Detail Letting Schedule for Harris County (FY 2005)
Detail Letting Schedule for Harris County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Harris County (FY 2005) |
CCSJ: 0027-09-096 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | NH 2005(508) | CSJ: | 0027-09-096 |
Description: | MILL, ASPHALT OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | KIRBY DR | Fund Cat: | 1 |
Limits To: | FM 865 | Estimate: | $4,604,986 |
Length: | 4.4 Miles | Actual: | $5,150,835 |
District: | Houston | Let Date: | JUN 2005 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | NH 2005(508) | CSJ: | 0027-10-066 |
Description: | MILL, ASPHALT OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | FM 865 | Estimate: | $1,900,592 |
Length: | 1.9 Miles | Actual: | $2,141,881 |
Bid Tabulations Back... |
Totals for 0027-09-096 | ||
---|---|---|---|
Length: | 6.3 Miles | ||
Estimate: | $6,505,578 | ||
Actual: | $7,292,716 | ||
CCSJ: 0027-13-188 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2004(750) | CSJ: | 0027-13-188 |
Description: | REPLACE PAVEMENT MARKINGS WITH WARRANTED PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CHIMNEY ROCK CENTER LINE | Fund Cat: | 1 |
Limits To: | FORT BEND COUNTY LINE | Estimate: | $991,262 |
Length: | 8.0 Miles | Actual: | $1,234,465 |
Back... |
Totals for 0027-13-188 | ||
Length: | 8.0 Miles | ||
Estimate: | $991,262 | ||
Actual: | $1,234,465 | ||
CCSJ: 0028-01-082 | |||
District: | Houston | Let Date: | APR 2005 |
Highway: | BU 90-U | Let Status: | Actual |
Project ID: | BR 2005(328) | CSJ: | 0028-01-082 |
Description: | REPLACE BRIDGE | Handling Code: |
|
Limits From: | AT SAN JACINTO RIVER RELIEF CHANNEL | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,632,006 |
Length: | 0.1 Miles | Actual: | $1,667,904 |
Back... |
Totals for 0028-01-082 | ||
Length: | 0.1 Miles | ||
Estimate: | $1,632,006 | ||
Actual: | $1,667,904 | ||
CCSJ: 0028-02-079 | |||
District: | Houston | Let Date: | DEC 2004 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2005(84) | CSJ: | 0028-02-079 |
Description: | BASE REPAIR, PLANING, ACP REHABILITATION, O / L, SIGNING & PAV | Handling Code: |
|
Limits From: | FM 2100 | Fund Cat: | 1 |
Limits To: | 0.08 MI W OF LIBERTY C/L | Estimate: | $1,849,330 |
Length: | 7.5 Miles | Actual: | $1,665,023 |
Back... |
Totals for 0028-02-079 | ||
Length: | 7.5 Miles | ||
Estimate: | $1,849,330 | ||
Actual: | $1,665,023 | ||
CCSJ: 0050-06-068 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | NH 2005(717) | CSJ: | 0050-06-068 |
Description: | CONSTRUCT 4 MAINLANES AND 2 - 2 LANE FRONTAGE ROADS | Handling Code: |
|
Limits From: | E OF BAUER | Fund Cat: | 2 |
Limits To: | W OF MASON | Estimate: | $16,240,507 |
Length: | 2.4 Miles | Actual: | $18,139,472 |
District: | Houston | Let Date: | JUL 2005 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | NH 2005(717) | CSJ: | 0050-06-069 |
Description: | CONSTRUCT 6 MAINLANES AND 2 - 2 LANE FRONTAGE ROADS WITH | Handling Code: |
|
Limits From: | E OF MASON | Fund Cat: | 2 |
Limits To: | W MUESCHKE | Estimate: | $10,742,176 |
Length: | 1.4 Miles | Actual: | $12,779,388 |
District: | Houston | Let Date: | JUL 2005 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | STP 2005(718) | CSJ: | 0050-06-074 |
Description: | REMOVE AND REPLACE BASE AND SURFACE OF WESTBOUND FRONTAGE | Handling Code: |
|
Limits From: | ROBERTS RD | Fund Cat: | 1 |
Limits To: | BAUER RD | Estimate: | $2,865,293 |
Length: | 2.8 Miles | Actual: | $3,042,344 |
Award Status Bid Tabulations Back... |
Totals for 0050-06-068 | ||
Length: | 6.6 Miles | ||
Estimate: | $29,847,976 | ||
Actual: | $33,961,204 | ||
CCSJ: 0050-08-082 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | NH 2005(482) | CSJ: | 0050-06-072 |
Description: | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER & INSTALL RAISED | Handling Code: |
|
Limits From: | MUESCHKE ROAD | Fund Cat: | 1 |
Limits To: | 0.187 MILE WEST OF TELGE ROAD | Estimate: | $366,648 |
Length: | 4.9 Miles | Actual: | $317,390 |
District: | Houston | Let Date: | JUN 2005 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | NH 2005(482) | CSJ: | 0050-08-082 |
Description: | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER & INSTALL RAISED | Handling Code: |
|
Limits From: | 0.187 MILE WEST OF TELGE ROAD | Fund Cat: | 1 |
Limits To: | JONES ROAD | Estimate: | $421,731 |
Length: | 5.3 Miles | Actual: | $344,094 |
Bid Tabulations Back... |
Totals for 0050-08-082 | ||
Length: | 10.2 Miles | ||
Estimate: | $788,379 | ||
Actual: | $661,484 | ||
CCSJ: 0050-09-062 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | CPM 50-9-62 | CSJ: | 0050-09-062 |
Description: | LONGITUDINAL CRACK REPAIR AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | W. LITTLE YORK | Fund Cat: | 1 |
Limits To: | IH 610 | Estimate: | $508,924 |
Length: | 7.6 Miles | Actual: | $369,847 |
Back... |
Totals for 0050-09-062 | ||
Length: | 7.6 Miles | ||
Estimate: | $508,924 | ||
Actual: | $369,847 | ||
CCSJ: 0051-06-015 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | SH 3 | Let Status: | Actual |
Project ID: | NH 2004(697) | CSJ: | 0051-06-015 |
Description: | FULL DEPTH REPAIR AND JOINT / CRACK SEAL | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | RICHEY | Estimate: | $122,730 |
Length: | 1.2 Miles | Actual: | $152,804 |
District: | Houston | Let Date: | SEP 2004 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | NH 2004(697) | CSJ: | 0598-01-078 |
Description: | ADD DOWEL SLOTTED CURBS | Handling Code: |
|
Limits From: | AT BW 8 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $218,428 |
Length: | 1.9 Miles | Actual: | $207,694 |
District: | Houston | Let Date: | SEP 2004 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 2004(697) | CSJ: | 3256-01-086 |
Description: | INSTALL INLET AND PIPE | Handling Code: |
