Letting Schedule for February, 2005 (FY 2005)
Letting Schedule for February, 2005 (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
February, 2005 (FY 2005) | (see Links) |
SEP 2004 | OCT 2004 | NOV 2004 | DEC 2004 | JAN 2005 | FEB 2005 | MAR 2005 | APR 2005 | MAY 2005 | JUN 2005 | JUL 2005 | AUG 2005 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0328-03-026 | Atascosa/ San Antonio |
SH 97 | Actual | $1,051,630 | 1 | INSTALLING SAFETY LIGHTING & IMPROVING VERTICAL ALIGNMENT |
0521-02-036 | Bexar/ San Antonio |
LP 13 | Actual | $1,067,567 | 1 | PLANING, SEAL, OVERLAY, AND PAVEMENT MARKINGS |
0915-12-356 | Bexar/ San Antonio |
CS | Actual | $245,841 | 7 | CONSTRUCT TRAFFIC SIGNAL |
0933-05-017 | Borden/ Abilene |
FM 1054 | Actual | $1,794,316 | 1 | REPLACE STRUCTURES, ADD SHOULDERS, REWORK BASE, 2 COURSE |
0010-12-061 | Bowie/ Atlanta |
US 67 | Actual | $198,840 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0917-29-086 | Brazos/ Bryan |
VA | Actual | $578,000 | 9 | TRANSPORTATION ENHANCEMENT PROJECT CONSISTING OF |
0252-01-054 | Burnet/ Austin |
US 281 | Actual | $2,798,219 | 8 | WIDEN, ADD 10' SHLDRS & 14'FLUSH MEDIAN |
1065-02-028 | Cameron/ Pharr |
SP 486 | Actual | $2,217,902 | 1 | RECONSTRUCT 4 LANE URBAN SECTION |
0508-03-084 | Chambers/ Beaumont |
IH 10 | Actual | $999,852 | 11 | SEAL CRACKS AND JOINTS IN PAVEMENT |
0381-03-020 | Childress/ Childress |
SH 256 | Actual | $1,553,955 | 1 | ASPHALTIC CONCRETE OVERLAY |
0044-02-072 | Clay/ Wichita Falls |
US 287 | Actual | $2,456,357 | 1 | NOVACHIP OVERLAY |
0918-24-120 | Collin/ Dallas |
VA | Actual | $295,983 | 1 | INSTALLING SMALL SIGN MOUNTS |
0903-15-072 | Cooke/ Wichita Falls |
CR | Actual | $168,899 | 9 | RESTORATION OF HISTORIC BRIDGE TRUSS |
0047-07-209 | Dallas/ Dallas |
US 75 | Actual | $862,400 | 10 | LANDSCAPE ESTABLISHMENT |
0092-02-110 | Dallas/ Dallas |
IH 45 | Actual | $2,151,638 | 1 | CONC. PAVEMENT, ACP OVERLAY, CLEAN & REPAIR DRAINAGE |
0918-00-101 | Dallas/ Dallas |
VA | Actual | $630,851 | 1 | SIGN AND SIGN STRUCTURE REPLACEMENTS |
0918-45-295 | Dallas/ Dallas |
CS | Actual | $461,191 | 5 | 2 INTERSECTION IMPROVEMENTS |
0918-45-350 | Dallas/ Dallas |
CS | Actual | $116,280 | 5 | 2 OFF - SYSTEM INTERSECTION IMPROVEMENTS |
8050-18-042 | Dallas/ Dallas |
MH | Actual | $22,509,208 | 2 | RECONSTRUCT EXISTING 4 - LANE DIVIDED RURAL ROADWAY TO |
0182-01-012 | Eastland/ Brownwood |
SH 36 | Actual | $1,931,488 | 1 | PFC OVERLAY AND STRIPING |
0004-07-111 | Ector/ Odessa |
IH 20 | Actual | $4,181,852 | 1 | FACILITY UPGRADES TO MEET FREEWAY STANDARDS |
0906-00-094 | Ector/ Odessa |
VA | Actual | $1,914,621 | 11 | LANDSCAPE DEVELOPMENT |
0002-12-019 | El Paso/ El Paso |
US 62 | Actual | $362,335 | 11 | IMPROVE TRAFFIC SIGNAL |
0173-01-043 | Ellis/ Dallas |
SH 34 | Actual | $2,592,355 | 1 | CONSTRUCT CONTINUOUS LEFT - TURN LANE |
0918-22-070 | Ellis/ Dallas |
CS | Actual | $484,812 | 6 | REPLACE BRIDGE & APPROACHES |
0918-22-072 | Ellis/ Dallas |
CR | Actual | $687,770 | 6 | REPLACE BRIDGE & APPROACHES |
0027-07-039 | Fort Bend/ Houston |
US 90A | Actual | $1,227,908 | 1 | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS |
0027-12-086 | Fort Bend/ Houston |
US 59 | Actual | $1,634,885 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0192-04-095 | Galveston/ Houston |
SH 6 | Actual | $496,328 | 1 | REGRADE, RELINE DITCHS, INSTALL INLETS AND RCP |
0912-73-084 | Galveston/ Houston |
CS | Actual | $531,193 | 9 | RESTORATION OF GH & H RAILROAD DEPOT |
0271-07-245 | Harris/ Houston |
IH 10 | Actual | 158,240,148 | ROW | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO |
0271-16-121 | Harris/ Houston |
IH 610 | Actual | $11,511,686 | 1 | RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS WITH FAST TRACK |
0912-00-278 | Harris/ Houston |
VA | Actual | $152,985 | 1 | REHABILITATE SERVICES AND LUMINAIRES |
0912-00-281 | Harris/ Houston |
VA | Actual | $1,265,476 | 1 | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT |
0912-00-288 | Harris/ Houston |
VA | Actual | $728,485 | 1 | RETRACE PAVEMENT MARKINGS & INSTALL RAISED REFLECTIVE |
0912-00-293 | Harris/ Houston |
VA | Actual | $1,866,435 | 1 | BASE REPAIR, PLANING, ONE COURSE SURFACE TREATMENT, ACP OVER |
0912-71-757 | Harris/ Houston |
VA | Actual | $5,263,150 | 5 | INSTALL TRANSMITTERS / ANTENNA AT 13 LOCATIONS IN HARRIS CO |
0912-71-854 | Harris/ Houston |
VA | Actual | $3,250,000 | 1 | AVI, CTMS, FLOW SIGNAL MAINTENANCE AND CTMS INTEGRATION |
3256-02-072 | Harris/ Houston |
BW 8 | Actual | $298,281 | 1 | REHAB FRONTAGE RD SHOULDERS, PLANING, BASE REPAIR, ASPHALT |
1108-01-016 | Hartley/ Amarillo |
FM 767 | Actual | $2,365,807 | 1 | OVERLAY AND ADD SHOULDERS |
1099-05-020 | Henderson/ Tyler |
FM 317 | Actual | $1,686,091 | 1 | RESURFACE ROADWAY |
0400-02-044 | Hopkins/ Paris |
SH 19 | Actual | $21,247 | 1 | INSTALL FLASHING BEACON |
0340-04-027 | Houston/ Lufkin |
FM 229 | Actual | $774,740 | 8 | SAFETY TREAT FIXED OBJECTS |
0028-13-123 | Jefferson/ Beaumont |
IH 10 | Actual | $433,950 | 11 | REPLACE ARMOR JOINTS |
0739-02-133 | Jefferson/ Beaumont |
IH 10 | Actual | $2,119,394 | 11 | OVERLAY EXISTING ROADWAY |
0915-11-015 | Kendall/ San Antonio |
CS | Actual | $992,650 | 6 | REPLACE BRIDGE & APPROACHES |
0905-00-038 | Lubbock/ Lubbock |
VA | Actual | $438,703 | 1 | MISCELLANEOUS CONSTRUCTION |
0905-00-039 | Lubbock/ Lubbock |
VA | Actual | $2,612,858 | 1 | MISCELLANEOUS CONSTRUCTION |
0049-01-085 | McLennan/ Waco |
