0178-03-138 SH 35 Actual APR 2009 $3,249,044 1 ONE - COURSE SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT
0188-04-045 SH 36 Actual JAN 2009 $855,987 1 REPAIR BASE FAILURES, SEAL COAT AND OVERLAY
0587-01-056 FM 1495 Actual APR 2009 $9,785 10 LANDSCAPE DEVELOPMENT
0598-02-044 SH 288 Actual AUG 2009 $8,328,816 7 CONSTRUCT GRADE SEPARATION AND RAMPS
0912-31-108 CS Actual FEB 2009 $12,637,056 7 WIDEN TO 4 LANES
0912-31-116 CR Actual NOV 2008 $1,474,840 6 REPLACE BRIDGE
0912-31-129 CS Actual NOV 2008 $2,326,203 6 REPLACE BRIDGE AND APPROACHES
0912-31-132 CR Actual NOV 2008 $2,739,208 6 REPLACE BRIDGE AND APPROACHES
0912-31-155 CR Actual JUL 2009 $1,469,919 6 REPLACE BRIDGE AND APPROACHES_NBI#12020W00065001
0912-31-174 CR Actual JUL 2009 $2,590,151 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0787002)
0912-31-175 CR Actual MAY 2009 $2,005,676 6 REPLACE BRIDGE (NBI# 12020AA0787003)
0912-31-179 CR Actual MAR 2009 $2,275,056 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0842002)
0912-31-228 VA Actual JUL 2009 $308,543 1 LANDSCAPE DEVELOPMENT
0976-02-085 FM 865 Actual FEB 2009 $13,661,784 11 GR, BS, STR, DRAINAGE & PAVEMENT
1003-01-087 FM 523 Actual FEB 2009 $422,395 1 MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND
1004-02-014 FM 524 Actual APR 2009 $1,360,459 1 ASPHALT OVERLAY AND PAVEMENT MARKINGS
1524-01-041 SH 332 Actual MAR 2009 $63,360,228 8 CONSTRUCT GRADE SEPARATION AND 2 2 - LANE FRONTAGE ROADS
2523-02-030 FM 2004 Actual JUL 2009 $18,488,622 6 WIDEN TO 4 LANE DIVIDED SUBURBAN SECTION
2523-02-061 FM 2004 Actual FEB 2009 $4,456,458 1 WIDENING TO ADD 10 FOOT SHOULDERS, APPROACHING AND ADJACENT

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-06-055 US 90A Actual APR 2009 $1,118,222 1 BASE REPAIR AND OVERLAY
0027-07-038 US 90A Actual JAN 2009 $323,853 1 ADD LEFT TURN LANE AND IMPROVE TURN RADIUS
0027-08-165 US 90A Actual MAY 2009 $403,676 10 RAISE ROADWAY ELEVATION TO MEET LEVEE ELEVATIONS
0111-03-054 FM 521 Actual APR 2009 $653,888 1 BASE REPAIR AND OVERLAY
0188-01-035 SH 36 Actual MAR 2009 $1,869,763 5 PHASE 2: CONSTRUCT FAIRGROUNDS PARK AND RIDE (250 SPACE)
0188-01-036 SH 36 Actual APR 2009 $1,269,485 1 REPLACE ASPHALT WITH CONCRETE
0912-34-127 CR Actual APR 2009 $1,439,644 6 REPLACE BRIDGE AND APPROACHES
0912-34-133 CR Actual APR 2009 $1,529,235 6 REPLACE BRIDGE (NBI# 12080AA0697002)
1258-02-031 FM 1093 Actual APR 2009 $821,886 1 BASE REPAIR AND OVERLAY
2940-02-009 FM 2919 Actual JAN 2009 $197,853 1 BASE REPAIR AND SEAL COAT
3223-01-009 FM 3155 Actual APR 2009 $207,545 1 BASE REPAIR AND OVERLAY
3510-04-027 SH 99 Actual APR 2009 $390,000 1 DRAINAGE IMPROVEMENTS ON TXDOT AND MUD 50 ROW
3510-04-029 SH 99 Actual NOV 2008 $698,662 5 ADD 5 TURN LANES
3510-04-030 SH 99 Actual DEC 2008 $2,246,393 10 CONSTRUCT 2 LANE SOUTHBOUND FRONTAGE ROADS

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0367-02-073 SH 87 Actual APR 2009 $6,167,954 1 RAISE, REHABILITATE AND OVERLAY (TO 5 YR. STORM ELEVATION)
0389-07-034 SH 146 Actual SEP 2008 $1,219,769 1 REPAIR BASE FAILURES AND OVERLAY
0389-11-057 LP 197 Actual APR 2009 $646,223 1 BASE REPAIRS, MILLING & 1.5" ASPHALT OVERLAY
0912-73-080 CS Actual SEP 2008 $436,567 6 REPLACE BRIDGE AND APPROACHES
0912-73-114 CR Actual APR 2009 $313,362 1 REPLACE BRIDGE
0912-73-118 PW Actual FEB 2009 $290,744 1 ENLARGE PAVED PARKING AREA AROUND BUILDINGS, BUILD VEHICLE
0912-73-140 CS Actual MAR 2009 $742,500 10 GALVESTON TROLLY RAIL EXTENSION
0976-05-025 FM 1266 Actual SEP 2008 $339,578 1 REPAIR BASE FAILURES AND SEAL COAT
0976-07-009 SH 96 Actual APR 2009 $194,000 10 LANDSCAPE DEVELOPMENT
3049-01-013 FM 646 Actual SEP 2008 $16,566,371 10 WIDENING FROM 2 LANES TO 4 - LANE DIVIDED (PTF)

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-10-067 US 90A Actual FEB 2009 $4,045,000 10 REPLACE BRIDGE
0028-02-087 US 90 Actual APR 2009 $1,241,291 1 MILL, SEAL COAT, BASE REPAIR AND ACP OVERLAY
0050-08-081 US 290 Actual APR 2009 $60,920 10 LANDSCAPE DEVELOPMENT (MATERIAL PURCHASE)
0050-08-088 US 290 Actual APR 2009 $118,220 1 CRACK & SPALL REPAIR, FULL DEPTH CONCRETE REPAIR (IN
0051-06-017 SH 3 Actual FEB 2009 $762,506 1 FULL DEPTH CONCRETE REPAIR, PLANING AND ASPHALT OVERLAY
0271-07-300 IH 10 Actual FEB 2009 $99,272 1 SEAL RETAINING WALL JOINTS AT IH 10 EASTBOUND ENTRANCE RAMP
0271-14-215 IH 610 Actual FEB 2009 $795,184 1 SHOULDER, FULL DEPTH AND BRIDGE DECK REPAIR ON CONNECTORS
0271-14-223 IH 610 Actual JUL 2009 $28,853,987 1 RECONSTRUCT ROADWAY
0389-05-105 SH 146 Actual AUG 2009 $41,949,337 8 CONSTRUCT DIRECT CONNECTORS
0500-03-555 IH 45 Actual JAN 2009 $423,083 11 LANDSCAPE DEVELOPMENT
0500-03-558 IH 45 Actual JAN 2009 $1,566,440 1 MILL & OVERLAY
0502-01-201 SH 225 Actual APR 2009 $298,000 10 LANDSCAPE DEVELOPMENT
0502-01-203 SH 225 Actual APR 2009 $882,735 1 FULL DEPTH CONCRETE REPAIR AND REPAIR OF SPALLING IN
0508-01-329 IH 10 Actual AUG 2009 $18,090,664 1 RECONSTRUCT ROADWAY
0598-01-085 SH 288 Actual DEC 2008 $4,858,311 11 TSM IMPRVMT AT TMC - ADD EXIT RAMP ON IH 610 BEFORE ALMEDA RD.
0598-01-089 SH 288 Actual AUG 2009 $635,655 5 FRONTAGE ROAD INTERSECTION IMPROVEMENTS (TSM)
0912-00-268 VA Actual SEP 2008 $450,000 1 FLOW SIGNAL SYSTEM MAINTENANCE
0912-00-350 VA Actual APR 2009 $1,289,999 5 NEW TRAFFIC SIGNALS
0912-00-357 VA Actual AUG 2009 $3,074,000 5 CLEAN AIR ACTION PROGRAM FY 2009, FY 2010, FY 2011
0912-00-363 VA Actual SEP 2008 $8,000,000 5 CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2008)
0912-00-371 VA Actual JUN 2009 $4,000,000 5 REGIONAL VANPOOL PROGRAM (FY 2009) CMAQ
0912-00-382 VA Actual MAR 2009 $548,762 1 PAVEMENT MARKINGS (NON - SITE SPECIFIC)
0912-00-388 VA Actual JUL 2009 $1,000,000 7 ACCESS MANAGEMENT STUDIES ALONG SIGNIFICANT CORRIDORS IN THE
0912-00-391 VA Actual JUL 2009 $1,000,000 7 TOUR - BASED DEMAND MODEL DEVELOPMENT
0912-70-012 VA Actual JAN 2009 $1,184,059 11 LANDSCAPE DEVELOPMENT
0912-70-013 VA Actual JAN 2009 $825,018 11 LANDSCAPE DEVELOPMENT
0912-71-586 CR Actual JUL 2009 $1,621,405 7 CONSTRUCT 2 LANE ASPHALT ROAD WITH TURN LANES
0912-71-591 VA Actual JUN 2009 $1,553,371 5 BIKE & HIKE TRAIL THROUGH HERMAN BROWN PARK (PHASE 2)
0912-71-622 VA Actual MAY 2009 $5,092,997 5 CONSTRUCT ADDITIONAL TRACK TO PASADENA JUNCTION
0912-71-697 VA Actual FEB 2009 $509,696 5 CONSTRUCT PEDESTRIAN PATH ALONG GOOSE CREEK
0912-71-705 CS Actual AUG 2009 $1,127,531 9 LANDSCAPE AND SCENIC BEAUTIFICATION OF HISTORIC
0912-71-804 CS Actual JAN 2009 $1,932,552 9 GULFGATE FREEWAY ENHANCEMENT - TIRZ 8 & GULFGATE REDEVELOPMENT
0912-71-809 CR Actual JUN 2009 $3,235,852 9 CONSTRUCT PED TUNNEL TO CONNECT NEW HARRIS CTY JURY ASSEMBLY
0912-72-045 CS Actual JUL 2009 $500,000 10 RESTORE SUNSET COFFEE HOUSE FOR USE AS A MULTIMODAL CENTER
0912-72-070 CS Actual OCT 2008 $8,786,305 10 CONSTRUCTION OF STREETS AND DRAINAGE
0912-72-073 CS Actual AUG 2009 $11,790,329 7 WIDEN TO 4 LANES, C & G, STORM SEWER AND APPURTENANCES
0912-72-111 CS Actual OCT 2008 $2,181,418 5 BELLAIRE TRAFFIC SIGNAL SYSTEM ENHANCE ALL THE 20 TRAFFIC
0912-72-118 VA Actual APR 2009 $1,025,616 1 ITS IMPROVEMENTS
0912-72-144 VA Actual MAY 2009 $1,062,176 10 ADA CURB RAMP PROGRAM FY 07, VARIOUS LOCATIONS ON SH 35,
0912-72-176 VA Actual FEB 2009 $260,028 1 MISCELLANEOUS DRAINAGE IMPROVEMENTS
0912-72-189 VA Actual JUL 2009 $800,000 7 HGAC TRAVEL DEMAND MODELING SUPPORT
0912-72-193 CS Actual MAR 2009 $1,000,000 5 MIDTOWN MASTER PLAN PHASE 4
0912-72-208 VA Actual AUG 2009 $2,568,233 1 TSM IMPROVEMENTS AT VARIOUS LOCATIONS
0912-72-210 VA Actual MAR 2009 $438,387 1 PAVEMENT MARKINGS (NON - STIE SPECIFIC)
1006-01-058 FM 529 Actual AUG 2009 $8,936,872 1 RECONSTRUCT AND WIDEN TO 4 - LANE DIVIDED AND REPLACE DINNER
1258-04-058 FM 1093 Actual APR 2009 $4,459,706 1 2" PLANING, 2" ACP OVERLAY, PAVEMENT MARKINGS
1685-01-091 FM 1960 Actual AUG 2009 $2,049,489 7 IMPLEMENT ACCESS MANAGEMENT TREATMENTS (INCLUDES ITS
3050-03-005 FM 2978 Actual AUG 2009 $18,490,602 6 WIDEN TO 5 LANE CURB AND GUTTER WITH IN - LINE DETENTION POND.
3050-03-016 FM 2978 Actual APR 2009 $366,817 1 GRADING, LIME TREATED SUBGRADE, CEMENT TREATED BASE,
3256-01-092 BW 8 Actual DEC 2008 $247,040 10 LANDSCAPE DEVELOPMENT
3256-01-093 BW 8 Actual FEB 2009 $336,432 1 CHANNEL REHABILITATION ON CHANNEL #2
3256-02-061 BW 8 Actual MAR 2009 $15,404,101 5 TSM IMPROVEMENTS (CONTINUOUS RIGHT TURN LANES)
3256-02-074 BW 8 Actual AUG 2009 $29,595,090 1 CONSTRUCT 4 DIRECT CONNECTORS
3256-02-083 BW 8 Actual JUN 2009 $35,380,092 10 CONSTRUCT 6 MAIN LANES (SECTION 6) TOLL_ (HCTRA LETTING)
3256-02-084 BW 8 Actual JUN 2009 $34,010,961 10 CONSTRUCT 6 MAIN LANES (SECTION 7) TOLL_ (HCTRA LETTING)
3256-03-083 BW 8 Actual JAN 2009 $705,933 10 LANDSCAPE DEVELOPMENT
3256-03-086 BW 8 Actual JUN 2009 $31,777,480 10 CONSTRUCT 6 MAIN LANES DCS (SECTION 1) TOLL (HCTRA LETTING)
3256-03-087 BW 8 Actual JUN 2009 $42,612,148 10 CONSTRUCT 6 MAIN LANES (SECTION 2) TOLL_ (HCTRA LETTING)
3256-03-088 BW 8 Actual JUN 2009 $41,039,493 10 CONSTRUCT 6 MAIN LANES (SECTION 3) TOLL_ (HCTRA LETTING)
3256-03-089 BW 8 Actual JUN 2009 $46,144,949 10 CONSTRUCT 6 MAIN LANES (SECTION 4) TOLL_ (HCTRA LETTING)

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-04-181 IH 45 Actual MAY 2009 $296,099 5 INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM
0177-05-092 US 59 Actual MAR 2009 $31,429,900 2 WIDEN TO 6 MAIN LANES, GRADE SEPARATIONS AND RECONSTRUCT
0177-14-026 LP 494 Actual APR 2009 $4,317,264 1 WIDEN SUBGRADE, OCST AND ACP OVERLAY
0523-10-016 FM 1488 Actual AUG 2009 $23,642,375 10 WIDEN 2 LANES TO 4 - LANE DIVIDED (PTF)
0523-10-033 FM 1488 Actual MAR 2009 $11,463,848 10 WIDEN 2 LANES TO 4 - LANE DIVIDED (PTF)
0912-37-195 VA Actual MAY 2009 $8,226,225 5 CONSTR OF TRANSITWAY, WATERWAY & PEDESTRIAN AMENITIES
0912-37-200 VA Actual APR 2009 $743,781 1 FAULT LINE BASE REPAIRS
0912-37-201 VA Actual JAN 2009 $738,493 11 LANDSCAPE DEVELOPMENT
1986-01-023 FM 1314 Actual SEP 2008 $36,872,791 10 WIDEN TO 4 LANE DIVIDED RURAL ROAD (PTF)
3050-02-019 FM 2978 Actual NOV 2008 $277,188 5 ADD LEFT TURN LANE

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0271-04-083 IH 10 Actual NOV 2008 $2,623,136 11 TEMPORARY RAMPS
0271-04-087 IH 10 Actual MAR 2009 $188,800 1 REMOVAL OF SHOULDER TEXTURING, REMOVING AND REPLACING
0523-01-015 FM 1098 Actual JUL 2009 $2,470,858 7 WIDEN TO 4 - LANE DIVIDED URBAN SECTION
0523-01-026 FM 1098 Actual SEP 2008 $402,975 1 REPAIR BASE FAILURES AND SEAL COATS
0523-02-030 FM 362 Actual APR 2009 $961,664 1 ADD SHOULDERS AND ACP OVERLAY
0523-02-041 FM 362 Actual APR 2009 $654,828 1 SEAL COAT AND 1.5" OVERLAY, PAVEMENT MARKINGS
0527-02-015 FM 1458 Actual APR 2009 $1,835,567 1 SUBGRADE WIDENING, SEAL COAT, ACP O / L AND PAVEMENT MARKINGS
0543-01-060 FM 359 Actual SEP 2008 $5,833,581 1 REPAIR BASE FAILURES, SEAL COAT AND OVERLAY WITH PERMEABLE
1687-01-014 FM 1736 Actual OCT 2008 $428,913 1 REPAIR BASE FAILURES AND SEAL COAT
3506-02-005 FM 3318 Actual OCT 2008 $218,650 1 REPAIR BASE FAILURES AND SEAL COAT