|
Limits From: | GESSNER | Fund Cat: | 1 |
Limits To: | CENTURY OAKS BUSINESS PARK | Estimate: | $29,770 |
Length: | 0.1 Miles | Actual: | $17,432 |
District: | Houston | Let Date: | SEP 2004 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 2004(697) | CSJ: | 3256-03-076 |
Description: | INSTALL INLET AND PIPE (IN SECTIONS) | Handling Code: |
|
Limits From: | AT FAIRMONT AND AT CONKLIN | Fund Cat: | 1 |
Limits To: | . | Estimate: | $41,478 |
Length: | 4.1 Miles | Actual: | $30,299 |
Back... |
Totals for 0051-06-015 | ||
Length: | 7.3 Miles | ||
Estimate: | $412,406 | ||
Actual: | $408,229 | ||
CCSJ: 0110-05-108 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 45-1(325) | CSJ: | 0110-05-108 |
Description: | UPGRADE GUARD FENCE TO CONCRETE TRAFFIC BARRIER | Handling Code: |
|
Limits From: | NORTH OF RANKIN ROAD | Fund Cat: | 1 |
Limits To: | NORTH CYPRESSWOOD DRIVE | Estimate: | $291,675 |
Length: | 5.7 Miles | Actual: | $368,574 |
District: | Houston | Let Date: | JUN 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 45-1(325) | CSJ: | 0110-06-127 |
Description: | UPGRADE GUARD FENCE TO CONCRETE TRAFFIC BARRIER | Handling Code: |
|
Limits From: | NORTH OF SPUR 261 | Fund Cat: | 1 |
Limits To: | NORTH OF RANKIN ROAD | Estimate: | $309,055 |
Length: | 6.0 Miles | Actual: | $380,471 |
District: | Houston | Let Date: | JUN 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 45-1(325) | CSJ: | 0500-03-041 |
Description: | UPGRADE GUARD FENCE TO CONCRETE TRAFFIC BARRIER | Handling Code: |
|
Limits From: | HB&T RAILROAD | Fund Cat: | 1 |
Limits To: | NORTH OF SPUR 261 | Estimate: | $422,032 |
Length: | 4.6 Miles | Actual: | $538,313 |
Bid Tabulations Back... |
Totals for 0110-05-108 | ||
Length: | 16.3 Miles | ||
Estimate: | $1,022,762 | ||
Actual: | $1,287,358 | ||
CCSJ: 0110-05-113 | |||
District: | Houston | Let Date: | AUG 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | CL 110-5-113 | CSJ: | 0110-05-113 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | HARRIS/MONTGOMERY COUNTY LINE | Fund Cat: | 10 |
Limits To: | MERCEDES STREET | Estimate: | $1,608,755 |
Length: | 10.0 Miles | Actual: | $1,514,237 |
District: | Houston | Let Date: | AUG 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | CL 110-6-128 | CSJ: | 0110-06-128 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | MERCEDES STREET | Fund Cat: | 10 |
Limits To: | BW 8 | Estimate: | $154,567 |
Length: | 1.8 Miles | Actual: | $137,866 |
List Showing Order Proposal Req Form Bidders List Bid Tabulations Back... |
Totals for 0110-05-113 | ||
Length: | 11.8 Miles | ||
Estimate: | $1,763,322 | ||
Actual: | $1,652,103 | ||
CCSJ: 0177-06-064 | |||
District: | Houston | Let Date: | AUG 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CM 2005(815) | CSJ: | 0177-06-064 |
Description: | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM | Handling Code: |
|
Limits From: | BF 1960A | Fund Cat: | 5 |
Limits To: | MONTGOMERY C/L | Estimate: | $1,151,857 |
Length: | 2.8 Miles | Actual: | $1,009,945 |
List Showing Order Proposal Req Form Bidders List Bid Tabulations Back... |
Totals for 0177-06-064 | ||
Length: | 2.8 Miles | ||
Estimate: | $1,151,857 | ||
Actual: | $1,009,945 | ||
CCSJ: 0271-07-245 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2003(81) | CSJ: | 0271-07-245 |
Description: | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO | Handling Code: |
|
Limits From: | E OF CAMPBELL RD | Fund Cat: | 5 |
Limits To: | E OF SILBER | Estimate: | 154,552,179 |
Length: | 2.5 Miles | Actual: | 153,981,461 |
District: | Houston | Let Date: | FEB 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2003(81) | CSJ: | 0271-07-286 |
Description: | REIMBURSABLE UTILITIES | Handling Code: |
|
Limits From: | CAMPBELL ROAD | Fund Cat: | ROW |
Limits To: | BINGLE | Estimate: | $3,683,612 |
Length: | 0.9 Miles | Actual: | $4,258,687 |
Back... |
Totals for 0271-07-245 | ||
Length: | 3.4 Miles | ||
Estimate: | 158,235,791 | ||
Actual: | 158,240,148 | ||
CCSJ: 0271-07-247 | |||
District: | Houston | Let Date: | JAN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2002(328) | CSJ: | 0271-07-247 |
Description: | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO | Handling Code: |
|
Limits From: | E OF BW 8 | Fund Cat: | 5 |
Limits To: | E OF CAMPBELL ROAD | Estimate: | 175,198,885 |
Length: | 2.7 Miles | Actual: | 184,581,449 |
District: | Houston | Let Date: | JAN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2002(328) | CSJ: | 0271-07-288 |
Description: | REIMBURSABLE UTILITIES | Handling Code: |
|
Limits From: | WITTE ROAD | Fund Cat: | ROW |
Limits To: | CAMPBELL ROAD | Estimate: | $9,976,932 |
Length: | 1.6 Miles | Actual: | $19,686,699 |
Back... |
Totals for 0271-07-247 | ||
Length: | 4.3 Miles | ||
Estimate: | 185,175,817 | ||
Actual: | 204,268,148 | ||
CCSJ: 0271-07-249 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2002(969) | CSJ: | 0271-07-249 |
Description: | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO | Handling Code: |
|
Limits From: | W OF SH 6 | Fund Cat: | 5 |
Limits To: | E OF ELDRIDGE | Estimate: | 143,295,221 |
Length: | 2.3 Miles | Actual: | 126,784,713 |
District: | Houston | Let Date: | MAR 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2002(969) | CSJ: | 0271-07-289 |
Description: | REIMBURSABLE UTILITIES | Handling Code: |
|
Limits From: | W OF SH 6 | Fund Cat: | ROW |
Limits To: | E OF ELDRIDGE | Estimate: | $3,958,420 |
Length: | 3.7 Miles | Actual: | $6,022,126 |
District: | Houston | Let Date: | MAR 2005 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | NH 2002(969) | CSJ: | 1685-05-047 |
Description: | CONSTRUCT 4 - LANE BRIDGE OVER IH 10 & PARK ROW BLVD WITH | Handling Code: |
|
Limits From: | N OF IH 10 | Fund Cat: | 11 |
