Letting Schedule for October, 2008 (FY 2009)
Letting Schedule for October, 2008 (FY 2009) | ||||
Last Update: Monday, November 9, 2009 |
October, 2008 (FY 2009) | (see Links) |
SEP 2008 | OCT 2008 | NOV 2008 | DEC 2008 | JAN 2009 | FEB 2009 | MAR 2009 | APR 2009 | MAY 2009 | JUN 2009 | JUL 2009 | AUG 2009 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0923-00-053 | Brown/ Brownwood |
VA | Actual | $460,230 | 1 | THERMOPLASTIC STRIPING |
0091-04-041 | Collin/ Dallas |
SH 289 | Actual | $35,046,753 | 1 | WIDEN 2 LANE RURAL HIGHWAY TO SIX LANE DIVIDED URBAN |
1594-02-010 | Coryell/ Waco |
FM 1783 | Actual | $1,325,148 | 6 | REPLACE BRIDGE AND APPROACHES |
0094-03-094 | Dallas/ Dallas |
SH 183 | Actual | $859,338 | 7 | ADD U - TURN |
0095-02-100 | Dallas/ Dallas |
US 80 | Actual | $24,968,165 | 10 | UPGRADING INTERCHANGE INCLUDING BRIDGES AND FRONTAGE ROADS |
0581-02-121 | Dallas/ Dallas |
LP 12 | Actual | 224,217,703 | 5 | WIDEN 6 TO 8 LANE FRWY, ADD 2 REVERSIBLE HOV / MANAGED LANES |
0918-45-755 | Dallas/ Dallas |
VA | Actual | $160,000 | 10 | LANDSCAPE DEVELOPMENT |
0918-45-801 | Dallas/ Dallas |
VA | Actual | $1,346,379 | 10 | SEGMENT 4 CURB RAMP IMPROVEMENT FOR ADA UPGRADES |
0923-09-055 | Eastland/ Brownwood |
CS | Actual | $268,988 | 8 | CONSTRUCT SIDEWALKS AND BIKE LANES |
0924-06-299 | El Paso/ El Paso |
CS | Actual | $1,000,000 | 7 | MISSION VALLEY TRAFFIC ANALYSIS STUDY |
0924-06-302 | El Paso/ El Paso |
CS | Actual | $2,000,000 | 7 | ZARAGOZA CORRIDOR STUDY |
0190-01-028 | Franklin/ Paris |
SH 37 | Actual | $10,355,695 | 1 | SEAL COAT |
1327-02-021 | Freestone/ Bryan |
FM 1451 | Actual | $1,854,430 | 1 | RESTORATION OF EXISTING ROAD CONSISTING OF GRADING, |
0112-02-024 | Gillespie/ Austin |
US 290 | Actual | $3,090,684 | 6 | REPLACE BRIDGE AND APPROACHES |
0516-02-024 | Goliad/ Corpus Christi |
SH 239 | Actual | $4,486,038 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
2641-01-006 | Grayson/ Paris |
PR 20A | Actual | $389,324 | 1 | OVERLAY |
0377-01-032 | Gregg/ Tyler |
SH 135 | Actual | $11,879,739 | 1 | RECONSTR TO 4 - LN DIVIDED CURB & GUTTER RDWY W / FLUSH MEDIAN |
0912-72-070 | Harris/ Houston |
CS | Actual | $8,786,305 | 10 | CONSTRUCTION OF STREETS AND DRAINAGE |
0912-72-111 | Harris/ Houston |
CS | Actual | $2,181,418 | 5 | BELLAIRE TRAFFIC SIGNAL SYSTEM ENHANCE ALL THE 20 TRAFFIC |
3379-01-010 | Hays/ Austin |
FM 3407 | Actual | $26,218,771 | 10 | CONSTRUCT 4 - LN DIVIDED ROADWAY |
1099-05-030 | Henderson/ Tyler |
US 175 | Actual | $1,045,566 | 1 | RESURFACE ROADWAY ON LOOP 7 |
0391-07-023 | Jack/ Fort Worth |
FM 4 | Actual | $2,388,295 | 6 | REPLACE BRIDGE AND APPROACHES |
0348-11-011 | Live Oak/ Corpus Christi |
FM 99 | Actual | $2,785,458 | 6 | REPLACE BRIDGE AND APPROACHES |
0905-06-069 | Lubbock/ Lubbock |
CR | Actual | $655,072 | 8 | WIDEN, CONVERT 2 TO 4 WAY STOP, ADD TURN LANE |
0920-06-025 | Newton/ Beaumont |
CR | Actual | $320,373 | 6 | REPLACE BRIDGE AND APPROACHES |
0731-01-047 | Panola/ Atlanta |
FM 31 | Actual | $3,642,710 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0902-38-063 | Parker/ Fort Worth |
CS | Actual | $6,962,395 | 10 | FOR THE RELOCATION OF FM 2552; TRAFFIC STUDIES AND PLAN |
0293-01-027 | Pecos/ Odessa |
US 285 | Actual | $2,188,445 | 6 | BRIDGE REPLACEMENT |
0045-17-005 | Red River/ Paris |
FM 194 | Actual | $1,156,705 | 6 | REPLACE BRIDGE AND APPROACHES |
0049-15-011 | Robertson/ Waco |
SH 14 | Actual | $13,510,473 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT AND |
0295-04-043 | Scurry/ Abilene |
US 180 | Actual | $906,554 | 6 | REHABILITATE BRIDGE AND APPROACHES |
2075-01-049 | Smith/ Tyler |
LP 323 | Actual | $361,374 | 10 | PROVIDE CONTINOUS SIDEWALK ON BOTH SIDES ON ROAD (SECTIONS) |
0011-09-062 | Stephens/ Brownwood |
US 180 | Actual | $2,491,112 | 6 | REPLACE BRIDGE AND APPROACHES |
0013-10-074 | Tarrant/ Fort Worth |
BU 287P | Actual | $41,869 | 1 | INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
0700-03-082 | Travis/ Austin |
SH 71 | Actual | $3,396,163 | 6 | REPLACE BRIDGE AND APPROACHES |
0700-03-094 | Travis/ Austin |
SH 71 | Actual | $4,873,301 | 11 | ADD TWLTL, RESTORE THRU LANES & WIDEN PAVED SHLDRS |
0914-04-195 | Travis/ Austin |
CR | Actual | $10,441,137 | 7 | CONSTRUCT 4 LANE DIVIDED ROADWAY |
1234-01-010 | Travis/ Austin |
FM 1100 | Actual | $707,391 | 6 | BRIDGE REPLACEMENT |
0913-27-046 | Victoria/ Yoakum |
CR | Actual | $1,198,632 | 6 | REPLACE BRIDGE AND APPROACHES |
1687-01-014 | Waller/ Houston |
FM 1736 | Actual | $428,913 | 1 | REPAIR BASE FAILURES AND SEAL COAT |
3506-02-005 | Waller/ Houston |
FM 3318 | Actual | $218,650 | 1 | REPAIR BASE FAILURES AND SEAL COAT |
0922-33-013 | Webb/ Laredo |
CR | Actual | $333,046 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING |
1201-01-012 | Williamson/ Austin |
FM 970 | Actual | $675,240 | 6 | BRIDGE REPLACEMENT |
0352-01-053 | Wise/ Fort Worth |
SH 114 | Actual | $13,713,607 | 1 | SEAL COAT |
|
|