Detail Letting Schedule for Dallas County (FY 2022)

Last Update: Monday, August 02, 2021

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Dallas County (FY 2022)

CCSJ: 0009-02-065

District:DALLASLet Date:Sep 2021
Highway:SH 78Let Status:Approved
Project ID:C 9-2-65CSJ:0009-02-065
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:LEON RDFund Cat:1
Limits To:STRATFORD DRESTIMATE:$1,073,735
Length:1.0Actual$0
 
District:DALLASLet Date:Sep 2021
Highway:US 80Let Status:Approved
Project ID:C 95-2-117CSJ:0095-02-117
Description:REPAIR ROADWAYHandling
Code:
 
Limits From:EAST OF PRESIDENTIAL ROWFund Cat:1
Limits To:EAST OF NORTH GALLOWAY AVENUEESTIMATE:$625,240
Length:2.4Actual$0
 
District:DALLASLet Date:Sep 2021
Highway:US 80Let Status:Approved
Project ID:C 95-10-57CSJ:0095-10-057
Description:REPAIR ROADWAYHandling
Code:
 
Limits From:IH 30Fund Cat:1
Limits To:E OF PRESIDENTIAL ROWESTIMATE:$650,619
Length:1.4Actual$0
 
Proposal Request
Back...
Totals for 0009-02-065
Length:4.8
Estimate:$2,349,593
Actual:

CCSJ: 0009-03-050

District:DALLASLet Date:Nov 2021
Highway:SH 66Let Status:Approved
Project ID:F 2022(110)CSJ:0009-03-050
Description:REPAIR ROADWAYHandling
Code:
 
Limits From:SH 78Fund Cat:1
Limits To:ROWLETT CREEKESTIMATE:$1,452,960
Length:2.3Actual$0
 
Back...
Totals for 0009-03-050
Length:2.3
Estimate:$1,452,960
Actual:

CCSJ: 0047-07-237

District:DALLASLet Date:Jun 2022
Highway:US 75Let Status:Tentative
Project ID:STP ( )HESCSJ:0047-07-237
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT CARUTH HAVEN LNFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$516,365
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2022
Highway:US 75Let Status:Tentative
Project ID:STP ( )HESCSJ:0047-07-238
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT FITZHUGH AVEFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$535,871
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2022
Highway:US 67Let Status:Tentative
Project ID:NH ( )CSJ:0261-02-078
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:COCKRELL HILL ROADFund Cat:1
Limits To:JOE WILSON RDESTIMATE:$1,754,100
Length:0.0Actual$0
 
District:DALLASLet Date:Jun 2022
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0353-04-109
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT SS 348Fund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$513,698
Length:0.2Actual$0
 
Back...
Totals for 0047-07-237
Length:0.6
Estimate:$3,320,034
Actual:

CCSJ: 0091-06-060

District:DALLASLet Date:Nov 2021
Highway:SH 289Let Status:Approved
Project ID:F 2022(111)CSJ:0091-06-060
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:IH 635Fund Cat:1
Limits To:COLLIN COUNTY LINEESTIMATE:$4,153,579
Length:4.2Actual$0
 
Back...
Totals for 0091-06-060
Length:4.2
Estimate:$4,153,579
Actual:

CCSJ: 0092-02-125

District:DALLASLet Date:Sep 2021
Highway:IH 45Let Status:Approved
Project ID:CM 2022(004)CSJ:0092-02-125
Description:INTERSECTION IMPROVEMENTHandling
Code:
 
Limits From:AT DOWDY FERRY RDFund Cat:5
Limits To:.ESTIMATE:$3,302,613
Length:0.7Actual$0
 
Back...
Totals for 0092-02-125
Length:0.7
Estimate:$3,302,613
Actual:

CCSJ: 0196-07-034

District:DALLASLet Date:Mar 2022
Highway:SS 366Let Status:Tentative
Project ID:STP ( )MMCSJ:0196-07-034
Description:CONSTRUCT PEDESTRIAN INFRASTRUCTUREHandling
Code:
 
Limits From:WEST OF AKARD STFund Cat:3
Limits To:SAINT PAUL STESTIMATE:$37,033,501
Length:0.0Actual$0
 
Back...
Totals for 0196-07-034
Length:0
Estimate:$37,033,501
Actual:

CCSJ: 0918-00-297

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:CM ( )CSJ:0918-00-297
Description:AIR QUALITY INITIATIVEHandling
Code:
XX
Limits From:M & O AIR QUAL. PUB ED & OUTREACH 2021Fund Cat:5
Limits To:IMP STR COMM EFFORTS TO EDU AND INFORMESTIMATE:$1,560,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-297
Length:0
Estimate:$1,560,000
Actual:

CCSJ: 0918-00-298

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:CM ( )CSJ:0918-00-298
Description:TRANSIT SYSTEM OPERATIONSHandling
Code:
XX
Limits From:M & O AIR QUAL. PUB ED & OUTREACH 2022Fund Cat:5
Limits To:IMP STR COMM EFFORTS TO EDU AND INFORMESTIMATE:$1,560,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-298
Length:0
Estimate:$1,560,000
Actual:

CCSJ: 0918-00-311

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0918-00-311
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:LU, BIKE/PEDESTRIAN SAFETY PROGRAMFund Cat:7
Limits To:TRANSIT ORIENTED DEV., REGIONAL PED SAFEESTIMATE:$1,524,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-311
Length:0
Estimate:$1,524,000
Actual:

CCSJ: 0918-00-314

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0918-00-314
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:TRAVEL SURVEY & DATA COLLECTION PROGRAMFund Cat:3
Limits To:AIR QUALITY, & MGMT PROJECTS IN THE MPAESTIMATE:$1,695,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-314
Length:0
Estimate:$1,695,000
Actual:

CCSJ: 0918-00-317

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP 2022(085)MMCSJ:0918-00-317
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:REGIONAL AIR QUALITY INITIATIVESFund Cat:3
Limits To:IDENTIFY & IMPL POLICIES/BEST PRAC FY21ESTIMATE:$2,543,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-317
Length:0
Estimate:$2,543,000
Actual:

CCSJ: 0918-00-318

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0918-00-318
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:REGIONAL AIR QUALITY INITIATIVESFund Cat:3
Limits To:IDENTIFY & IMPL POLICIES/BEST PRACTICESESTIMATE:$2,594,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-318
Length:0
Estimate:$2,594,000
Actual:

CCSJ: 0918-00-324

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:CSJ:0918-00-324
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:DFW AUTOMATED VEHICLE PROVINGFund Cat:7
Limits To:GROUNDS PROJECT (REGION-WIDE)ESTIMATE:$250,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-324
Length:0
Estimate:$250,000
Actual:

CCSJ: 0918-00-327

District:DALLASLet Date:Jan 2022
Highway:VALet Status:Tentative
Project ID:STP ( )CSJ:0918-00-327
Description:REHAB OF DYNAMIC MESSAGE SIGNHandling
Code:
 
Limits From:VARIOUS LOCATIONSFund Cat:1
Limits To:IN THE DALLAS DISTRICTESTIMATE:$1,159,030
Length:0.0Actual$0
 
District:DALLASLet Date:Jan 2022
Highway:SL 288Let Status:Tentative
Project ID:CSJ:2250-01-029
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:AT SHADY OAKS DRIVEFund Cat:8
Limits To:.ESTIMATE:$19,165
Length:0.2Actual$0
 
District:DALLASLet Date:Jan 2022
Highway:SL 288Let Status:Tentative
Project ID:CSJ:2250-01-030
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:AT SPENCER RDFund Cat:8
Limits To:.ESTIMATE:$25,781
Length:0.0Actual$0
 
Back...
Totals for 0918-00-327
Length:0.2
Estimate:$1,203,976
Actual:

CCSJ: 0918-00-330

District:DALLASLet Date:Sep 2021
Highway:VALet Status:Approved
Project ID:C 918-00-330CSJ:0918-00-330
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:VARIOUS LOCATIONSFund Cat:1
Limits To:IN THE DALLAS DISTRICTESTIMATE:$2,500,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-330
Length:0
Estimate:$2,500,000
Actual:

