Letting Schedule for June, 2005 (FY 2005)

 
 
Last Update: Monday, August 15, 2005
June, 2005 (FY 2005) (see Links)
SEP 2004 | OCT 2004 | NOV 2004 | DEC 2004 | JAN 2005 | FEB 2005 | MAR 2005 | APR 2005 | MAY 2005 | JUN 2005 | JUL 2005 | AUG 2005
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0911-00-057 Angelina/
Lufkin
VA Actual $233,614 1 INSTALL RAISED PAVEMENT MARKERS AT VARIOUS LOCATIONS DIST
0911-38-060 Angelina/
Lufkin
VA Actual $1,000,000 10 INTERMODAL TRANSIT TERMINAL, PARKING FACILITY AND
0180-03-034 Aransas/
Corpus Christi
SH 35 Actual $1,323,423 1 ADD TURNING LANES AND PASSING LANES
0913-20-059 Austin/
Yoakum
CR Actual $439,085 6 REPLACE BRIDGE AND APPROACHES
0088-01-054 Bee/
Corpus Christi
US 59 Actual $9,311,151 10 UPGRADE TO 5 LANE CURB AND GUTTER SECTION
0101-01-062 Bee/
Corpus Christi
US 181 Actual $1,124,848 1 INSTALLATION OF MEDIAN BARRIER
0231-03-089 Bell/
Waco
US 190 Actual $42,173,270 3 ADD ONE LANE IN EACH DIRECTION
0320-01-059 Bell/
Waco
US 190 Actual $6,319,438 11 REPLACE RAILROAD UNDERPASS
0025-02-168 Bexar/
San Antonio
IH 10 Actual $10,922,121 1 INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM)
0073-08-150 Bexar/
San Antonio
US 281 Actual $2,999,731 1 MILL, SEAL COAT, PFC OV, & PAV'T MARKINGS
0915-12-364 Bexar/
San Antonio
CS Actual $2,654,213 7 REHAB & WIDEN NARROW PAVEMENT W / TURN LN (CURB, SDWK, DRAINAGE,
0915-12-413 Bexar/
San Antonio
VA Actual $231,000 7 ALAMO AREA COMMUTE SOLUTION PGM - FY 2005
1021-01-010 Bowie/
Atlanta
FM 560 Actual $303,027 6 REPLACE BRIDGE AND APPROACHES
0049-12-067 Brazos/
Bryan
SH 6 Actual $6,341,040 11 MISCELLANEOUS WORK CONSISTING OF THE ADDITION AND RELOCATION
0054-06-079 Brown/
Brownwood
US 67 Actual $1,203,656 11 CONSTRUCT DECELERATION LANE AND AN INTERSECTION
2377-01-032 Brown/
Brownwood
FM 2524 Actual $2,743,785 11 RECONSTRUCT URBAN SECTION
0700-05-005 Burnet/
Austin
SP 191 Actual $242,950 11 WIDEN ROADWAY AND CONSTRUCT LTL
0432-01-060 Calhoun/
Yoakum
SH 185 Actual $457,633 8 SAFETY TREAT FIXED OBJECTS
0220-07-051 Cameron/
Pharr
SH 48 Actual $16,827,865 4 WIDEN TO 4 LANE
1425-03-042 Cameron/
Pharr
FM 106 Actual $1,221,622 11 REALIGN ROADWAY AT PORT CURVES
1019-01-024 Camp/
Atlanta
FM 556 Actual $1,351,828 8 SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN LANES
0919-14-014 Cass/
Atlanta
CR Actual $233,240 6 REPLACE BRIDGE AND APPROACHES
0508-02-086 Chambers/
Beaumont
IH 10 Actual $64,980,062 4 RECONSTRUCT AND WIDEN EXISTING FOUR LANE TO SIX LANE
0047-06-126 Collin/
Dallas
US 75 Actual $391,390 10 LANDSCAPE DEVELOPMENT
0271-01-069 Colorado/
Yoakum
IH 10 Actual $9,071,231 1 CONSTRUCT MEDIAN BARRIER
0909-39-111 Coryell/
Waco
VA Actual $171,433 1 DISTRICTWIDE PAVEMENT MARKINGS
0047-07-179 Dallas/
Dallas
US 75 Actual $626,188 5 1 ON - SYSTEM INTERSECTION IMPROVEMENTS
0092-02-111 Dallas/
Dallas
IH 45 Actual $71,522 10 LANDSCAPE DEVELOPMENT
0196-03-106 Dallas/
Dallas
IH 35E Actual $1,027,520 11 ADD AUXILIARY LANES IN EACH DIRECTION BETWEEN ENTRANCE AND
0442-02-138 Dallas/
Dallas
IH 35E Actual $231,820 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
0918-00-116 Dallas/
Dallas
VA Actual $4,016,849 1 FUNDS TRANSFER FOR BASE REPAIRS, LEVEL UP PAVEMENT AND FULL
0918-45-699 Dallas/
Dallas
CS Actual $82,615 9 SIDEWALKS, SCHOOL ZONE FLASHERS, RAMPS RAIL, RETAINING WALL
2964-01-029 Dallas/
Dallas
SH 161 Actual $43,132,516 2 CONSTRUCT 6 LANE FRONTAGE ROAD SECTIONS (PHASE I)
0134-09-060 Denton/
Dallas
US 380 Actual $1,696,828 1 MILL / INLAY, OVERLAY
0918-46-128 Denton/
Dallas
VA Actual $1,324,684 9 CONSTRUCTION OF (PHASE I) OF HIGHLAND VILLAGE INLAND TRAIL
0918-46-167 Denton/
Dallas
CS Actual $437,052 6 REPLACE BRIDGE AND APPROACHES
0918-46-193 Denton/
Dallas
CS Actual $1,068,823 7 NEW CITY STREETS
0913-17-016 Dewitt/
Yoakum
CR Actual $801,405 6 REPLACE BRIDGE AND APPROACHES
0007-04-104 Eastland/
Brownwood
SH 112 Actual $1,005,556 1 ILLUMINATION, ACCESSIBILITY FACILITIES & STORM DRAIN INLETS
0906-00-107 Ector/
Odessa
VA Actual $1,587,531 11 PAVEMENT MARKINGS
0167-01-092 El Paso/
El Paso
US 54 Actual $2,165,363 5 REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE
0665-01-007 El Paso/
El Paso
FM 3255 Actual $2,129,061 11 CONSTRUCTION OF DRAINAGE STRUCTURES AND ASPHALTIC PAVEMENT
0924-06-163 El Paso/
El Paso
CS Actual $1,361,876 7 RECONSTRUCT MAGOFFIN AVE.
0924-06-259 El Paso/
El Paso
VA Actual $39,180 5 PHOTOGRAMMETRY EQUIPMENT FOR CRIME SCENE AND COLLISION
0924-06-262 El Paso/
El Paso
CS Actual $4,700,000 5 SMART UTEP EXTENSION WITH TRANSIT TERMINAL AND PARKING AND
2121-03-127 El Paso/
El Paso
IH 10 Actual $6,260,926 1 REPLACE & REWORK BASE, NEW SURFACING
0092-04-067 Ellis/
Dallas
IH 45 Actual $8,116,816 1 FRONTAGE ROAD PAVEMENT REPAIR
0909-38-018 Falls/
Waco
VA Actual $958,993 1 CONSTRUCT / RECONSTRUCT ADA RAMPS
0089-09-064 Fort Bend/
Houston
US 59 Actual $40,642,839 1 CONSTRUCT GRADE SEPARATIONS
0188-02-040 Fort Bend/
Houston
SH 36 Actual $1,742,371 1 ACP LEVEL - UP & OVERLAY WITH VIVDS CAMERA INSTALLATION
0912-34-106 Fort Bend/
Houston
CS Actual $367,828 6 REPLACE BRIDGE
1418-03-015 Fort Bend/
Houston
FM 1489 Actual $588,980 1 SLOPE STABILIZATION
3420-01-011 Fort Bend/
Houston
FM 3345 Actual $2,111,784 1 TURN LANE MODIFICATIONS
0675-01-052 Freestone/
Bryan
IH 45 Actual $534,599 1 MISCELLANEOUS WORK CONSISTING OF THE PLACEMENT OF PAVEMENT
0367-04-077 Galveston/
Houston
SH 87 Actual $7,354,353 1 BASE REPAIR, ONE COURSE SURFACE TREATMENT & STRIPING
0500-01-130 Galveston/
Houston
IH 45 Actual $3,357,967 1 SPALL REPAIR, FULL DEPTH CONCRETE REPAIR AND ASPHALT OVERLAY
0976-03-049 Galveston/
Houston
FM 518 Actual $21,243,826 2 WIDEN TO 4 - LANE DIVIDED CURB & GUTTER
0091-01-040 Grayson/
Paris
SH 289 Actual $470,975 1 MICROSURFACE
0925-09-016 Hall/
Childress
CR Actual $493,501 6 REPLACE BRIDGE AND APPROACHES
0813-02-033 Hardin/
Beaumont
FM 787 Actual $1,384,296 1 OVERLAY EXISTING ROADWAY
0027-09-096 Harris/
Houston
US 90A Actual $7,292,716 1 MILL, ASPHALT OVERLAY & PAVEMENT MARKINGS
0050-08-082 Harris/
Houston
US 290 Actual $661,484 1 REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER & INSTALL RAISED
0110-05-108 Harris/
Houston
IH 45 Actual $1,287,358 1 UPGRADE GUARD FENCE TO CONCRETE TRAFFIC BARRIER
0502-01-199 Harris/
Houston
SH 225 Actual $2,717,046 1 BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS
0720-03-084 Harris/
Houston
SH 249 Actual $51,771,537 1 CONSTRUCT 2 3 - LANE FTG ROADS W GS AND TSM AT FM 2920, 2 DET
0912-72-006 Harris/
Houston
VA Actual $1,000,000 10 FREIGHT RAIL TRANSPORTATION CORRIDOR AND URBAN MOBILITY
1258-04-055 Harris/
Houston
FM 1093 Actual $427,018 10 LANDSCAPE DEVELOPMENT
1575-02-028 Harrison/
Atlanta
FM 968 Actual $4,183,632 1 SAFETY TREAT DRAINAGE STRUCTURES, REHABILITATE AND WIDEN
0904-03-010 Hemphill/
Amarillo
VA Actual $1,214,243 9 TRANSPORTATION ENHANCEMENT
1099-05-023 Henderson/
Tyler
LP 7 Actual $325,581 1 UPGRADE SIGNAGE TO REDESIGNATE FM 317 AS SL 7
0014-07-092 Hill/
Waco
IH 35 Actual $10,982,231 1 ASPHALT CONCRETE PAVEMENT OVERLAY
0010-02-079 Hopkins/
Paris
IH 30 Actual $9,549,633 1 REHABILITATE MAIN LANES
0010-02-081 Hopkins/
Paris
IH 30 Actual $2,265,290 1 REHAB AND WIDEN TO 24'
0083-03-044 Hopkins/
Paris
SH 11 Actual $24,849 8 INSTALL FLASHING BEACON
0911-28-024 Houston/
Lufkin
CR Actual $401,575 6 REPLACE BRIDGE AND APPROACHES
0726-01-025 Hunt/
Paris
FM 118 Actual $870,298 1 WIDEN ROADWAY
0134-10-017 Jack/
Fort Worth
US 380 Actual $436,243 1 MICROSURFACE DRIVING LANES ONLY
0902-50-089 Johnson/
Fort Worth
VA Actual $1,075,675 1 INSTALL CONCRETE TRAFFIC RAIL AS COLUMN PROTECTION ON IH 35W
0751-03-033 Kaufman/
Dallas
FM 3094 Actual $578,377 1 REPLACE BRIDGE AND APPROACHES
0918-11-060 Kaufman/
Dallas
VA Actual $4,666,649 1 BASE REPAIR AND OVERLAY
0918-11-061 Kaufman/
Dallas
VA Actual $5,619,443 1 BASE REPAIR AND OVERLAY
0918-11-062 Kaufman/
Dallas
VA Actual $989,376 1 BRIDGE JOINT REPAIR
0017-08-061 La Salle/
Laredo
IH 35 Actual $794,329 11 CONSTRUCT EXIT AND ENTRANCE RAMPS TO IH 35 AND REALIGN
0221-01-068 Lamar/
Paris
US 271 Actual $32,300 8 INSTALL INTERSECTION FLASHING BEACON
0388-03-071 Liberty/
Beaumont
SH 146 Actual $1,983,891 1 SAFETY TREAT AND WIDEN DRAINAGE STRUCTURES
0254-01-124 Live Oak/
Corpus Christi
US 281 Actual $984,069 1 REPLACE BRIDGE AND APPROACHES
0548-02-030 Martin/
Odessa
SH 176 Actual $79,110 8 SAFETY TREAT FIXED OBJECTS
0055-08-104 McLennan/
Waco
US 84 Actual $1,795,617 1 ASPHALT CONCRETE PAVEMENT OVERLAY
0013-02-018 Montague/
Wichita Falls
US 81 Actual $1,837,682 6 REPLACE BRIDGE AND APPROACHES
0911-08-028 Nacogdoches/
Lufkin
CR Actual $374,441 6 REPLACE BRIDGE AND APPROACHES
0093-01-082 Navarro/
Dallas
IH 45 Actual $1,557,091 8 INSTALL WIRE FENCE IN MEDIAN
0999-01-026 Navarro/
Dallas
FM 1394 Actual $6,948,164 1 OV - ASPHALTIC CONCRETE PAVEMENT OVERLAY
0090-04-062 Oldham/
Amarillo
IH 40 Actual $3,745,661 1 OVERLAY
0028-11-191 Orange/
Beaumont
IH 10 Actual $1,442,468 1 MILL AND INLAY EXISTING ROADWAY
0306-02-067 Orange/
Beaumont
SH 73 Actual $5,590,404 1 REHABILITATE EXISTING ROADWAY
1179-03-009 Parker/
Fort Worth
FM 2552 Actual $71,200 1 INSTALL TRAFFIC SIGNALS
0441-07-065 Pecos/
Odessa
IH 10 Actual $337,745 11 RELOCATE FRONTAGE ROAD TO ACCOMODATE SAFETY REST AREA
0866-06-017 Pecos/
Odessa
US 385 Actual $35,915 8 SAFETY ILLUMINATION
0221-03-048 Red River/
Paris
US 271 Actual $10,964,995 12 REPLACE BRIDGES AND APPROACHES WITH 5 - LANE FACILITY
0009-12-067 Rockwall/
Dallas
IH 30 Actual $371,322 11 ADD NEW EXIT RAMP
0911-39-016 Shelby/
Lufkin
CR Actual $662,820 6 BRIDGE REPLACEMENT
0910-16-093 Smith/
Tyler
VA Actual $386,445 10 UPGRD EXISTING RDWY & CONSTRUCT NEW RDWY & PARKING LOTS
0504-02-020 Tarrant/
Fort Worth
SH 121 Actual $86,770 11 DETAILED 3D COMPUTER MODEL OF SH 121 ROADWAY
0902-00-099 Tarrant/
Fort Worth
VA Actual $7,963,378 1 CRACK SEAL, FULL DEPTH CONCRETE REPAIR, STRIPING, MARKERS,
0902-48-621 Tarrant/
Fort Worth
VA Actual $767,831 6 REPLACE BRIDGE AND APPROACHES
0908-00-057 Taylor/
Abilene
VA Actual $602,766 1 SIGN REHAB AND REPLACEMENT
0907-24-027 Tom Green/
San Angelo
VA Actual $99,800 10 LANDSCAPE ESTABLISHMENT
0015-13-330 Travis/
Austin
IH 35 Actual $337,200 1 UPGRADE BARREL ATTENUATORS / AT 9 LOCATIONS
0113-13-135 Travis/
Austin
LP 360 Actual $138,311 7 SIGNAL IMPROVEMENTS
0265-01-097 Travis/
Austin
SH 71 Actual $166,007 1 CONSTRUCT SIGN BRIDGE
0683-04-012 Travis/
Austin
RM 12 Actual $1,679,011 1 1 - CST AND 2" OVERLAY
0700-03-085 Travis/
Austin
SH 71 Actual $1,647,005 1 1 - CST AND 2" OVERLAY
0914-00-152 Travis/
Austin
VA Actual $23,000 7 PORTABLE CHANGEABLE MESSAGE SIGNS
2100-01-045 Travis/
Austin
RM 2222 Actual $185,259 7 SIGNAL IMPROVEMENTS
3417-01-021 Travis/
Austin
FM 734 Actual $113,200 7 SIGNAL IMPROVEMENTS
1169-01-019 Uvalde/
San Antonio
RM 1050 Actual $199,351 10 FLOOD DAMAGE REPAIR - ROADWAY DAMAGED IN FLOOD
0050-05-066 Waller/
Houston
BU 290H Actual $459,531 1 BASE REPAIR, SEAL COAT, ASPHALT OVERLAY & PAVEMENT MARKINGS
0114-11-065 Waller/
Houston
US 290 Actual $4,811,646 1 BRIDGE REPLACEMENT AND APPROACHES
0523-02-036 Waller/
Houston
FM 362 Actual $1,174,211 1 BASE REPAIR, PLANING, PERMEABLE FRICTION COURSE, ONE COURSE
1745-01-013 Waller/
Houston
FM 1887 Actual $944,557 6 REPLACE BRIDGE
0917-19-039 Washington/
Bryan
VA Actual $1,456,836 9 TRANSPORTATION ENHANCEMENT PROJECT TO CONSISTING OF HIKE AND
0018-08-015 Webb/
Laredo
BI 35-A Actual $159,062 8 IMPROVE TRAFFIC SIGNAL
0018-08-016 Webb/
Laredo
BI 35-A Actual $207,994 8 IMPROVE TRAFFIC SIGNAL
2150-04-038 Webb/
Laredo
FM 1472 Actual $4,762,905 1 INSTALLATION OF RAISED MEDIAN
0124-03-056 Wilbarger/
Wichita Falls
US 283 Actual $1,747,519 1 HOT MIX OVERLAY
0914-05-118 Williamson/
Austin
CR Actual $1,556,058 6 REPLACE BRIDGE AND APPROACHES
3417-02-020 Williamson/
Austin
FM 734 Actual $123,493 7 SIGNAL IMPROVEMENTS
0134-08-039 Wise/
Fort Worth
US 380 Actual $575,013 1 MILL AND OVERLAY
0134-03-028 Young/
Wichita Falls
US 380 Actual $3,167,608 1 HOT MIX OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract