Letting Schedule for October, 2004 (FY 2005)

 
 
Last Update: Monday, August 15, 2005
October, 2004 (FY 2005) (see Links)
SEP 2004 | OCT 2004 | NOV 2004 | DEC 2004 | JAN 2005 | FEB 2005 | MAR 2005 | APR 2005 | MAY 2005 | JUN 2005 | JUL 2005 | AUG 2005
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0421-06-016 Bandera/
San Antonio
SH 173 Actual $984,120 1 REHAB ROADWAY
0088-01-062 Bee/
Corpus Christi
US 59 Actual $4,474,409 1 SEAL COAT ROADWAY (FY 05 N. LOW CONTROL SEAL COAT PROJECT)
0521-04-223 Bexar/
San Antonio
IH 410 Actual 154,717,662 ROW CONSTR CONNECTORS & TMS
1477-01-032 Bexar/
San Antonio
FM 1516 Actual $1,281,096 1 BASE REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
0010-11-067 Bowie/
Atlanta
US 67 Actual $11,047,548 1 SEAL COAT
0912-31-122 Brazoria/
Houston
VA Actual $603,409 9 PEDESTRIAN WALKWAY
0925-12-010 Briscoe/
Childress
VA Actual $93,296 10 LANDSCAPE
0054-06-084 Brown/
Brownwood
US 67 Actual $262,708 10 LANDSCAPE DEVELOPMENT
0914-24-006 Burnet/
Austin
VA Actual $1,666,225 9 PEDESTRIAN IMPROVEMENTS
0921-06-171 Cameron/
Pharr
VA Actual $2,422,523 10 PKG E & F, RAILROAD YARD EXPANSION AT OLMITO
2369-01-014 Cameron/
Pharr
FM 509 Actual $2,871,048 11 WIDEN TO 4 LANE DIVIDED
1012-02-020 Collin/
Dallas
FM 545 Actual $980,228 10 ADD SHOULDERS AND RECONSTRUCT EXISTING ROADWAY ON NEW
0925-13-011 Collingsworth/
Childress
CR Actual $565,261 6 REPLACE EXIST BRIDGE FACILITY
0903-15-079 Cooke/
Wichita Falls
VA Actual $366,066 1 STRIPING AND RAISED PAVEMENT MARKINGS
0184-01-048 Coryell/
Waco
SH 36 Actual $6,486,476 11 WIDEN ROADWAY
0066-01-016 Dallam/
Amarillo
US 287 Actual $13,578,872 1 SEAL COAT
0092-14-068 Dallas/
Dallas
IH 345 Actual $847,625 7 INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM
0094-07-038 Dallas/
Dallas
SH 183 Actual $470,165 10 LANDSCAPE DEVELOPMENT
0581-02-112 Dallas/
Dallas
LP 12 Actual $7,271,133 1 WIDEN EXISTING 6 LANES TO 8 LANES
2374-01-111 Dallas/
Dallas
IH 635 Actual $1,142,119 2 3 INTERSECTION IMPROVEMENTS
2374-02-121 Dallas/
Dallas
IH 635 Actual $2,500 10 WILDFLOWER SEEDING
2374-04-058 Dallas/
Dallas
IH 20 Actual $3,606,395 5 INSTALL SENSOR STATIONS WITH COMPRESSED CCTV CAMERAS,
2964-01-035 Dallas/
Dallas
SH 161 Actual $5,182,590 1 INSTALLATION / CONSTRUCTION OF CTB
0718-01-048 Denton/
Dallas
FM 156 Actual $159,403 1 INSTALL FLASHING BEACONS, ACP OVERLAY FOR LEFT TURN BAY,
0918-46-101 Denton/
Dallas
CR Actual $645,361 6 REPLACE BRIDGE AND APPROACHES
0913-28-047 Fayette/
Yoakum
CS Actual $113,000 9 RESTORE HISTORIC TRAIN DEPOT
1965-02-006 Fort Bend/
Houston
FM 1994 Actual $3,342,029 6 BASE REPAIR, ADD SHOULDER AND OVERLAY
1607-02-016 Galveston/
Houston
FM 1764 Actual $14,617,697 1 WIDENING FROM 2 LANES TO 4 LANES
0912-00-202 Harris/
Houston
VA Actual $350,000 1 FY 2001 AVI SYSTEM MAINTENANCE
0912-00-203 Harris/
Houston
VA Actual $385,000 1 FY 2002 AVI SYSTEM MAINTENANCE
0912-00-204 Harris/
Houston
VA Actual $425,000 1 FY 2003 AVI SYSTEM MAINTENANCE
0912-00-211 Harris/
Houston
VA Actual $467,500 1 FY 2004 AVI SYSTEM MAINTENANCE
0912-00-276 Harris/
Houston
VA Actual $1,538,199 1 INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC)
0912-00-282 Harris/
Houston
VA Actual $525,000 1 AVI UPGRADES
0912-00-284 Harris/
Houston
VA Actual $80,000 1 TRANSTAR MAINTENANCE AND UPGRADES
0912-00-285 Harris/
Houston
VA Actual $1,200,000 1 RELOCATE EXISTING AVI EQUIPMENT
0912-00-286 Harris/
Houston
VA Actual $184,000 1 RELOCATE HAR, SYNCHRONIZATION AND INTEGRATION
0912-71-704 Harris/
Houston
CS Actual $328,815 9 T - 38'S SCENIC / HISTORIC HIGHWAY DISPLAY
0912-71-884 Harris/
Houston
VA Actual $15,000,000 5 CLEAN VEHICLES (FY 2005)
0865-01-083 Hidalgo/
Pharr
SH 495 Actual $5,606,590 ROW WIDEN TO 4 LANE DIVIDED URBAN ROADWAY
0921-02-100 Hidalgo/
Pharr
VA Actual $1,993,642 9 CONSTRUCT (PHASE II) MCALLEN PEDESTRIAN AND BICYCLE TRAIL
0380-02-022 Hockley/
Lubbock
US 62 Actual $228,181 10 LANDSCAPE AND SCENIC ENHANCEMENT
0920-00-067 Jefferson/
Beaumont
VA Actual $867,835 1 SIGN REPLACEMENT
0259-04-034 Johnson/
Fort Worth
US 67 Actual $153,608 11 ADD LEFT TURN LANES ON US 67 TO THE WESTBOUND LANES
0916-36-012 Karnes/
Corpus Christi
CR Actual $657,500 6 REPLACE BRIDGE AND APPROACHES
0915-15-080 Kerr/
San Antonio
CR Actual $1,009,249 6 REPLACE BRIDGE AND APPROACHES
0141-18-004 Kimble/
San Angelo
RM 1674 Actual $714,625 1 STABILIZE ERODED EMBANKMENTS
0044-04-052 Montague/
Wichita Falls
US 82 Actual $8,423,330 1 SEAL COAT
0007-10-052 Palo Pinto/
Wichita Falls
US 180 Actual $2,628,310 1 SEAL COAT FY 05
0904-00-103 Potter/
Amarillo
VA Actual $130,719 1 CRACK POURING
0792-01-025 Real/
San Angelo
RM 337 Actual $4,218,586 1 REHABILITATE EXISTING ROADWAY
0049-06-072 Robertson/
Bryan
SH 6 Actual $482,251 1 OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, AN HMA
0049-08-056 Robertson/
Bryan
US 190 Actual $12,406,492 1 SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT,
0009-04-057 Rockwall/
Dallas
SH 66 Actual $161,538 10 LANDSCAPE DEVELOPMENT
0053-08-060 Scurry/
Abilene
US 84 Actual $56,999 10 LANDSCAPE DEVELOPMENT
0175-04-067 Shelby/
Lufkin
US 59 Actual $2,824,452 1 REPLACE BRIDGES AND APPROACHES
0191-01-061 Smith/
Tyler
US 69 Actual $6,462,809 1 IMPROVE SIGNALIZATION & LIGHTING, INSTALL RAISED MEDIAN
0910-00-062 Smith/
Tyler
VA Actual $295,050 11 FY 2004 ADA UPGRADE PROGRAM
0360-07-019 Stonewall/
Abilene
FM 610 Actual $1,914,413 1 REPLACE BRIDGE AND APPROACHES
0747-04-057 Tarrant/
Fort Worth
FM 157 Actual $59,439 10 INSTALL TRAFFIC SIGNAL
3136-01-138 Travis/
Austin
LP 1 Actual $4,670,000 10 CONST CUSTOMER SERVICE CENTER
5700-00-002 Travis/
Austin
VA Actual $200,000 10 SATELLITE IMAGERY FOR DELINEATION EFFECTIVENESS
0913-27-038 Victoria/
Yoakum
CS Actual $445,204 9 SIDEWALK AND PATHWAY IMPROVEMENT AT
0004-04-078 Ward/
Odessa
IH 20 Actual $989,716 1 PAVEMENT OVERLAY
0204-03-039 Williamson/
Austin
US 79 Actual $5,832,713 ROW UPGRADE TO 4 - LANE DIV RDWY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract