Monthly State Let Construction Report For Dallas District As Of Apr 11, 2016 Page 6 Of 9

Last Update: Monday, April 11, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyELLIS
Highway CR
From RICHLAND BEND ROAD
To AT RICHLAND CREEK
CSJ 0918-22-086
Proj ID BR 2013(494)
Work Type REPL BR
 
0.152 934144.91 13937.00 738713.41 81.0
Work Order 06-15-15
Work Began 08-10-15
Work Completed  
Time Computed 08-24-15
Contract Working Days 129
Addl Days Granted 0
Working Days Charged 159
Percent Time Used 123
Contractor(s)
PIERCE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-22-086
M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.79%)
ALTUS TRAFFIC MANAGEMENT LLC (0.68%)
PEACHTREE CONSTRUCTION, LTD. (3.75%)
FORTSON CONTRACTING, INC.(1.87%)
USA SWPPP INSPECTIONS, INC.(2.87%)
JUST GROOVING, LTD.(0.26%)
MCL CONTRACTING, LLC (0.27%)
Contract # 04153012
Totals 934144.91 13937.00 738713.41 81.0

CountyELLIS
Highway CR
From FOREST BROOK DR AT RED OAK CREEK
To CITY OF OAK LEAF
CSJ 0918-22-141
Proj ID BR 2013(598)
Work Type REPL BR
 
0.084 1038508.40 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-07-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 82
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DCI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-22-141
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12153036
Totals 1038508.40 0.00 0.00 0.0

CountyDALLAS
Highway CS
From ON PLEASANT RUN RD. AT BEE BRANCH
To IN CITY OF DESOTO
CSJ 0918-45-731
Proj ID BR 2006(473)
Work Type REPL BR & APPRS
 
0.259 3181746.72 172034.35 2199790.97 69.1
Work Order 09-30-14
Work Began 03-24-15
Work Completed  
Time Computed 10-16-14
Contract Working Days 247
Addl Days Granted 31
Working Days Charged 196
Percent Time Used 70
Contractor(s)
IOWA BRIDGE & CULVERT, LC
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-731
TOTAL HIGHWAY MAINTENANCE, LLC (0.45%)
ACU CONSTRUCTION LLC (0.53%)
TISEO PAVING CO. ( 11.06%)
RICE ENVIRONMENTAL SERVICES(0.12%)
MELS ELECTRIC, L.P.(0.36%)
FORTSON CONTRACTING, INC.(0.20%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.41%)
MCL CONTRACTING, LLC (0.05%)
PREMIER PAVING, LTD. (4.57%)
T & R EXCAVATION, INC. (5.83%)
STRIPE-A-ZONE, INC.(0.81%)
UNDERGROUND COALITION, INC.(3.67%)
USA SWPPP INSPECTIONS, INC.(1.36%)
ENVIRONMENTAL SAFETY SERVICES, INC.(5.47%)
FOUNDATION DRILLERS, INC.(1.52%)
FARR FOUNDATION, INC.(0.76%)
DFW SERVICES, LLC(3.67%)
KDAT (2.65%)
VENUS CONSTRUCTION (1.32%)
Contract # 07143014
Totals 3181746.72 172034.35 2199790.97 69.1

CountyDALLAS
Highway CS
From LAKERIDGE PKWY, S OF GREAT SW PKWY
To IH 20 EB FRTG ROAD
CSJ 0918-45-747
Proj ID STP 2011(413)MM
Work Type GR, STRS AND PVT
 
1.968 15998353.47 0.00 17141322.49 99.9
Work Order 01-10-11
Work Began 02-28-11
Work Completed  
Time Computed 01-26-11
Contract Working Days 366
Addl Days Granted 341
Working Days Charged 706
Percent Time Used 99
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-747
TOTAL HIGHWAY MAINTENANCE, LLC (0.54%)
PREMIER PAVING, LTD. (9.76%)
A.M.S. COMPANY, INC. (7.39%)
TEXAS STAR TRANSPORT, LP (2.21%)
DENALI SERVICES, L.P.(0.22%)
ALLIANCE TRUCKING(0.59%)
SUPREME SAWING AND SEALING (0.04%)
WYLIE DRILLING & DRAINAGE, INC.(2.14%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.46%)
UNDERGROUND COALITION, INC.(5.46%)
J.L. STEEL REINFORCING, LLC(0.17%)
THURMAN TRANSPORTATION, INC. (0.36%)
TRYMOR TRUCKING, INC.(0.14%)
INTEGRATED ROADWAY SERVICES, INC.(4.31%)
TCB FOUNDATION DRILLERS, INC.(0.58%)
INDUS CONSTRUCTION, L.P. (1.78%)
CONCRETE CUTTING BY BOND (0.30%)
JM MATERIALS, INC. (0.14%)
A BROTHERS MILLING, LLC(0.06%)
SCOTT DERR PAINTING CO (0.07%)
J & M MANHOLE CONSTRUCTION (0.02%)
RICE ENVIRONMENTAL SERVICES(0.09%)
VANN/ELLI, INC.(0.04%)
STRIPE-A-ZONE, INC.(0.04%)
PHILLIPS LAWN SPRINKLER CO., INC.(0.35%)
ARTEX ELECTRIC, INC. (0.09%)
Contract # 11103001
Totals 15998353.47 0.00 17141322.49 99.9

