Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0178-03-138 | SH 35 | Actual | APR 2009 | $3,249,044 | 1 | ONE - COURSE SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT |
0188-04-045 | SH 36 | Actual | JAN 2009 | $855,987 | 1 | REPAIR BASE FAILURES, SEAL COAT AND OVERLAY |
0587-01-056 | FM 1495 | Actual | APR 2009 | $9,785 | 10 | LANDSCAPE DEVELOPMENT |
0598-02-044 | SH 288 | Actual | AUG 2009 | $8,328,816 | 7 | CONSTRUCT GRADE SEPARATION AND RAMPS |
0912-31-108 | CS | Actual | FEB 2009 | $12,637,056 | 7 | WIDEN TO 4 LANES |
0912-31-116 | CR | Actual | NOV 2008 | $1,474,840 | 6 | REPLACE BRIDGE |
0912-31-129 | CS | Actual | NOV 2008 | $2,326,203 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-31-132 | CR | Actual | NOV 2008 | $2,739,208 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-31-155 | CR | Actual | JUL 2009 | $1,469,919 | 6 | REPLACE BRIDGE AND APPROACHES_NBI#12020W00065001 |
0912-31-174 | CR | Actual | JUL 2009 | $2,590,151 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0787002) |
0912-31-175 | CR | Actual | MAY 2009 | $2,005,676 | 6 | REPLACE BRIDGE (NBI# 12020AA0787003) |
0912-31-179 | CR | Actual | MAR 2009 | $2,275,056 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0842002) |
0912-31-228 | VA | Actual | JUL 2009 | $308,543 | 1 | LANDSCAPE DEVELOPMENT |
0976-02-085 | FM 865 | Actual | FEB 2009 | $13,661,784 | 11 | GR, BS, STR, DRAINAGE & PAVEMENT |
1003-01-087 | FM 523 | Actual | FEB 2009 | $422,395 | 1 | MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND |
1004-02-014 | FM 524 | Actual | APR 2009 | $1,360,459 | 1 | ASPHALT OVERLAY AND PAVEMENT MARKINGS |
1524-01-041 | SH 332 | Actual | MAR 2009 | $63,360,228 | 8 | CONSTRUCT GRADE SEPARATION AND 2 2 - LANE FRONTAGE ROADS |
2523-02-030 | FM 2004 | Actual | JUL 2009 | $18,488,622 | 6 | WIDEN TO 4 LANE DIVIDED SUBURBAN SECTION |
2523-02-061 | FM 2004 | Actual | FEB 2009 | $4,456,458 | 1 | WIDENING TO ADD 10 FOOT SHOULDERS, APPROACHING AND ADJACENT |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-06-055 | US 90A | Actual | APR 2009 | $1,118,222 | 1 | BASE REPAIR AND OVERLAY |
0027-07-038 | US 90A | Actual | JAN 2009 | $323,853 | 1 | ADD LEFT TURN LANE AND IMPROVE TURN RADIUS |
0027-08-165 | US 90A | Actual | MAY 2009 | $403,676 | 10 | RAISE ROADWAY ELEVATION TO MEET LEVEE ELEVATIONS |
0111-03-054 | FM 521 | Actual | APR 2009 | $653,888 | 1 | BASE REPAIR AND OVERLAY |
0188-01-035 | SH 36 | Actual | MAR 2009 | $1,869,763 | 5 | PHASE 2: CONSTRUCT FAIRGROUNDS PARK AND RIDE (250 SPACE) |
0188-01-036 | SH 36 | Actual | APR 2009 | $1,269,485 | 1 | REPLACE ASPHALT WITH CONCRETE |
0912-34-127 | CR | Actual | APR 2009 | $1,439,644 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-34-133 | CR | Actual | APR 2009 | $1,529,235 | 6 | REPLACE BRIDGE (NBI# 12080AA0697002) |
1258-02-031 | FM 1093 | Actual | APR 2009 | $821,886 | 1 | BASE REPAIR AND OVERLAY |
2940-02-009 | FM 2919 | Actual | JAN 2009 | $197,853 | 1 | BASE REPAIR AND SEAL COAT |
3223-01-009 | FM 3155 | Actual | APR 2009 | $207,545 | 1 | BASE REPAIR AND OVERLAY |
3510-04-027 | SH 99 | Actual | APR 2009 | $390,000 | 1 | DRAINAGE IMPROVEMENTS ON TXDOT AND MUD 50 ROW |
3510-04-029 | SH 99 | Actual | NOV 2008 | $698,662 | 5 | ADD 5 TURN LANES |
3510-04-030 | SH 99 | Actual | DEC 2008 | $2,246,393 | 10 | CONSTRUCT 2 LANE SOUTHBOUND FRONTAGE ROADS |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0367-02-073 | SH 87 | Actual | APR 2009 | $6,167,954 | 1 | RAISE, REHABILITATE AND OVERLAY (TO 5 YR. STORM ELEVATION) |
0389-07-034 | SH 146 | Actual | SEP 2008 | $1,219,769 | 1 | REPAIR BASE FAILURES AND OVERLAY |
0389-11-057 | LP 197 | Actual | APR 2009 | $646,223 | 1 | BASE REPAIRS, MILLING & 1.5" ASPHALT OVERLAY |
0912-73-080 | CS | Actual | SEP 2008 | $436,567 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-73-114 | CR | Actual | APR 2009 | $313,362 | 1 | REPLACE BRIDGE |
0912-73-118 | PW | Actual | FEB 2009 | $290,744 | 1 | ENLARGE PAVED PARKING AREA AROUND BUILDINGS, BUILD VEHICLE |
0912-73-140 | CS | Actual | MAR 2009 | $742,500 | 10 | GALVESTON TROLLY RAIL EXTENSION |
0976-05-025 | FM 1266 | Actual | SEP 2008 | $339,578 | 1 | REPAIR BASE FAILURES AND SEAL COAT |
0976-07-009 | SH 96 | Actual | APR 2009 | $194,000 | 10 | LANDSCAPE DEVELOPMENT |
3049-01-013 | FM 646 | Actual | SEP 2008 | $16,566,371 | 10 | WIDENING FROM 2 LANES TO 4 - LANE DIVIDED (PTF) |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-10-067 | US 90A | Actual | FEB 2009 | $4,045,000 | 10 | REPLACE BRIDGE |
0028-02-087 | US 90 | Actual | APR 2009 | $1,241,291 | 1 | MILL, SEAL COAT, BASE REPAIR AND ACP OVERLAY |
0050-08-081 | US 290 | Actual | APR 2009 | $60,920 | 10 | LANDSCAPE DEVELOPMENT (MATERIAL PURCHASE) |
0050-08-088 | US 290 | Actual | APR 2009 | $118,220 | 1 | CRACK & SPALL REPAIR, FULL DEPTH CONCRETE REPAIR (IN |
0051-06-017 | SH 3 | Actual | FEB 2009 | $762,506 | 1 | FULL DEPTH CONCRETE REPAIR, PLANING AND ASPHALT OVERLAY |
0271-07-300 | IH 10 | Actual | FEB 2009 | $99,272 | 1 | SEAL RETAINING WALL JOINTS AT IH 10 EASTBOUND ENTRANCE RAMP |
0271-14-215 | IH 610 | Actual | FEB 2009 | $795,184 | 1 | SHOULDER, FULL DEPTH AND BRIDGE DECK REPAIR ON CONNECTORS |
0271-14-223 | IH 610 | Actual | JUL 2009 | $28,853,987 | 1 | RECONSTRUCT ROADWAY |
0389-05-105 | SH 146 | Actual | AUG 2009 | $41,949,337 | 8 | CONSTRUCT DIRECT CONNECTORS |
0500-03-555 | IH 45 | Actual | JAN 2009 | $423,083 | 11 | LANDSCAPE DEVELOPMENT |
0500-03-558 | IH 45 | Actual | JAN 2009 | $1,566,440 | 1 | MILL & OVERLAY |
0502-01-201 | SH 225 | Actual | APR 2009 | $298,000 | 10 | LANDSCAPE DEVELOPMENT |
0502-01-203 | SH 225 | Actual | APR 2009 | $882,735 | 1 | FULL DEPTH CONCRETE REPAIR AND REPAIR OF SPALLING IN |
0508-01-329 | IH 10 | Actual | AUG 2009 | $18,090,664 | 1 | RECONSTRUCT ROADWAY |
0598-01-085 | SH 288 | Actual | DEC 2008 | $4,858,311 | 11 | TSM IMPRVMT AT TMC - ADD EXIT RAMP ON IH 610 BEFORE ALMEDA RD. |
0598-01-089 | SH 288 | Actual | AUG 2009 | $635,655 | 5 | FRONTAGE ROAD INTERSECTION IMPROVEMENTS (TSM) |
0912-00-268 | VA | Actual | SEP 2008 | $450,000 | 1 | FLOW SIGNAL SYSTEM MAINTENANCE |
0912-00-350 | VA | Actual | APR 2009 | $1,289,999 | 5 | NEW TRAFFIC SIGNALS |
0912-00-357 | VA | Actual | AUG 2009 | $3,074,000 | 5 | CLEAN AIR ACTION PROGRAM FY 2009, FY 2010, FY 2011 |
0912-00-363 | VA | Actual | SEP 2008 | $8,000,000 | 5 | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2008) |
0912-00-371 | VA | Actual | JUN 2009 | $4,000,000 | 5 | REGIONAL VANPOOL PROGRAM (FY 2009) CMAQ |
0912-00-382 | VA | Actual | MAR 2009 | $548,762 | 1 | PAVEMENT MARKINGS (NON - SITE SPECIFIC) |
0912-00-388 | VA | Actual | JUL 2009 | $1,000,000 | 7 | ACCESS MANAGEMENT STUDIES ALONG SIGNIFICANT CORRIDORS IN THE |
0912-00-391 | VA | Actual | JUL 2009 | $1,000,000 | 7 | TOUR - BASED DEMAND MODEL DEVELOPMENT |
0912-70-012 | VA | Actual | JAN 2009 | $1,184,059 | 11 | LANDSCAPE DEVELOPMENT |
0912-70-013 | VA | Actual | JAN 2009 | $825,018 | 11 | LANDSCAPE DEVELOPMENT |
0912-71-586 | CR | Actual | JUL 2009 | $1,621,405 | 7 | CONSTRUCT 2 LANE ASPHALT ROAD WITH TURN LANES |
0912-71-591 | VA | Actual | JUN 2009 | $1,553,371 | 5 | BIKE & HIKE TRAIL THROUGH HERMAN BROWN PARK (PHASE 2) |
0912-71-622 | VA | Actual | MAY 2009 | $5,092,997 | 5 | CONSTRUCT ADDITIONAL TRACK TO PASADENA JUNCTION |
0912-71-697 | VA | Actual | FEB 2009 | $509,696 | 5 | CONSTRUCT PEDESTRIAN PATH ALONG GOOSE CREEK |
0912-71-705 | CS | Actual | AUG 2009 | $1,127,531 | 9 | LANDSCAPE AND SCENIC BEAUTIFICATION OF HISTORIC |
0912-71-804 | CS | Actual | JAN 2009 | $1,932,552 | 9 | GULFGATE FREEWAY ENHANCEMENT - TIRZ 8 & GULFGATE REDEVELOPMENT |
0912-71-809 | CR | Actual | JUN 2009 | $3,235,852 | 9 | CONSTRUCT PED TUNNEL TO CONNECT NEW HARRIS CTY JURY ASSEMBLY |
0912-72-045 | CS | Actual | JUL 2009 | $500,000 | 10 | RESTORE SUNSET COFFEE HOUSE FOR USE AS A MULTIMODAL CENTER |
0912-72-070 | CS | Actual | OCT 2008 | $8,786,305 | 10 | CONSTRUCTION OF STREETS AND DRAINAGE |
0912-72-073 | CS | Actual | AUG 2009 | $11,790,329 | 7 | WIDEN TO 4 LANES, C & G, STORM SEWER AND APPURTENANCES |
0912-72-111 | CS | Actual | OCT 2008 | $2,181,418 | 5 | BELLAIRE TRAFFIC SIGNAL SYSTEM ENHANCE ALL THE 20 TRAFFIC |
0912-72-118 | VA | Actual | APR 2009 | $1,025,616 | 1 | ITS IMPROVEMENTS |
0912-72-144 | VA | Actual | MAY 2009 | $1,062,176 | 10 | ADA CURB RAMP PROGRAM FY 07, VARIOUS LOCATIONS ON SH 35, |
0912-72-176 | VA | Actual | FEB 2009 | $260,028 | 1 | MISCELLANEOUS DRAINAGE IMPROVEMENTS |
0912-72-189 | VA | Actual | JUL 2009 | $800,000 | 7 | HGAC TRAVEL DEMAND MODELING SUPPORT |
0912-72-193 | CS | Actual | MAR 2009 | $1,000,000 | 5 | MIDTOWN MASTER PLAN PHASE 4 |
0912-72-208 | VA | Actual | AUG 2009 | $2,568,233 | 1 | TSM IMPROVEMENTS AT VARIOUS LOCATIONS |
0912-72-210 | VA | Actual | MAR 2009 | $438,387 | 1 | PAVEMENT MARKINGS (NON - STIE SPECIFIC) |
1006-01-058 | FM 529 | Actual | AUG 2009 | $8,936,872 | 1 | RECONSTRUCT AND WIDEN TO 4 - LANE DIVIDED AND REPLACE DINNER |
1258-04-058 | FM 1093 | Actual | APR 2009 | $4,459,706 | 1 | 2" PLANING, 2" ACP OVERLAY, PAVEMENT MARKINGS |
1685-01-091 | FM 1960 | Actual | AUG 2009 | $2,049,489 | 7 | IMPLEMENT ACCESS MANAGEMENT TREATMENTS (INCLUDES ITS |
3050-03-005 | FM 2978 | Actual | AUG 2009 | $18,490,602 | 6 | WIDEN TO 5 LANE CURB AND GUTTER WITH IN - LINE DETENTION POND. |
3050-03-016 | FM 2978 | Actual | APR 2009 | $366,817 | 1 | GRADING, LIME TREATED SUBGRADE, CEMENT TREATED BASE, |
3256-01-092 | BW 8 | Actual | DEC 2008 | $247,040 | 10 | LANDSCAPE DEVELOPMENT |
3256-01-093 | BW 8 | Actual | FEB 2009 | $336,432 | 1 | CHANNEL REHABILITATION ON CHANNEL #2 |
3256-02-061 | BW 8 | Actual | MAR 2009 | $15,404,101 | 5 | TSM IMPROVEMENTS (CONTINUOUS RIGHT TURN LANES) |
3256-02-074 | BW 8 | Actual | AUG 2009 | $29,595,090 | 1 | CONSTRUCT 4 DIRECT CONNECTORS |
3256-02-083 | BW 8 | Actual | JUN 2009 | $35,380,092 | 10 | CONSTRUCT 6 MAIN LANES (SECTION 6) TOLL_ (HCTRA LETTING) |
3256-02-084 | BW 8 | Actual | JUN 2009 | $34,010,961 | 10 | CONSTRUCT 6 MAIN LANES (SECTION 7) TOLL_ (HCTRA LETTING) |
3256-03-083 | BW 8 | Actual | JAN 2009 | $705,933 | 10 | LANDSCAPE DEVELOPMENT |
3256-03-086 | BW 8 | Actual | JUN 2009 | $31,777,480 | 10 | CONSTRUCT 6 MAIN LANES DCS (SECTION 1) TOLL (HCTRA LETTING) |
3256-03-087 | BW 8 | Actual | JUN 2009 | $42,612,148 | 10 | CONSTRUCT 6 MAIN LANES (SECTION 2) TOLL_ (HCTRA LETTING) |
3256-03-088 | BW 8 | Actual | JUN 2009 | $41,039,493 | 10 | CONSTRUCT 6 MAIN LANES (SECTION 3) TOLL_ (HCTRA LETTING) |
3256-03-089 | BW 8 | Actual | JUN 2009 | $46,144,949 | 10 | CONSTRUCT 6 MAIN LANES (SECTION 4) TOLL_ (HCTRA LETTING) |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0110-04-181 | IH 45 | Actual | MAY 2009 | $296,099 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0177-05-092 | US 59 | Actual | MAR 2009 | $31,429,900 | 2 | WIDEN TO 6 MAIN LANES, GRADE SEPARATIONS AND RECONSTRUCT |
0177-14-026 | LP 494 | Actual | APR 2009 | $4,317,264 | 1 | WIDEN SUBGRADE, OCST AND ACP OVERLAY |
0523-10-016 | FM 1488 | Actual | AUG 2009 | $23,642,375 | 10 | WIDEN 2 LANES TO 4 - LANE DIVIDED (PTF) |
0523-10-033 | FM 1488 | Actual | MAR 2009 | $11,463,848 | 10 | WIDEN 2 LANES TO 4 - LANE DIVIDED (PTF) |
0912-37-195 | VA | Actual | MAY 2009 | $8,226,225 | 5 | CONSTR OF TRANSITWAY, WATERWAY & PEDESTRIAN AMENITIES |
0912-37-200 | VA | Actual | APR 2009 | $743,781 | 1 | FAULT LINE BASE REPAIRS |
0912-37-201 | VA | Actual | JAN 2009 | $738,493 | 11 | LANDSCAPE DEVELOPMENT |
1986-01-023 | FM 1314 | Actual | SEP 2008 | $36,872,791 | 10 | WIDEN TO 4 LANE DIVIDED RURAL ROAD (PTF) |
3050-02-019 | FM 2978 | Actual | NOV 2008 | $277,188 | 5 | ADD LEFT TURN LANE |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0271-04-083 | IH 10 | Actual | NOV 2008 | $2,623,136 | 11 | TEMPORARY RAMPS |
0271-04-087 | IH 10 | Actual | MAR 2009 | $188,800 | 1 | REMOVAL OF SHOULDER TEXTURING, REMOVING AND REPLACING |
0523-01-015 | FM 1098 | Actual | JUL 2009 | $2,470,858 | 7 | WIDEN TO 4 - LANE DIVIDED URBAN SECTION |
0523-01-026 | FM 1098 | Actual | SEP 2008 | $402,975 | 1 | REPAIR BASE FAILURES AND SEAL COATS |
0523-02-030 | FM 362 | Actual | APR 2009 | $961,664 | 1 | ADD SHOULDERS AND ACP OVERLAY |
0523-02-041 | FM 362 | Actual | APR 2009 | $654,828 | 1 | SEAL COAT AND 1.5" OVERLAY, PAVEMENT MARKINGS |
0527-02-015 | FM 1458 | Actual | APR 2009 | $1,835,567 | 1 | SUBGRADE WIDENING, SEAL COAT, ACP O / L AND PAVEMENT MARKINGS |
0543-01-060 | FM 359 | Actual | SEP 2008 | $5,833,581 | 1 | REPAIR BASE FAILURES, SEAL COAT AND OVERLAY WITH PERMEABLE |
1687-01-014 | FM 1736 | Actual | OCT 2008 | $428,913 | 1 | REPAIR BASE FAILURES AND SEAL COAT |
3506-02-005 | FM 3318 | Actual | OCT 2008 | $218,650 | 1 | REPAIR BASE FAILURES AND SEAL COAT |
|
|