Letting Schedule for Fort Worth District (FY 2009)
Letting Schedule for Fort Worth District (FY 2009) | ||||
Last Update: Monday, November 9, 2009 |
Fort Worth District (FY 2009) |
Erath | Hood | Jack | Johnson | Parker | Tarrant | Wise | ||||||
Erath County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0902-49-032 | VA | Actual | JUL 2009 | $1,250,782 | 9 | CONSTRUCT LINEAR TRAIL |
1597-02-014 | FM 847 | Actual | AUG 2009 | $800,000 | 8 | 2009 FEDERAL RAILROAD SIGNAL PROGRAM |
2550-01-008 | FM 2303 | Actual | NOV 2008 | $1,158,395 | 8 | SAFETY TREAT FIXED OBJECTS; WIDEN LANE & CONSTRUCT PAVED SHO |
Hood County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0080-03-050 | US 377 | Actual | APR 2009 | $1,789,001 | 1 | MILL 2" AND HMAC OVERLAY |
0385-04-040 | SH 144 | Actual | DEC 2008 | $94,700 | 10 | INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
Jack County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0391-07-023 | FM 4 | Actual | OCT 2008 | $2,388,295 | 6 | REPLACE BRIDGE AND APPROACHES |
Johnson County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0014-03-089 | IH 35W | Actual | APR 2009 | $5,560,047 | 1 | RECONSTRUCT MAIN LANES |
0019-01-132 | SH 174 | Actual | MAR 2009 | $725,691 | 1 | ADD LEFT TURN LANES ON ALL APPROACHES |
0259-04-036 | US 67 | Actual | APR 2009 | $662,994 | 11 | PAVEMENT REPAIR AND OVERLAY |
0519-01-026 | SH 174 | Actual | APR 2009 | $1,833,527 | 11 | HMAC OVERLAY |
0902-50-097 | CS | Actual | MAY 2009 | $575,454 | 10 | CONSTRUCT AND CONNECT COLONIAL DRIVE AS TWO LANE WITH |
0902-50-098 | VA | Actual | FEB 2009 | $24,423 | 5 | THOROUGFARE ASSESSMENT PROGRAM |
3372-01-011 | FM 3391 | Actual | JAN 2009 | $93,282 | 10 | INSTALLATION OF TWO TRAFFIC SIGNALS AND |
Parker County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0008-03-077 | US 180 | Actual | AUG 2009 | $8,635,958 | 6 | REPLACE 2 BRIDGES AND APPROACHES |
0008-03-096 | US 180 | Actual | APR 2009 | $3,460,812 | 11 | 2 INCH OVERLAY |
0314-07-034 | IH 20 | Actual | JUN 2009 | $24,869,908 | 10 | RECONSTRUCT AND EXTEND FRONTAGE ROAD TO CONNECT AND |
0314-07-039 | IH 20 | Actual | AUG 2009 | $518,999 | 10 | CONSTRUCT WESTBOUND EXIT RAMP WEST OF LAKESHORE DRIVE TO |
0365-01-038 | SH 171 | Actual | MAR 2009 | $3,620,735 | 10 | WIDEN FROM 2 LANE TO 4 LANE CURB AND GUTTER SECTION_WITH |
0365-01-042 | SH 171 | Actual | APR 2009 | $682,212 | 11 | MILL 1.5 INCH, FABRIC, HMAC OVERLAY AND TRAFFIC SIGNAL LOOPS |
0902-38-063 | CS | Actual | OCT 2008 | $6,962,395 | 10 | FOR THE RELOCATION OF FM 2552; TRAFFIC STUDIES AND PLAN |
0902-38-074 | VA | Actual | FEB 2009 | $83,588 | 5 | THOROUGHFARE ASSESSMENT PROGRAM |
Tarrant County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0008-13-211 | IH 820 | Actual | JAN 2009 | $161,019 | 1 | CONSTRUCT RIGHT TURN LANE / DECELERATION LANE TO ENTER |
0008-14-058 | IH 820 | Actual | AUG 2009 | 594,192,593 | 1 | RECONSTRUCT 4 TO 10 W / HOV / MANAGED LANE |
0008-14-110 | IH 820 | Actual | APR 2009 | $3,967,560 | 11 | PAVEMENT AND BRIDGE JOINT REPAIR WITH 2" HMAC OVERLAY |
0013-10-072 | BU 287P | Actual | NOV 2008 | $86,500 | 1 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0013-10-074 | BU 287P | Actual | OCT 2008 | $41,869 | 1 | INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
0013-10-075 | BU 287P | Actual | SEP 2008 | $51,208 | 1 | INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
