 2006(514) | CSJ: | 0092-07-053 |
Description: | BRIDGE DECK REPAIR | Handling Code: |
|
Limits From: | W ABUTMENT OF TRINITY RIVER BRIDGE | Fund Cat: | 1 |
Limits To: | E ABUTMENT OF TRINITY RIVER BRIDGE | Estimate: | $1,450,120 |
Length: | 0.3 Miles | Actual: | $769,091 |
District: | Dallas | Let Date: | MAY 2006 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | NH 2006(514) | CSJ: | 0196-02-108 |
Description: | BRIDGE DECK REPAIR | Handling Code: |
|
Limits From: | W ABUTMENT OF FOX AVE BRIDGE | Fund Cat: | 1 |
Limits To: | E ABUTMENT OF FOX AVE BRIDGE | Estimate: | $82,844 |
Length: | 0.1 Miles | Actual: | $41,007 |
Back... |
Totals for 0092-07-053 | ||
Length: | 0.5 Miles | ||
Estimate: | $1,570,960 | ||
Actual: | $827,975 | ||
CCSJ: 0092-07-054 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | SH 356 | Let Status: | Actual |
Project ID: | NH 2006(515) | CSJ: | 0092-07-054 |
Description: | REHABILITATION OF EXISTING ROADWAY | Handling Code: |
|
Limits From: | WILLOW CREEK | Fund Cat: | 1 |
Limits To: | W ABUTMENT OF TRINITY RIVER BRIDGE | Estimate: | $2,455,370 |
Length: | 5.3 Miles | Actual: | $2,730,709 |
Back... |
Totals for 0092-07-054 | ||
Length: | 5.3 Miles | ||
Estimate: | $2,455,370 | ||
Actual: | $2,730,709 | ||
CCSJ: 0092-14-075 | |||
District: | Dallas | Let Date: | JAN 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0453(124) | CSJ: | 0092-14-075 |
Description: | TEXTURING PORTLAND CEMENT CONCRETE PAVEMENT | Handling Code: |
|
Limits From: | 0.3 MILES NORTH OF LINFIELD ROAD | Fund Cat: | 1 |
Limits To: | SOUTH OF SP 366 | Estimate: | $562,536 |
Length: | 5.2 Miles | Actual: | $449,754 |
Back... |
Totals for 0092-14-075 | ||
Length: | 5.2 Miles | ||
Estimate: | $562,536 | ||
Actual: | $449,754 | ||
CCSJ: 0094-03-093 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | NH 2006(516) | CSJ: | 0094-03-093 |
Description: | REHABILITATE VIDEO CAMERA | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 1 |
Limits To: | SP 482 | Estimate: | $133,460 |
Length: | 7.2 Miles | Actual: | $93,118 |
District: | Dallas | Let Date: | MAY 2006 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | NH 2006(516) | CSJ: | 0094-07-035 |
Description: | REHABILITATE VIDEO CAMERAS | Handling Code: |
|
Limits From: | SP 482 | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $66,040 |
Length: | 2.9 Miles | Actual: | $41,869 |
District: | Dallas | Let Date: | MAY 2006 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | NH 2006(516) | CSJ: | 0196-03-228 |
Description: | REHABILITATE VIDEO CAMERAS | Handling Code: |
|
Limits From: | LOOP 12 TO IH 635 AND | Fund Cat: | 1 |
Limits To: | AT REUNION BLVD AND INDUSTRIAL BLVD | Estimate: | $96,160 |
Length: | 2.4 Miles | Actual: | $61,993 |
District: | Dallas | Let Date: | MAY 2006 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2006(516) | CSJ: | 0581-02-113 |
Description: | REHABILITATE VIDEO CAMERA | Handling Code: |
|
Limits From: | SH 183 | Fund Cat: | 1 |
Limits To: | IH 35E | Estimate: | $35,920 |
Length: | 2.7 Miles | Actual: | $21,745 |
Back... |
Totals for 0094-03-093 | ||
Length: | 15.2 Miles | ||
Estimate: | $331,580 | ||
Actual: | $218,725 | ||
CCSJ: 0095-02-071 | |||
District: | Dallas | Let Date: | DEC 2005 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 96(902) | CSJ: | 0095-02-071 |
Description: | RECONSTRUCT EB RAMPS, ADD EB EXIT RAMP, REPLACE EB & WB | Handling Code: |
|
Limits From: | BELT LINE ROAD | Fund Cat: | 1 |
Limits To: | SH 352 | Estimate: | $4,687,646 |
Length: | 2.0 Miles | Actual: | $6,941,047 |
Back... |
Totals for 0095-02-071 | ||
Length: | 2.0 Miles | ||
Estimate: | $4,687,646 | ||
Actual: | $6,941,047 | ||
CCSJ: 0095-10-042 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2006(095)MM | CSJ: | 0095-02-098 |
Description: | RECONFIGURATION, FRONTAGE ROADS, FLOOD RELIEF AND | Handling Code: |
|
Limits From: | 0.3 MILE EAST OF TOWN EAST BLVD | Fund Cat: | 1 |
Limits To: | GROSS RD | Estimate: | $7,722,633 |
Length: | 1.0 Miles | Actual: | $9,799,039 |
District: | Dallas | Let Date: | MAY 2006 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2006(095)MM | CSJ: | 0095-10-042 |
Description: | RECONFIGURATION, FRONTAGE ROADS, FLOOD RELIEF AND | Handling Code: |
|
Limits From: | TOWN EAST BLVD | Fund Cat: | 7 |
