Letting Schedule for September, 2008 (FY 2009)
| Letting Schedule for September, 2008 (FY 2009) | ||||
| Last Update: Monday, November 9, 2009 |
| September, 2008 (FY 2009) | (see Links) |
| SEP 2008 | OCT 2008 | NOV 2008 | DEC 2008 | JAN 2009 | FEB 2009 | MAR 2009 | APR 2009 | MAY 2009 | JUN 2009 | JUL 2009 | AUG 2009 | ||||||
| CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0240-01-021 | Austin/ Yoakum |
SH 60 | Actual | $4,708,651 | 1 | REPLACE BRIDGE AND APPROACHES |
| 0913-20-066 | Austin/ Yoakum |
CR | Actual | $1,037,671 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0025-09-070 | Bexar/ San Antonio |
FM 78 | Actual | $4,547,699 | 7 | CONSTRUCT CURB, SIDEWALKS AND DRAINAGE MODIFICATION |
| 0915-12-446 | Bexar/ San Antonio |
CS | Actual | $839,035 | 6 | REPLACE BRIDGE & APPROACHES |
| 0049-12-077 | Brazos/ Bryan |
SH 6 | Actual | $1,934,634 | 1 | MISCELLANEOUS WORK CONSISTING OF GRADING, STRUCTURES, |
| 0540-04-061 | Brazos/ Bryan |
FM 2154 | Actual | $1,003,269 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF MILLING, SURFACE |
| 2399-01-022 | Brazos/ Bryan |
FM 2818 | Actual | $20,854,415 | 6 | CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE |
| 0571-02-023 | Caldwell/ Austin |
FM 86 | Actual | $1,999,591 | 6 | REPLACE BRIDGE & APPROACHES |
| 0138-10-026 | Cass/ Atlanta |
FM 248 | Actual | $3,535,272 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
| 0215-02-029 | Comal/ San Antonio |
SH 46 | Actual | $43,681,936 | 4 | EXPAND ROADWAY FROM 2 TO 6 LANES W / CLTL |
| 0094-07-039 | Dallas/ Dallas |
SH 183 | Actual | $958,168 | 1 | REHAB OF AN EXISTING ROADWAY |
| 0261-02-070 | Dallas/ Dallas |
US 67 | Actual | $386,127 | 1 | SIGN REFURBISHING |
| 0918-00-144 | Dallas/ Dallas |
VA | Actual | $1,504,608 | 1 | NON - SITE SPECIFIC SIGN REPLACEMENT |
| 0918-45-777 | Dallas/ Dallas |
VA | Actual | $528,200 | 10 | COMPENSATORY MITIGATION FOR RIPARIAN FORESTS ON SH 161 IN |
| 0918-45-825 | Dallas/ Dallas |
CS | Actual | $920,000 | 7 | CREATE RAILROAD QUIET ZONE BY INSTALLING MEDIANS AND WAYSIDE |
| 0918-45-847 | Dallas/ Dallas |
VA | Actual | $265,792 | 1 | SMALL SIGN REPLACEMENTS IN DALLAS COUNTY |
| 0389-07-034 | Galveston/ Houston |
SH 146 | Actual | $1,219,769 | 1 | REPAIR BASE FAILURES AND OVERLAY |
| 0912-73-080 | Galveston/ Houston |
CS | Actual | $436,567 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0976-05-025 | Galveston/ Houston |
FM 1266 | Actual | $339,578 | 1 | REPAIR BASE FAILURES AND SEAL COAT |
| 3049-01-013 | Galveston/ Houston |
FM 646 | Actual | $16,566,371 | 10 | WIDENING FROM 2 LANES TO 4 - LANE DIVIDED (PTF) |
| 0913-22-029 | Gonzales/ Yoakum |
CR | Actual | $552,465 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0047-02-128 | Grayson/ Paris |
US 75 | Actual | $2,489,574 | 1 | MILL AND OVERLAY |
| 0912-00-268 | Harris/ Houston |
VA | Actual | $450,000 | 1 | FLOW SIGNAL SYSTEM MAINTENANCE |
| 0912-00-363 | Harris/ Houston |
VA | Actual | $8,000,000 | 5 | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2008) |
| 0667-01-108 | Jefferson/ Beaumont |
SH 347 | Actual | $878,738 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0975-02-019 | Jones/ Abilene |
FM 1082 | Actual | $719,048 | 11 | DRAINAGE IMPROVEMENTS CONSISTING OF BOX CULVERTS, SAFETY END |
| 0901-29-043 | Lamar/ Paris |
CR | Actual | $900,053 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0251-06-033 | Lampasas/ Brownwood |
US 281 | Actual | $1,131,594 | 11 | GRADING, BASE, SURFACE, SIGNAL, ILLUMINATION, CURB & GUTTER |
| 0909-00-046 | McLennan/ Waco |
VA | Actual | $442,550 | 1 | NON - SITE SPECIFIC TRAFFIC SIGNALS |
| 1986-01-023 | Montgomery/ Houston |
FM 1314 | Actual | $36,872,791 | 10 | WIDEN TO 4 LANE DIVIDED RURAL ROAD (PTF) |
| 0093-01-084 | Navarro/ Dallas |
IH 45 | Actual | $906,931 | 6 | REHABILITATE BRIDGE AND APPROACHES |
| 0882-02-052 | Orange/ Beaumont |
FM 1006 | Actual | $1,245,232 | 1 | REHABILITATE EXISTING ROADWAY |
| 0049-08-053 | Robertson/ Bryan |
SH 6 | Actual | $2,540,044 | 6 | REHABILITATE AND WIDEN EXISTING BRIDGE CONSISTING OF GRADING |
| 0911-29-031 | Sabine/ Lufkin |
CR | Actual | $1,864,516 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0910-00-083 | Smith/ Tyler |
VA | Actual | $188,820 | 1 | DISTRICT - WIDE THERMO PLASTIC PAVEMENT MARKINGS PROGRAM |
| 0013-10-075 | Tarrant/ Fort Worth |
BU 287P | Actual | $51,208 | 1 | INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
| 2374-05-067 | Tarrant/ Fort Worth |
IH 20 | Actual | $1,176,610 | 1 | CONSTRUCT AUXILIARY LANE ON EASTBOUND SIDE TO PROVIDE MORE |
| 0914-04-199 | Travis/ Austin |
VA | Actual | $593,802 | 7 | CONSTRUCT CONCRETE TRAIL; BICYCLE PEDESTRIAN PROJECT |
| 0914-04-235 | Travis/ Austin |
CR | Actual | $411,073 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS AND |
| 0578-02-036 | Walker/ Bryan |
FM 247 | Actual | $2,814,270 | 1 | RESTORATION OF EXISTING ROAD CONSISTING OF GRADING, |
| 0523-01-026 | Waller/ Houston |
FM 1098 | Actual | $402,975 | 1 | REPAIR BASE FAILURES AND SEAL COATS |
| 0543-01-060 | Waller/ Houston |
FM 359 | Actual | $5,833,581 | 1 | REPAIR BASE FAILURES, SEAL COAT AND OVERLAY WITH PERMEABLE |
| 0030-09-043 | Wheeler/ Childress |
US 83 | Actual | $1,250,626 | 6 | REPLACE EXIST BRIDGE FACILITY |
| 0321-01-049 | Williamson/ Austin |
SH 95 | Actual | $2,185,580 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0914-05-144 | Williamson/ Austin |
CR | Actual | $533,646 | 8 | IMPROVE GUARDRAIL AND SAFETY TREAT FIXED OBJECTS |
| 0914-05-164 | Williamson/ Austin |
CS | Actual | $226,135 | 10 | ADD HIGH SPEED RAIL CROSSING |
| 0914-05-165 | Williamson/ Austin |
CR | Actual | $226,135 | 10 | ADD HIGH SPEED RAIL CROSSING |
|
| |