0014-16-259 | IH 35W | Actual | JUL 2009 | $157,490 | 1 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0094-01-038 | SH 183 | Actual | NOV 2008 | $1,800,035 | 1 | REPLACE HYDRAULICALLY INADEQUATE CULVERT |
0353-03-079 | SH 114 | Actual | JUN 2009 | 916,878,800 | 12 | CONSTRUCT SEPARATE FREEWAY (MANAGED FACILITY) |
0363-01-133 | SH 26 | Actual | APR 2009 | $744,508 | 11 | PAVEMENT REPAIR, 2" MILLING, AND 2" HMAC OVERLAY WITH |
0747-03-076 | FM 157 | Actual | APR 2009 | $662,733 | 11 | REPAIR FAILURES AND OVERLAY WITH 2 INCHES |
0747-04-059 | FM 157 | Actual | AUG 2009 | $2,833,448 | 1 | WIDEN BRIDGE ACROSS IH20 TO 6 THRU LANES WITH AUXILIARY LANE |
0902-00-110 | VA | Actual | AUG 2009 | $924,322 | 1 | INSTALLATION OF PERMANENT PAVEMENT MARKINGS FOR FY08 |
0902-00-113 | VA | Actual | MAY 2009 | $1,500,000 | 7 | REGIONAL GOODS MOVEMENT PROGRAM / OUTER LOOP STUDY |
0902-48-454 | VA | Actual | AUG 2009 | $1,733,389 | 5 | CONSTRUCT TRAIL TO CONNECT LINKS BETWEEN ENTITIES |
0902-48-537 | CS | Actual | JAN 2009 | $5,585,633 | 7 | WIDEN 2 TO 4 LANES AND CONSTRUCT NEW 4 LANE UNDIVIDED |
0902-48-562 | CS | Actual | MAR 2009 | $977,101 | 7 | PEDESTRIAN CONNECTIONS IN SOUTH OF 7TH CORRIDOR INCLUDING |
0902-48-587 | VA | Actual | AUG 2009 | $1,769,040 | 7 | SIGNAL TIMING / ITS TO MANAGE CONGESTION WITH CONNECTIONS TO |
0902-48-691 | CS | Actual | JUL 2009 | $720,146 | 8 | REALIGN INTERSECTION AND INSTALL TRAFFIC SIGNAL |
0902-48-692 | CS | Actual | JUL 2009 | $85,800 | 8 | INSTALL FULLED ACTUATED TRAFFIC SIGNAL |
0902-48-738 | VA | Actual | MAR 2009 | $375,000 | 5 | REAL TIME TRAIN SCHEDULE AND PASSENGER INFORMATION |
0902-48-740 | VA | Actual | FEB 2009 | $27,789 | 5 | THOROUGHFARE ASSESSMENT PROGRAM |
0902-48-745 | VA | Actual | APR 2009 | $1,065,751 | 11 | VARIOUS LOCATIONS FOR EXPANSION JOINT REPAIRS IN NORTH |
1978-01-048 | FM 1938 | Actual | AUG 2009 | $15,244,574 | 7 | CONSTRUCT 6 LANE NEW LOCATION ROADWAY FROM SH 114 TO DOVE RD |
2266-02-121 | SH 360 | Actual | JAN 2009 | $78,800 | 1 | INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
2266-02-126 | SH 360 | Actual | JUL 2009 | $2,556,832 | 1 | PROVIDE ALTERNATIVE ACCESS RAMP TO IMPROVE TRAFFIC OPERATION |
2374-05-064 | IH 20 | Actual | DEC 2008 | $2,298,170 | 5 | RECONSTRUCT GREAT SOUTHWEST PARKWAY TO INCLUDE DUAL LEFT |
2374-05-067 | IH 20 | Actual | SEP 2008 | $1,176,610 | 1 | CONSTRUCT AUXILIARY LANE ON EASTBOUND SIDE TO PROVIDE MORE |
2374-05-070 | IH 20 | Actual | AUG 2009 | $146,900 | 1 | ABATEMENT OF ASBESTOS FROM BRIDGE STRUCTURE AND ELEMENTS |
Wise County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0013-06-037 | US 81 | Actual | APR 2009 | $2,686,375 | 6 | REPLACE BRIDGE |
0013-06-039 | US 81 | Actual | JUN 2009 | $48,983 | 6 | ABATEMENT OF ASBESTOS ON BRIDGE |
0013-08-112 | US 81 | Actual | MAR 2009 | $1,661,991 | 6 | REPLACE THE BOX - BEAM SUPERSTRUCTURE |
0013-08-114 | US 81 | Actual | MAY 2009 | $2,041,715 | 11 | 3 INCH OVERLAY AND CONCRETE TEXTURE |
0013-08-120 | US 81 | Actual | APR 2009 | $1,846,267 | 11 | MILL ASPHALT, CONCRETE REPAIR AND 3 INCH OVERLAY |
0134-08-030 | US 380 | Actual | MAR 2009 | $37,682,222 | 6 | RECONSTRUCT 2 LANES TO FOUR LANES DIVIDED RURAL |
0352-01-053 | SH 114 | Actual | OCT 2008 | $13,713,607 | 1 | SEAL COAT |
0352-01-054 | SH 114 | Actual | APR 2009 | $553,103 | 1 | MILL AND HMAC OVERLAY |
0902-20-065 | VA | Actual | MAR 2009 | $585,737 | 9 | CONSTRUCT SIDEWALKS IN DOWNTOWN AREA "DOWNTOWN DECATUR |
|
|