Limits To: | 0.3 MILE EAST OF TOWN EAST BLVD | Estimate: | $19,052 |
Length: | 0.3 Miles | Actual: | $72,746 |
Back... |
Totals for 0095-10-042 | ||
Length: | 1.3 Miles | ||
Estimate: | $7,741,685 | ||
Actual: | $9,871,785 | ||
CCSJ: 0196-03-225 | |||
District: | Dallas | Let Date: | NOV 2005 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(395) | CSJ: | 0196-03-225 |
Description: | RECONSTRUCT EXISTING PAVEMENT AND CONSTRUCT AUXILIARY LANE | Handling Code: |
|
Limits From: | IH 635 | Fund Cat: | 1 |
Limits To: | VALLEY VIEW | Estimate: | $2,672,089 |
Length: | 1.1 Miles | Actual: | $3,277,500 |
Back... |
Totals for 0196-03-225 | ||
Length: | 1.1 Miles | ||
Estimate: | $2,672,089 | ||
Actual: | $3,277,500 | ||
CCSJ: 0196-03-241 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-215 | CSJ: | 0009-11-215 |
Description: | INSTALL OVERHEAD SIGN BRIDGE | Handling Code: |
|
Limits From: | AT HOTEL ST | Fund Cat: | 1 |
Limits To: | . | Estimate: | $55,365 |
Length: | 0.0 Miles | Actual: | $65,219 |
District: | Dallas | Let Date: | JUL 2006 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | C 196-3-241 | CSJ: | 0196-03-241 |
Description: | INSTALL OVERHEAD SIGN BRIDGE | Handling Code: |
|
Limits From: | AT SH 183 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $95,688 |
Length: | 0.0 Miles | Actual: | $103,248 |
Bid Tabulations Back... |
Totals for 0196-03-241 | ||
Length: | 0.0 Miles | ||
Estimate: | $151,053 | ||
Actual: | $168,467 | ||
CCSJ: 0196-06-017 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | LP 354 | Let Status: | Actual |
Project ID: | STP 2006(385)MM | CSJ: | 0196-06-017 |
Description: | RECONSTRUCT EXISTING 4 - LANE ROADWAY TO 6 - LANE DIVIDED URBAN | Handling Code: |
|
Limits From: | IN DALLAS ON HARRY HINES BOULEVARD | Fund Cat: | 7 |
Limits To: | FROM ROYAL LANE TO IH 35E | Estimate: | $20,204,599 |
Length: | 1.4 Miles | Actual: | $21,020,242 |
Back... |
Totals for 0196-06-017 | ||
Length: | 1.4 Miles | ||
Estimate: | $20,204,599 | ||
Actual: | $21,020,242 | ||
CCSJ: 0261-02-058 | |||
District: | Dallas | Let Date: | NOV 2005 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | CM 2006(032) | CSJ: | 0261-02-058 |
Description: | INTERSECTION IMPROVEMENTS ON FRONTAGE ROAD | Handling Code: |
|
Limits From: | US 67 | Fund Cat: | 5 |
Limits To: | AT FM 1382 | Estimate: | $319,987 |
Length: | 0.2 Miles | Actual: | $423,721 |
Back... |
Totals for 0261-02-058 | ||
Length: | 0.2 Miles | ||
Estimate: | $319,987 | ||
Actual: | $423,721 | ||
CCSJ: 0261-03-045 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | BR 2006(692) | CSJ: | 0261-03-045 |
Description: | REHABILITATE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | NBFR AT FIVE MILE CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $718,911 |
Length: | 0.1 Miles | Actual: | $736,993 |
Bid Tabulations Back... |
Totals for 0261-03-045 | ||
Length: | 0.1 Miles | ||
Estimate: | $718,911 | ||
Actual: | $736,993 | ||
CCSJ: 0281-03-044 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | NH 2006(362) | CSJ: | 0281-03-044 |
Description: | CONSTRUCTION OF FULL INTERCHANGE LIGHTING FOR SH 78 BRIDGE, | Handling Code: |
|
Limits From: | INTERCHANGE AT PGBT | Fund Cat: | 1 |
Limits To: | IN GARLAND | Estimate: | $580,175 |
Length: | 0.3 Miles | Actual: | $524,654 |
Back... |
Totals for 0281-03-044 | ||
Length: | 0.3 Miles | ||
Estimate: | $580,175 | ||
Actual: | $524,654 | ||
CCSJ: 0353-04-082 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | STP 2006(064)SFT | CSJ: | 0353-04-082 |
Description: | INSTALL CABLE BARRIER, ATTENUATOR AND ILLUMINATION | Handling Code: |
|
Limits From: | WEST OF FREEPORT PKWY | Fund Cat: | 8 |
Limits To: | SPUR 348 | Estimate: | $944,076 |
Length: | 5.9 Miles | Actual: | $913,011 |
District: | Dallas | Let Date: | FEB 2006 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | NH 2006(135) | CSJ: | 0353-04-087 |
Description: | ADD ADDITIONAL EB LANE AND SHLDR FOR BOTTLENECK IMPROVEMENT | Handling Code: |
|
Limits From: | WEST OF FREEPORT PKWY | Fund Cat: | 11 |
Limits To: | SH 161 | Estimate: | $3,996,594 |
Length: | 2.8 Miles | Actual: | $4,315,989 |
Back... |
Totals for 0353-04-082 | ||
Length: | 8.7 Miles | ||
Estimate: | $4,940,670 | ||
Actual: | $5,229,000 | ||
CCSJ: 0442-02-140 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | CL 442-2-140 | CSJ: | 0442-02-140 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
NC |
Limits From: | 0.15 MI SOUTH OF WINTERGREEN ROAD | Fund Cat: | 10 |
Limits To: | 0.15 MI NORTH OF WINTERGREEN ROAD | Estimate: | $159,837 |
Length: | 0.3 Miles | Actual: | $153,242 |
Back... |
Totals for 0442-02-140 | ||
Length: | 0.3 Miles | ||
Estimate: | $159,837 | ||
Actual: | $153,242 | ||
CCSJ: 0581-02-125 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | STP 2005(534)SFT | CSJ: | 0581-02-125 |
Description: | INSTALL MEDIAN BARRIER | Handling Code: |
|
Limits From: | WEST FORK OF TRINITY RIVER | Fund Cat: | 1 |
Limits To: | SHADY GROVE RD IN CITY OF IRVING | Estimate: | $175,884 |
Length: | 1.1 Miles | Actual: | $174,308 |
Back... |
Totals for 0581-02-125 | ||
Length: | 1.1 Miles | ||
Estimate: | $175,884 | ||
Actual: | $174,308 | ||
CCSJ: 0581-02-126 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2006(506) | CSJ: | 0581-02-126 |
Description: | REHABILITATION OF EXISTING ROADWAY | Handling Code: |
|
Limits From: | SH 183 | Fund Cat: | 1 |
Limits To: | N ABUTMENT OF TRINITY RIVER BRIDGE | Estimate: | $1,607,582 |
Length: | 3.3 Miles | Actual: | $1,560,920 |
Back... |
Totals for 0581-02-126 | ||
Length: | 3.3 Miles | ||
Estimate: | $1,607,582 | ||
Actual: | $1,560,920 | ||
CCSJ: 0918-00-073 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 918-00-73 | CSJ: | 0918-00-073 |
Description: | SEALCOAT | Handling Code: |
|
Limits From: | DALLAS DISTRICTWIDE-FY 2006 | Fund Cat: | 1 |
Limits To: | NORTHERN SECTIONS | Estimate: | $4,058,563 |
Length: | 85.7 Miles | Actual: | $4,044,643 |
Back... |
Totals for 0918-00-073 | ||
Length: | 85.7 Miles | ||
Estimate: | $4,058,563 | ||
Actual: | $4,044,643 | ||
CCSJ: 0918-00-089 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(715)MM | CSJ: | 0918-00-089 |
Description: | MOBILITY ASSISTANCE PATROL | Handling Code: |
XX |
Limits From: | TXDOT DALLAS DISTRICT COURTESY | Fund Cat: | 7 |
Limits To: | PATROL FUNDING FOR FY 2004 | Estimate: | $2,440,000 |
Length: | 0.0 Miles | Actual: | $2,440,000 |
Back... |
Totals for 0918-00-089 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,440,000 | ||
Actual: | $2,440,000 | ||
CCSJ: 0918-00-099 | |||
District: | Dallas | Let Date: | NOV 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-00-99 | CSJ: | 0918-00-099 |
Description: | NON SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,648,783 |
Length: | 0.0 Miles | Actual: | $1,990,649 |
Back... |
Totals for 0918-00-099 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,648,783 | ||
Actual: | $1,990,649 | ||
CCSJ: 0918-00-106 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(608)MM | CSJ: | 0918-00-106 |
Description: | PARKING CASH - OUT PILOT PROGRAM | Handling Code: |
XX |
Limits From: | PARKING CASH-OUT PILOT PROGRAM | Fund Cat: | 7 |
Limits To: | NCTCOG AIR QUALITY PROGRAM | Estimate: | $312,500 |
Length: | 0.0 Miles | Actual: | $375,000 |
Back... |
Totals for 0918-00-106 | ||
Length: | 0.0 Miles | ||
Estimate: | $312,500 | ||
Actual: | $375,000 | ||
CCSJ: 0918-00-114 | |||
District: | Dallas | Let Date: | APR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(609)MM | CSJ: | 0918-00-114 |
Description: | NCTCOG - REGIONAL STORM WATER MANAGEMENT | Handling Code: |
XX |
Limits From: | REGIONAL STORM WATER MANAGEMENT | Fund Cat: | 7 |
Limits To: | NCTCOG PROGRAM | Estimate: | $250,000 |
Length: | 0.0 Miles | Actual: | $250,000 |
Back... |
Totals for 0918-00-114 | ||
Length: | 0.0 Miles | ||
Estimate: | $250,000 | ||
Actual: | $250,000 | ||
CCSJ: 0918-00-115 | |||
District: | Dallas | Let Date: | APR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(610)MM | CSJ: | 0918-00-115 |
Description: | NCTCOG CENTER OF DEVELOPMENT EXCELLENCE | Handling Code: |
XX |
Limits From: | CENTER OF DEVELOPMENT EXCELLENCE | Fund Cat: | 7 |
Limits To: | FUNDING FOR FY 2006 | Estimate: | $268,166 |
Length: | 0.0 Miles | Actual: | $268,166 |
Back... |
Totals for 0918-00-115 | ||
Length: | 0.0 Miles | ||
Estimate: | $268,166 | ||
Actual: | $268,166 | ||
CCSJ: 0918-00-117 | |||
District: | Dallas | Let Date: | APR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(611)MM | CSJ: | 0918-00-117 |
Description: | RAILROAD CROSSING SAFETY EDUCATION PROGRAM | Handling Code: |
XX |
Limits From: | RAILROAD CROSSING SAFETY EDUCATION | Fund Cat: | 7 |
Limits To: | PROGRAM - NCTCOG PROGRAM | Estimate: | $562,500 |
Length: | 0.0 Miles | Actual: | $562,500 |
Back... |
Totals for 0918-00-117 | ||
Length: | 0.0 Miles | ||
Estimate: | $562,500 | ||
Actual: | $562,500 | ||
CCSJ: 0918-00-118 | |||
District: | Dallas | Let Date: | APR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(612)MM | CSJ: | 0918-00-118 |
Description: | ADMINISTRATION OF THE TEXAS EMISSIONS REDUCTION PROGRAM | Handling Code: |
XX |
Limits From: | ADMINISTRATION OF THE TEXAS | Fund Cat: | 7 |
Limits To: | EMISSIONS REDUCTION PROGRAM (TERP) | Estimate: | $1,250,000 |
Length: | 0.0 Miles | Actual: | $1,250,000 |
Back... |
Totals for 0918-00-118 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,250,000 | ||
Actual: | $1,250,000 | ||
CCSJ: 0918-00-119 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(454)MM | CSJ: | 0918-00-119 |
Description: | DART VANPOOL PROGRAM - TRAVEL DEMAND MANAGEMENT | Handling Code: |
XX |
Limits From: | DART VANPOOL PROGRAM | Fund Cat: | 7 |
Limits To: | FUNDING FOR FY 2006 | Estimate: | $316,982 |
Length: | 0.0 Miles | Actual: | $316,982 |
Back... |
Totals for 0918-00-119 | ||
Length: | 0.0 Miles | ||
Estimate: | $316,982 | ||
Actual: | $316,982 | ||
CCSJ: 0918-00-120 | |||
District: | Dallas | Let Date: | APR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(613)MM | CSJ: | 0918-00-120 |
Description: | AIR QUALITY PUBLIC EDUCATION AND INFORMATION | Handling Code: |
XX |
Limits From: | AIR QUALITY PUBLIC EDUCATION | Fund Cat: | 7 |
Limits To: | FUNDING FOR FY 2006 | Estimate: | $250,000 |
Length: | 0.0 Miles | Actual: | $250,000 |
Back... |
Totals for 0918-00-120 | ||
Length: | 0.0 Miles | ||
Estimate: | $250,000 | ||
Actual: | $250,000 | ||
CCSJ: 0918-00-135 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 918-00-135 | CSJ: | 0918-00-135 |
Description: | SEALCOAT | Handling Code: |
|
Limits From: | DALLAS DISTRICTWIDE-FY 2006 | Fund Cat: | 1 |
Limits To: | SOUTHERN SECTIONS | Estimate: | $6,650,290 |
Length: | 148.1 Miles | Actual: | $6,440,011 |
Back... |
Totals for 0918-00-135 | ||
Length: | 148.1 Miles | ||
Estimate: | $6,650,290 | ||
Actual: | $6,440,011 | ||
CCSJ: 0918-45-293 | |||
District: | Dallas | Let Date: | DEC 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 96(103)MM | CSJ: | 0918-45-293 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
LC |
Limits From: | ON ROWLETT ROAD | Fund Cat: | 7 |
Limits To: | AT CHAHA | Estimate: | $399,822 |
Length: | 0.1 Miles | Actual: | $498,785 |
Back... |
Totals for 0918-45-293 | ||
Length: | 0.1 Miles | ||
Estimate: | $399,822 | ||
Actual: | $498,785 | ||
CCSJ: 0918-45-353 | |||
District: | Dallas | Let Date: | DEC 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 97(252)TE | CSJ: | 0918-45-353 |
Description: | DUCK CREEK GREENBELT AND LAKE RAY HUBBARD TRANSIT CENTER | Handling Code: |
LN |
Limits From: | N END DUCK CREEK GREENBELT | Fund Cat: | 9 |
Limits To: | DART LAKE RAY HUBBARD TRANSIT | Estimate: | $448,000 |
Length: | 1.2 Miles | Actual: | $412,573 |
Back... |
Totals for 0918-45-353 | ||
Length: | 1.2 Miles | ||
Estimate: | $448,000 | ||
Actual: | $412,573 | ||
CCSJ: 0918-45-415 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 99(128) | CSJ: | 0918-45-415 |
Description: | REPLACE BR & APPRS | Handling Code: |
|
Limits From: | NOKOMIS RD AT TEN MILE CR TRIB | Fund Cat: | 6 |
Limits To: | . | Estimate: | $380,044 |
Length: | 0.1 Miles | Actual: | $513,529 |
Back... |
Totals for 0918-45-415 | ||
Length: | 0.1 Miles | ||
Estimate: | $380,044 | ||
Actual: | $513,529 | ||
CCSJ: 0918-45-487 | |||
District: | Dallas | Let Date: | JUN 2006 |
Highway: | PW | Let Status: | Actual |
Project ID: | C 918-45-487 | CSJ: | 0918-45-487 |
Description: | REBUILD 5 SECT OF MAIN PARK RD.APPRX 1 MI., ADD PARKING | Handling Code: |
NC |
Limits From: | REBUILD 5 SECT OF MAIN PARK RD. | Fund Cat: | 10 |
Limits To: | ADD PARKING & DOUBLE ENTRY LN @ HQ | Estimate: | $4,461,936 |
Length: | 2.7 Miles | Actual: | $4,495,270 |
Bid Tabulations Back... |
Totals for 0918-45-487 | ||
Length: | 2.7 Miles | ||
Estimate: | $4,461,936 | ||
Actual: | $4,495,270 | ||
CCSJ: 0918-45-528 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2000(579)TE | CSJ: | 0918-45-528 |
Description: | BEAUTIFYING & HUMANIZING THE US 75 / DART RAIL GREENVILLE AVE | Handling Code: |
LN |
Limits From: | IN THE CITY OF RICHARDSON FROM | Fund Cat: | 9 |
Limits To: | ARAPAHO RD DART STA TO GALATYN PARK | Estimate: | $2,063,417 |
Length: | 0.0 Miles | Actual: | $1,257,618 |
Back... |
Totals for 0918-45-528 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,063,417 | ||
Actual: | $1,257,618 | ||
CCSJ: 0918-45-540 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2001(134) | CSJ: | 0918-45-540 |
Description: | ITS ARCHITECTURE DEVELOPMENT | Handling Code: |
XX |
Limits From: | DALLAS AREA INTER-CITY COMMUNICATIO | Fund Cat: | 5 |
Limits To: | EXCHANGE - PHASE I | Estimate: | $357,535 |
Length: | 0.0 Miles | Actual: | $357,533 |
Back... |
Totals for 0918-45-540 | ||
Length: | 0.0 Miles | ||
Estimate: | $357,535 | ||
Actual: | $357,533 | ||
CCSJ: 0918-45-610 | |||
District: | Dallas | Let Date: | JAN 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2006(204)SFT | CSJ: | 0918-45-610 |
Description: | SIGNAL UPGRADE | Handling Code: |
|
Limits From: | MALCOLM X BLVD AT MAIN STREET | Fund Cat: | 8 |
Limits To: | IN CITY OF DALLAS | Estimate: | $44,395 |
Length: | 0.0 Miles | Actual: | $39,400 |
Back... |
Totals for 0918-45-610 | ||
Length: | 0.0 Miles | ||
Estimate: | $44,395 | ||
Actual: | $39,400 | ||
CCSJ: 0918-45-638 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(211)TE | CSJ: | 0918-45-638 |
Description: | CONSTRUCT HIKE & BIKE TRAIL - 3.49 MILES | Handling Code: |
XX |
Limits From: | HUNTER/FERRELL RD S.W.ALONG WEST FO | Fund Cat: | 9 |
Limits To: | TRINITY RIVER TO BELTLINE,N.ALONG B | Estimate: | $3,539,707 |
Length: | 3.5 Miles | Actual: | $3,717,000 |
Back... |
Totals for 0918-45-638 | ||
Length: | 3.5 Miles | ||
Estimate: | $3,539,707 | ||
Actual: | $3,717,000 | ||
CCSJ: 0918-45-644 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(130)TE | CSJ: | 0918-45-644 |
Description: | AESTHETIC IMPROVEMENTS TO MAIN ST - DOWNTOWN | Handling Code: |
LN |
Limits From: | MAIN ST, FROM ROWLETT ROAD EASTWARD | Fund Cat: | 9 |
Limits To: | SKYLINE DRIVE | Estimate: | $2,120,977 |
Length: | 0.5 Miles | Actual: | $2,061,495 |
Back... |
Totals for 0918-45-644 | ||
Length: | 0.5 Miles | ||
Estimate: | $2,120,977 | ||
Actual: | $2,061,495 | ||
CCSJ: 0918-45-646 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(938) | CSJ: | 0918-45-646 |
Description: | KATY TRAIL EXT (PHASE FIVE & VICTORY DEV PED DIST & 3 CITY | Handling Code: |
LC |
Limits From: | VICTORY DEVELOPMENT PED DST & LU/JU | Fund Cat: | 7 |
Limits To: | PARK ST, DART ST, AND KATY TR PH 5 | Estimate: | $5,746,621 |
Length: | 0.3 Miles | Actual: | $4,018,052 |
Back... |
Totals for 0918-45-646 | ||
Length: | 0.3 Miles | ||
Estimate: | $5,746,621 | ||
Actual: | $4,018,052 | ||
CCSJ: 0918-45-659 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2004(430) | CSJ: | 0918-45-659 |
Description: | REPL BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | FAITHON LUCAS BLVD @ S MESQUITE_CRK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,434,051 |
Length: | 0.4 Miles | Actual: | $2,220,657 |
Bid Tabulations Back... |
Totals for 0918-45-659 | ||
Length: | 0.4 Miles | ||
Estimate: | $2,434,051 | ||
Actual: | $2,220,657 | ||
CCSJ: 0918-45-706 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(039)MM | CSJ: | 0918-45-706 |
Description: | QUIET ZONES / QUAD GATES - - RAIL TRANSIT | Handling Code: |
TR |
Limits From: | CITY OF IRVING | Fund Cat: | 7 |
Limits To: | TRE QUIET ZONES | Estimate: | $4,174,000 |
Length: | 0.0 Miles | Actual: | $3,149,824 |
Back... |
Totals for 0918-45-706 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,174,000 | ||
Actual: | $3,149,824 | ||
CCSJ: 0918-45-718 | |||
District: | Dallas | Let Date: | JAN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2006(205) | CSJ: | 0918-45-718 |
Description: | ARMOR JOINTS REPAIR, DRAINAGE, FRACTURE CRITICAL REPAIR ON | Handling Code: |
|
Limits From: | VARIOUS FREEWAYS IN DALLAS COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $879,890 |
Length: | 0.0 Miles | Actual: | $636,602 |
Back... |
Totals for 0918-45-718 | ||
Length: | 0.0 Miles | ||
Estimate: | $879,890 | ||
Actual: | $636,602 | ||
CCSJ: 0918-45-719 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2006(605) | CSJ: | 0918-45-719 |
Description: | INTERSECTION AND SIGNAL IMPROVEMENT | Handling Code: |
|
Limits From: | INTERSECTION OF ROWLETT RD AT SH 66 | Fund Cat: | 5 |
Limits To: | IN ROWLETT | Estimate: | $1,251,875 |
Length: | 0.2 Miles | Actual: | $1,305,410 |
Bid Tabulations Back... |
Totals for 0918-45-719 | ||
Length: | 0.2 Miles | ||
Estimate: | $1,251,875 | ||
Actual: | $1,305,410 | ||
CCSJ: 0918-45-730 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(950)MM | CSJ: | 0918-45-730 |
Description: | CONSTRUCTION OF ENTRANCE TO DALLAS AREA TRANSPORTATION | Handling Code: |
|
Limits From: | DALLAS AREA TRAFFIC | Fund Cat: | 7 |
Limits To: | MANAGEMENT CENTER | Estimate: | $501,958 |
Length: | 0.0 Miles | Actual: | $721,256 |
Back... |
Totals for 0918-45-730 | ||
Length: | 0.0 Miles | ||
Estimate: | $501,958 | ||
Actual: | $721,256 | ||
CCSJ: 0918-45-744 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2004(720)MM | CSJ: | 0918-45-744 |
Description: | ACQUISITION | Handling Code: |
XX |
Limits From: | VICTORY DVLPMNT PED DIST_& LU/JU | Fund Cat: | 7 |
Limits To: | PARK ST,DART ST,&DATY TRAIL,PHASE 5 | Estimate: | |
Length: | 0.0 Miles | Actual: | $2,126,250 |
Back... |
Totals for 0918-45-744 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $2,126,250 | ||
CCSJ: 0918-45-749 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(204) | CSJ: | 0918-45-749 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
LC |
Limits From: | D/FW AIRPORT - AIRFIELD DR | Fund Cat: | 5 |
Limits To: | . | Estimate: | $2,233,000 |
Length: | 0.0 Miles | Actual: | $2,788,358 |
Back... |
Totals for 0918-45-749 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,233,000 | ||
Actual: | $2,788,358 | ||
CCSJ: 0918-45-769 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM 2006(598) | CSJ: | 0918-45-769 |
Description: | SIP IMPLEMENTATION - ON - SYSTEM | Handling Code: |
XX |
Limits From: | TRAFFIC SIGNAL INTEGRATION AND | Fund Cat: | 5 |
Limits To: | MONITORING - CITY OF DALLAS | Estimate: | $238,860 |
Length: | 0.0 Miles | Actual: | |
District: | Dallas | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM 2006(598) | CSJ: | 0918-45-770 |
Description: | SIP IMPLEMENTATION - OFF - SYSTEM | Handling Code: |
XX |
Limits From: | TRAFFIC SIGNAL INTEGRATION AND | Fund Cat: | 5 |
Limits To: | MONITORING - CITY OF DALLAS | Estimate: | $542,435 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0918-45-769 | ||
Length: | 0.0 Miles | ||
Estimate: | $781,295 | ||
Actual: | |||
CCSJ: 0918-45-775 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM ( ) | CSJ: | 0918-45-775 |
Description: | 19 INTERSECTIONS - SIGNAL IMPROVEMENTS, LEDS AND GPS CLOCKS | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS - CITY MESQUITE | Fund Cat: | 5 |
Limits To: | 19 ON-SYSTEM LOCATIONS | Estimate: | $22,100 |
Length: | 0.0 Miles | Actual: | |
District: | Dallas | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM ( ) | CSJ: | 0918-45-776 |
Description: | 20 OFF - SYSTEM LOCATIONS - SIGNAL IMPROVEMENTS, LEDS & GPS | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS - CITY MESQUITE | Fund Cat: | 5 |
Limits To: | 20 OFF-SYSTEM LOCATIONS | Estimate: | $44,850 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0918-45-775 | ||
Length: | 0.0 Miles | ||
Estimate: | $66,950 | ||
Actual: | |||
CCSJ: 0918-45-778 | |||
District: | Dallas | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-45-778 | CSJ: | 0918-45-778 |
Description: | SPECIALTY PAVEMENT MARKINGS ON ALL STATE FACILITIES IN SEAO | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN SOUTHEAST | Fund Cat: | 1 |
Limits To: | DALLAS COUNTY | Estimate: | $510,473 |
Length: | 87.2 Miles | Actual: | $438,053 |
Bid Tabulations Back... |
Totals for 0918-45-778 | ||
Length: | 87.2 Miles | ||
Estimate: | $510,473 | ||
Actual: | $438,053 | ||
CCSJ: 0918-45-784 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2006(617) | CSJ: | 0918-45-784 |
Description: | RETROFIT SIGNALS WITH LED LENSES | Handling Code: |
XX |
Limits From: | DFW AIRPORT SIGNALS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $64,546 |
Length: | 0.0 Miles | Actual: | $64,546 |
Back... |
Totals for 0918-45-784 | ||
Length: | 0.0 Miles | ||
Estimate: | $64,546 | ||
Actual: | $64,546 | ||
CCSJ: 0918-45-785 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2006(650)MM | CSJ: | 0918-45-785 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | ON SAMUELL BOULEVARD FROM IH 30 | Fund Cat: | 7 |
Limits To: | BUCKNER BLVD | Estimate: | |
Length: | 0.0 Miles | Actual: | $72,888 |
Back... |
Totals for 0918-45-785 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $72,888 | ||
CCSJ: 0918-45-798 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | CS | Let Status: | Tentative |
Project ID: | HP 2006(849) | CSJ: | 0918-45-798 |
Description: | DART LRT OVERPASS | Handling Code: |
TR |
Limits From: | SANTA FE TRAIL OVERPASS - HILL ST | Fund Cat: | 10 |
Limits To: | COMMERCE ON ABANDONED SANTA FE RR | Estimate: | $1,000,000 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0918-45-798 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,000,000 | ||
Actual: | |||
CCSJ: 1047-02-043 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | CL 1047-2-43 | CSJ: | 1047-02-043 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
XX |
Limits From: | DUNCANVILLE ROAD | Fund Cat: | 10 |
Limits To: | 0.3 MILES EAST OF DUNCANVILLE ROAD | Estimate: | $16,000 |
Length: | 0.3 Miles | Actual: | $16,000 |
Back... |
Totals for 1047-02-043 | ||
Length: | 0.3 Miles | ||
Estimate: | $16,000 | ||
Actual: | $16,000 | ||
CCSJ: 1047-03-049 | |||
District: | Dallas | Let Date: | JAN 2006 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | STP 2006(206)RGS | CSJ: | 1047-03-049 |
Description: | CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE | Handling Code: |
|
Limits From: | AT UNION PACIFIC RAILROAD CROSSING | Fund Cat: | 10 |
Limits To: | (DOT NO. 794 952A) | Estimate: | $10,227,687 |
Length: | 0.6 Miles | Actual: | $11,083,070 |
Back... |
Totals for 1047-03-049 | ||
Length: | 0.6 Miles | ||
Estimate: | $10,227,687 | ||
Actual: | $11,083,070 | ||
CCSJ: 1047-03-060 | |||
District: | Dallas | Let Date: | DEC 2005 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | BR 2006(084) | CSJ: | 1047-03-060 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | AT DRAW | Fund Cat: | 10 |
Limits To: | . | Estimate: | $3,179,114 |
Length: | 0.2 Miles | Actual: | $3,993,189 |
Back... |
Totals for 1047-03-060 | ||
Length: | 0.2 Miles | ||
Estimate: | $3,179,114 | ||
Actual: | $3,993,189 | ||
CCSJ: 1068-04-115 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2006(208) | CSJ: | 1068-04-115 |
Description: | CONSTRUCT 5 LEVEL INTERCHANGE - PHASE 1_ (TOLL) | Handling Code: |
|
Limits From: | AT SH 161/NW 19TH | Fund Cat: | 2 |
Limits To: | . | Estimate: | $26,992,522 |
Length: | 1.8 Miles | Actual: | $27,988,228 |
District: | Dallas | Let Date: | MAR 2006 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2000(459) | CSJ: | 1068-04-121 |
Description: | RIGHT OF WAY ACQUISITION, RELOCATION ASSISTANCE AND UTILITY | Handling Code: |
|
Limits From: | AT SH 161/NW 19TH | Fund Cat: | ROW |
Limits To: | . | Estimate: | $133,509 |
Length: | 0.0 Miles | Actual: | $72,845 |
Back... |
Totals for 1068-04-115 | ||
Length: | 1.8 Miles | ||
Estimate: | $27,126,031 | ||
Actual: | $28,061,073 | ||
CCSJ: 1068-04-136 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | ITS 2004(808) | CSJ: | 1068-04-136 |
Description: | DALLAS - FORT WORTH REGION VALUE PRICING DEPLOYMENT PLAN IH 30 | Handling Code: |
XX |
Limits From: | VALUE PRICING PILOT PROGRAM,IH 30 | Fund Cat: | 10 |
Limits To: | MANAGED FACILITY OPERATION | Estimate: | $590,520 |
Length: | 13.3 Miles | Actual: | $590,520 |
Back... |
Totals for 1068-04-136 | ||
Length: | 13.3 Miles | ||
Estimate: | $590,520 | ||
Actual: | $590,520 | ||
CCSJ: 2208-02-019 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | SP 303 | Let Status: | Actual |
Project ID: | NH 2006(521) | CSJ: | 2208-02-019 |
Description: | REHABILITATION OF EXISTING ROADWAY | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 1 |
Limits To: | SE 14TH STREET IN GRAND PRAIRIE | Estimate: | $1,049,348 |
Length: | 3.0 Miles | Actual: | $1,349,366 |
Back... |
Totals for 2208-02-019 | ||
Length: | 3.0 Miles | ||
Estimate: | $1,049,348 | ||
Actual: | $1,349,366 | ||
CCSJ: 2374-01-153 | |||
District: | Dallas | Let Date: | FEB 2006 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CM 2006(033) | CSJ: | 2374-01-153 |
Description: | ADD 1 CONCRNT HOV EA DIR FROM GREENVILLE TO SKILLMAN & 1 REV | Handling Code: |
|
Limits From: | W OF US 75 | Fund Cat: | 1 |
Limits To: | KCS RR (WEST OF SH 78) | Estimate: | $21,593,145 |
Length: | 6.7 Miles | Actual: | $22,891,433 |
District: | Dallas | Let Date: | FEB 2006 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CM 2006(033) | CSJ: | 2374-02-118 |
Description: | ADD 1 REV HOV FR KCS RR TO IH 30, 4 AUX LANES AND ATMS; TCM | Handling Code: |
|
Limits From: | KCS RR (WEST OF SH 78) | Fund Cat: | 7 |
Limits To: | IH 30 | Estimate: | $17,836,401 |
Length: | 4.5 Miles | Actual: | $18,999,289 |
Back... |
Totals for 2374-01-153 | ||
Length: | 11.2 Miles | ||
Estimate: | $39,429,546 | ||
Actual: | $41,890,722 | ||
CCSJ: 2374-02-110 | |||
District: | Dallas | Let Date: | OCT 2005 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IMD 635-6(389) | CSJ: | 2374-02-110 |
Description: | CONSTRUCT I / C @ TOWN EAST BLVD, REPLACE BRIDGE, ADD A | Handling Code: |
|
Limits From: | NORTH OF TOWN EAST BLVD | Fund Cat: | 7 |
Limits To: | US 80 | Estimate: | $34,080,154 |
Length: | 1.8 Miles | Actual: | $41,329,395 |
District: | Dallas | Let Date: | OCT 2005 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | NH 2004(230) | CSJ: | 2374-02-112 |
Description: | UTILITIES | Handling Code: |
|
Limits From: | NORTH OF TOWN EAST BLVD | Fund Cat: | ROW |
Limits To: | US 80 | Estimate: | $3,812,947 |
Length: | 1.0 Miles | Actual: | $4,612,893 |
Back... |
Totals for 2374-02-110 | ||
Length: | 2.8 Miles | ||
Estimate: | $37,893,101 | ||
Actual: | $45,942,288 | ||
CCSJ: 2374-02-122 | |||
District: | Dallas | Let Date: | APR 2006 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 6356(398) | CSJ: | 2374-02-122 |
Description: | REFURBISHING GUIDE SIGNS | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $425,733 |
Length: | 6.8 Miles | Actual: | $342,496 |
District: | Dallas | Let Date: | APR 2006 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0205(136) | CSJ: | 2374-03-069 |
Description: | SIGN REFURBISHING | Handling Code: |
|
Limits From: | SOUTH OF US 175 | Fund Cat: | 1 |
Limits To: | IH 635 | Estimate: | $150,138 |
Length: | 0.9 Miles | Actual: | $116,503 |
Back... |
Totals for 2374-02-122 | ||
Length: | 7.7 Miles | ||
Estimate: | $575,871 | ||
Actual: | $458,999 | ||
CCSJ: 2374-03-049 | |||
District: | Dallas | Let Date: | AUG 2006 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | C 2374-3-49 | CSJ: | 2374-03-049 |
Description: | CONSTRUCT 2 LANE FRONTAGE ROADS EASTBOUND AND WESTBOUND | Handling Code: |
|
Limits From: | BONNIE VIEW | Fund Cat: | 11 |
Limits To: | JJ LEMMON IN THE CITY OF DALLAS | Estimate: | $11,610,836 |
Length: | 1.2 Miles | Actual: | $10,974,322 |
Bid Tabulations Award Status Back... |
Totals for 2374-03-049 | ||
Length: | 1.2 Miles | ||
Estimate: | $11,610,836 | ||
Actual: | $10,974,322 | ||
CCSJ: 2374-04-061 | |||
District: | Dallas | Let Date: | JAN 2006 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | C 2374-4-61 | CSJ: | 2374-04-061 |
Description: | CONTINUOUS ILLUMINATION | Handling Code: |
|
Limits From: | CEDAR RIDGE ROAD | Fund Cat: | 1 |
Limits To: | COCKRELL HILL, CITY OF DUNCANVILLE | Estimate: | $207,321 |
Length: | 2.1 Miles | Actual: | $172,327 |
Back... |
Totals for 2374-04-061 | ||
Length: | 2.1 Miles | ||
Estimate: | $207,321 | ||
Actual: | $172,327 | ||
CCSJ: 2374-07-053 | |||
District: | Dallas | Let Date: | MAY 2006 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CC 2374-7-53 | CSJ: | 2374-07-053 |
Description: | CONSTRUCT WESTBOUND FRONTAGE ROAD AND RAMP REVERSALS | Handling Code: |
|
Limits From: | 0.095 MILES WEST OF BELTLINE ROAD | Fund Cat: | 10 |
Limits To: | 0.075 MILES WEST OF OLYMPUS BLVD | Estimate: | $4,247,552 |
Length: | 1.1 Miles | Actual: | $4,034,163 |
Back... |
Totals for 2374-07-053 | ||
Length: | 1.1 Miles | ||
Estimate: | $4,247,552 | ||
Actual: | $4,034,163 | ||
CCSJ: 8044-18-001 | |||
District: | Dallas | Let Date: | MAR 2006 |
Highway: | MH | Let Status: | Actual |
Project ID: | STP 88(777)MM | CSJ: | 8044-18-001 |
Description: | RECONSTRUCT EXISTING 4 - LN UNDIV RDWY TO 6 - LN DIV URB FACILTY | Handling Code: |
LC |
Limits From: | DALLAS @ OAK LAWN, IH 35E TO MAPLE | Fund Cat: | 11 |
Limits To: | & HARRY HINES TO S OF MAPLE ON DNT | Estimate: | $14,359,000 |
Length: | 0.9 Miles | Actual: | $16,142,117 |
Back... |
Totals for 8044-18-001 | ||
Length: | 0.9 Miles | ||
Estimate: | $14,359,000 | ||
Actual: | $16,142,117 |
|
|