Letting Schedule for Dallas District (FY 2009)

 
 
Last Update: Monday, November 9, 2009
Dallas District (FY 2009)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-06-142 US 75 Actual JUN 2009 $217,092 10 LANDSCAPE DEVELOPMENT INCLUDING TREE & SHRUB PLANTING AND
0091-04-041 SH 289 Actual OCT 2008 $35,046,753 1 WIDEN 2 LANE RURAL HIGHWAY TO SIX LANE DIVIDED URBAN
0091-05-055 SH 289 Actual JUL 2009 $1,292,753 5 INTERSECTION IMPROVEMENTS - RIGHT & LEFT TURN LANES
0281-02-060 SH 78 Actual AUG 2009 $12,800,993 10 WIDEN FROM 4 LANE TO 6 LANE DIVIDED
0918-24-132 VA Actual MAR 2009 $532,326 5 TRAFFIC SIGNAL IMPROVEMENTS
2351-01-013 FM 2478 Actual JAN 2009 $33,738,431 5 WIDEN 2 - LANE RURAL TO 6 - LANE DIVIDED URBAN

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-02-058 SH 78 Actual AUG 2009 $1,568,590 1 ACP OVERLAY, CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS
0047-07-214 US 75 Actual APR 2009 $8,650 10 LANDSCAPE DEVELOPMENT
0047-07-215 US 75 Actual FEB 2009 $510,280 10 LANDSCAPE DEVELOPMENT TO INCLUDE PLANT IRRIGATION
0092-02-117 IH 45 Actual JUN 2009 $1,523,430 10 DRAINAGE IMPROVEMENT
0092-14-076 IH 345 Actual JUL 2009 $855,200 1 REPAIR BENT CAPS AND GIRDERS
0094-03-094 SH 183 Actual OCT 2008 $859,338 7 ADD U - TURN
0094-07-039 SH 183 Actual SEP 2008 $958,168 1 REHAB OF AN EXISTING ROADWAY
0095-02-100 US 80 Actual OCT 2008 $24,968,165 10 UPGRADING INTERCHANGE INCLUDING BRIDGES AND FRONTAGE ROADS
0095-13-028 IH 20 Actual MAR 2009 $375,691 10 LANDSCAPE DEVELOPMENT INCLUDING TREE & SHRUB PLANTING,
0196-03-249 IH 35E Actual MAY 2009 $2,633,864 10 CONSTRUCT SOUTHBOUND FRONTAGE ROAD & ENTRANCE AND EXIT RAMPS
0196-03-252 IH 35E Actual DEC 2008 $1,117,000 1 UPGRADE TRAFFIC SIGNAL HARDWARE AT 3 INTERSECTIONS OH IH 35E
0196-07-027 SP 366 Actual JUL 2009 $44,492,731 9 CONSTRUCTION OF DECK AND PLAZA OVER FREEWAY
0261-02-070 US 67 Actual SEP 2008 $386,127 1 SIGN REFURBISHING
0353-04-090 SH 114 Actual JUL 2009 $5,922,280 1 PLANE EXISTING SURFACE AND ACP OVERLAY
0442-02-147 IH 35E Actual MAR 2009 $377,987 1 FULL DEPTH REPAIR, RESTRIPE CAMP WISDOM INTERSECTION AND
0581-02-121 LP 12 Actual OCT 2008 224,217,703 5 WIDEN 6 TO 8 LANE FRWY, ADD 2 REVERSIBLE HOV / MANAGED LANES
0918-00-130 VA Actual MAR 2009 $1,155,000 5 INTERIM REGIONAL BUS CONNECTOR ALONG IH 35E BETWEEN DENTON &
0918-00-140 VA Actual MAY 2009 $748,973 1 INSTALL UNINTERRUPTED POWER SUPPLY AT SIGNALIZED
0918-00-141 VA Actual FEB 2009 $234,258 1 INSTALL SPREAD SPECTRUM RADIO AT SIGNALIZED INTERSECTIONS
0918-00-144 VA Actual SEP 2008 $1,504,608 1 NON - SITE SPECIFIC SIGN REPLACEMENT
