Letting Schedule for June, 2005 (FY 2005)
Letting Schedule for June, 2005 (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
June, 2005 (FY 2005) | (see Links) |
SEP 2004 | OCT 2004 | NOV 2004 | DEC 2004 | JAN 2005 | FEB 2005 | MAR 2005 | APR 2005 | MAY 2005 | JUN 2005 | JUL 2005 | AUG 2005 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0911-00-057 | Angelina/ Lufkin |
VA | Actual | $233,614 | 1 | INSTALL RAISED PAVEMENT MARKERS AT VARIOUS LOCATIONS DIST |
0911-38-060 | Angelina/ Lufkin |
VA | Actual | $1,000,000 | 10 | INTERMODAL TRANSIT TERMINAL, PARKING FACILITY AND |
0180-03-034 | Aransas/ Corpus Christi |
SH 35 | Actual | $1,323,423 | 1 | ADD TURNING LANES AND PASSING LANES |
0913-20-059 | Austin/ Yoakum |
CR | Actual | $439,085 | 6 | REPLACE BRIDGE AND APPROACHES |
0088-01-054 | Bee/ Corpus Christi |
US 59 | Actual | $9,311,151 | 10 | UPGRADE TO 5 LANE CURB AND GUTTER SECTION |
0101-01-062 | Bee/ Corpus Christi |
US 181 | Actual | $1,124,848 | 1 | INSTALLATION OF MEDIAN BARRIER |
0231-03-089 | Bell/ Waco |
US 190 | Actual | $42,173,270 | 3 | ADD ONE LANE IN EACH DIRECTION |
0320-01-059 | Bell/ Waco |
US 190 | Actual | $6,319,438 | 11 | REPLACE RAILROAD UNDERPASS |
0025-02-168 | Bexar/ San Antonio |
IH 10 | Actual | $10,922,121 | 1 | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) |
0073-08-150 | Bexar/ San Antonio |
US 281 | Actual | $2,999,731 | 1 | MILL, SEAL COAT, PFC OV, & PAV'T MARKINGS |
0915-12-364 | Bexar/ San Antonio |
CS | Actual | $2,654,213 | 7 | REHAB & WIDEN NARROW PAVEMENT W / TURN LN (CURB, SDWK, DRAINAGE, |
0915-12-413 | Bexar/ San Antonio |
VA | Actual | $231,000 | 7 | ALAMO AREA COMMUTE SOLUTION PGM - FY 2005 |
1021-01-010 | Bowie/ Atlanta |
FM 560 | Actual | $303,027 | 6 | REPLACE BRIDGE AND APPROACHES |
0049-12-067 | Brazos/ Bryan |
SH 6 | Actual | $6,341,040 | 11 | MISCELLANEOUS WORK CONSISTING OF THE ADDITION AND RELOCATION |
0054-06-079 | Brown/ Brownwood |
US 67 | Actual | $1,203,656 | 11 | CONSTRUCT DECELERATION LANE AND AN INTERSECTION |
2377-01-032 | Brown/ Brownwood |
FM 2524 | Actual | $2,743,785 | 11 | RECONSTRUCT URBAN SECTION |
0700-05-005 | Burnet/ Austin |
SP 191 | Actual | $242,950 | 11 | WIDEN ROADWAY AND CONSTRUCT LTL |
0432-01-060 | Calhoun/ Yoakum |
SH 185 | Actual | $457,633 | 8 | SAFETY TREAT FIXED OBJECTS |
0220-07-051 | Cameron/ Pharr |
SH 48 | Actual | $16,827,865 | 4 | WIDEN TO 4 LANE |
1425-03-042 | Cameron/ Pharr |
FM 106 | Actual | $1,221,622 | 11 | REALIGN ROADWAY AT PORT CURVES |
1019-01-024 | Camp/ Atlanta |
FM 556 | Actual | $1,351,828 | 8 | SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN LANES |
0919-14-014 | Cass/ Atlanta |
CR | Actual | $233,240 | 6 | REPLACE BRIDGE AND APPROACHES |
0508-02-086 | Chambers/ Beaumont |
IH 10 | Actual | $64,980,062 | 4 | RECONSTRUCT AND WIDEN EXISTING FOUR LANE TO SIX LANE |
0047-06-126 | Collin/ Dallas |
US 75 | Actual | $391,390 | 10 | LANDSCAPE DEVELOPMENT |
0271-01-069 | Colorado/ Yoakum |
IH 10 | Actual | $9,071,231 | 1 | CONSTRUCT MEDIAN BARRIER |
0909-39-111 | Coryell/ Waco |
VA | Actual | $171,433 | 1 | DISTRICTWIDE PAVEMENT MARKINGS |
0047-07-179 | Dallas/ Dallas |
US 75 | Actual | $626,188 | 5 | 1 ON - SYSTEM INTERSECTION IMPROVEMENTS |
0092-02-111 | Dallas/ Dallas |
IH 45 | Actual | $71,522 | 10 | LANDSCAPE DEVELOPMENT |
0196-03-106 | Dallas/ Dallas |
IH 35E | Actual | $1,027,520 | 11 | ADD AUXILIARY LANES IN EACH DIRECTION BETWEEN ENTRANCE AND |
0442-02-138 | Dallas/ Dallas |
IH 35E | Actual | $231,820 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
0918-00-116 | Dallas/ Dallas |
VA | Actual | $4,016,849 | 1 | FUNDS TRANSFER FOR BASE REPAIRS, LEVEL UP PAVEMENT AND FULL |
0918-45-699 | Dallas/ Dallas |
CS | Actual | $82,615 | 9 | SIDEWALKS, SCHOOL ZONE FLASHERS, RAMPS RAIL, RETAINING WALL |
2964-01-029 | Dallas/ Dallas |
SH 161 | Actual | $43,132,516 | 2 | CONSTRUCT 6 LANE FRONTAGE ROAD SECTIONS (PHASE I) |
0134-09-060 | Denton/ Dallas |
US 380 | Actual | $1,696,828 | 1 | MILL / INLAY, OVERLAY |
0918-46-128 | Denton/ Dallas |
VA | Actual | $1,324,684 | 9 | CONSTRUCTION OF (PHASE I) OF HIGHLAND VILLAGE INLAND TRAIL |
0918-46-167 | Denton/ Dallas |
CS | Actual | $437,052 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-193 | Denton/ Dallas |
CS | Actual | $1,068,823 | 7 | NEW CITY STREETS |
0913-17-016 | Dewitt/ Yoakum |
CR | Actual | $801,405 | 6 | REPLACE BRIDGE AND APPROACHES |
0007-04-104 | Eastland/ Brownwood |
SH 112 | Actual | $1,005,556 | 1 | ILLUMINATION, ACCESSIBILITY FACILITIES & STORM DRAIN INLETS |
0906-00-107 | Ector/ Odessa |
VA | Actual | $1,587,531 | 11 | PAVEMENT MARKINGS |
0167-01-092 | El Paso/ El Paso |
US 54 | Actual | $2,165,363 | 5 | REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE |
0665-01-007 | El Paso/ El Paso |
FM 3255 | Actual | $2,129,061 | 11 | CONSTRUCTION OF DRAINAGE STRUCTURES AND ASPHALTIC PAVEMENT |
0924-06-163 | El Paso/ El Paso |
CS | Actual | $1,361,876 | 7 | RECONSTRUCT MAGOFFIN AVE. |
0924-06-259 | El Paso/ El Paso |
VA | Actual | $39,180 | 5 | PHOTOGRAMMETRY EQUIPMENT FOR CRIME SCENE AND COLLISION |
0924-06-262 | El Paso/ El Paso |
CS | Actual | $4,700,000 | 5 | SMART UTEP EXTENSION WITH TRANSIT TERMINAL AND PARKING AND |
2121-03-127 | El Paso/ El Paso |
IH 10 | Actual | $6,260,926 | 1 | REPLACE & REWORK BASE, NEW SURFACING |
0092-04-067 | Ellis/ Dallas |
IH 45 | Actual | $8,116,816 | 1 | FRONTAGE ROAD PAVEMENT REPAIR |
0909-38-018 | Falls/ Waco |
VA | Actual | $958,993 | 1 | CONSTRUCT / RECONSTRUCT ADA RAMPS |
0089-09-064 | Fort Bend/ Houston |
US 59 | Actual | $40,642,839 | 1 | CONSTRUCT GRADE SEPARATIONS |
0188-02-040 | Fort Bend/ Houston |
SH 36 | Actual | $1,742,371 | 1 | ACP LEVEL - UP & OVERLAY WITH VIVDS CAMERA INSTALLATION |
0912-34-106 | Fort Bend/ Houston |
CS | Actual | $367,828 | 6 | REPLACE BRIDGE |
1418-03-015 | Fort Bend/ Houston |
FM 1489 | Actual | $588,980 | 1 | SLOPE STABILIZATION |
3420-01-011 | Fort Bend/ Houston |
FM 3345 | Actual | $2,111,784 | 1 | TURN LANE MODIFICATIONS |
0675-01-052 | Freestone/ Bryan |
IH 45 | Actual | $534,599 | 1 | MISCELLANEOUS WORK CONSISTING OF THE PLACEMENT OF PAVEMENT |
0367-04-077 | Galveston/ Houston |
SH 87 | Actual | $7,354,353 | 1 | BASE REPAIR, ONE COURSE SURFACE TREATMENT & STRIPING |
0500-01-130 | Galveston/ Houston |
IH 45 | Actual | $3,357,967 | 1 | SPALL REPAIR, FULL DEPTH CONCRETE REPAIR AND ASPHALT OVERLAY |
0976-03-049 | Galveston/ Houston |
FM 518 | Actual | $21,243,826 | 2 | WIDEN TO 4 - LANE DIVIDED CURB & GUTTER |
0091-01-040 | Grayson/ Paris |
SH 289 | Actual | $470,975 | 1 | MICROSURFACE |
0925-09-016 | Hall/ Childress |
CR | Actual | $493,501 | 6 | REPLACE BRIDGE AND APPROACHES |
0813-02-033 | Hardin/ Beaumont |
FM 787 | Actual | $1,384,296 | 1 | OVERLAY EXISTING ROADWAY |
0027-09-096 | Harris/ Houston |
US 90A | Actual | $7,292,716 | 1 | MILL, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0050-08-082 | Harris/ Houston |
US 290 | Actual | $661,484 | 1 | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER & INSTALL RAISED |
0110-05-108 | Harris/ Houston |
IH 45 | Actual | $1,287,358 | 1 | UPGRADE GUARD FENCE TO CONCRETE TRAFFIC BARRIER |
0502-01-199 | Harris/ Houston |
SH 225 | Actual | $2,717,046 | 1 | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS |
0720-03-084 | Harris/ Houston |
SH 249 | Actual | $51,771,537 | 1 | CONSTRUCT 2 3 - LANE FTG ROADS W GS AND TSM AT FM 2920, 2 DET |
0912-72-006 | Harris/ Houston |
VA | Actual | $1,000,000 | 10 | FREIGHT RAIL TRANSPORTATION CORRIDOR AND URBAN MOBILITY |
1258-04-055 | Harris/ Houston |
FM 1093 | Actual | $427,018 | 10 | LANDSCAPE DEVELOPMENT |
1575-02-028 | Harrison/ Atlanta |
FM 968 | Actual | $4,183,632 | 1 | SAFETY TREAT DRAINAGE STRUCTURES, REHABILITATE AND WIDEN |
0904-03-010 | Hemphill/ Amarillo |
VA | Actual | $1,214,243 | 9 | TRANSPORTATION ENHANCEMENT |
1099-05-023 | Henderson/ Tyler |
LP 7 | Actual | $325,581 | 1 | UPGRADE SIGNAGE TO REDESIGNATE FM 317 AS SL 7 |
0014-07-092 | Hill/ Waco |
IH 35 | Actual | $10,982,231 | 1 | ASPHALT CONCRETE PAVEMENT OVERLAY |
0010-02-079 | Hopkins/ Paris |
IH 30 | Actual | $9,549,633 | 1 | REHABILITATE MAIN LANES |
0010-02-081 | Hopkins/ Paris |
IH 30 | Actual | $2,265,290 | 1 | REHAB AND WIDEN TO 24' |
0083-03-044 | Hopkins/ Paris |
SH 11 | Actual | $24,849 | 8 | INSTALL FLASHING BEACON |
0911-28-024 | Houston/ Lufkin |
CR | Actual | $401,575 | 6 | REPLACE BRIDGE AND APPROACHES |
0726-01-025 | Hunt/ Paris |
FM 118 | Actual | $870,298 | 1 | WIDEN ROADWAY |
0134-10-017 | Jack/ Fort Worth |
US 380 | Actual | $436,243 | 1 | MICROSURFACE DRIVING LANES ONLY |
0902-50-089 | Johnson/ Fort Worth |
VA | Actual | $1,075,675 | 1 | INSTALL CONCRETE TRAFFIC RAIL AS COLUMN PROTECTION ON IH 35W |
0751-03-033 | Kaufman/ Dallas |
FM 3094 | Actual | $578,377 | 1 | REPLACE BRIDGE AND APPROACHES |
0918-11-060 | Kaufman/ Dallas |
VA | Actual | $4,666,649 | 1 | BASE REPAIR AND OVERLAY |
0918-11-061 | Kaufman/ Dallas |
VA | Actual | $5,619,443 | 1 | BASE REPAIR AND OVERLAY |
0918-11-062 | Kaufman/ Dallas |
VA | Actual | $989,376 | 1 | BRIDGE JOINT REPAIR |
0017-08-061 | La Salle/ Laredo |
IH 35 | Actual | $794,329 | 11 | CONSTRUCT EXIT AND ENTRANCE RAMPS TO IH 35 AND REALIGN |
0221-01-068 | Lamar/ Paris |
US 271 | Actual | $32,300 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0388-03-071 | Liberty/ Beaumont |
SH 146 | Actual | $1,983,891 | 1 | SAFETY TREAT AND WIDEN DRAINAGE STRUCTURES |
0254-01-124 | Live Oak/ Corpus Christi |
US 281 | Actual | $984,069 | 1 | REPLACE BRIDGE AND APPROACHES |
0548-02-030 | Martin/ Odessa |
SH 176 | Actual | $79,110 | 8 | SAFETY TREAT FIXED OBJECTS |
0055-08-104 | McLennan/ Waco |
US 84 | Actual | $1,795,617 | 1 | ASPHALT CONCRETE PAVEMENT OVERLAY |
0013-02-018 | Montague/ Wichita Falls |
US 81 | Actual | $1,837,682 | 6 | REPLACE BRIDGE AND APPROACHES |
0911-08-028 | Nacogdoches/ Lufkin |
CR | Actual | $374,441 | 6 | REPLACE BRIDGE AND APPROACHES |
0093-01-082 | Navarro/ Dallas |
IH 45 | Actual | $1,557,091 | 8 | INSTALL WIRE FENCE IN MEDIAN |
0999-01-026 | Navarro/ Dallas |
FM 1394 | Actual | $6,948,164 | 1 | OV - ASPHALTIC CONCRETE PAVEMENT OVERLAY |
0090-04-062 | Oldham/ Amarillo |
IH 40 | Actual | $3,745,661 | 1 | OVERLAY |
0028-11-191 | Orange/ Beaumont |
IH 10 | Actual | $1,442,468 | 1 | MILL AND INLAY EXISTING ROADWAY |
0306-02-067 | Orange/ Beaumont |
SH 73 | Actual | $5,590,404 | 1 | REHABILITATE EXISTING ROADWAY |
1179-03-009 | Parker/ Fort Worth |
FM 2552 | Actual | $71,200 | 1 | INSTALL TRAFFIC SIGNALS |
0441-07-065 | Pecos/ Odessa |
IH 10 | Actual | $337,745 | 11 | RELOCATE FRONTAGE ROAD TO ACCOMODATE SAFETY REST AREA |
0866-06-017 | Pecos/ Odessa |
US 385 | Actual | $35,915 | 8 | SAFETY ILLUMINATION |
0221-03-048 | Red River/ Paris |
US 271 | Actual | $10,964,995 | 12 | REPLACE BRIDGES AND APPROACHES WITH 5 - LANE FACILITY |
0009-12-067 | Rockwall/ Dallas |
IH 30 | Actual | $371,322 | 11 | ADD NEW EXIT RAMP |
0911-39-016 | Shelby/ Lufkin |
CR | Actual | $662,820 | 6 | BRIDGE REPLACEMENT |
0910-16-093 | Smith/ Tyler |
VA | Actual | $386,445 | 10 | UPGRD EXISTING RDWY & CONSTRUCT NEW RDWY & PARKING LOTS |
0504-02-020 | Tarrant/ Fort Worth |
SH 121 | Actual | $86,770 | 11 | DETAILED 3D COMPUTER MODEL OF SH 121 ROADWAY |
0902-00-099 | Tarrant/ Fort Worth |
VA | Actual | $7,963,378 | 1 | CRACK SEAL, FULL DEPTH CONCRETE REPAIR, STRIPING, MARKERS, |
0902-48-621 | Tarrant/ Fort Worth |
VA | Actual | $767,831 | 6 | REPLACE BRIDGE AND APPROACHES |
0908-00-057 | Taylor/ Abilene |
VA | Actual | $602,766 | 1 | SIGN REHAB AND REPLACEMENT |
0907-24-027 | Tom Green/ San Angelo |
VA | Actual | $99,800 | 10 | LANDSCAPE ESTABLISHMENT |
0015-13-330 | Travis/ Austin |
IH 35 | Actual | $337,200 | 1 | UPGRADE BARREL ATTENUATORS / AT 9 LOCATIONS |
0113-13-135 | Travis/ Austin |
LP 360 | Actual | $138,311 | 7 | SIGNAL IMPROVEMENTS |
0265-01-097 | Travis/ Austin |
SH 71 | Actual | $166,007 | 1 | CONSTRUCT SIGN BRIDGE |
0683-04-012 | Travis/ Austin |
RM 12 | Actual | $1,679,011 | 1 | 1 - CST AND 2" OVERLAY |
0700-03-085 | Travis/ Austin |
SH 71 | Actual | $1,647,005 | 1 | 1 - CST AND 2" OVERLAY |
0914-00-152 | Travis/ Austin |
VA | Actual | $23,000 | 7 | PORTABLE CHANGEABLE MESSAGE SIGNS |
2100-01-045 | Travis/ Austin |
RM 2222 | Actual | $185,259 | 7 | SIGNAL IMPROVEMENTS |
3417-01-021 | Travis/ Austin |
FM 734 | Actual | $113,200 | 7 | SIGNAL IMPROVEMENTS |
1169-01-019 | Uvalde/ San Antonio |
RM 1050 | Actual | $199,351 | 10 | FLOOD DAMAGE REPAIR - ROADWAY DAMAGED IN FLOOD |
0050-05-066 | Waller/ Houston |
BU 290H | Actual | $459,531 | 1 | BASE REPAIR, SEAL COAT, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0114-11-065 | Waller/ Houston |
US 290 | Actual | $4,811,646 | 1 | BRIDGE REPLACEMENT AND APPROACHES |
0523-02-036 | Waller/ Houston |
FM 362 | Actual | $1,174,211 | 1 | BASE REPAIR, PLANING, PERMEABLE FRICTION COURSE, ONE COURSE |
1745-01-013 | Waller/ Houston |
FM 1887 | Actual | $944,557 | 6 | REPLACE BRIDGE |
0917-19-039 | Washington/ Bryan |
VA | Actual | $1,456,836 | 9 | TRANSPORTATION ENHANCEMENT PROJECT TO CONSISTING OF HIKE AND |
0018-08-015 | Webb/ Laredo |
BI 35-A | Actual | $159,062 | 8 | IMPROVE TRAFFIC SIGNAL |
0018-08-016 | Webb/ Laredo |
BI 35-A | Actual | $207,994 | 8 | IMPROVE TRAFFIC SIGNAL |
2150-04-038 | Webb/ Laredo |
FM 1472 | Actual | $4,762,905 | 1 | INSTALLATION OF RAISED MEDIAN |
0124-03-056 | Wilbarger/ Wichita Falls |
US 283 | Actual | $1,747,519 | 1 | HOT MIX OVERLAY |
0914-05-118 | Williamson/ Austin |
CR | Actual | $1,556,058 | 6 | REPLACE BRIDGE AND APPROACHES |
3417-02-020 | Williamson/ Austin |
FM 734 | Actual | $123,493 | 7 | SIGNAL IMPROVEMENTS |
0134-08-039 | Wise/ Fort Worth |
US 380 | Actual | $575,013 | 1 | MILL AND OVERLAY |
0134-03-028 | Young/ Wichita Falls |
US 380 | Actual | $3,167,608 | 1 | HOT MIX OVERLAY |
|
|