Monthly State Let Construction Report For Dallas District As Of Jul 12, 2016 Page 4 Of 9

Last Update: Tuesday, July 12, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyCOLLIN
Highway SH 78
From BUSINESS 78
To FM 6
CSJ 0281-01-030
Proj ID C 281-1-030
Work Type GRADING, DRAINAGE, AND PAVEMENT
 
2.563 24832811.20 21454.72 25672779.82 99.9
Work Order 06-15-12
Work Began 12-13-12
Work Completed  
Time Computed 12-12-12
Contract Working Days 630
Addl Days Granted 139
Working Days Charged 857
Percent Time Used 111
Contractor(s)
MARIO SINACOLA & SONS EXCAVATING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0281-01-030
STORM WATER MANAGEMENT, INC. (0.35%)
INTEGRATED ROADWAY SERVICES, INC.(1.79%)
TEX OP CONSTRUCTION, LP(0.61%)
FOUNDATION DRILLERS, INC.(1.05%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 12.22%)
FORTSON CONTRACTING, INC.(0.03%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.05%)
J.L. STEEL REINFORCING, LLC(1.02%)
W.O.E. CONSTRUCTION(0.36%)
ALLIANCE GEOTECHNICAL GROUP(0.09%)
SCOTT DERR PAINTING CO (0.14%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.76%)
GREAT WESTERN ERECTORS (0.06%)
LONE STAR MANHOLE & STRUCTURES, LLC(3.52%)
AMERICAN INTERLOCK & MODULAR CONSTRUCTION, INC.(0.03%)
USA SWPPP INSPECTIONS, INC.(0.19%)
JET UNDERGROUND UTILITIES, INC.(1.23%)
TEXAS ENVIRONMENTAL MANAGEMENT, INC(0.54%)
SOUTHEAST GRINDING & GROOVING, LLC (0.02%)
J. E. GUZMAN CONSTRUCTION, INC.(0.53%)
IRON CONCRETE CONSTRUCTION COMPANY, INC. (1.35%)
T-BAR FENCE, INC.(0.07%)
INFINITY PLUMBING & IRRIGATION (0.11%)
Contract # 04123201
Totals 24832811.20 21454.72 25672779.82 99.9

CountyCOLLIN
Highway SH 78
From FM 6
To US 380
CSJ 0281-01-032
Proj ID STP 2016(096)
Work Type MILL, BASE REPAIR, OVERLAY
 
10.318 2633294.34 363093.90 2649449.83 99.9
Work Order 10-21-15
Work Began 03-01-16
Work Completed  
Time Computed 03-01-16
Contract Working Days 83
Addl Days Granted 0
Working Days Charged 85
Percent Time Used 102
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0281-01-032
ALTUS TRAFFIC MANAGEMENT LLC (0.33%)
SCOTT PAVING, INC. ( 11.06%)
TRP CONSTRUCTION GROUP, LLC(4.50%)
Contract # 09153016
Totals 2633294.34 363093.90 2649449.83 99.9

CountyCOLLIN
Highway SH 78
From SPRING CREEK PKWY
To SH 205
CSJ 0281-02-039
Proj ID C 281-2-39
Work Type WDN GR STRS & SURF
 
3.349 21337007.60 333636.66 9290487.03 43.5
Work Order 08-28-12
Work Began 09-12-13
Work Completed  
Time Computed 05-25-13
Contract Working Days 630
Addl Days Granted 41
Working Days Charged 526
Percent Time Used 78
Contractor(s)
GLENN THURMAN, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0281-02-039
CONCRETE CUTTING BY BOND (0.33%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 15.66%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.92%)
BUYERS BARRICADES, INC.(0.25%)
DT CONSTRUCTION SERVICES (2.63%)
LARRETT, INC.( 11.16%)
INTEGRATED ROADWAY SERVICES, INC.(2.02%)
INDUS CONSTRUCTION, L.P. (0.68%)
DUSTROL, INC.(1.51%)
ENVIRONMENTAL STANDARDS, INC.(2.51%)
COPPELL CONSTRUCTION CO., INC. ( 12.74%)
TEXAS SHAFTS, INC. (1.32%)
MCL CONTRACTING, LLC (0.07%)
IOWA BRIDGE & CULVERT, LC(0.77%)
MEADE SERVICING GROUP, INC.(2.52%)
W.O.E. CONSTRUCTION(0.29%)
CACTUS ABATEMENT & DEMOLITION, LLC (0.16%)
Contract # 06123202
Totals 21337007.60 333636.66 9290487.03 43.5

CountyDENTON
Highway FM 51
From AT BLOCKER CREEK
To .
CSJ 0312-02-016
Proj ID BR 2013(603)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.303 2575804.40 146663.42 1514735.20 58.8
Work Order 04-10-15
Work Began 07-30-15
Work Completed  
Time Computed 06-09-15
Contract Working Days 316
Addl Days Granted 0
Working Days Charged 232
Percent Time Used 73
Contractor(s)
IOWA BRIDGE & CULVERT, LC
SUBCONTRACTOR(S) FOR CCSJ: 0312-02-016
ALTUS TRAFFIC MANAGEMENT LLC (0.36%)
DUSTROL, INC.(0.88%)
ENVIRONMENTAL SAFETY SERVICES, INC.(4.57%)
FARR FOUNDATION, INC.(1.58%)
FORTSON CONTRACTING, INC.(1.78%)
GRANBURY EXCAVATING, INC.( 11.18%)
PEACHTREE CONSTRUCTION, LTD. (6.11%)
PENHALL COMPANY(0.22%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.65%)
USA SWPPP INSPECTIONS, INC.(2.11%)
W. W. FOUNDATION DRILLING, LTD.(5.33%)
Contract # 02153023
Totals 2575804.40 146663.42 1514735.20 58.8

CountyDENTON
Highway SH 114
From WEST OF COUNTY LINE ROAD
To WEST OF FM 156
CSJ 0353-02-029
Proj ID C 353-2-29
Work Type GR STRS & SURF
 
4.638 28612477.14 0.00 26627169.16 93.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-28-12
Work Began 04-22-13
Work Completed  
Time Computed 02-25-13
Contract Working Days 569
Addl Days Granted 0
Working Days Charged 514
Percent Time Used 90
Contractor(s)
SEMA CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0353-02-029
FOUNDATION DRILLERS, INC.(0.31%)
HIGHWAY TECHNOLOGIES, INC. (0.19%)
INTEGRATED ROADWAY SERVICES, INC.(2.34%)
THE LANE CONSTRUCTION CORPORATION( 35.42%)
NORTH TEXAS CONTRACTING, INC.(8.47%)
TRP CONSTRUCTION GROUP, LLC(0.85%)
W.O.E. CONSTRUCTION(4.17%)
FOWLER UNLIMITED, LLC(0.17%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.04%)
J.L. STEEL REINFORCING, LLC(0.00%)
K.L. DURHAM CONSTRUCTION, LLC(1.57%)
FARR FOUNDATION, INC.(0.69%)
CEN CONCRETE CONSTRUCTION COMPANY, INC.(0.46%)
INDUS CONSTRUCTION, L.P. (0.87%)
WEBBER BARRIER SERVICES, LLC.(0.27%)
SLATON BROTHERS, INC.(0.52%)
Contract # 06123201
Totals 28612477.14 0.00 26627169.16 93.0

CountyDENTON
Highway SH 114
From AT FM 156
To .
CSJ 0353-02-063
Proj ID C 353-2-63
Work Type GR, STRS & PAVT
 
1.269 30580029.40 740171.70 1369660.06 4.4
Work Order 04-03-15
Work Began 00-00-00
Work Completed  
Time Computed 10-30-15
Contract Working Days 651
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0353-02-063
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02153001
Totals 30580029.40 740171.70 1369660.06 4.4

CountyDENTON
Highway SH 114
From TROPHY LAKE DR. IN TROPHY CLUB
To TARRANT CO LINE (WEST OF FM 1938)
CSJ 0353-02-074
Proj ID STP 1602(325)MM
Work Type GR, PVMT, SIGNS
 
3.409 24897375.15 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 439
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MARIO SINACOLA & SONS EXCAVATING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0353-02-074
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07163202
Totals 24897375.15 0.00 0.00 0.0

CountyDENTON
Highway SH 114
From RACEWAY DRIVE
To BUS SH 114
CSJ 0353-02-075
Proj ID NH 1602(163)
Work Type FLEXIBLE PAVEMENT REPAIR
 
1.955 693594.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 87
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
THE LANE CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0353-02-075
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06163012
Totals 693594.00 0.00 0.00 0.0

CountyDALLAS
Highway SL 12
From WEST OF HARRY HINES
To WEST OF MIDWAY
CSJ 0353-05-082
Proj ID CM 1502(091)
Work Type RECONSTRUCT, GRADING, BASE, PAVEMEN
 
2.746 5165037.00 152703.51 1981157.27 38.3
CountyDALLAS
Highway SL 12
From WEST OF HARRY HINES
To WEST OF MIDWAY
CSJ 0353-05-105
Proj ID CM 2005(220)
Work Type ROW ACQ., UTIL. ADJ., RELOC ASSIST.
 
3.201 1151839.50 10976.00 190981.00 16.5
CountyDALLAS
Highway SL 12
From AT WEBB CHAPEL EXTENSION
To .
CSJ 0353-05-114
Proj ID STP 1502(092)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.001 235159.80 0.00 24120.00 10.2
CountyDALLAS
Highway SL 12
From AT WEBB CHAPEL
To .
CSJ 0353-05-115
Proj ID STP 1502(093)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.001 184815.20 0.00 18090.00 9.7
Work Order 07-15-15
Work Began 11-09-15
Work Completed  
Time Computed 10-14-15
Contract Working Days 335
Addl Days Granted 0
Working Days Charged 156
Percent Time Used 46
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0353-05-082
W.O.E. CONSTRUCTION(0.00%)
STORM WATER MANAGEMENT, INC. (0.12%)
INTEGRATED ROADWAY SERVICES, INC.( 14.58%)
FARR FOUNDATION, INC.(1.03%)
ALTUS TRAFFIC MANAGEMENT LLC (0.59%)
ACU CONSTRUCTION LLC (0.12%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(5.74%)
STRIPING TECHNOLOGY, L.P.(1.35%)
PROJECT 2015, LLC( 22.65%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.34%)
JFC PLUMBING CORP(1.12%)
NORTH TEXAS CONTRACTING, INC.( 20.04%)
COWBOY TRUCKING(0.00%)
ASSOCIATED CUTTING, INC. (0.02%)
PRECISE TRUCKS, LLC(0.16%)
Contract # 05153215
Totals 6736851.50 163679.51 2214348.27 32.8

CountyDALLAS
Highway SL 12
From WEST OF MIDWAY
To US 75
CSJ 0353-05-088
Proj ID CM 1402(026)
Work Type INTERSECTION IMPROVEMENT
 
3.939 6564020.36 106231.07 3518936.01 53.6
CountyDALLAS
Highway SL 12
From WEST OF MIDWAY
To US 75
CSJ 0353-05-107
Proj ID CM 2005(517)
Work Type ACQUISITION, UTILITIES AND RELOCATI
 
3.940 1087941.00 0.00 484224.30 44.5
Work Order 11-19-14
Work Began 02-19-15
Work Completed  
Time Computed 02-19-15
Contract Working Days 457
Addl Days Granted 6
Working Days Charged 349
Percent Time Used 75
Contractor(s)
REBCON, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0353-05-088
DURABLE SPECIALTIES, INC.( 16.58%)
BUYERS BARRICADES, INC.(1.31%)
INLET STRUCTURE SPECIALTIES LTD. (0.64%)
PREMIER PAVING, LTD. (3.01%)
W.O.E. CONSTRUCTION(0.08%)
USA SWPPP INSPECTIONS, INC.(1.16%)
NORTH TEXAS CONTRACTING, INC.( 14.83%)
STRIPING TECHNOLOGY, L.P.(1.00%)
TED ALVAREZ TRUCKING (1.64%)
SKAGGS ROAD BORING INC.(0.84%)
J. E. GUZMAN CONSTRUCTION, INC.(0.05%)
BRENDA PRICE TRUCKING(0.15%)
UTILITY AND ENVIRONMENTAL SERVICES, INCORPORATED (0.04%)
MAGNUM MANHOLE & UNDERGROUND COMPANY (0.01%)
GAJESKE INC. (0.04%)
ASSOCIATED CUTTING, INC. (0.02%)
FORTSON CONTRACTING, INC.(0.11%)
Contract # 08143219
Totals 7651961.36 106231.07 4003160.31 52.3

CountyDALLAS
Highway SH 121
From TARRANT/DALLAS COUNTY LINE
To BUSINESS 121H
CSJ 0364-02-017
Proj ID NH 2013(829)
Work Type GRADING, STRUCTURES AND SURFACE
 
2.567 58805233.66 2289917.64 41914148.25 71.2
Work Order 09-04-13
Work Began 03-04-14
Work Completed  
Time Computed 03-03-14
Contract Working Days 986
Addl Days Granted 1
Working Days Charged 681
Percent Time Used 68
Contractor(s)
OHL USA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0364-02-017
ALTUS TRAFFIC MANAGEMENT LLC (0.12%)
USA SWPPP INSPECTIONS, INC.(1.33%)
FOWLER UNLIMITED, LLC(0.05%)
RAMBO CONTRACTING, INC.(1.72%)
RDI FOUNDATION DRILLING(1.93%)
VALLEY PLACERS, LLC(0.15%)
FORTSON CONTRACTING, INC.(0.32%)
HOUSTON SAWING & DRILLING(0.03%)
BORTUNCO (0.83%)
AUSTIN BRIDGE & ROAD, LP ( 12.65%)
TEX OP CONSTRUCTION, LP(0.61%)
RONE ENGINEERING SERVICES, LTD (0.07%)
SCOTT DERR PAINTING CO (0.15%)
W.O.E. CONSTRUCTION(3.18%)
STRIPING TECHNOLOGY, L.P.(0.89%)
MCL CONTRACTING, LLC (7.51%)
SOUTH TEXAS ILLUMINATION, LLC(3.83%)
LABOR READY CENTRAL III L.P. (0.00%)
Contract # 07133002
Totals 58805233.66 2289917.64 41914148.25 71.2

CountyDALLAS
Highway IH 35E
From IH 20
To N. ABUTMENT OF SL 12 BRIDGE
CSJ 0442-02-157
Proj ID NH 2016(097)
Work Type FDR - CP, MILL, OV, SHLDR, PAV MRKS
 
13.880 3240394.35 382205.40 819948.50 25.3
Work Order 10-22-15
Work Began 04-21-16
Work Completed  
Time Computed 04-21-16
Contract Working Days 156
Addl Days Granted 0
Working Days Charged 49
Percent Time Used 31
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0442-02-157
ALTUS TRAFFIC MANAGEMENT LLC (0.89%)
DURABLE SPECIALTIES, INC.(0.31%)
EROSION CONTROL MANAGEMENT SERVICES(0.32%)
O. TREVINO CONSTRUCTION, LLC ( 30.43%)
TRP CONSTRUCTION GROUP, LLC(1.76%)
W.O.E. CONSTRUCTION(1.78%)
BRENDA PRICE TRUCKING(1.53%)
Contract # 09153014
Totals 3240394.35 382205.40 819948.50 25.3

CountyDALLAS
Highway IH 35E
From AT SL 12 (E LEDBETTER DR)
To .
CSJ 0442-02-158
Proj ID STP 1602(164)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.200 182830.50 0.00 0.00 0.0
CountyDALLAS
Highway SL 12
From AT HAMPTON RD
To .
CSJ 0581-02-144
Proj ID STP 1602(165)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.200 278315.00 0.00 0.00 0.0
CountyDALLAS
Highway IH 635
From AT US 75
To .
CSJ 2374-01-178
Proj ID STP 1602(166)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.200 824139.50 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 134
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0442-02-158
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06163215
Totals 1285285.00 0.00 0.00 0.0

CountyROCKWALL
Highway SH 205
From AT FM 549
To .
CSJ 0451-01-051
Proj ID STP 1502(326)HES
Work Type ADD LEFT AND RIGHT TURN LANES
 
0.559 801819.95 0.00 0.00 0.0
CountyROCKWALL
Highway FM 549
From SH 205
To SH 276
CSJ 1015-01-025
Proj ID STP 1502(325)
Work Type GR, BASE, ACP OVERLAY, PVMT MKGS
 
4.866 6648602.81 49000.00 961407.84 14.4
CountyROCKWALL
Highway SH 276
From AT FM 548
To .
CSJ 1290-03-026
Proj ID STP 1502(327)HES
Work Type ADD LEFT TURN LANE
 
0.306 299049.77 0.00 0.00 0.0
Work Order 07-22-15
Work Began 02-15-16
Work Completed  
Time Computed 01-19-16
Contract Working Days 410
Addl Days Granted 0
Working Days Charged 104
Percent Time Used 25
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1015-01-025
BROCK ENVIRONMENTAL SERVICES, LLC(0.95%)
PREMIER PAVING, LTD. ( 19.33%)
FORTSON CONTRACTING, INC.(0.23%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.74%)
BRENDA PRICE TRUCKING(1.63%)
SYNERGY SIGNS & SERVICES, LLC(0.80%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.86%)
DUSTROL, INC.(2.00%)
Contract # 06153249
Totals 7749472.53 49000.00 961407.84 12.4

CountyKAUFMAN
Highway IH 20
From ROSEHILL ROAD
To VAN ZANDT COUNTY LINE
CSJ 0495-01-070
Proj ID NH 2016(835)
Work Type CABLE BARRIER SYSTEM
 
35.088 2582661.45 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 143
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 0495-01-070
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163003
Totals 2582661.45 0.00 0.00 0.0

CountyCOLLIN
Highway SH 121
From SOUTH OF SH 160
To NORTH OF SH 160
CSJ 0549-03-025
Proj ID STP 1502(318)HES
Work Type GRADE SEPARATION
 
1.483 14843626.57 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-16-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 415
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0549-03-025
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163003
Totals 14843626.57 0.00 0.00 0.0

CountyCOLLIN
Highway SH 121
From SH 5
To 1.65 MILES WEST OF FM 455
CSJ 0549-03-027
Proj ID C 549-3-27
Work Type GRD, STR, BASE, PVMT, SIGNS
 
5.918 43893899.25 1436840.76 4818235.81 10.9
Work Order 07-14-15
Work Began 10-22-15
Work Completed  
Time Computed 09-13-15
Contract Working Days 768
Addl Days Granted 0
Working Days Charged 150
Percent Time Used 19
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0549-03-027
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.84%)
ALTUS TRAFFIC MANAGEMENT LLC (0.24%)
DURABLE SPECIALTIES, INC.(1.76%)
STRIPING TECHNOLOGY, L.P.(0.99%)
THELIN RECYCLING COMPANY, L.P. (0.06%)
TEXAS SHAFTS, INC. (0.39%)
CTBX, INC. (0.02%)
PREMIER PAVING, LTD. ( 14.25%)
STRIPING SYSTEMS, INC. (0.00%)
DUSTROL, INC.(0.91%)
RPM XCONSTRUCTION, LLC (5.92%)
Contract # 05153202
Totals 43893899.25 1436840.76 4818235.81 10.9

CountyDALLAS
Highway SL 12 ETC
From AT JOHN WEST
To .
CSJ 0581-01-141
Proj ID STP 2016(983)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.800 1625000.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-27-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 286
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0581-01-141
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04163031
Totals 1625000.00 0.00 0.00 0.0

CountyDALLAS
Highway SL 12
From ILLINOIS AVENUE
To NORTH OF SINGLETON BLVD
CSJ 0581-02-141
Proj ID STP 1502(042)
Work Type FDR - CP AND OVERLAY ON FRONTAGE RDS
 
8.760 2761594.56 46715.29 2778486.36 99.9
Work Order 04-20-15
Work Began 06-15-15
Work Completed  
Time Computed 05-06-15
Contract Working Days 225
Addl Days Granted 0
Working Days Charged 219
Percent Time Used 97
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0581-02-141
AUSTIN BRIDGE & ROAD SERVICES, LP( 33.94%)
EROSION CONTROL MANAGEMENT SERVICES(0.27%)
DURABLE SPECIALTIES, INC.(0.96%)
ALTUS TRAFFIC MANAGEMENT LLC (0.51%)
STRIPING TECHNOLOGY, L.P.(3.68%)
BRENDA PRICE TRUCKING(2.14%)
UNDER CONSTRUCTION INC.(2.54%)
Contract # 03153219
Totals 2761594.56 46715.29 2778486.36 99.9

CountyELLIS
Highway FM 66
From AT WEST FORK WEAKLY BRANCH
To .
CSJ 0596-02-037
Proj ID BR 1502(319)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.345 2694785.55 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-16-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 378
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
IEA INC.
SUBCONTRACTOR(S) FOR CCSJ: 0596-02-037
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11153017
Totals 2694785.55 0.00 0.00 0.0