0918-00-145 VA Actual JUL 2009 $2,499,999 5 REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION
0918-00-146 VA Actual DEC 2008 $2,630,738 7 REGIONAL TRIP REDUCTION PROGRAM IMPLEMENTATION BY NCTCOG
0918-00-150 VA Actual JAN 2009 $723,260 1 REPLACE INCANDESCENT LENSES WITH LED'S FOR EXISTING
0918-00-151 VA Actual MAR 2009 $3,023,866 7 DART VANPOOL PROGRAM - TRAVEL DEMAND MANAGEMENT
0918-00-153 VA Actual NOV 2008 $1,833,000 1 FUNDS TRANSFER FOR VARIOUS ROUTINE ITS MAINTENANCE CONTRACTS
0918-45-299 CS Actual MAR 2009 $3,862,053 5 4 INTERSECTION IMPROVEMENTS
0918-45-531 VA Actual JAN 2009 $1,422,710 9 CONSTRUCTION OF A LANCASTER VISITOR'S CENTER IN THE_DOWNTOWN
0918-45-643 VA Actual JUN 2009 $2,233,379 9 CONSTRUCT 2 MILES OF BICYCLE WEB ROUTE
0918-45-667 VA Actual JUN 2009 $367,900 10 TRAFFIC CONTROL SYSTEM 31 LOCATIONS
0918-45-709 VA Actual JUN 2009 $591,692 5 SIGNAL IMPROVEMENTS
0918-45-710 VA Actual JUN 2009 $431,584 5 SIGNAL IMPROVEMENTS, OFF - SYSTEM
0918-45-755 VA Actual OCT 2008 $160,000 10 LANDSCAPE DEVELOPMENT
0918-45-777 VA Actual SEP 2008 $528,200 10 COMPENSATORY MITIGATION FOR RIPARIAN FORESTS ON SH 161 IN
0918-45-801 VA Actual OCT 2008 $1,346,379 10 SEGMENT 4 CURB RAMP IMPROVEMENT FOR ADA UPGRADES
0918-45-825 CS Actual SEP 2008 $920,000 7 CREATE RAILROAD QUIET ZONE BY INSTALLING MEDIANS AND WAYSIDE
0918-45-845 VA Actual MAR 2009 $98,113 5 TAP - CITY OF DALLAS
0918-45-847 VA Actual SEP 2008 $265,792 1 SMALL SIGN REPLACEMENTS IN DALLAS COUNTY
0918-45-850 VA Actual FEB 2009 $214,856 1 REFURBISH SIGNS FOR HAZARDOUS CARGO ROUTE
0918-45-854 VA Actual MAR 2009 $2,953,125 5 LAS COLINAS AREA PERSONAL TRANSIT SYSTEM SMALL STARTS PROJ
0918-45-856 VA Actual MAR 2009 $6,437,500 5 CONSTRUCT RAIL STATION ON DART BLUELINE IN LAKE HIGHLANDS
1047-02-044 FM 1382 Actual APR 2009 $1,388,408 1 INTERSECTION APPROACH WIDENING, SIGNAL UPGRADES AND
2374-01-068 IH 635 Actual AUG 2009 566,009,652 2 IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV / MANAGED LANES
2374-07-059 IH 635 Actual MAR 2009 $3,483,582 10 CONSTRUCT EASTBOUND FRONTAGE ROAD AND RAMP REVERSALS
2374-07-061 IH 635 Actual AUG 2009 $79,980 10 LANDSCAPE DEVELOPMENT
2964-01-036 SH 161 Actual AUG 2009 $3,988,685 2 ELECTRONIC TOLL COLLECTION__ (TOLL)
2964-06-009 SH 190 Actual FEB 2009 $98,539,359 2 CONSTRUCT 6 LANE TOLL ROAD
2964-06-010 SH 190 Actual DEC 2008 $56,971,131 2 CONSTRUCT 6 LANE TOLL ROAD WITH FRONTAGE ROADS_ (SECTION 31)
2964-06-017 SH 190 Actual FEB 2009 $57,931,781 2 CONSTRUCT NEW LOCATION SIX LANE TOLLWAY WITH SIX LANE
2964-06-018 SH 190 Actual FEB 2009 121,867,756 2 CONSTRUCT NEW LOCATION TOLLWAY AND FRONTAGE ROADS

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0134-09-062 US 380 Actual NOV 2008 $7,063,537 1 SEALCOAT - DISTRICT NORTHERN SECTION
0195-02-059 IH 35 Actual JAN 2009 $398,951 1 BRIDGE PREVENTATIVE MAINTENANCE
0195-02-062 IH 35 Actual MAR 2009 $4,401,916 1 CEMENT TREATED BASE AND OVERLAY OF FRONTAGE ROADS
0619-05-030 FM 544 Actual JUN 2009 $7,974,083 10 RECONSTRUCT AND WIDEN TO SIX LANE DIVIDED URBAN SECTION.
0918-46-065 CR Actual MAY 2009 $625,784 6 REPLACE BRIDGE AND APPROACHES (NEW STEEL TRUSS)
0918-46-099 CR Actual AUG 2009 $1,637,473 6 REPLACE BRIDGE AND APPROACHES
0918-46-199 VA Actual DEC 2008 $654,538 7 PEDESTRIAN IMPROVEMENTS ALONG WIND RIVER LANE & STATE SCHOOL
1059-01-040 FM 1173 Actual MAY 2009 $4,716,242 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1310-01-033 FM 407 Actual APR 2009 $690,968 8 REALIGN INTERSECTION
1567-02-027 FM 423 Actual AUG 2009 $29,931,000 10 WIDEN 2 LANE RURAL TO 6 LANE DIVIDED URBAN HIGHWAY

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-04-082 IH 35E Actual MAY 2009 $1,430,816 1 INSTALL MEDIAN BARRIER
0092-08-015 BI 45-G Actual JUL 2009 $1,950,526 1 REHABILITATE EXISTING ROADWAY
0092-10-007 BI 45-J Actual JUN 2009 $1,487,344 1 REHABILITATE EXISTING ROADWAY
0918-22-112 CR Actual JUL 2009 $1,615,006 6 REPLACE BRIDGE AND APPROACHES
0918-22-119 CS Actual JUL 2009 $499,080 6 REPLACE BRIDGE AND APPROACHES
1160-01-028 FM 877 Actual AUG 2009 $7,087,828 1 ADD 3 FOOT PAVE SHOULDERS

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0197-04-073 US 175 Actual JUL 2009 $3,485,206 6 REPLACE BRIDGE AND APPROACHES
0642-05-020 FM 986 Actual NOV 2008 $941,874 1 REPLACE BRIDGE AND APPROACHES
0751-04-001 FM 598 Actual JUN 2009 $2,705,890 1 UPGRADE EXISTING COUNTY ROAD
0918-11-065 CR Actual APR 2009 $388,178 6 REPLACE BRIDGE AND APPROACHES
1091-01-016 FM 740 Actual JUL 2009 $2,856,521 6 REPLACE BRIDGE AND APPROACHES
1395-01-015 FM 1389 Actual MAY 2009 $2,178,895 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1397-01-021 FM 1836 Actual MAY 2009 $1,708,660 1 REPLACE BRIDGE AND APPROACHES
1397-01-026 FM 1836 Actual MAY 2009 $1,875,930 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0092-13-020 BI 45-F Actual DEC 2008 $1,258,301 1 INSTALL SIGNAL AT 3 INTERSECTIONS: 13TH ST, 5TH ST AND 1ST
0093-01-084 IH 45 Actual SEP 2008 $906,931 6 REHABILITATE BRIDGE AND APPROACHES
0121-04-024 SH 22 Actual NOV 2008 $13,978,394 1 SEALCOAT - DISTRICT SOUTHERN SECTION
0166-01-041 IH 45 Actual JUL 2009 $14,712,616 9 RECONSTRUCTION OF SAFETY REST AREA
0918-18-092 CR Actual DEC 2008 $1,109,009 6 REPLACE BRIDGE AND APPROACHES
0918-18-093 CR Actual JUL 2009 $1,127,072 6 REPLACE BRIDGE AND APPROACHES
0918-18-112 CS Actual AUG 2009 $438,307 8 CONSTRUCT SIDEWALKS, CROSSWALKS, AND SIGNS AT RICE JR HIGH
1289-01-028 FM 1126 Actual APR 2009 $7,287,236 1 OV - ASPHALTIC CONCRETE PAVEMENT, OVERLAY, RESTORE PAVEMENT

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-12-073 IH 30 Actual JUL 2009 $19,585,218 10 CONSTRUCT INTERCHANGE INCLUDING FRONTAGE ROADS AND RAMPS
1014-03-039 FM 740 Actual AUG 2009 $12,283,664 10 WIDEN 2 LN RURAL TO 4 LN DIV URBAN