Letting Schedule for February, 2009 (FY 2009)
Letting Schedule for February, 2009 (FY 2009) | ||||
Last Update: Monday, November 9, 2009 |
February, 2009 (FY 2009) | (see Links) |
SEP 2008 | OCT 2008 | NOV 2008 | DEC 2008 | JAN 2009 | FEB 2009 | MAR 2009 | APR 2009 | MAY 2009 | JUN 2009 | JUL 2009 | AUG 2009 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0025-02-188 | Bexar/ San Antonio |
IH 10 | Actual | $2,927,910 | 1 | SEAL COAT, OVERLAY, & PAV MRKINGS |
0915-00-143 | Bexar/ San Antonio |
VA | Actual | $981,718 | 1 | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2009 (PROJECT 1) |
0915-00-144 | Bexar/ San Antonio |
VA | Actual | $876,294 | 1 | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2009 (PROJECT 2) |
1890-01-045 | Bexar/ San Antonio |
FM 1976 | Actual | $202,808 | 7 | OPERATIONAL IMPROVEMENTS TO INCLUDE THE ADDITION OF RAISED |
2452-01-049 | Bexar/ San Antonio |
LP 1604 | Actual | $299,870 | 1 | INSTALLATION OF TRAFFIC SIGNALS |
0912-31-108 | Brazoria/ Houston |
CS | Actual | $12,637,056 | 7 | WIDEN TO 4 LANES |
0976-02-085 | Brazoria/ Houston |
FM 865 | Actual | $13,661,784 | 11 | GR, BS, STR, DRAINAGE & PAVEMENT |
1003-01-087 | Brazoria/ Houston |
FM 523 | Actual | $422,395 | 1 | MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND |
2523-02-061 | Brazoria/ Houston |
FM 2004 | Actual | $4,456,458 | 1 | WIDENING TO ADD 10 FOOT SHOULDERS, APPROACHING AND ADJACENT |
0179-10-102 | Calhoun/ Yoakum |
SH 35 | Actual | $82,194 | 10 | LANDSCAPE DEVELOPMENT |
1357-03-004 | Cooke/ Wichita Falls |
FM 3496 | Actual | $1,033,965 | 1 | ADD SHOULDERS |
0047-07-215 | Dallas/ Dallas |
US 75 | Actual | $510,280 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE PLANT IRRIGATION |
0918-00-141 | Dallas/ Dallas |
VA | Actual | $234,258 | 1 | INSTALL SPREAD SPECTRUM RADIO AT SIGNALIZED INTERSECTIONS |
0918-45-850 | Dallas/ Dallas |
VA | Actual | $214,856 | 1 | REFURBISH SIGNS FOR HAZARDOUS CARGO ROUTE |
2964-06-009 | Dallas/ Dallas |
SH 190 | Actual | $98,539,359 | 2 | CONSTRUCT 6 LANE TOLL ROAD |
2964-06-017 | Dallas/ Dallas |
SH 190 | Actual | $57,931,781 | 2 | CONSTRUCT NEW LOCATION SIX LANE TOLLWAY WITH SIX LANE |
2964-06-018 | Dallas/ Dallas |
SH 190 | Actual | 121,867,756 | 2 | CONSTRUCT NEW LOCATION TOLLWAY AND FRONTAGE ROADS |
0748-01-027 | Frio/ San Antonio |
FM 140 | Actual | $2,142,325 | 1 | RECONSTRUCT AND WIDEN NARROW ROADWAY |
0912-73-118 | Galveston/ Houston |
PW | Actual | $290,744 | 1 | ENLARGE PAVED PARKING AREA AROUND BUILDINGS, BUILD VEHICLE |
0155-02-024 | Goliad/ Corpus Christi |
US 183 | Actual | $1,845,241 | 1 | RESTORATION OF EXISTING ROADWAY |
0050-03-085 | Grimes/ Bryan |
SH 6 | Actual | $2,117,247 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF PLANING, SEAL COAT, |
0025-10-083 | Guadalupe/ San Antonio |
FM 78 | Actual | $413,627 | 1 | MILL, SEAL COAT, OVERLAY, PAVEMENT MARKINGS & TRAFFIC SIGNAL |
2231-01-005 | Guadalupe/ San Antonio |
FM 477 | Actual | $1,335,507 | 1 | REHAB EXISTING ROADWAY, ADD SHOULDERS |
0027-10-067 | Harris/ Houston |
US 90A | Actual | $4,045,000 | 10 | REPLACE BRIDGE |
0051-06-017 | Harris/ Houston |
SH 3 | Actual | $762,506 | 1 | FULL DEPTH CONCRETE REPAIR, PLANING AND ASPHALT OVERLAY |
0271-07-300 | Harris/ Houston |
IH 10 | Actual | $99,272 | 1 | SEAL RETAINING WALL JOINTS AT IH 10 EASTBOUND ENTRANCE RAMP |
0271-14-215 | Harris/ Houston |
IH 610 | Actual | $795,184 | 1 | SHOULDER, FULL DEPTH AND BRIDGE DECK REPAIR ON CONNECTORS |
0912-71-697 | Harris/ Houston |
VA | Actual | $509,696 | 5 | CONSTRUCT PEDESTRIAN PATH ALONG GOOSE CREEK |
0912-72-176 | Harris/ Houston |
VA | Actual | $260,028 | 1 | MISCELLANEOUS DRAINAGE IMPROVEMENTS |
3256-01-093 | Harris/ Houston |
BW 8 | Actual | $336,432 | 1 | CHANNEL REHABILITATION ON CHANNEL #2 |
0843-08-010 | Harrison/ Atlanta |
FM 2625 | Actual | $4,817,774 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
2880-01-016 | Harrison/ Atlanta |
FM 2879 | Actual | $1,710,564 | 6 | REHABILITATE BRIDGES AND APPROACHES |
0909-37-041 | Hill/ Waco |
CR | Actual | $672,561 | 6 | REPLACE BRIDGE AND APPROACHES |
1190-01-036 | Hill/ Waco |
FM 933 | Actual | $339,683 | 10 | WIDEN PAVEMENT AND ADD RIGHT AND LEFT TURN LANE |
0069-01-050 | Howard/ Abilene |
US 87 | Actual | $5,249,894 | 1 | PLANING, ASPHALT CONCRETE PAVEMENT, CURB AND GUTTER, AND |
0902-50-098 | Johnson/ Fort Worth |
VA | Actual | $24,423 | 5 | THOROUGFARE ASSESSMENT PROGRAM |
0072-14-020 | Kendall/ San Antonio |
US 87 | Actual | $1,172,942 | 1 | STORM SEWER |
0072-14-026 | Kendall/ San Antonio |
US 87 | Actual | $177,525 | 1 | WIDEN EXISTING ROADWAY TO ADD CONTINUOUS LEFT TURN LANE |
0017-08-071 | La Salle/ Laredo |
IH 35 | Actual | $2,539,958 | 1 | RESTORATION OF SOUTH BOUND MAINLANE, RAMPS |
0905-00-049 | Lubbock/ Lubbock |
VA | Actual | $559,961 | 11 | DISTRICT WIDE RAISED PAVEMENT MARKERS |
0905-00-051 | Lubbock/ Lubbock |
VA | Actual | $2,552,924 | 1 | FY 2009 DISTRICT WIDE STRIPING |
0905-06-046 | Lubbock/ Lubbock |
CS | Actual | $4,469,027 | 7 | WIDEN NON - FREEWAY |
0258-09-132 | McLennan/ Waco |
SH 6 | Actual | $1,075,610 | 1 | MICROSURFACE |
0916-35-129 | Nueces/ Corpus Christi |
CS | Actual | $2,826,067 | 7 | CONSTRUCT ADA ACCESSIBILITY RAMPS |
0920-30-055 | Orange/ Beaumont |
CS | Actual | $2,247,749 | 5 | IMPROVE INTERSECTIONS |
0902-38-074 | Parker/ Fort Worth |
VA | Actual | $83,588 | 5 | THOROUGHFARE ASSESSMENT PROGRAM |
0138-04-043 | Rusk/ Tyler |
US 259 | Actual | $372,998 | 1 | CONSTRUCT TURN LANES AT NEW SCHOOL |
0119-03-024 | Sabine/ Lufkin |
SH 21 | Actual | $923,984 | 1 | RECONFIGURE INTERSECTION |
0371-07-005 | San Patricio/ Corpus Christi |
BU 77-T | Actual | $1,413,115 | 6 | REPLACE BRIDGE AND APPROACHES |
0372-01-092 | San Patricio/ Corpus Christi |
US 77 | Actual | $1,748,657 | 1 | SEAL AND OVERLAY BOTH NB & SB LANES |
0809-02-061 | Shelby/ Lufkin |
US 96 | Actual | $92,559 | 8 | INSTALL TRAFFIC SIGNALS |
0910-00-077 | Smith/ Tyler |
VA | Actual | $1,465,650 | 10 | CONSTRUCT ADA COMPLIANT CURB RAMPS |
0038-07-061 | Starr/ Pharr |
US 83 | Actual | $5,483,044 | 1 | FY 2009 OVERLAY PROGRAM |
0902-48-740 | Tarrant/ Fort Worth |
VA | Actual | $27,789 | 5 | THOROUGHFARE ASSESSMENT PROGRAM |
0070-02-083 | Tom Green/ San Angelo |
US 87 | Actual | $2,022,234 | 1 | SEAL COAT (TRAVEL LANES ONLY) |
0520-02-035 | Upshur/ Atlanta |
SH 155 | Actual | $3,379,544 | 6 | REPLACE BRIDGE AND APPROACHES |
0275-12-068 | Wheeler/ Childress |
IH 40 | Actual | $1,478,916 | 1 | REHABILITATION OF EXISTING ROADWAY |
0044-01-090 | Wichita/ Wichita Falls |
US 287 | Actual | $1,141,767 | 1 | CONCRETE PATCH REPAIR |
2211-01-016 | Williamson/ Austin |
RM 2338 | Actual | $11,464,068 | 7 | WIDEN ROADWAY |
|
|