SH 6 | Actual | $4,932,401 | 1 | REHABILITATE ROADWAY AND ACP OVERLAY |
0909-00-042 | McLennan/ Waco |
VA | Actual | $662,807 | 1 | DISTRICTWIDE GUIDE SIGNS |
0110-04-178 | Montgomery/ Houston |
IH 45 | Actual | $103,170 | 1 | STRUCTURAL REPAIR & REPLACE ELASTOMERIC BEARING PADS |
0675-08-090 | Montgomery/ Houston |
IH 45 | Actual | $9,612,659 | 1 | BASE REPAIR, PLANING, THIN BONDED PERMEABLE FRICTION COURSE |
0074-06-201 | Nueces/ Corpus Christi |
IH 37 | Actual | $8,894,284 | 1 | IMPROVEMENT OF CONNECTOR RAMP FROM NORTHBOUND IH 37 TO |
0617-01-167 | Nueces/ Corpus Christi |
SH 358 | Actual | $498,699 | 11 | CONSTRUCTION OF TRAF. MGMT CENTER |
0063-10-011 | Panola/ Atlanta |
US 59 | Actual | $1,858,786 | 1 | REHABILITATION OF EXISTING ROADWAY |
0045-12-073 | Red River/ Paris |
US 82 | Actual | $428,177 | 1 | MICROSURFACE |
0447-05-058 | Refugio/ Corpus Christi |
FM 774 | Actual | $2,119,935 | 6 | BRIDGE REPLACEMENT |
0371-04-051 | San Patricio/ Corpus Christi |
US 77 | Actual | $1,877,030 | 1 | PREVENTIVE MAINTENANCE |
0916-28-032 | San Patricio/ Corpus Christi |
CR | Actual | $362,356 | 6 | REPLACE BRIDGE AND APPROACHES |
0053-10-039 | Scurry/ Abilene |
US 84 | Actual | $5,359,207 | 1 | MILL EXIST ACP, REHAB BASE, FLEX BASE, HMAC, PAVEMENT MKGS |
0910-00-072 | Smith/ Tyler |
VA | Actual | $260,000 | 1 | REPAIR BRIDGE PILING |
0172-09-026 | Tarrant/ Fort Worth |
US 287 | Actual | $96,350 | 1 | INSTALL TRAFFIC SIGNALS ON FRONTAGE ROADS |
0902-48-492 | Tarrant/ Fort Worth |
VA | Actual | $776,589 | 9 | CONSTRUCT TRAIL FROM EXISTING TRAILHEAD, ALONG PR 1 AND PR2 |
0902-48-547 | Tarrant/ Fort Worth |
VA | Actual | $1,210,543 | 5 | 241 INTERSECTIONS AND 18 CABINETS |
0902-48-561 | Tarrant/ Fort Worth |
VA | Actual | $859,000 | 5 | PHASING |
0902-48-578 | Tarrant/ Fort Worth |
VA | Actual | $97,476 | 5 | SIGNAL CONTROLLER AND CABINETS AT 62 INTERSECTIONS AND |
0006-04-062 | Taylor/ Abilene |
IH 20 | Actual | $8,237,527 | 1 | MILLING, UNDERSEAL, ASPHALT CONCRETE PAVEMENT, PLANT MIX |
0015-13-234 | Travis/ Austin |
IH 35 | Actual | $6,077,560 | 2 | INSTALL CONDUIT & DETECTION AND FREEWAY TRAFFIC MANAGEMENT |
0114-02-078 | Travis/ Austin |
US 290 | Actual | $266,033 | 8 | LENGTHEN LEFT TURN LANE |
1200-05-011 | Travis/ Austin |
FM 973 | Actual | $457,299 | 11 | SAFETY TREAT DRAINAGE STRUCTURES |
0004-04-080 | Ward/ Odessa |
IH 20 | Actual | $156,616 | 11 | LANDSCAPE |
0709-02-044 | Wharton/ Yoakum |
FM 102 | Actual | $1,978,067 | 1 | ADD SHOULDERS |
0043-08-071 | Wichita/ Wichita Falls |
US 287 | Actual | $4,253,123 | 1 | SEAL COAT, ACP OVERLAY AND 1.5 MILES CRCP OVERLAY (NBL) |
0902-20-066 | Wise/ Fort Worth |
CR | Actual | $707,002 | 6 | REPLACE BRIDGE_AND APPROACHES |
|
|