CountyDALLAS
Highway CS
From S MARSALIS AVE AT FIVEMILE CREEK
To .
CSJ 0918-45-761
Proj ID BR 2007(306)
Work Type REPL BR & APPRS
 
0.077 2688948.21 39994.50 1345512.72 50.0
CountyDALLAS
Highway CS
From S MARSALIS AVE AT FIVEMILE CREEK
To .
CSJ 0918-47-085
Proj ID RW 918-47-85
Work Type ADJUSTMENT OF UTILITIES
 
0.090 255486.60 0.00 72407.00 28.3
Work Order 09-22-14
Work Began 03-30-15
Work Completed  
Time Computed 11-21-14
Contract Working Days 353
Addl Days Granted 0
Working Days Charged 309
Percent Time Used 87
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-761
ALTUS TRAFFIC MANAGEMENT LLC (0.97%)
BROCK ENVIRONMENTAL, LLC (0.53%)
ATS DRILLING, INC. (7.00%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(1.19%)
FRAIRE"S REBAR, INC(8.53%)
STRIPE-A-ZONE, INC.(0.16%)
ACTION SERVICES(0.29%)
FORTSON CONTRACTING, INC.(0.26%)
IOWA BRIDGE & CULVERT, LC(0.33%)
METRO CUTTING AND SEALING, INC.(0.20%)
DUSTROL, INC.(0.30%)
J & M MANHOLE CONSTRUCTION (0.30%)
RICE TUNNELING & BORING, INC.(0.25%)
MAGNUM MANHOLE & UNDERGROUND COMPANY (0.36%)
CLEMONS TRUCKING (1.23%)
FOUNDATION DRILLERS, INC.(1.17%)
K & A STEEL, LLC (1.73%)
XIT PAVING AND CONSTRUCTION INC. (1.11%)
Contract # 06143014
Totals 2944434.81 39994.50 1417919.72 48.1

CountyDALLAS
Highway CS
From RED OAK RD AT TEN MILE CREEK
To IN THE CITY OF LANCASTER
CSJ 0918-45-791
Proj ID BR 2013(493)
Work Type REHAB BRIDGE AND APPROACHES
 
0.100 1305085.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-15-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 247
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HODGES AND SON CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-791
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11153230
Totals 1305085.00 0.00 0.00 0.0

CountyDALLAS
Highway CS
From ON WHITLOCK RD, FROM IH 35E
To OLD DENTON RD IN CARROLLTON
CSJ 0918-45-864
Proj ID STP 2009(860)MM
Work Type GR, STRS & SURF
 
0.505 3063573.24 0.00 12988.07 0.4
CountyDALLAS
Highway CS
From ON WHITLOCK RD, FROM IH 35E
To OLD DENTON RD IN CARROLLTON
CSJ 0918-47-116
Proj ID RW 918-47-116
Work Type ADJUSTMENT OF UTILITIES IN CONSTRUC
 
0.505 372163.90 0.00 0.00 0.0
Work Order 09-11-14
Work Began 00-00-00
Work Completed  
Time Computed 12-09-14
Contract Working Days 276
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TISEO PAVING CO.
SUBCONTRACTOR(S) FOR CCSJ: 0918-45-864
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143222
Totals 3435737.14 0.00 12988.07 0.3

CountyDENTON
Highway PW
From AT RAY ROBERTS (ISLE DUBOIS)
To STATE PARK
CSJ 0918-46-269
Proj ID C 918-46-269
Work Type REHABILITATE ROADS
 
0.001 1587178.56 0.00 1753072.90 99.9
Work Order 05-21-15
Work Began 08-07-15
Work Completed  
Time Computed 06-21-15
Contract Working Days 91
Addl Days Granted 0
Working Days Charged 63
Percent Time Used 69
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0918-46-269
ALTUS TRAFFIC MANAGEMENT LLC (0.21%)
STRIPING TECHNOLOGY, L.P.(9.73%)
USA SWPPP INSPECTIONS, INC.(1.90%)
Contract # 04153243
Totals 1587178.56 0.00 1753072.90 99.9

CountyDALLAS
Highway VA
From VARIOUS LOCATIONS ON STATE HIGHWAYS
To IN DALLAS COUNTY
CSJ 0918-47-052
Proj ID STP 1102(553)
Work Type CONSTRUCT CURB RAMPS
 
0.001 2270944.30 7094.10 2162311.95 95.2
Work Order 07-25-14
Work Began 09-02-14
Work Completed  
Time Computed 09-02-14
Contract Working Days 244
Addl Days Granted 0
Working Days Charged 243
Percent Time Used 99
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-47-052
CLASSIC TEJAS CONSTRUCTION, INC. ( 17.31%)
ACTION SERVICES(1.21%)
Contract # 06143039
Totals 2270944.30 7094.10 2162311.95 95.2

CountyDALLAS
Highway VA
From VARIOUS LOCATIONS ON STATE HIGHWAYS
To IN DALLAS COUNTY
CSJ 0918-47-100
Proj ID NH 2015(653)
Work Type CONSTRUCT CURB RAMPS
 
0.001 3464886.46 95598.02 2487274.56 71.7
Work Order 04-22-15
Work Began 06-22-15
Work Completed  
Time Computed 05-08-15
Contract Working Days 315
Addl Days Granted 0
Working Days Charged 200
Percent Time Used 63
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-47-100
CLASSIC TEJAS CONSTRUCTION, INC. ( 10.16%)
Contract # 03153224
Totals 3464886.46 95598.02 2487274.56 71.7

CountyDALLAS
Highway CS
From JEFFERSON ST AT MERRIFIELD ST
To .
CSJ 0918-47-101
Proj ID STP 1502(494)HES
Work Type INSTALL TRAFFIC SIGNAL
 
0.100 395282.15 168609.67 168609.67 42.6
CountyDALLAS
Highway CS
From WESTMORELAND AT CLARENDON
To .
CSJ 0918-47-103
Proj ID STP 1502(496)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.100 257625.45 18750.00 18750.00 7.2
CountyDALLAS
Highway CS
From MCKINNEY AT MAPLE
To .
CSJ 0918-47-110
Proj ID STP 1502(495)HES
Work Type IMPROVE TRAFFIC SIGNALS
 
0.100 150048.25 18750.00 18750.00 12.4
Work Order 10-05-15
Work Began 02-29-16
Work Completed  
Time Computed 02-29-16
Contract Working Days 140
Addl Days Granted 0
Working Days Charged 32
Percent Time Used 22
Contractor(s)
FNH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0918-47-101
DALLAS LITE AND BARRICADE INC. (1.43%)
MABAK DIRECTIONAL DRILLING (4.36%)
Contract # 07153012
Totals 802955.85 206109.67 206109.67 25.6

CountyDALLAS
Highway CS
From W TARRANT ROAD
To AT CURVE AT HAWAII DRIVE
CSJ 0918-47-102
Proj ID STP 2015(784)HES
Work Type INSTALL CHEVRONS AND OVERLAY
 
0.100 128676.50 0.00 1250.00 0.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-21-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 40
Addl Days Granted 0
Working Days Charged 9
Percent Time Used 22
Contractor(s)
TOTAL HIGHWAY MAINTENANCE, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0918-47-102
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04153236
Totals 128676.50 0.00 1250.00 0.9

CountyCOLLIN
Highway FM 546
From WEST OF THE CROSSINGS RD
To FM 982
CSJ 1013-01-028
Proj ID STP 1402(180)HES
Work Type GR, BASE, PVMT, PVMT MKGS, SIGNS
 
5.051 5997170.81 242116.40 5689020.14 95.9
Work Order 09-15-14
Work Began 12-01-14
Work Completed  
Time Computed 12-01-14
Contract Working Days 263
Addl Days Granted 3
Working Days Charged 324
Percent Time Used 121
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1013-01-028
TOTAL HIGHWAY MAINTENANCE, LLC (1.22%)
TEXAS ENVIRONMENTAL MANAGEMENT, INC(0.43%)
FARR FOUNDATION, INC.(3.02%)
EROSION CONTROL MANAGEMENT SERVICES(0.36%)
K & S UTILITY CONTRACTORS, INC.( 21.42%)
MARCOM"S MOWING SERVICE, LLC (3.13%)
ACU CONSTRUCTION LLC (0.45%)
GOLDEN TREE MAINTENANCE(0.13%)
IOWA BRIDGE & CULVERT, LC(0.51%)
Contract # 07143245
Totals 5997170.81 242116.40 5689020.14 95.9

CountyROCKWALL
Highway FM 548
From SH 276
To SH 66
CSJ 1014-02-041
Proj ID STP 2016(145)
Work Type WDN, STR, REMX, OL, PV MRKS
 
12.751 13784401.35 68101.50 68101.50 0.4
Work Order 02-03-16
Work Began 03-28-16
Work Completed  
Time Computed 03-28-16
Contract Working Days 363
Addl Days Granted 0
Working Days Charged 16
Percent Time Used 4
Contractor(s)
ZACHRY CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 1014-02-041
TEXOP CONSTRUCTION (1.79%)
EROSION CONTROL MANAGEMENT SERVICES(0.48%)
PREMIER PAVING, LTD. ( 22.61%)
SCOTT PAVING, INC. (3.33%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.66%)
TRP CONSTRUCTION GROUP, LLC(0.94%)
DALLAS LITE AND BARRICADE INC. (0.54%)
RICE ENVIRONMENTAL SERVICES(1.23%)
Contract # 10153205
Totals 13784401.35 68101.50 68101.50 0.4

CountyROCKWALL
Highway FM 740
From FM 549 / FM 550 INTERSECTION
To FM 1140 NORTH IN HEATH
CSJ 1014-03-049
Proj ID C 1014-3-49
Work Type GRADING, STRUCTURES, DRAINAGE, & PVMT
 
1.856 12967453.42 100531.92 1881854.19 14.5
Work Order 11-14-13
Work Began 07-20-15
Work Completed  
Time Computed 08-11-14
Contract Working Days 412
Addl Days Granted 0
Working Days Charged 72
Percent Time Used 17
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1014-03-049
W.O.E. CONSTRUCTION(0.30%)
TEX OP CONSTRUCTION, LP(2.01%)
TEXAS INLETS, INC. (3.62%)
SYNERGY SIGNS & SERVICES, LLC(0.37%)
HAYWARD BAKER, INC.(0.81%)
STRIPING TECHNOLOGY, L.P.(0.99%)
USA SWPPP INSPECTIONS, INC.(1.15%)
PREMIER PAVING, LTD. (4.86%)
DURABLE SPECIALTIES, INC.(3.25%)
BREDA COMPANY, INC.(0.67%)
BUYERS BARRICADES, INC.(0.31%)
BRENDA PRICE TRUCKING(4.98%)
FANNIN TREE FARM, LTD(0.33%)
Contract # 08133209
Totals 12967453.42 100531.92 1881854.19 14.5

CountyROCKWALL
Highway FM 3549
From SH 66
To FM 552
CSJ 1015-01-022
Proj ID STP 2015(590)
Work Type BASE REPAIR, LEVEL UP, OVERLAY
 
2.319 2576274.62 462128.73 2248266.25 87.2
Work Order 03-30-15
Work Began 08-05-15
Work Completed  
Time Computed 04-15-15
Contract Working Days 165
Addl Days Granted 0
Working Days Charged 160
Percent Time Used 96
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 1015-01-022
PEACHTREE CONSTRUCTION, LTD. ( 14.69%)
K & S UTILITY CONTRACTORS, INC.(9.85%)
ALTUS TRAFFIC MANAGEMENT LLC (0.36%)
USA SWPPP INSPECTIONS, INC.(2.61%)
STRIPING TECHNOLOGY, L.P.(1.47%)
BAHENA CONSTRUCTION CO.,INC. (0.28%)
RAMBO CONTRACTING, INC.(2.41%)
Contract # 02153221
Totals 2576274.62 462128.73 2248266.25 87.2

CountyROCKWALL
Highway FM 551
From NORTH OF IH 30
To SH 66
CSJ 1016-01-027
Proj ID STP 2014(766)
Work Type BASE REPAIR, LEVEL UP, OVERLAY
 
2.479 5349450.72 187107.20 2268703.90 42.4
Work Order 08-07-14
Work Began 06-15-15
Work Completed  
Time Computed 02-03-15
Contract Working Days 126
Addl Days Granted 62
Working Days Charged 114
Percent Time Used 60
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1016-01-027
DUSTROL, INC.(4.85%)
PREMIER PAVING, LTD. ( 29.61%)
USA SWPPP INSPECTIONS, INC.(1.91%)
FORTSON CONTRACTING, INC.(1.26%)
STRIPING TECHNOLOGY, L.P.(0.71%)
HAYWOOD BAKER(1.24%)
SYNERGY SIGNS & SERVICES, LLC(0.86%)
BRENDA PRICE TRUCKING(1.08%)
FANNIN TREE FARM, LTD(0.13%)
Contract # 06143232
Totals 5349450.72 187107.20 2268703.90 42.4

CountyELLIS
Highway FM 85
From IH 45
To FM 1182
CSJ 1050-01-017
Proj ID STP 2016(146)
Work Type ACP OVERLAY, GR, STR, PVMT MKGS
 
8.401 12874396.21 44844.70 44844.70 0.3
Work Order 12-21-15
Work Began 03-14-16
Work Completed  
Time Computed 03-14-16
Contract Working Days 490
Addl Days Granted 0
Working Days Charged 11
Percent Time Used 2
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1050-01-017
FARR FOUNDATION, INC.(0.78%)
LONE STAR BARRIER SERVICES, LLC(0.82%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.18%)
SHALOM SERVICES CORPORATION(1.22%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.24%)
WOLFE CONSTRUCTION GROUP, INC. (0.30%)
STRIPING TECHNOLOGY, L.P.(0.81%)
PROJECT 2015, LLC(3.53%)
UNDER CONSTRUCTION INC.(0.00%)
GLL CORPORATION DBA MG TRUCKING(0.01%)
NIXON ENGINEERING(0.00%)
Contract # 10153212
Totals 12874396.21 44844.70 44844.70 0.3

CountyELLIS
Highway FM 664
From NORTH OF US 287
To SOUTH OF RED OAK CREEK IN OVILLA
CSJ 1051-01-042
Proj ID STP 2015(654)
Work Type ADD 3 - FOOT PAVED SHOULDERS
 
7.303 11142221.20 0.00 3921728.18 35.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-20-15
Work Began 06-22-15
Work Completed  
Time Computed 12-23-15
Contract Working Days 293
Addl Days Granted 0
Working Days Charged 162
Percent Time Used 55
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1051-01-042
BROCK ENVIRONMENTAL SERVICES, LLC(0.31%)
CROSSROADS, L.P. (0.48%)
DUSTROL, INC.(1.95%)
STRIPING TECHNOLOGY, L.P.(0.63%)
PEACHTREE CONSTRUCTION, LTD. ( 33.79%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.89%)
JE CASEY, LLC(1.56%)
SYNERGY SIGNS & SERVICES (0.72%)
OSCAR ORDUNO, INC. (2.36%)
BRENDA PRICE TRUCKING(1.09%)
AAA DRILLING FOUNDATION CO., INC.(0.32%)
FORTSON CONTRACTING, INC.(0.58%)
LONE STAR BARRIER SERVICES, LLC(0.53%)
Contract # 03153213
Totals 11142221.20 0.00 3921728.18 35.1

CountyELLIS
Highway FM 876
From AT BIG ONION CREEK
To .
CSJ 1051-02-017
Proj ID BR 2015(591)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.255 1721378.55 13991.63 646001.97 37.5
Work Order 04-03-15
Work Began 09-15-15
Work Completed  
Time Computed 09-15-15
Contract Working Days 360
Addl Days Granted 0
Working Days Charged 138
Percent Time Used 38
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 1051-02-017
N-LINE TRAFFIC MAINTENANCE, L.P. (0.93%)
IOWA BRIDGE & CULVERT, LC(3.59%)
STRIPING TECHNOLOGY, L.P.(1.60%)
GJ SEEDING, LLC(5.27%)
FOUNDATION DRILLERS, INC.(3.17%)
FRAIRE"S REBAR, INC(4.42%)
F & K BUILDERS (2.81%)
PEACHTREE CONSTRUCTION, LTD. (6.81%)
CLEMONS TRUCKING (2.17%)
JANEK & WHITTEN CONSTRUCTION INC.(0.43%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.70%)
FORTSON CONTRACTING, INC.(1.45%)
Contract # 02153207
Totals 1721378.55 13991.63 646001.97 37.5