Limits To: | S OF IH 10 | Estimate: | $23,740,161 |
Length: | 1.3 Miles | Actual: | $19,728,537 |
Back... |
Totals for 0271-07-249 | ||
Length: | 7.3 Miles | ||
Estimate: | 170,993,802 | ||
Actual: | 152,535,376 | ||
CCSJ: 0271-07-254 | |||
District: | Houston | Let Date: | DEC 2004 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2005(85) | CSJ: | 0271-07-254 |
Description: | WIDENING OF A FREEWAY FACILITY | Handling Code: |
|
Limits From: | E. OF ELDRIDGE | Fund Cat: | 5 |
Limits To: | E. OF KIRKWOOD | Estimate: | $83,180,378 |
Length: | 1.8 Miles | Actual: | $83,955,125 |
District: | Houston | Let Date: | DEC 2004 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2005(85) | CSJ: | 0271-07-291 |
Description: | REIMBURSABLE UTILITIES IN CONSTRUCTION CONTRACT, CITY OF | Handling Code: |
|
Limits From: | EAST OF ELDRIDGE | Fund Cat: | 2 |
Limits To: | EAST OF KIRKWOOD | Estimate: | $3,681,523 |
Length: | 1.8 Miles | Actual: | $3,423,335 |
Back... |
Totals for 0271-07-254 | ||
Length: | 3.6 Miles | ||
Estimate: | $86,861,901 | ||
Actual: | $87,378,460 | ||
CCSJ: 0271-07-290 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 177-11-143 | CSJ: | 0177-11-143 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | BUFFALO BAYOU | Fund Cat: | 10 |
Limits To: | RUIZ ST | Estimate: | $117,264 |
Length: | 0.5 Miles | Actual: | $112,238 |
District: | Houston | Let Date: | JUL 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-7-290 | CSJ: | 0271-07-290 |
Description: | LANDSCAPE DEVELOPMENT (HOV CONNECTOR AT TAYLOR MEDIAN) | Handling Code: |
|
Limits From: | TAYLOR | Fund Cat: | 10 |
Limits To: | CROCKETT/HOGAN | Estimate: | $224,256 |
Length: | 1.0 Miles | Actual: | $268,007 |
District: | Houston | Let Date: | JUL 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | C 500-3-541 | CSJ: | 0500-03-541 |
Description: | LANDSCAPE DEVELOPMENT (DALLAS STREET) | Handling Code: |
|
Limits From: | JEFFERSON | Fund Cat: | 10 |
Limits To: | CAPITOL | Estimate: | $104,745 |
Length: | 0.7 Miles | Actual: | $126,223 |
Award Status Bid Tabulations Back... |
Totals for 0271-07-290 | ||
Length: | 2.2 Miles | ||
Estimate: | $446,265 | ||
Actual: | $506,468 | ||
CCSJ: 0271-14-196 | |||
District: | Houston | Let Date: | APR 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(398) | CSJ: | 0271-14-196 |
Description: | BONDED CONCRETE OVERLAY AND RECONSTRUCTION OF BRIDGE SLABS, | Handling Code: |
|
Limits From: | IH 45(N) | Fund Cat: | 1 |
Limits To: | W OF US 59(N) | Estimate: | $22,511,451 |
Length: | 2.3 Miles | Actual: | $27,989,522 |
District: | Houston | Let Date: | APR 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(398) | CSJ: | 0271-14-201 |
Description: | FULL DEPTH REPAIR OF INTERSECTION AND RECONSTRUCTION OF | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | HARDY | Estimate: | $7,000,001 |
Length: | 0.0 Miles | Actual: | $5,838,056 |
District: | Houston | Let Date: | APR 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(398) | CSJ: | 0271-14-204 |
Description: | REPAIR INTERSECTION, U - TURN, RIPRAP AND WIDEN INTERSECTION | Handling Code: |
|
Limits From: | AT IRVINGTON | Fund Cat: | 1 |
Limits To: | . | Estimate: | $859,219 |
Length: | 0.0 Miles | Actual: | $757,094 |
Back... |
Totals for 0271-14-196 | ||
Length: | 2.3 Miles | ||
Estimate: | $30,370,671 | ||
Actual: | $34,584,672 | ||
CCSJ: 0271-14-203 | |||
District: | Houston | Let Date: | APR 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(403) | CSJ: | 0271-14-203 |
Description: | MILL EXISTING ASPHALT PAVEMENT AND REPLACE WITH 2" TY D | Handling Code: |
|
Limits From: | SHEPHERD | Fund Cat: | 1 |
Limits To: | AIRLINE | Estimate: | $3,051,565 |
Length: | 1.8 Miles | Actual: | $3,270,437 |
Back... |
Totals for 0271-14-203 | ||
Length: | 1.8 Miles | ||
Estimate: | $3,051,565 | ||
Actual: | $3,270,437 | ||
CCSJ: 0271-16-121 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(402) | CSJ: | 0271-16-119 |
Description: | REHABILITATE BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | AT WILLOW WATERHOLE BAY (STR #153) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $41,767 |
Length: | 0.0 Miles | Actual: | $43,765 |
District: | Houston | Let Date: | FEB 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(402) | CSJ: | 0271-16-121 |
Description: | RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS WITH FAST TRACK | Handling Code: |
|
Limits From: | BRAESWOOD | Fund Cat: | 1 |
Limits To: | KIRBY | Estimate: | $13,695,196 |
Length: | 3.1 Miles | Actual: | $11,424,046 |
District: | Houston | Let Date: | FEB 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(402) | CSJ: | 0271-16-125 |
Description: | REHABILITATE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | IH 610 WB AT WILLOW WATERHOLE BAYOU | Fund Cat: | 1 |
Limits To: | . | Estimate: | $41,901 |
Length: | 0.0 Miles | Actual: | $43,875 |
Back... |
Totals for 0271-16-121 | ||
Length: | 3.1 Miles | ||
Estimate: | $13,778,864 | ||
Actual: | $11,511,686 | ||
CCSJ: 0271-17-150 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-17-150 | CSJ: | 0271-17-150 |
Description: | LANDSCAPE DEVELOPMENT IN BELLAIRE | Handling Code: |
|
Limits From: | N BRAESWOOD | Fund Cat: | 10 |
Limits To: | WESTPARK | Estimate: | $636,183 |
Length: | 3.3 Miles | Actual: | $577,225 |
Back... |
Totals for 0271-17-150 | ||
Length: | 3.3 Miles | ||
Estimate: | $636,183 | ||
Actual: | $577,225 | ||
CCSJ: 0500-03-516 | |||
District: | Houston | Let Date: | DEC 2004 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | C 500-3-516 | CSJ: | 0500-03-516 |
Description: | LANDSCAPE ENHANCEMENTS FOR BUFFALO BAYOU MASTER PLAN | Handling Code: |
XX |
Limits From: | AT BUFFALO BAYOU | Fund Cat: | 11 |
Limits To: | AND US 59 | Estimate: | $2,200,000 |
Length: | 0.0 Miles | Actual: | $2,200,000 |
Back... |
Totals for 0500-03-516 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,200,000 | ||
Actual: | $2,200,000 | ||
CCSJ: 0500-03-518 | |||
District: | Houston | Let Date: | APR 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 45-1(324) | CSJ: | 0500-03-518 |
Description: | ACP MILL AND OVERLAY | Handling Code: |
|
Limits From: | N OF FM 1959 | Fund Cat: | 1 |
Limits To: | CLEAR CREEK | Estimate: | $9,662,087 |
Length: | 7.0 Miles | Actual: | $9,156,218 |
Back... |
Totals for 0500-03-518 | ||
Length: | 7.0 Miles | ||
Estimate: | $9,662,087 | ||
Actual: | $9,156,218 | ||
CCSJ: 0502-01-183 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | NH 2005(720) | CSJ: | 0502-01-183 |
Description: | ADD TURNING LANES | Handling Code: |
|
Limits From: | AT GEORGIA | Fund Cat: | 1 |
Limits To: | . | Estimate: | $438,598 |
Length: | 0.3 Miles | Actual: | $501,320 |
Award Status Bid Tabulations Back... |
Totals for 0502-01-183 | ||
Length: | 0.3 Miles | ||
Estimate: | $438,598 | ||
Actual: | $501,320 | ||
CCSJ: 0502-01-192 | |||
District: | Houston | Let Date: | JAN 2005 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | CPM 389-12-80 | CSJ: | 0389-12-080 |
Description: | REPAIR ARMOR JOINT | Handling Code: |
|
Limits From: | SH 146 NB AT MISSOURI ST | Fund Cat: | 1 |
Limits To: | CONNECTOR RAMP FROM BS 146E TO SH 1 | Estimate: | $74,266 |
Length: | 0.0 Miles | Actual: | $58,960 |
District: | Houston | Let Date: | JAN 2005 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | C 502-1-192 | CSJ: | 0502-01-192 |
Description: | REPLACE SACRIFICIAL JOINTS WITH WIDE FLANGE TERMINAL ANCHORS | Handling Code: |
|
Limits From: | AT PASADENA BLVD, RED BLUFF, BEARLE | Fund Cat: | 1 |
Limits To: | PRESTON, CREEK CHANNEL, AND BW 8 | Estimate: | $945,834 |
Length: | 0.1 Miles | Actual: | $1,253,480 |
Back... |
Totals for 0502-01-192 | ||
Length: | 0.1 Miles | ||
Estimate: | $1,020,100 | ||
Actual: | $1,312,440 | ||
CCSJ: 0502-01-199 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | NH 2005(484) | CSJ: | 0502-01-199 |
Description: | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 610 | Fund Cat: | 1 |
Limits To: | 0.40 MILES WEST OF RICHEY STREET | Estimate: | $4,277,764 |
Length: | 2.2 Miles | Actual: | $2,717,046 |
Bid Tabulations Back... |
Totals for 0502-01-199 | ||
Length: | 2.2 Miles | ||
Estimate: | $4,277,764 | ||
Actual: | $2,717,046 | ||
CCSJ: 0508-01-290 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2004(700) | CSJ: | 0508-01-290 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | EB AT IH 610 (E) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $194,743 |
Length: | 0.0 Miles | Actual: | $216,763 |
District: | Houston | Let Date: | SEP 2004 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2004(700) | CSJ: | 0508-01-311 |
Description: | REHABILITATE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | IH 10 WB AT IH 610 EB ML | Fund Cat: | 6 |
Limits To: | . | Estimate: | $59,513 |
Length: | 0.0 Miles | Actual: | $86,115 |
Back... |
Totals for 0508-01-290 | ||
Length: | 0.0 Miles | ||
Estimate: | $254,256 | ||
Actual: | $302,878 | ||
CCSJ: 0508-01-296 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 10-7(399) | CSJ: | 0508-01-296 |
Description: | REHABILITATE AND OVERLAY FRONTAGE ROADS | Handling Code: |
|
Limits From: | 0.6 MILES WEST OF JOHN MARTIN RD. | Fund Cat: | 1 |
Limits To: | CHAMBERS COUNTY LINE | Estimate: | $4,495,174 |
Length: | 6.0 Miles | Actual: | $5,841,897 |
Back... |
Totals for 0508-01-296 | ||
Length: | 6.0 Miles | ||
Estimate: | $4,495,174 | ||
Actual: | $5,841,897 | ||
CCSJ: 0508-07-027 | |||
District: | Houston | Let Date: | AUG 2005 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | CM 2005(816) | CSJ: | 0389-13-049 |
Description: | INSTALL COMPUTERIZED TRANSPORTATION MANAGMENT SYSTEM | Handling Code: |
|
Limits From: | SP 330 | Fund Cat: | 5 |
Limits To: | MISSOURI | Estimate: | $924,569 |
Length: | 2.5 Miles | Actual: | $1,024,223 |
District: | Houston | Let Date: | AUG 2005 |
Highway: | SP 330 | Let Status: | Actual |
Project ID: | CM 2005(816) | CSJ: | 0508-07-027 |
Description: | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 5 |
Limits To: | SH 146 | Estimate: | $1,817,214 |
Length: | 5.1 Miles | Actual: | $1,458,272 |
List Showing Order Proposal Req Form Bidders List Bid Tabulations Back... |
Totals for 0508-07-027 | ||
Length: | 7.6 Miles | ||
Estimate: | $2,741,783 | ||
Actual: | $2,482,495 | ||
CCSJ: 0598-01-079 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CL 27-13-193 | CSJ: | 0027-13-193 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | MCGOWEN | Fund Cat: | 10 |
Limits To: | ELGIN | Estimate: | $172,535 |
Length: | 0.3 Miles | Actual: | $159,435 |
District: | Houston | Let Date: | JUL 2005 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | CL 598-1-79 | CSJ: | 0598-01-079 |
Description: | LANDSCAPE DEVELOPMENT (REFORESTATION) | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 10 |
Limits To: | US 59 TO OLD SPANISH TRAIL | Estimate: | $368,245 |
Length: | 0.9 Miles | Actual: | $346,878 |
District: | Houston | Let Date: | JUL 2005 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | CL 598-3-22 | CSJ: | 0598-03-022 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | CR 45 | Fund Cat: | 11 |
Limits To: | CR 290 | Estimate: | $29,302 |
Length: | 7.1 Miles | Actual: | $13,493 |
Award Status Bid Tabulations Back... |
Totals for 0598-01-079 | ||
Length: | 8.3 Miles | ||
Estimate: | $570,082 | ||
Actual: | $519,806 | ||
CCSJ: 0598-01-080 | |||
District: | Houston | Let Date: | NOV 2004 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | CL 598-1-80 | CSJ: | 0598-01-080 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
XX |
Limits From: | BLOGETT | Fund Cat: | 10 |
Limits To: | BINZ | Estimate: | $204,345 |
Length: | 0.0 Miles | Actual: | $204,345 |
Back... |
Totals for 0598-01-080 | ||
Length: | 0.0 Miles | ||
Estimate: | $204,345 | ||
Actual: | $204,345 | ||
CCSJ: 0720-03-084 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | NH 2005(416) | CSJ: | 0720-03-084 |
Description: | CONSTRUCT 2 3 - LANE FTG ROADS W GS AND TSM AT FM 2920, 2 DET | Handling Code: |
|
Limits From: | WILLOW CREEK | Fund Cat: | 1 |
Limits To: | BROWN RD (PHASE 1 IN SECTIONS) | Estimate: | $51,789,128 |
Length: | 3.2 Miles | Actual: | $51,771,537 |
Bid Tabulations Back... |
Totals for 0720-03-084 | ||
Length: | 3.2 Miles | ||
Estimate: | $51,789,128 | ||
Actual: | $51,771,537 | ||
CCSJ: 0720-03-115 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | NH 2004(402) | CSJ: | 0720-03-115 |
Description: | IMPROVE STORM SEWER DRAINAGE SYSTEM | Handling Code: |
NC |
Limits From: | KILLOUGH ST | Fund Cat: | 1 |
Limits To: | 1700' SOUTH OF KILLOUGH ST | Estimate: | $189,064 |
Length: | 0.3 Miles | Actual: | $233,048 |
Back... |
Totals for 0720-03-115 | ||
Length: | 0.3 Miles | ||
Estimate: | $189,064 | ||
Actual: | $233,048 | ||
CCSJ: 0912-00-076 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2004(768)MM | CSJ: | 0912-00-076 |
Description: | FY 2005 CAPITAL UPGRADE (FUNDING FOR PURCHASE OF SOFTWARE / | Handling Code: |
XX |
Limits From: | AT TRANSTAR | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,267,665 |
Length: | 0.0 Miles | Actual: | $1,267,665 |
Back... |
Totals for 0912-00-076 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,267,665 | ||
Actual: | $1,267,665 | ||
CCSJ: 0912-00-202 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-202 | CSJ: | 0912-00-202 |
Description: | FY 2001 AVI SYSTEM MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $350,000 |
Length: | 0.0 Miles | Actual: | $350,000 |
Back... |
Totals for 0912-00-202 | ||
Length: | 0.0 Miles | ||
Estimate: | $350,000 | ||
Actual: | $350,000 | ||
CCSJ: 0912-00-203 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-203 | CSJ: | 0912-00-203 |
Description: | FY 2002 AVI SYSTEM MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $385,000 |
Length: | 0.0 Miles | Actual: | $385,000 |
Back... |
Totals for 0912-00-203 | ||
Length: | 0.0 Miles | ||
Estimate: | $385,000 | ||
Actual: | $385,000 | ||
CCSJ: 0912-00-204 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-204 | CSJ: | 0912-00-204 |
Description: | FY 2003 AVI SYSTEM MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $425,000 |
Length: | 0.0 Miles | Actual: | $425,000 |
Back... |
Totals for 0912-00-204 | ||
Length: | 0.0 Miles | ||
Estimate: | $425,000 | ||
Actual: | $425,000 | ||
CCSJ: 0912-00-211 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-211 | CSJ: | 0912-00-211 |
Description: | FY 2004 AVI SYSTEM MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $467,500 |
Length: | 0.0 Miles | Actual: | $467,500 |
Back... |
Totals for 0912-00-211 | ||
Length: | 0.0 Miles | ||
Estimate: | $467,500 | ||
Actual: | $467,500 | ||
CCSJ: 0912-00-276 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2004(734) | CSJ: | 0912-00-276 |
Description: | INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC) | Handling Code: |
|
Limits From: | VARIOUS ON-SYSTEM LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,799,396 |
Length: | 0.0 Miles | Actual: | $1,538,199 |
Back... |
Totals for 0912-00-276 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,799,396 | ||
Actual: | $1,538,199 | ||
CCSJ: 0912-00-277 | |||
District: | Houston | Let Date: | JAN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(125) | CSJ: | 0912-00-277 |
Description: | REHABILITATE ELECTRICAL SERVICES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | OUTSIDE HARRIS COUNTY | Estimate: | $218,583 |
Length: | 0.0 Miles | Actual: | $196,453 |
Back... |
Totals for 0912-00-277 | ||
Length: | 0.0 Miles | ||
Estimate: | $218,583 | ||
Actual: | $196,453 | ||
CCSJ: 0912-00-278 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | MG 2004(727) | CSJ: | 0912-00-278 |
Description: | REHABILITATE SERVICES AND LUMINAIRES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISCRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $156,533 |
Length: | 0.0 Miles | Actual: | $152,985 |
Back... |
Totals for 0912-00-278 | ||
Length: | 0.0 Miles | ||
Estimate: | $156,533 | ||
Actual: | $152,985 | ||
CCSJ: 0912-00-280 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(263) | CSJ: | 0912-00-280 |
Description: | REPLACE RAISED REFLECTIVE PAVEMENT MARKERS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | (INTERSTATES) | Estimate: | $824,988 |
Length: | 0.0 Miles | Actual: | $646,971 |
Back... |
Totals for 0912-00-280 | ||
Length: | 0.0 Miles | ||
Estimate: | $824,988 | ||
Actual: | $646,971 | ||
CCSJ: 0912-00-281 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(198) | CSJ: | 0912-00-281 |
Description: | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | OUTSIDE HARRIS COUNTY | Estimate: | $2,064,121 |
Length: | 0.0 Miles | Actual: | $1,265,476 |
Back... |
Totals for 0912-00-281 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,064,121 | ||
Actual: | $1,265,476 | ||
CCSJ: 0912-00-282 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(41) | CSJ: | 0912-00-282 |
Description: | AVI UPGRADES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $525,000 |
Length: | 0.0 Miles | Actual: | $525,000 |
Back... |
Totals for 0912-00-282 | ||
Length: | 0.0 Miles | ||
Estimate: | $525,000 | ||
Actual: | $525,000 | ||
CCSJ: 0912-00-284 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(42) | CSJ: | 0912-00-284 |
Description: | TRANSTAR MAINTENANCE AND UPGRADES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $800,000 |
Length: | 0.0 Miles | Actual: | $80,000 |
Back... |
Totals for 0912-00-284 | ||
Length: | 0.0 Miles | ||
Estimate: | $800,000 | ||
Actual: | $80,000 | ||
CCSJ: 0912-00-285 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(43) | CSJ: | 0912-00-285 |
Description: | RELOCATE EXISTING AVI EQUIPMENT | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,200,000 |
Length: | 0.0 Miles | Actual: | $1,200,000 |
Back... |
Totals for 0912-00-285 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,200,000 | ||
Actual: | $1,200,000 | ||
CCSJ: 0912-00-286 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(44) | CSJ: | 0912-00-286 |
Description: | RELOCATE HAR, SYNCHRONIZATION AND INTEGRATION | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $184,000 |
Length: | 0.0 Miles | Actual: | $184,000 |
Back... |
Totals for 0912-00-286 | ||
Length: | 0.0 Miles | ||
Estimate: | $184,000 | ||
Actual: | $184,000 | ||
CCSJ: 0912-00-287 | |||
District: | Houston | Let Date: | JAN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(126) | CSJ: | 0912-00-287 |
Description: | INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC) | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,767,550 |
Length: | 0.0 Miles | Actual: | $1,398,147 |
Back... |
Totals for 0912-00-287 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,767,550 | ||
Actual: | $1,398,147 | ||
CCSJ: 0912-00-288 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(199) | CSJ: | 0912-00-288 |
Description: | RETRACE PAVEMENT MARKINGS & INSTALL RAISED REFLECTIVE | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | OUTSIDE HARRIS COUNTY | Estimate: | $1,042,500 |
Length: | 0.0 Miles | Actual: | $728,485 |
Back... |
Totals for 0912-00-288 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,042,500 | ||
Actual: | $728,485 | ||
CCSJ: 0912-00-293 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(200) | CSJ: | 0912-00-293 |
Description: | BASE REPAIR, PLANING, ONE COURSE SURFACE TREATMENT, ACP OVER | Handling Code: |
|
Limits From: | US 90,2250 FT W OF KATY FT BD CO RD | Fund Cat: | 1 |
Limits To: | FM 359 | Estimate: | $2,909,792 |
Length: | 8.9 Miles | Actual: | $1,866,435 |
Back... |
Totals for 0912-00-293 | ||
Length: | 8.9 Miles | ||
Estimate: | $2,909,792 | ||
Actual: | $1,866,435 | ||
CCSJ: 0912-00-301 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(99) | CSJ: | 0912-00-301 |
Description: | FY 2005 CONTINUATION OF ALTERNATIVE FUEL PROGRAM | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $2,200,000 |
Length: | 0.0 Miles | Actual: | $2,200,000 |
Back... |
Totals for 0912-00-301 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,200,000 | ||
Actual: | $2,200,000 | ||
CCSJ: 0912-71-429 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 94(227)TE | CSJ: | 0912-71-429 |
Description: | CONSTRUCT HIKE AND BIKE TRAIL | Handling Code: |
NC |
Limits From: | ARIZONA | Fund Cat: | 9 |
Limits To: | S.OF MARKET ST | Estimate: | $1,086,672 |
Length: | 1.0 Miles | Actual: | $1,032,117 |
District: | Houston | Let Date: | SEP 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 99(756) | CSJ: | 0912-71-698 |
Description: | CONSTRUCT HIKE / BIKE TRAIL | Handling Code: |
|
Limits From: | S. OF MARKET ST | Fund Cat: | 5 |
Limits To: | W. TEXAS AVE. | Estimate: | $572,880 |
Length: | 0.7 Miles | Actual: | $593,941 |
Back... |
Totals for 0912-71-429 | ||
Length: | 1.7 Miles | ||
Estimate: | $1,659,552 | ||
Actual: | $1,626,058 | ||
CCSJ: 0912-71-659 | |||
District: | Houston | Let Date: | MAY 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2005(417) | CSJ: | 0912-71-659 |
Description: | REHABILITATE STREET | Handling Code: |
|
Limits From: | ON LYONS AVE. FROM US 59 NORTH | Fund Cat: | 10 |
Limits To: | WACO ST. IN HOUSTON | Estimate: | $4,395,684 |
Length: | 0.8 Miles | Actual: | $5,330,942 |
Back... |
Totals for 0912-71-659 | ||
Length: | 0.8 Miles | ||
Estimate: | $4,395,684 | ||
Actual: | $5,330,942 | ||
CCSJ: 0912-71-696 | |||
District: | Houston | Let Date: | MAY 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 99(758) | CSJ: | 0912-71-696 |
Description: | CONSTRUCT GRADE SEPARATION | Handling Code: |
|
Limits From: | ON FAIRMONT PARKWAY AT UPRR | Fund Cat: | 5 |
Limits To: | . | Estimate: | $10,078,656 |
Length: | 0.7 Miles | Actual: | $10,649,359 |
Back... |
Totals for 0912-71-696 | ||
Length: | 0.7 Miles | ||
Estimate: | $10,078,656 | ||
Actual: | $10,649,359 | ||
CCSJ: 0912-71-704 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(596)TE | CSJ: | 0912-71-704 |
Description: | T - 38'S SCENIC / HISTORIC HIGHWAY DISPLAY | Handling Code: |
NC |
Limits From: | ON NASA 1 IN HOUSTON | Fund Cat: | 9 |
Limits To: | . | Estimate: | $305,760 |
Length: | 0.0 Miles | Actual: | $328,815 |
Back... |
Totals for 0912-71-704 | ||
Length: | 0.0 Miles | ||
Estimate: | $305,760 | ||
Actual: | $328,815 | ||
CCSJ: 0912-71-757 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(94) | CSJ: | 0912-71-757 |
Description: | INSTALL TRANSMITTERS / ANTENNA AT 13 LOCATIONS IN HARRIS CO | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $5,263,150 |
Length: | 0.0 Miles | Actual: | $5,263,150 |
Back... |
Totals for 0912-71-757 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,263,150 | ||
Actual: | $5,263,150 | ||
CCSJ: 0912-71-811 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 94(345)TE | CSJ: | 0912-71-811 |
Description: | MEDICAL CENTER / GREENWAY PLAZA / GALERIA PHASE 2 BIKEWAY | Handling Code: |
NC |
Limits From: | HOLLY HALL,FANNIN | Fund Cat: | 9 |
Limits To: | ARDMORE | Estimate: | $991,479 |
Length: | 1.3 Miles | Actual: | $732,252 |
Bid Tabulations Back... |
Totals for 0912-71-811 | ||
Length: | 1.3 Miles | ||
Estimate: | $991,479 | ||
Actual: | $732,252 | ||
CCSJ: 0912-71-827 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2005(533) | CSJ: | 0912-71-827 |
Description: | INTELLIGENCE TRANSPORTATION SYSTEM MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 11 |
Limits To: | . | Estimate: | $2,500,000 |
Length: | 0.0 Miles | Actual: | $1,500,000 |
Back... |
Totals for 0912-71-827 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,500,000 | ||
Actual: | $1,500,000 | ||
CCSJ: 0912-71-854 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-71-854 | CSJ: | 0912-71-854 |
Description: | AVI, CTMS, FLOW SIGNAL MAINTENANCE AND CTMS INTEGRATION | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $3,250,000 |
Length: | 0.0 Miles | Actual: | $3,250,000 |
Back... |
Totals for 0912-71-854 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,250,000 | ||
Actual: | $3,250,000 | ||
CCSJ: 0912-71-858 | |||
District: | Houston | Let Date: | NOV 2004 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | NH 2004(798) | CSJ: | 0271-16-122 |
Description: | TOTAL RECONSTRUCTION OF THE NUMBER 3 AND 4 MAINLANES AND | Handling Code: |
|
Limits From: | BROAD STREET | Fund Cat: | 1 |
Limits To: | TELEPHONE ROAD | Estimate: | $184,090 |
Length: | 0.2 Miles | Actual: | $143,172 |
District: | Houston | Let Date: | NOV 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2004(798) | CSJ: | 0912-71-858 |
Description: | PAVEMENT REPAIR, JOINT REPAIR AND SMALL SIGN UPGRADE | Handling Code: |
|
Limits From: | IH 610 LOOP | Fund Cat: | 1 |
Limits To: | . | Estimate: | $4,946,441 |
Length: | 38.0 Miles | Actual: | $5,786,118 |
Back... |
Totals for 0912-71-858 | ||
Length: | 38.2 Miles | ||
Estimate: | $5,130,531 | ||
Actual: | $5,929,290 | ||
CCSJ: 0912-71-859 | |||
District: | Houston | Let Date: | DEC 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2005(87) | CSJ: | 0912-71-859 |
Description: | REPAIR SLOPE FAILURE | Handling Code: |
|
Limits From: | US 90, SH 146, IH 10 AND SH 225 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,762,526 |
Length: | 0.0 Miles | Actual: | $1,687,018 |
Back... |
Totals for 0912-71-859 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,762,526 | ||
Actual: | $1,687,018 | ||
CCSJ: 0912-71-861 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2005(418) | CSJ: | 0912-71-861 |
Description: | GRADING, CONCRETE PAVEMENT, AND STRUCTURES | Handling Code: |
|
Limits From: | DAIRY ASHFORD AT TURKEY CREEK | Fund Cat: | 5 |
Limits To: | WEST TERMINUS OF CHATTERTON DRIVE | Estimate: | $2,563,658 |
Length: | 2.3 Miles | Actual: | $1,344,604 |
Bid Tabulations Back... |
Totals for 0912-71-861 | ||
Length: | 2.3 Miles | ||
Estimate: | $2,563,658 | ||
Actual: | $1,344,604 | ||
CCSJ: 0912-71-867 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | SP 501 | Let Status: | Actual |
Project ID: | STP 2005(269) | CSJ: | 0389-16-007 |
Description: | CULVERT LENGTHENING | Handling Code: |
|
Limits From: | .0543 MI SOUTH OF PINEBLUFF STREET | Fund Cat: | 1 |
Limits To: | .0259 MI SOUTH OF PINEBLUFF STREET | Estimate: | $83,198 |
Length: | 0.0 Miles | Actual: | $93,631 |
District: | Houston | Let Date: | MAR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2004(504)TE | CSJ: | 0912-71-867 |
Description: | INSTALL SIDEWALK & SLOTTED CURB (SAFE ROUTES TO SCHOOLS) | Handling Code: |
|
Limits From: | FAIRMONT PARKWAY AT BS 146D | Fund Cat: | 9 |
Limits To: | FAIRFIELD STREET ON SP 501 IN LA PO | Estimate: | $511,153 |
Length: | 2.0 Miles | Actual: | $595,676 |
Back... |
Totals for 0912-71-867 | ||
Length: | 2.0 Miles | ||
Estimate: | $594,351 | ||
Actual: | $689,307 | ||
CCSJ: 0912-71-880 | |||
District: | Houston | Let Date: | SEP 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 912-71-880 | CSJ: | 0912-71-880 |
Description: | CRACK SEALING | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN WEST HARRIS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $508,924 |
Length: | 0.0 Miles | Actual: | $293,120 |
Back... |
Totals for 0912-71-880 | ||
Length: | 0.0 Miles | ||
Estimate: | $508,924 | ||
Actual: | $293,120 | ||
CCSJ: 0912-71-884 | |||
District: | Houston | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(107) | CSJ: | 0912-71-884 |
Description: | CLEAN VEHICLES (FY 2005) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $49,000,000 |
Length: | 0.0 Miles | Actual: | $15,000,000 |
Back... |
Totals for 0912-71-884 | ||
Length: | 0.0 Miles | ||
Estimate: | $49,000,000 | ||
Actual: | $15,000,000 | ||
CCSJ: 0912-71-885 | |||
District: | Houston | Let Date: | AUG 2005 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM (_) | CSJ: | 0912-71-885 |
Description: | COMMUTE SOLUTIONS (FY 2005) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $4,636,000 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0912-71-885 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,636,000 | ||
Actual: | |||
CCSJ: 0912-71-889 | |||
District: | Houston | Let Date: | JAN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(127) | CSJ: | 0912-71-889 |
Description: | REPLACE VIA'S WITH REACT 350 | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN CENTRAL HOUSTON MAINTENANCE AREA | Estimate: | $1,646,850 |
Length: | 0.0 Miles | Actual: | $1,652,208 |
Back... |
Totals for 0912-71-889 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,646,850 | ||
Actual: | $1,652,208 | ||
CCSJ: 0912-71-890 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(264) | CSJ: | 0912-71-890 |
Description: | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,000,000 |
Length: | 0.0 Miles | Actual: | $1,070,097 |
Back... |
Totals for 0912-71-890 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,000,000 | ||
Actual: | $1,070,097 | ||
CCSJ: 0912-71-891 | |||
District: | Houston | Let Date: | MAY 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(419) | CSJ: | 0912-71-891 |
Description: | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,200,000 |
Length: | 0.0 Miles | Actual: | $842,930 |
Back... |
Totals for 0912-71-891 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,200,000 | ||
Actual: | $842,930 | ||
CCSJ: 0912-71-897 | |||
District: | Houston | Let Date: | NOV 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(106) | CSJ: | 0912-71-897 |
Description: | CLEAN VEHICLES (FY 2004 & FY 2005) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $15,000,000 |
Length: | 0.0 Miles | Actual: | $15,000,000 |
Back... |
Totals for 0912-71-897 | ||
Length: | 0.0 Miles | ||
Estimate: | $15,000,000 | ||
Actual: | $15,000,000 | ||
CCSJ: 0912-72-006 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | DMO 2005(909) | CSJ: | 0912-72-006 |
Description: | FREIGHT RAIL TRANSPORTATION CORRIDOR AND URBAN MOBILITY | Handling Code: |
XX |
Limits From: | HARRIS COUNTY CORRIDOR | Fund Cat: | 10 |
Limits To: | . | Estimate: | $1,000,000 |
Length: | 0.0 Miles | Actual: | $1,000,000 |
Back... |
Totals for 0912-72-006 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0912-72-009 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(721) | CSJ: | 0912-72-009 |
Description: | CITY OF HOUSTON RCTSS / CMAQ PROGRAM PHASE 2 | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HOUSTON | Fund Cat: | 5 |
Limits To: | . | Estimate: | $2,703,382 |
Length: | 0.0 Miles | Actual: | $2,167,863 |
Bid Tabulations Back... |
Totals for 0912-72-009 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,703,382 | ||
Actual: | $2,167,863 | ||
CCSJ: 0912-72-012 | |||
District: | Houston | Let Date: | AUG 2005 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM () | CSJ: | 0912-72-012 |
Description: | COMMUTE SOLUTIONS (FY 2006) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $3,071,000 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0912-72-012 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,071,000 | ||
Actual: | |||
CCSJ: 0912-72-027 | |||
District: | Houston | Let Date: | AUG 2005 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM 2006(020) | CSJ: | 0912-72-027 |
Description: | FY 2005 NEW BUS SERVICE FOR METRO | Handling Code: |
TR |
Limits From: | VARIOUS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $22,418,882 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0912-72-027 | ||
Length: | 0.0 Miles | ||
Estimate: | $22,418,882 | ||
Actual: | |||
CCSJ: 0912-72-049 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(933) | CSJ: | 0912-72-049 |
Description: | METRO FY 2005 RCTSS | Handling Code: |
TR |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,125,000 |
Length: | 0.0 Miles | Actual: | $1,125,000 |
Back... |
Totals for 0912-72-049 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,125,000 | ||
Actual: | $1,125,000 | ||
CCSJ: 1062-04-050 | |||
District: | Houston | Let Date: | JUL 2005 |
Highway: | FM 2100 | Let Status: | Actual |
Project ID: | STP 2005(278) | CSJ: | 1062-04-050 |
Description: | ADD RIGHT TURN LANE | Handling Code: |
|
Limits From: | AT FIRST STREET IN CROSBY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $166,540 |
Length: | 0.1 Miles | Actual: | $190,638 |
Bid Tabulations Back... |
Totals for 1062-04-050 | ||
Length: | 0.1 Miles | ||
Estimate: | $166,540 | ||
Actual: | $190,638 | ||
CCSJ: 1258-04-055 | |||
District: | Houston | Let Date: | JUN 2005 |
Highway: | FM 1093 | Let Status: | Actual |
Project ID: | NH 2005(748) | CSJ: | 1258-04-055 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
NC |
Limits From: | KIRKWOOD | Fund Cat: | 10 |
Limits To: | FONDREN | Estimate: | $287,854 |
Length: | 4.0 Miles | Actual: | $249,077 |
District: | Houston | Let Date: | JUN 2005 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 2005(748) | CSJ: | 3256-01-087 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | RICHMOND | Fund Cat: | 10 |
Limits To: | WESTHEIMER | Estimate: | $204,215 |
Length: | 0.7 Miles | Actual: | $177,941 |
Bid Tabulations Back... |
Totals for 1258-04-055 | ||
Length: | 4.7 Miles | ||
Estimate: | $492,069 | ||
Actual: | $427,018 | ||
CCSJ: 2941-02-043 | |||
District: | Houston | Let Date: | MAR 2005 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | CPM 2941-2-43 | CSJ: | 2941-02-043 |
Description: | BASE REPAIR, PLANING, LEVEL - UP, ONE COURSE SURFACE TREATMENT | Handling Code: |
|
Limits From: | FALVEL ROAD | Fund Cat: | 1 |
Limits To: | 0.2 MILES WEST OF IH 45 | Estimate: | $1,646,833 |
Length: | 2.3 Miles | Actual: | $1,424,096 |
Back... |
Totals for 2941-02-043 | ||
Length: | 2.3 Miles | ||
Estimate: | $1,646,833 | ||
Actual: | $1,424,096 | ||
CCSJ: 3256-02-071 | |||
District: | Houston | Let Date: | MAY 2005 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 2005(172) | CSJ: | 3256-02-071 |
Description: | RETROFIT BRIDGE RAIL, REPLACE ALL ARMOR JOINTS, REPLACE MBGF | Handling Code: |
|
Limits From: | HARDY TOLL ROAD | Fund Cat: | 1 |
Limits To: | ALDINE WESTFIELD ROAD | Estimate: | $596,963 |
Length: | 0.7 Miles | Actual: | $837,010 |
Back... |
Totals for 3256-02-071 | ||
Length: | 0.7 Miles | ||
Estimate: | $596,963 | ||
Actual: | $837,010 | ||
CCSJ: 3256-02-072 | |||
District: | Houston | Let Date: | FEB 2005 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | CPM 3256-2-72 | CSJ: | 3256-02-072 |
Description: | REHAB FRONTAGE RD SHOULDERS, PLANING, BASE REPAIR, ASPHALT | Handling Code: |
|
Limits From: | HARDY TOLL ROAD | Fund Cat: | 1 |
Limits To: | ALDINE WESTFIELD ROAD | Estimate: | $223,077 |
Length: | 1.5 Miles | Actual: | $244,861 |
District: | Houston | Let Date: | FEB 2005 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | CPM 3256-2-73 | CSJ: | 3256-02-073 |
Description: | CONCRETE SPALL REPAIR AT FRONTAGE ROADS | Handling Code: |
|
Limits From: | JOHN F KENNEDY BLVD | Fund Cat: | 1 |
Limits To: | LEE ROAD | Estimate: | $40,570 |
Length: | 1.7 Miles | Actual: | $53,420 |
Back... |
Totals for 3256-02-072 | ||
Length: | 3.2 Miles | ||
Estimate: | $263,647 | ||
Actual: | $298,281 |
|
|