Letting Schedule for December, 2004 (FY 2005)

 
 
Last Update: Monday, August 15, 2005
December, 2004 (FY 2005) (see Links)
SEP 2004 | OCT 2004 | NOV 2004 | DEC 2004 | JAN 2005 | FEB 2005 | MAR 2005 | APR 2005 | MAY 2005 | JUN 2005 | JUL 2005 | AUG 2005
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0042-03-036 Armstrong/
Amarillo
US 287 Actual $9,386,789 1 REHABILITATE EXISTING ROADWAY
0025-02-167 Bexar/
San Antonio
IH 10 Actual $1,575,990 1 MILL, BASE REPAIR, SEALCOAT, OV & PAV MRK
0073-08-147 Bexar/
San Antonio
IH 37 Actual $3,039,805 1 SEALCOAT, BASE REPAIR, OVERLAY, & PAVEMENT MARKINGS
0613-01-053 Bexar/
San Antonio
SH 16 Actual $1,993,107 1 BASE REPAIR, OVERLAY & PAVEMENT MARKINGS
0945-01-030 Bowie/
Atlanta
FM 1397 Actual $1,017,642 8 SAFETY TREAT FIXED OBJECTS
0144-04-037 Calhoun/
Yoakum
SH 238 Actual $3,474,131 1 SEAL COAT
0327-08-077 Cameron/
Pharr
BU 77-X Actual $2,571,938 1 MICRO SURFACE
0684-01-061 Cameron/
Pharr
FM 511 Actual $7,676,574 1 ASPHALTIC CONCRETE PAVEMENT OVERLAY
0211-10-036 Colorado/
Yoakum
FM 155 Actual $2,968,583 1 SEAL COAT
0016-04-102 Comal/
San Antonio
IH 35 Actual $2,705,041 1 SEALCOAT, PFC OVERLAY, & PAVEMENT MARKINGS
0253-03-063 Comal/
San Antonio
US 281 Actual $4,763,492 1 MILL, BASE REPAIR, SEALCOAT, OV & PAV MRK
0867-02-012 Coryell/
Waco
FM 932 Actual $2,087,103 1 EMULSION
0095-02-095 Dallas/
Dallas
US 80 Actual $1,656,247 1 INSTALL MEDIAN BARRIER & SAFETY LIGHTING
0918-00-096 Dallas/
Dallas
VA Actual $1,186,056 1 COBRA HEAD REPLACEMENT
0918-00-100 Dallas/
Dallas
VA Actual $413,000 1 LED SIGNAL HEAD UPGRADE
0918-45-579 Dallas/
Dallas
VA Actual $7,584,617 7 ROADWAY WIDENING TO ACCOMMODATE INCREASED TRUCK TRAFFIC WITH
0918-45-753 Dallas/
Dallas
VA Actual $1,500,000 1 ABR TRANSFER FOR SWAO CONCRETE PAVEMENT REPAIR
1047-02-042 Dallas/
Dallas
FM 1382 Actual $228,635 10 LANDSCAPE DEVELOPMENT
0918-46-141 Denton/
Dallas
CR Actual $437,736 6 REPLACE BR & APPRS
0007-03-081 Eastland/
Brownwood
IH 20 Actual $3,389,363 1 SEAL COAT
0229-01-028 Ector/
Odessa
US 385 Actual $3,998,819 1 ROADWAY REHABILITATION
0167-01-082 El Paso/
El Paso
IH 110 Actual $2,377,891 2 RECONSTRUCTION OF RAMPS & OUTSIDE LANES BETWEEN IH 10 AND
0924-06-245 El Paso/
El Paso
VA Actual $375,760 1 REMOVE AND REPLACE CCTV CAMERAS
0924-06-250 El Paso/
El Paso
VA Actual $1,104,423 5 HIGHWAY ADVISORY RADIO SYSTEM
0596-02-031 Ellis/
Dallas
FM 66 Actual $2,092,415 6 REPLACE BR & APPRS
0188-09-041 Fort Bend/
Houston
FM 723 Actual $585,191 1 ACP OVERLAY WITH VEHICLE IMAGING VEHICLE DETECTING SYSTEM
0017-06-075 Frio/
San Antonio
IH 35 Actual $3,594,685 1 SEALCOAT, PFC, & PAVEMENT MARKINGS
0686-01-043 Galveston/
Houston
FM 1765 Actual $732,160 1 MILLING, DETECTOR LOOPS, SEAL COAT, A.C.P. OVERLAY, AND
1442-02-011 Gonzales/
Yoakum
FM 1296 Actual $2,144,095 10 RESTORE ROADWAY
0901-19-113 Grayson/
Paris
VA Actual $55,000 9 MEDIAN BEAUTIFICATION
0495-07-062 Gregg/
Tyler
IH 20 Actual $195,227 1 INSTALLL DYNAMIC MESSAGE SIGN (DMS)
0016-06-042 Guadalupe/
San Antonio
IH 35 Actual $5,476,449 1 MILL, BASE REPAIR, SEALCOAT, PFC & PAVEMENT MARKINGS
1268-02-021 Guadalupe/
San Antonio
FM 1103 Actual $6,746,531 1 RESTORE EXISTING ROADWAY
0028-02-079 Harris/
Houston
US 90 Actual $1,665,023 1 BASE REPAIR, PLANING, ACP REHABILITATION, O / L, SIGNING & PAV
0271-07-254 Harris/
Houston
IH 10 Actual $87,378,460 2 WIDENING OF A FREEWAY FACILITY
0500-03-516 Harris/
Houston
IH 45 Actual $2,200,000 11 LANDSCAPE ENHANCEMENTS FOR BUFFALO BAYOU MASTER PLAN
0912-71-859 Harris/
Houston
VA Actual $1,687,018 1 REPAIR SLOPE FAILURE
0208-02-034 Harrison/
Atlanta
SH 43 Actual $3,324,590 8 SAFETY TREAT FIXED OBJECTS
0016-02-103 Hays/
Austin
IH 35 Actual $16,529,588 11 REPLACE BRIDGE AND APPROACHES AND RECONSTRUCT FRONTAGE ROADS
0255-11-011 Hidalgo/
Pharr
BU 281W Actual $1,048,989 8 INSTALL INTERSECTION FLASHING BEACON
2450-01-015 Hidalgo/
Pharr
FM 2128 Actual $9,079,461 7 WIDEN TO 4 LANES DIVIDED URBAN
0005-05-095 Howard/
Abilene
IH 20 Actual $9,092,655 1 REHABILITATION
0083-01-046 Hunt/
Paris
SH 11 Actual $1,252,593 1 SEAL COAT
0243-01-044 Jasper/
Beaumont
SH 62 Actual $864,302 1 MILL AND OVERLAY EXISTING ROADWAY
0102-12-029 Kleberg/
Corpus Christi
BU 77-V Actual $483,591 11 INTERCONNECT TRAFFIC SIGNALS
0917-16-021 Leon/
Bryan
CR Actual $235,289 6 REPLACE BRIDGE AND APPROACHES
0380-01-064 Lubbock/
Lubbock
US 82 Actual 131,098,888 7 CONVERT NON - FREEWAY TO FREEWAY
0070-06-040 McCulloch/
Brownwood
US 87 Actual $6,354,027 1 SEAL COAT
0421-08-029 Medina/
San Antonio
SH 173 Actual $58,031 10 REMOVAL OF CHANNEL MATERIAL & EROSION PREVENTION
0849-02-035 Medina/
San Antonio
FM 471 Actual $1,929,083 1 MILL, BASE REPAIR, SEALCOAT, OV & PAV MRK
0028-11-190 Orange/
Beaumont
IH 10 Actual $4,727,231 1 SEAL COAT
0045-17-004 Red River/
Paris
FM 194 Actual $1,548,636 1 SEAL COAT
0003-06-074 Reeves/
Odessa
IH 20 Actual $518,717 6 REPLACE BRIDGE & APPROACHES
0064-04-033 San Augustine/
Lufkin
FM 1 Actual $9,376,139 1 SEAL COAT
0743-03-012 Shelby/
Lufkin
FM 414 Actual $1,570,275 1 REPLACE BRIDGE AND APPROACHES
0910-00-065 Smith/
Tyler
VA Actual $4,614,740 1 REHABILITATE PAVEMENT ON IH 20 (SECTS) , REALIGN RAMP AT US 69
2853-01-010 Somervell/
Fort Worth
FM 200 Actual $186,438 11 ADD AN ADDITIONAL BARREL TO BOX CULVERT DUE TO EROSION
0081-12-035 Tarrant/
Fort Worth
IH 35W Actual $2,611,971 10 CONSTRUCT FRONTAGE ROAD FROM NORTH TARRANT PARKWAY TO HARMON
0902-48-542 Tarrant/
Fort Worth
CS Actual $2,627,110 7 RECONSTRUCT FROM 2 LANES TO 4 LANES WITH TWLTL
0361-01-025 Throckmorton/
Wichita Falls
US 380 Actual $5,320,589 6 ADD SHOULDERS, REPLACE BRIDGE AND APPROACHES
0371-01-079 Victoria/
Yoakum
BU 77-S Actual $2,015,558 6 REPLACE BRIDGE AND APPROACHES
0913-27-043 Victoria/
Yoakum
VA Actual $443,241 10 LANDSCAPE ENHANCEMENT
0466-01-003 Walker/
Bryan
SP 94 Actual $405,982 1 MISCELLANEOUS WORK CONSISTING OF SIDEWALKS, CURB, SURFACE
0315-06-030 Washington/
Bryan
SH 105 Actual $836,649 1 OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, AN HMA
1260-02-015 Wharton/
Yoakum
FM 1163 Actual $1,851,009 1 RESTORE ROADWAY
0337-01-029 Williamson/
Austin
SH 29 Actual $5,742,870 10 RECONST TO 4 - LN URBAN DIVIDED ROADWAY
0100-03-069 Wilson/
San Antonio
US 181 Actual $4,146,253 1 ULTRATHIN BONDED WEARING COURSE & PAVEMENT MARKINGS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract