Letting Schedule for September, 2004 (FY 2005)
Letting Schedule for September, 2004 (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
September, 2004 (FY 2005) | (see Links) |
SEP 2004 | OCT 2004 | NOV 2004 | DEC 2004 | JAN 2005 | FEB 2005 | MAR 2005 | APR 2005 | MAY 2005 | JUN 2005 | JUL 2005 | AUG 2005 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0891-01-010 | Anderson/ Tyler |
FM 320 | Actual | $189,158 | 8 | INSTALL GUARDRAILS ON CURVES GREATER THAN 2 DEGREES |
2607-01-008 | Aransas/ Corpus Christi |
SH 188 | Actual | $552,619 | 11 | CULVERT REPLACEMENTS |
2412-01-010 | Bee/ Corpus Christi |
FM 351 | Actual | $3,270,530 | 1 | WIDEN STRUCTURES & REHAB EXISTING ROADWAY |
1437-01-032 | Bexar/ San Antonio |
FM 1346 | Actual | $7,359,954 | 1 | WIDEN ROADWAY & ADD SHOULDERS |
3544-04-005 | Bexar/ San Antonio |
SH 211 | Actual | $2,345,411 | 1 | OVERLAY AND PAVEMENT MARKINGS |
0111-07-045 | Brazoria/ Houston |
BS 288B | Actual | $572,029 | 1 | FOR WORK CONSISTING OF THE MODERNIZATION OF EXISTING |
0179-02-081 | Brazoria/ Houston |
SH 35 | Actual | $672,587 | 1 | BASE REPAIR, OVERLAY AND EXTEND STRUCTURE |
0587-01-054 | Brazoria/ Houston |
FM 1495 | Actual | $776,711 | 1 | ACP OVERLAY AND PAVEMENT MARKINGS |
0050-02-091 | Brazos/ Bryan |
SH 6 | Actual | $984,032 | 12 | MISCELLANEOUS WORK CONSISTING OF THE PREPARATION OF RIGHT OF |
0039-06-031 | Cameron/ Pharr |
BU 83-S | Actual | $11,254,991 | 11 | CONSTRUCT 4 LANE DIVIDED URBAN SECTION |
0039-08-086 | Cameron/ Pharr |
US 77 | Actual | $21,896,273 | 4 | WIDEN TO 6 LANES |
0039-19-042 | Cameron/ Pharr |
US 83 | Actual | $97,320,200 | 3 | WIDEN TO 6 LANES |
0331-04-056 | Cameron/ Pharr |
PR 100 | Actual | $1,296,103 | 1 | CATHODIC PROTECTION |
0218-04-105 | Cass/ Atlanta |
US 59 | Actual | $274,593 | 8 | SAFETY LIGHTING AT INTERSECTION |
0569-01-043 | Cass/ Atlanta |
SH 43 | Actual | $3,261,101 | 10 | IMPROVE DRAINAGE AND RESURFACE ROADWAY |
0918-24-109 | Collin/ Dallas |
CS | Actual | $2,909,651 | 7 | NEW ROADWAY |
1012-02-026 | Collin/ Dallas |
FM 545 | Actual | $1,574,313 | 1 | SPOT BASE REPAIR, LEVEL - UP, OVERLAY & PAVEMENT MARKINGS |
3476-02-004 | Collin/ Dallas |
FM 3286 | Actual | $20,767,940 | 6 | REPLACE BRIDGE AND APPROACHES |
2293-02-005 | Comal/ San Antonio |
FM 2439 | Actual | $545,997 | 1 | REHAB & WIDEN NARROW PAVEMENT & SHOULDER |
0312-01-059 | Cooke/ Wichita Falls |
FM 51 | Actual | $304,750 | 1 | UPGRADE TRAFFIC SIGNALS |
0794-01-016 | Dallam/ Amarillo |
FM 1727 | Actual | $2,558,209 | 1 | REHABILITATE EXISTING ROADWAY |
0047-07-189 | Dallas/ Dallas |
US 75 | Actual | $7,063,037 | 7 | CONSTRUCTION AND WIDENING OF CHURCHILL WAY |
0918-45-674 | Dallas/ Dallas |
VA | Actual | $20,452,240 | 5 | TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPERATIONS; |
2208-02-018 | Dallas/ Dallas |
SP 303 | Actual | $1,144,460 | 1 | REHABILITATION OF EXISTING ROADWAY |
8050-18-037 | Dallas/ Dallas |
MH | Actual | $5,708,080 | 2 | TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPERATIONS; |
2250-02-015 | Denton/ Dallas |
LP 288 | Actual | $820,278 | 1 | INSTALL CTB & HEADLIGHT BARRIER FENCE TO PROVIDE SAFETY |
0311-01-016 | Donley/ Childress |
SH 70 | Actual | $7,101,753 | 1 | DISTRICTWIDE SEAL COAT |
3541-01-004 | Ector/ Odessa |
FM 3472 | Actual | $182,648 | 11 | INSTALL TRAFFIC SIGNALS |
0924-06-256 | El Paso/ El Paso |
CS | Actual | $31,250 | 10 | BORDER WIZARD SOFTWARE AS PART OF A DEMONSTRATION PROJECT |
0807-03-030 | Fayette/ Yoakum |
FM 153 | Actual | $4,272,449 | 1 | RESTORE ROADWAY |
0188-10-011 | Fort Bend/ Houston |
FM 1463 | Actual | $125,409 | 10 | LANDSCAPE DEVELOPMENT |
0527-06-017 | Fort Bend/ Houston |
FM 360 | Actual | $964,749 | 1 | MILL, BASE REPAIR AND OVERLAY |
1415-02-036 | Fort Bend/ Houston |
FM 1464 | Actual | $318,233 | 1 | WIDEN SUBGRADE, TRAFFIC SIGNAL, ACP OVERLAY, SIGNING AND |
0426-02-015 | Freestone/ Bryan |
FM 489 | Actual | $2,536,199 | 1 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, |
0500-01-128 | Galveston/ Houston |
IH 45 | Actual | $497,953 | 11 | REHABILITATION OF EXISTING ROADWAY |
0287-03-023 | Gonzales/ Yoakum |
SH 80 | Actual | $837,007 | 1 | RESTORE ROADWAY |
0212-04-027 | Grimes/ Bryan |
SH 30 | Actual | $6,446,542 | 11 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, |
0366-02-065 | Guadalupe/ San Antonio |
SH 123 | Actual | $15,701,892 | 11 | RECONSTRUCT AND EXPAND 2 TO 4 LINE DIVIDED |
0535-01-053 | Guadalupe/ San Antonio |
IH 10 | Actual | $3,087,483 | 1 | RECONSTRUCT EXISTING FRONTAGE ROADS |
0042-09-103 | Hall/ Childress |
US 287 | Actual | $1,659,658 | 11 | OVERLAY |
0027-13-188 | Harris/ Houston |
US 59 | Actual | $1,234,465 | 1 | REPLACE PAVEMENT MARKINGS WITH WARRANTED PAVEMENT MARKINGS |
0050-09-062 | Harris/ Houston |
US 290 | Actual | $369,847 | 1 | LONGITUDINAL CRACK REPAIR AND PAVEMENT MARKINGS |
0051-06-015 | Harris/ Houston |
SH 3 | Actual | $408,229 | 1 | FULL DEPTH REPAIR AND JOINT / CRACK SEAL |
0508-01-290 | Harris/ Houston |
IH 10 | Actual | $302,878 | 6 | REHABILITATE BRIDGE |
0508-01-296 | Harris/ Houston |
IH 10 | Actual | $5,841,897 | 1 | REHABILITATE AND OVERLAY FRONTAGE ROADS |
0720-03-115 | Harris/ Houston |
SH 249 | Actual | $233,048 | 1 | IMPROVE STORM SEWER DRAINAGE SYSTEM |
0912-71-429 | Harris/ Houston |
VA | Actual | $1,626,058 | 5 | CONSTRUCT HIKE AND BIKE TRAIL |
0912-71-880 | Harris/ Houston |
VA | Actual | $293,120 | 1 | CRACK SEALING |
0164-02-034 | Henderson/ Tyler |
SH 31 | Actual | $336,901 | 8 | SAFETY LIGHTING AT INTERSECTION |
0203-02-034 | Hunt/ Paris |
US 69 | Actual | $93,243 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0916-36-015 | Karnes/ Corpus Christi |
CR | Actual | $154,089 | 6 | REPLACE BRIDGE AND APPROACHES |
0095-04-050 | Kaufman/ Dallas |
US 80 | Actual | $1,016,316 | 6 | WIDEN BRIDGES AND APPROACHES |
0762-02-039 | Liberty/ Beaumont |
FM 1409 | Actual | $10,242,480 | 6 | REHABILITATE EXISTING ROADWAY |
0952-01-046 | Liberty/ Beaumont |
FM 163 | Actual | $4,598,052 | 1 | REHABILITATE EXISTING ROADWAY |
0380-01-049 | Lubbock/ Lubbock |
US 82 | Actual | $32,724,166 | 2 | CONVERT NON - FREEWAY TO FREEWAY |
0847-05-032 | Matagorda/ Yoakum |
FM 521 | Actual | $96,370 | 11 | REPLACE PIPE AND HEADWALLS |
0909-22-127 | McLennan/ Waco |
VA | Actual | $320,041 | 1 | BRIDGE PAINTING AT VARIOUS LOCATIONS IN MCLENNAN COUNTY |
2373-02-016 | McMullen/ San Antonio |
FM 624 | Actual | $3,017,159 | 1 | RESTORE EXISTING ROADWAY |
0177-05-055 | Montgomery/ Houston |
US 59 | Actual | $58,583,584 | 1 | WIDEN TO 8 MAIN LANES |
0912-37-169 | Montgomery/ Houston |
VA | Actual | $6,393,000 | 5 | CONSTRUCTION OF PARK AND RIDE FACILITY |
0912-37-170 | Montgomery/ Houston |
VA | Actual | $5,625,000 | 5 | PEDESTRIAN TRANSITWAY (PHASE 1) |
0093-01-080 | Navarro/ Dallas |
IH 45 | Actual | $181,492 | 1 | SAFETY LIGHTING |
0916-35-074 | Nueces/ Corpus Christi |
CS | Actual | $467,548 | 6 | REPLACE BRIDGE AND APPROACHES |
0904-00-098 | Potter/ Amarillo |
VA | Actual | $201,275 | 1 | UPGRADE SMALL SIGNS |
0904-00-099 | Potter/ Amarillo |
VA | Actual | $523,998 | 1 | SMALL SIGNING |
0067-17-026 | Randall/ Amarillo |
IH 27 | Actual | $363,589 | 11 | STRIPING & PVMT MARKERS |
2494-02-007 | Randall/ Amarillo |
FM 2186 | Actual | $610,000 | 1 | SAFETY LIGHTING |
2635-03-008 | Randall/ Amarillo |
LP 335 | Actual | $1,547,280 | 1 | OVERLAY |
0045-12-058 | Red River/ Paris |
US 82 | Actual | $1,265,704 | 6 | REPLACE BRIDGE & APPROACHES |
0916-28-033 | San Patricio/ Corpus Christi |
CR | Actual | $272,997 | 6 | REPLACE BRIDGE AND APPROACHES |
0910-00-051 | Smith/ Tyler |
VA | Actual | $344,830 | 1 | THERMO PLASTIC PAVEMENT MARKINGS |
0910-00-060 | Smith/ Tyler |
VA | Actual | $395,600 | 1 | NON - SITE SPECIFIC SIGNAL UPGRADE FOR 2004 |
0908-25-007 | Stonewall/ Abilene |
CR | Actual | $484,601 | 6 | REPLACE BRIDGE AND APPROACHES |
0013-10-066 | Tarrant/ Fort Worth |
BU 287P | Actual | $43,200 | 10 | INSTALL TRAFFIC SIGNAL; NEAR BAILEY - BOSWELL |
0902-48-411 | Tarrant/ Fort Worth |
VA | Actual | $1,482,629 | 9 | CONSTRUCT TRAIL AND BICYCLE TRANSIT STATION IN NORTH RICHLAN |
0902-48-489 | Tarrant/ Fort Worth |
VA | Actual | $200,000 | 5 | BICYCLE ROUTES MARKED AND SIGNED IN FORT WORTH |
0908-00-056 | Taylor/ Abilene |
VA | Actual | $542,596 | 1 | THERMOPLASTIC STRIPING AND REFLECTIVE PAVEMENT MARKERS |
0010-07-046 | Titus/ Atlanta |
US 67 | Actual | $247,070 | 1 | UPGRADE TRAFFIC SIGNALS |
0914-00-195 | Travis/ Austin |
VA | Actual | $500,682 | 1 | SIGNING / TRUCK LANE RESTRICTION |
0914-04-171 | Travis/ Austin |
VA | Actual | $264,711 | 7 | CONSTRUCT CONCRETE TRAIL |
3417-01-019 | Travis/ Austin |
FM 734 | Actual | $422,325 | 1 | ADD SIGNAL AND MODIFY LEFT TURN LANES |
1706-01-019 | Walker/ Bryan |
FM 1791 | Actual | $1,748,851 | 1 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, |
1006-02-005 | Waller/ Houston |
FM 529 | Actual | $1,458,915 | 1 | WIDEN SUBGRADE, OCST, ACP OVERLAY, BASE REPAIR, PLANE, SET, AND |
1745-01-018 | Waller/ Houston |
FM 1887 | Actual | $2,036,867 | 1 | BASE REPAIR, PLANING, SEAL COAT, ACP OVERLAY AND PAVEMENT |
0114-09-063 | Washington/ Bryan |
US 290 | Actual | $132,726 | 1 | MISCELLANEOUS WORK CONSISTING OF REPLACING LARGE GUIDE SIGNS |
3532-02-008 | Webb/ Laredo |
FM 3338 | Actual | $3,396,801 | 1 | REHABILITATION OF ROADWAY AND ADD SHOULDERS |
0043-09-106 | Wichita/ Wichita Falls |
IH 44 | Actual | $234,159 | 8 | MISCELLANEOUS WORK - CONSISTING OF LANDSCAPING |
2103-01-022 | Williamson/ Austin |
RM 2243 | Actual | $262,343 | 1 | ADD RIGHT TURN LANE |
|
|