Monthly State Let Construction Report For Dallas District As Of Feb 11, 2015 Page 6 Of 9

Last Update: Wednesday, February 11, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyCOLLIN
Highway FM 455
From US 75 NB FRONTAGE ROAD
To SH 5
CSJ 0816-04-044
Proj ID C 816-4-44
Work Type GR, STRS, BASE, SURF, PAV, MARK
 
1.960 12399737.47 0.00 0.00 0.0
Work Order 09-03-13
Work Began 00-00-00
Work Completed  
Time Computed 03-02-14
Contract Working Days 251
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0816-04-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03133204
Totals 12399737.47 0.00 0.00 0.0

CountyCOLLIN
Highway FM 455
From CR 98
To FM 3356
CSJ 0816-04-047
Proj ID STP 2014(700)HES
Work Type GR, BASE, PVMT, PVMT MKGS, SIGNS
 
8.080 5536032.38 722331.18 4985446.83 90.0
Work Order 06-20-14
Work Began 07-09-14
Work Completed  
Time Computed 07-06-14
Contract Working Days 191
Addl Days Granted 2
Working Days Charged 135
Percent Time Used 69
Contractor(s)
AUSTIN BRIDGE & ROAD, LP
SUBCONTRACTOR(S) FOR CCSJ: 0816-04-047
TRP CONSTRUCTION GROUP, LLC(1.04%)
ALTUS TRAFFIC MANAGEMENT LLC (0.26%)
RICE ENVIRONMENTAL SERVICES(2.95%)
W.S. CONSTRUCTION COMPANY( 10.92%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(3.34%)
Contract # 04143009
Totals 5536032.38 722331.18 4985446.83 90.0

CountyELLIS
Highway FM 308
From HILL COUNTY LINE
To US 77
CSJ 0834-01-013
Proj ID STP 2013(953)
Work Type GR, BASE, PVMT, CULVERTS, PVMT MKGS
 
4.806 3096481.32 236404.87 2690472.89 87.2
Work Order 11-19-13
Work Began 02-03-14
Work Completed  
Time Computed 01-18-14
Contract Working Days 252
Addl Days Granted 0
Working Days Charged 262
Percent Time Used 103
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0834-01-013
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.13%)
STRIPING TECHNOLOGY, L.P.(1.45%)
FORTSON CONTRACTING, INC.(0.28%)
N-LINE TRAFFIC MAINTENANCE, L.P. (3.26%)
BEAR CREEK CONSTRUCTION, LLC ( 18.14%)
Contract # 08133026
Totals 3096481.32 236404.87 2690472.89 87.2

CountyDALLAS
Highway VA
From DISTRICTWIDE
To (ON-SYSTEM)
CSJ 0918-00-156
Proj ID STP 2010(038)
Work Type ASBESTOS ABATEMENT ON BRIDGES
 
0.001 690174.50 9536.00 464930.94 67.3
Work Order 10-06-09
Work Began 01-04-10
Work Completed  
Time Computed 10-22-09
Contract Working Days 252
Addl Days Granted 120
Working Days Charged 294
Percent Time Used 79
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-156
1 PRIORITY ENVIRONMENTAL SERVICES, INC.( 60.27%)
Contract # 09093038
Totals 690174.50 9536.00 464930.94 67.3

CountyDALLAS
Highway VA
From DISTRICTWIDE
To .
CSJ 0918-00-160
Proj ID C 918-00-160
Work Type SIGN AND SIGN STRUCTURE REPLACEMENT
 
0.001 883958.00 0.00 948362.08 99.9
Work Order 02-10-12
Work Began 06-19-12
Work Completed  
Time Computed 06-19-12
Contract Working Days 365
Addl Days Granted 30
Working Days Charged 223
Percent Time Used 56
Contractor(s)
TIME STRIPING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-160
GIBSON & ASSOCIATES, INC.(3.84%)
FORTSON CONTRACTING, INC.(2.27%)
LONG FOUNDATION DRILLING (0.49%)
Contract # 12113212
Totals 883958.00 0.00 948362.08 99.9

CountyDALLAS
Highway VA
From DISTRICTWIDE
To .
CSJ 0918-00-162
Proj ID STP 2013(452)
Work Type INSTALL GUIDE SIGNS
 
0.001 336139.97 0.00 206087.67 61.3
Work Order 06-12-13
Work Began 01-16-14
Work Completed  
Time Computed 09-10-13
Contract Working Days 540
Addl Days Granted 0
Working Days Charged 229
Percent Time Used 42
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-162
DYNAMIC VISION CO., INC. ( 10.24%)
MARCOM"S MOWING SERVICE, LLC (2.10%)
Contract # 03133012
Totals 336139.97 0.00 206087.67 61.3

CountyDALLAS
Highway VA
From DISTRICTWIDE
To .
CSJ 0918-00-163
Proj ID STP 1102(197)
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.001 1556550.00 103592.35 1542424.46 99.0
Work Order 08-11-11
Work Began 03-02-12
Work Completed  
Time Computed 10-10-11
Contract Working Days 548
Addl Days Granted 0
Working Days Charged 513
Percent Time Used 93
Contractor(s)
ROADWAY SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-163
ROADMASTER, INC. (3.01%)
Contract # 07113231
Totals 1556550.00 103592.35 1542424.46 99.0

CountyDALLAS
Highway VA
From VARIOUS LOCATIONS
To IN DALLAS DISTRICT
CSJ 0918-00-185
Proj ID STP 1402(027)
Work Type NON SITE SPECIFIC SIGNAL CONTRACT
 
0.001 1297700.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-28-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 346
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-185
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08143248
Totals 1297700.00 0.00 0.00 0.0

CountyDALLAS
Highway VA
From VARIOUS LOCATIONS
To IN DALLAS DISTRICT
CSJ 0918-00-186
Proj ID STP 2013(533)
Work Type NON SITE SPECIFIC SIGNAL CONTRACT
 
0.001 1598000.00 13650.00 301451.93 18.8
Work Order 06-28-13
Work Began 04-28-14
Work Completed  
Time Computed 09-26-13
Contract Working Days 345
Addl Days Granted 0
Working Days Charged 117
Percent Time Used 33
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-186
DYNAMIC VISION CO., INC. (3.87%)
ROAD MASTER STRIPING LLC (3.33%)
Contract # 04133224
Totals 1598000.00 13650.00 301451.93 18.8

CountyDALLAS
Highway VA
From AT VARIOUS LOCATIONS
To IN DALLAS DISTRICT
CSJ 0918-00-228
Proj ID STP 2014(390)
Work Type INSTALL GUIDE SIGNS
 
0.001 479586.80 43764.50 62902.50 13.1
Work Order 04-22-14
Work Began 12-16-14
Work Completed  
Time Computed 12-16-14
Contract Working Days 240
Addl Days Granted 0
Working Days Charged 29
Percent Time Used 12
Contractor(s)
SOUTH TEXAS ILLUMINATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-228
FIREMAN EXCAVATING, INC. (2.33%)
Contract # 02143228
Totals 479586.80 43764.50 62902.50 13.1

CountyDALLAS
Highway VA
From VARIOUS LOCATIONS
To AT DIAMOND INTERSECTIONS
CSJ 0918-00-234
Proj ID C 918-00-234
Work Type PAVEMENT MARKINGS, SIGNS, SIGNALS
 
0.001 714066.00 0.00 97165.56 13.6
Work Order 02-18-14
Work Began 07-09-14
Work Completed  
Time Computed 04-19-14
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 22
Percent Time Used 6
Contractor(s)
STAR OPERATIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-234
STRIPE-A-ZONE, INC.(5.80%)
Contract # 01143209
Totals 714066.00 0.00 97165.56 13.6

CountyNAVARRO
Highway CR
From CR NE 0070, 3.5 MI E OF IH 45
To CHAMBERS CREEK
CSJ 0918-18-123
Proj ID BR 2011(796)
Work Type REPL BR & APPR
 
0.320 1416000.00 2209.62 1270650.22 100.0
Work Order 05-22-12
Work Began 08-21-12
Work Completed 10-24-14
Time Computed 07-21-12
Contract Working Days 251
Addl Days Granted 0
Working Days Charged 403
Percent Time Used 160
Contractor(s)
EMPIRE CIVIL CONSTRUCTION, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0918-18-123
FORTSON CONTRACTING, INC.(3.13%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.58%)
NORTH TEXAS REBAR, LLC (0.97%)
SOUTHWEST ENVIRONMENT SERVICES LLC (3.52%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (8.51%)
N.L. SCHUTTE FOUNDATION DRILLING, INC. (5.11%)
PIERCE CONSTRUCTION, INC.( 36.30%)
Contract # 04123225
Totals 1416000.00 2209.62 1270650.22 100.0

CountyELLIS
Highway CR
From CARTWRIGHT RD @ BIG ONION CRK TRIB
To .
CSJ 0918-22-143
Proj ID BR 2013(502)
Work Type REPL BR & APPRS
 
0.143 602706.08 18932.75 574250.75 95.2
Work Order 05-05-14
Work Began 06-16-14
Work Completed  
Time Computed 05-21-14
Contract Working Days 123
Addl Days Granted 5
Working Days Charged 117
Percent Time Used 91
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-22-143
EROSION CONTROL MANAGEMENT SERVICES(5.46%)
FORTSON CONTRACTING, INC.(2.46%)
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC(0.76%)
PEACHTREE CONSTRUCTION, LTD. (4.56%)
USA EROSION, INC.(8.47%)
WYLIE DRILLING & DRAINAGE, INC.(6.07%)
Contract # 03143208
Totals 602706.08 18932.75 574250.75 95.2

CountyDALLAS
Highway CS
From ON MONTFORT DRIVE, PETERSON LANE
To ALPHA ROAD
CSJ 0918-45-368
Proj ID STP 97(433)MM
Work Type GRADING, BASE AND PAVING
 
0.207 563823.19 42395.72 454108.08 89.6
CountyDALLAS
Highway CS
From ON MONTFORT DRIVE, PETERSON LANE
To ALPHA ROAD
CSJ 0918-45-577
Proj ID STP 2001(674)MM
Work Type ACQUISITION, UTILITIES AND RELOCATI
 
0.001 173390.40 0.00 115524.09 66.6
Work Order 06-10-10
Work Began 01-02-14
Work Completed  
Time Computed 12-07-10
Contract Working Days 147
Addl Days Granted 36
Working Days Charged 209
Percent Time Used 188
Contractor(s)
MCMAHON CONTRACTING, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-368
PEACHTREE CONSTRUCTION, LTD. (9.03%)
W.O.E. CONSTRUCTION(0.29%)
DURABLE SPECIALTIES, INC.( 11.62%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.16%)
J. E. GUZMAN CONSTRUCTION, INC.(3.87%)
S.Y.B. CONSTRUCTION CO., INC.(0.18%)
DAL-PRO CONSTRUCTION, INC. (0.13%)
BUYERS BARRICADES, INC.(0.33%)
LB TRANSPORTATION(0.56%)
ORNELAS & SON"S TRUCKING ( 12.09%)
SUPREME SAWING AND SEALING (0.08%)
ROAD MASTER STRIPING LLC (1.46%)
LAUGHLEY BRIDGE & CONSTRUCTION, INC. (4.03%)
Contract # 04103224
Totals 737213.59 42395.72 569632.17 84.2

CountyDALLAS
Highway CS
From SYLVAN AVE AT TRINITY RIVER
To .
CSJ 0918-45-669
Proj ID BR 2004(709)
Work Type REPLACE BR & APPRS
 
0.827 42157517.98 413162.30 40826688.27 97.8
CountyDALLAS
Highway CR
From SYLVAN AVE AT TRINITY RIVER
To .
CSJ 0918-47-033
Proj ID RW 918-47-33
Work Type ROW UTL. ADJ.
 
0.827 120057.50 0.00 108577.23 90.4
Work Order 09-27-11
Work Began 03-28-12
Work Completed  
Time Computed 03-28-12
Contract Working Days 692
Addl Days Granted 12
Working Days Charged 856
Percent Time Used 121
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-669
ATS DRILLING, L.P. (6.56%)
NORTH TEXAS REBAR, LLC (1.32%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.15%)
HIGHWAY TECHNOLOGIES, INC. (0.04%)
GREAT WESTERN ERECTORS (0.50%)
BRENDA PRICE TRUCKING(0.23%)
BRUNDAGE-BONE(0.02%)
NORTH TEXAS CONTRACTING, INC.(0.27%)
TEX OP CONSTRUCTION, LP(0.02%)
STAR OPERATIONS, INC.(3.52%)
EW WELLS GROUP LLC (0.49%)
LINDAMOOD DEMOLITION, INC. (0.48%)
GIBSON & ASSOCIATES, INC.(0.03%)
DYWIDAG-SYSTEMS INTERNATIONAL_USA,INC. (2.38%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.01%)
PREMIER PAVING, LTD. (0.44%)
FORTSON CONTRACTING, INC.(0.13%)
SCOTT DERR PAINTING CO (0.21%)
W.O.E. CONSTRUCTION(1.21%)
FINE CURBS (0.02%)
UNDER CONSTRUCTION INC.(0.02%)
ARLINGTON PAVERS, INC. (0.29%)
BROWN FIELD SERVICE(0.41%)
ALAMO TILE & STONE (0.16%)
MICA CORPORATION (0.00%)
PORTADAM (0.00%)
Contract # 07113002
Totals 42277575.48 413162.30 40935265.50 97.8

CountyDALLAS
Highway CS
From ON PLEASANT RUN RD. AT BEE BRANCH
To IN CITY OF DESOTO
CSJ 0918-45-731
Proj ID BR 2006(473)
Work Type REPL BR & APPRS
 
0.259 3181746.72 0.00 47838.07 1.5
Work Order 09-30-14
Work Began 00-00-00
Work Completed  
Time Computed 10-16-14
Contract Working Days 247
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
IOWA BRIDGE & CULVERT, LC
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-731
TOTAL HIGHWAY MAINTENANCE, LLC (0.45%)
ACU CONSTRUCTION LLC (0.53%)
TISEO PAVING CO. ( 11.06%)
RICE ENVIRONMENTAL SERVICES(0.12%)
MELS ELECTRIC, L.P.(0.36%)
FORTSON CONTRACTING, INC.(0.20%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.41%)
MCL CONTRACTING, LLC (0.05%)
PREMIER PAVING, LTD. (4.57%)
T & R EXCAVATION, INC. (5.83%)
STRIPE-A-ZONE, INC.(0.81%)
UNDERGROUND COALITION, INC.(3.67%)
USA SWPPP INSPECTIONS, INC.(1.36%)
Contract # 07143014
Totals 3181746.72 0.00 47838.07 1.5

CountyDALLAS
Highway CS
From LAKERIDGE PKWY, S OF GREAT SW PKWY
To IH 20 EB FRTG ROAD
CSJ 0918-45-747
Proj ID STP 2011(413)MM
Work Type GR, STRS AND PVT
 
1.968 15998353.47 20193.54 15930829.91 99.5
Work Order 01-10-11
Work Began 02-28-11
Work Completed  
Time Computed 01-26-11
Contract Working Days 366
Addl Days Granted 341
Working Days Charged 706
Percent Time Used 99
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-747
TOTAL HIGHWAY MAINTENANCE, LLC (0.54%)
PREMIER PAVING, LTD. (9.76%)
A.M.S. COMPANY, INC. (7.39%)
TEXAS STAR TRANSPORT, LP (2.21%)
DENALI SERVICES, L.P.(0.22%)
ALLIANCE TRUCKING(0.59%)
SUPREME SAWING AND SEALING (0.04%)
WYLIE DRILLING & DRAINAGE, INC.(2.14%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.46%)
UNDERGROUND COALITION, INC.(5.46%)
J.L. STEEL REINFORCING, LLC(0.17%)
THURMAN TRANSPORTATION, INC. (0.36%)
TRYMOR TRUCKING, INC.(0.14%)
INTEGRATED ROADWAY SERVICES, INC.(4.31%)
TCB FOUNDATION DRILLERS, INC.(0.58%)
INDUS CONSTRUCTION, L.P. (1.78%)
CONCRETE CUTTING BY BOND (0.30%)
JM MATERIALS, INC. (0.14%)
A BROTHERS MILLING, LLC(0.06%)
SCOTT DERR PAINTING CO (0.07%)
J & M MANHOLE CONSTRUCTION (0.02%)
RICE ENVIRONMENTAL SERVICES(0.09%)
VANN/ELLI, INC.(0.04%)
STRIPE-A-ZONE, INC.(0.04%)
PHILLIPS LAWN SPRINKLER CO., INC.(0.35%)
ARTEX ELECTRIC, INC. (0.09%)
Contract # 11103001
Totals 15998353.47 20193.54 15930829.91 99.5

CountyDALLAS
Highway CS
From S MARSALIS AVE AT FIVEMILE CREEK
To .
CSJ 0918-45-761
Proj ID BR 2007(306)
Work Type REPL BR & APPRS
 
0.077 2688948.21 4228.00 4228.00 0.1
CountyDALLAS
Highway CS
From S MARSALIS AVE AT FIVEMILE CREEK
To .
CSJ 0918-47-085
Proj ID RW 918-47-85
Work Type ADJUSTMENT OF UTILITIES
 
0.090 255486.60 0.00 0.00 0.0
Work Order 09-22-14
Work Began 00-00-00
Work Completed  
Time Computed 11-21-14
Contract Working Days 353
Addl Days Granted 0
Working Days Charged 17
Percent Time Used 4
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-761
ALTUS TRAFFIC MANAGEMENT LLC (0.97%)
BROCK ENVIRONMENTAL, LLC (0.53%)
ATS DRILLING, INC. (7.00%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(1.19%)
Contract # 06143014
Totals 2944434.81 4228.00 4228.00 0.1

CountyDALLAS
Highway CS
From GALATYN PARKWAY EXTENSION FROM US75
To PALISADES BLVD IN RICHARDSON
CSJ 0918-45-821
Proj ID CM 2007(892)
Work Type ROADWAY EXTENSION
 
0.169 2999312.68 21065.00 3229167.00 100.0
CountyDALLAS
Highway VA
From GALATYN PARKWAY EXTENSION FROM US75
To PALISADES BLVD IN RICHARDSON
CSJ 0918-47-009
Proj ID CC 918-47-9
Work Type ROW UTL. ADJ.
 
0.027 63229.80 0.00 84756.54 100.0
Work Order 11-09-11
Work Began 01-11-12
Work Completed 11-20-14
Time Computed 01-03-12
Contract Working Days 270
Addl Days Granted 88
Working Days Charged 358
Percent Time Used 100
Contractor(s)
REBCON, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-821
COWTOWN TRAFFIC CONTROL, INC.(0.39%)
NORTH TEXAS CONTRACTING, INC.(6.01%)
CONCRETE CUTTING BY BOND (0.18%)
N.L. SCHUTTE FOUNDATION DRILLING, INC. (0.48%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (2.17%)
SCOTT DERR PAINTING CO, LLC(0.37%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.40%)
INTEGRATED ROADWAY SERVICES, INC.(5.23%)
ROAD MASTER STRIPING LLC (0.77%)
WEST TEXAS REBAR PLACERS INC.(1.07%)
HOUSTON SAWING & DRILLING(0.07%)
DOWN UNDER CONSTRUCTION(0.04%)
SYNERGY SIGNS & SERVICES (0.08%)
Contract # 09113011
Totals 3062542.48 21065.00 3313923.54 100.0

CountyDALLAS
Highway CS
From ON PLEASANT RUN RD, E OF SUNRISE RD
To WEST OF IH 45
CSJ 0918-45-844
Proj ID HP 2010(854)
Work Type GRD, STR, PVMT, SIGNS
 
0.759 7719831.64 0.00 7784885.04 99.9
Work Order 04-03-13
Work Began 04-22-13
Work Completed  
Time Computed 04-22-13
Contract Working Days 270
Addl Days Granted 7
Working Days Charged 277
Percent Time Used 100
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-844
MCL CONTRACTING, LLC (1.04%)
FOUNDATION DRILLERS, INC.(1.55%)
S & S BRIDGE PAINTING, INC.(0.12%)
HOUSTON SAWING & DRILLING(0.07%)
STORM WATER MANAGEMENT, INC. (0.51%)
IOWA BRIDGE & CULVERT, LC(0.32%)
COWTOWN TRAFFIC CONTROL, INC.(0.19%)
STRIPING TECHNOLOGY, L.P.(1.07%)
GREAT WESTERN ERECTORS (0.10%)
PEACHTREE CONSTRUCTION, LTD. (8.07%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.62%)
COWBOY TRUCKING(1.80%)
TEX OP CONSTRUCTION, LP(0.20%)
W.O.E. CONSTRUCTION(0.03%)
TWS ENVIRONMENTAL, LLC (0.22%)
INTEGRATED ROADWAY SERVICES, INC.(2.35%)
PLACIDO CONSTRUCTION COMPANY (0.46%)
LONE STAR HIGHWAY PRODUCTS, INC. (5.42%)
Contract # 12123014
Totals 7719831.64 0.00 7784885.04 99.9