CCSJ: 0918-00-343

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0918-00-343
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:DART VANPOOL PROGRAMFund Cat:3
Limits To:.ESTIMATE:$4,178,751
Length:0.0Actual$0
 
Back...
Totals for 0918-00-343
Length:0
Estimate:$4,178,751
Actual:

CCSJ: 0918-00-346

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0918-00-346
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:REGIONAL MOBILITY ASSISTANCE PATROLFund Cat:7
Limits To:.ESTIMATE:$4,312,500
Length:0.0Actual$0
 
Back...
Totals for 0918-00-346
Length:0
Estimate:$4,312,500
Actual:

CCSJ: 0918-47-148

District:DALLASLet Date:Sep 2021
Highway:CSLet Status:Approved
Project ID:BR 2018(785)CSJ:0918-47-148
Description:BRIDGE REPLACEMENTHandling
Code:
 
Limits From:MALLOY BRIDGE RD AT PARSONS SLOUGHFund Cat:6
Limits To:.ESTIMATE:$1,449,768
Length:0.1Actual$0
 
Back...
Totals for 0918-47-148
Length:0.1
Estimate:$1,449,768
Actual:

CCSJ: 0918-47-204

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )TPCSJ:0918-47-204
Description:INSTALL/UPGRADE ROADWAY LIGHTINGHandling
Code:
LC
Limits From:UNIVERSITY CROSSING TRAIL LIGHTINGFund Cat:3
Limits To:FROM ELLSWORTH AVE TO SKILLMAN STESTIMATE:$859,100
Length:0.0Actual$0
 
Back...
Totals for 0918-47-204
Length:0
Estimate:$859,100
Actual:

CCSJ: 0918-47-206

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP 2021(958)TPCSJ:0918-47-206
Description:BICYCLE AND PEDESTRIAN IMPROVEMENTSHandling
Code:
LC
Limits From:LAKE HIGHLANDS TRL DART STATIONFund Cat:3
Limits To:AND WHITE ROCK TRL ROADWAYESTIMATE:$7,095,618
Length:0.0Actual$0
 
Back...
Totals for 0918-47-206
Length:0
Estimate:$7,095,618
Actual:

CCSJ: 0918-47-207

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )TPCSJ:0918-47-207
Description:BICYCLE AND PEDESTRIAN IMPROVEMENTSHandling
Code:
LC
Limits From:ALONG CHIESA RD FROM SCHRADE RDFund Cat:3
Limits To:NORTH OF MILLER RDESTIMATE:$436,685
Length:0.0Actual$0
 
Back...
Totals for 0918-47-207
Length:0
Estimate:$436,685
Actual:

CCSJ: 0918-47-209

District:DALLASLet Date:Aug 2022
Highway:CSLet Status:Tentative
Project ID:STP 1902(098)TPCSJ:0918-47-209
Description:BICYCLE AND PEDESTRIAN IMPROVEMENTSHandling
Code:
LC
Limits From:SIDEWALKS IN VARIOUS LOCATIONSFund Cat:3
Limits To:IN CITY OF CEDAR HILLESTIMATE:$1,949,824
Length:0.0Actual$0
 
Back...
Totals for 0918-47-209
Length:0
Estimate:$1,949,824
Actual:

CCSJ: 0918-47-248

District:DALLASLet Date:Apr 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-248
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:HATCHER ST AT MALCOM X BLVDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$330,867
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-253
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AKARD ST AT CADIZ STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$332,169
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-255
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:ELM ST AT ST PAUL STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$283,445
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-259
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:OLD SEAGOVILLE AT ST AUGUSTINE DRFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$339,049
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-260
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:MALCOLM X AT PENNSYLVANIA AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$324,786
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-268
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:BENNETT AVE ROSS AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$323,552
Length:0.2Actual$0
 
Back...
Totals for 0918-47-248
Length:1.2
Estimate:$1,933,868
Actual:

CCSJ: 0918-47-249

District:DALLASLet Date:Feb 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-249
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:MCMILLAN AVE AT MOCKINGBIRD LNFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$262,663
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-251
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:GREENVILLE AVE AT ROYAL LNFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$360,381
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-252
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:FERGUSON RD AT HIGHLAND RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$377,532
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-258
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:PLANO RD AT WALNUT HILL LNFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$364,481
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-263
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:GUS THOMASSON AT MAYLEE BLVDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$338,423
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2022
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-267
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:GREENVILLE AVE AT MOCKINGBIRD LNFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$386,118
Length:0.2Actual$0
 
Back...
Totals for 0918-47-249
Length:1.2
Estimate:$2,089,598
Actual:

CCSJ: 0918-47-250

District:DALLASLet Date:Nov 2021
Highway:CSLet Status:Approved
Project ID:STP 2022(087)HESCSJ:0918-47-250
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:CORINTH ST AT MORREL AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$328,628
Length:0.0Actual$0
 
District:DALLASLet Date:Nov 2021
Highway:CSLet Status:Approved
Project ID:STP 2022(087)HESCSJ:0918-47-256
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:CAMP WISDOM RD AT POLK STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$357,246
Length:0.0Actual$0
 
District:DALLASLet Date:Nov 2021
Highway:CSLet Status:Approved
Project ID:STP 2022(087)HESCSJ:0918-47-257
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:EIGHTH ST AT MARSALIS AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$339,513
Length:0.0Actual$0
 
District:DALLASLet Date:Nov 2021
Highway:CSLet Status:Approved
Project ID:STP 2022(087)HESCSJ:0918-47-262
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:HAMPTON RD AT KIEST BLVDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$356,728
Length:0.2Actual$0
 
District:DALLASLet Date:Nov 2021
Highway:CSLet Status:Approved
Project ID:STP 2022(087)HESCSJ:0918-47-265
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:HAMPTON TD AT WHEATLAND RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$364,481
Length:0.0Actual$0
 
Back...
Totals for 0918-47-250
Length:0.2
Estimate:$1,746,596
Actual:

CCSJ: 0918-47-277

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0918-47-277
Description:TRANSPORTATION NON-ROADWAYHandling
Code:
XX
Limits From:DALLAS CENTRAL BUSINESS DISTRICTFund Cat:7
Limits To:N MEMORIAL DR AND S CADIZ ST (FY 2022)ESTIMATE:$13,500,000
Length:0.0Actual$0
 
Back...
Totals for 0918-47-277
Length:0
Estimate:$13,500,000
Actual:

CCSJ: 0918-47-296

District:DALLASLet Date:Aug 2022
Highway:VALet Status:Tentative
Project ID:CSJ:0918-47-296
Description:BICYCLE AND PEDESTRIAN IMPROVEMENTSHandling
Code:
LC
Limits From:KATY TRAILFund Cat:3
Limits To:TRINITY STRAND TRAILESTIMATE:$15,500,000
Length:0.0Actual$0
 
Back...
Totals for 0918-47-296
Length:0
Estimate:$15,500,000
Actual:

CCSJ: 2374-03-096

District:DALLASLet Date:Feb 2022
Highway:IH 20Let Status:Tentative
Project ID:CSJ:2374-03-096
Description:BRIDGE MAINTENANCEHandling
Code:
 
Limits From:AT IH 35EFund Cat:6
Limits To:.ESTIMATE:$4,210,000
Length:0.5Actual$0
 
Back...
Totals for 2374-03-096
Length:0.5
Estimate:$4,210,000
Actual:

CCSJ: 2374-04-085

District:DALLASLet Date:Dec 2021
Highway:IH 20Let Status:Tentative
Project ID:NH ( )CSJ:2374-04-085
Description:CONSTRUCT FRONTAGE ROADSHandling
Code:
 
Limits From:WEST OF COCKRELL HILL RDFund Cat:1
Limits To:HAMPTON RDESTIMATE:$80,581,578
Length:2.9Actual$0
 
Back...
Totals for 2374-04-085
Length:2.9
Estimate:$80,581,578
Actual:

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract