Letting Schedule for Houston District (FY 2005)
Letting Schedule for Houston District (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Houston District (FY 2005) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0111-07-045 | BS 288B | Actual | SEP 2004 | $572,029 | 1 | FOR WORK CONSISTING OF THE MODERNIZATION OF EXISTING |
0111-09-039 | BS 288B | Actual | APR 2005 | $976,314 | 1 | SHOULDER WIDENING FOR CLTL, BASE REPAIR, STRIPING AND |
0179-02-081 | SH 35 | Actual | SEP 2004 | $672,587 | 1 | BASE REPAIR, OVERLAY AND EXTEND STRUCTURE |
0587-01-054 | FM 1495 | Actual | SEP 2004 | $776,711 | 1 | ACP OVERLAY AND PAVEMENT MARKINGS |
0912-31-120 | CR | Actual | JAN 2005 | $5,351,140 | 2 | CONSTRUCT 4 LANE DIVIDED URBAN ROAD ON NEW LOCATION |
0912-31-122 | VA | Actual | OCT 2004 | $603,409 | 9 | PEDESTRIAN WALKWAY |
0912-31-147 | VA | Actual | APR 2005 | $429,888 | 1 | REPLACE CULVERT |
1414-03-035 | FM 1462 | Actual | MAY 2005 | $1,245,812 | 1 | ASPHALT OVERLAY AND STRIPING |
2523-02-059 | FM 2004 | Actual | JUL 2005 | $447,554 | 1 | BASE REPAIR, STRIPING & ASPHALT OVERLAY |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-07-039 | US 90A | Actual | FEB 2005 | $1,227,908 | 1 | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS |
0027-08-103 | US 90A | Actual | JUL 2005 | $24,747,181 | 7 | WIDEN TO 8 MAINLANES WITH 2 - LEVEL INTERCHANGE AT FM 2234 AND |
0027-08-145 | US 90A | Actual | JUL 2005 | $68,927,549 | 6 | WIDEN TO 8 - LANE DIVIDED WITH FM 1092 MAIN LANE DEPRESSED AT |
0027-12-086 | US 59 | Actual | FEB 2005 | $1,634,885 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0027-12-129 | US 59 | Actual | JAN 2005 | $528,209 | 10 | LANDSCAPE DEVELOPMENT |
0027-12-130 | US 59 | Actual | MAY 2005 | $2,595,676 | 10 | REFLECTIVE CRACK RELIEF INTERLAYER, ACP OVERLAY, THIN BONDED |
0089-09-064 | US 59 | Actual | JUN 2005 | $40,642,839 | 1 | CONSTRUCT GRADE SEPARATIONS |
0188-01-030 | SH 36 | Actual | AUG 2005 | $820,077 | 5 | CONSTRUCT 5' SIDEWALK TO PROVIDE A CONNECTION BETWEEN US 90A |
0188-02-040 | SH 36 | Actual | JUN 2005 | $1,742,371 | 1 | ACP LEVEL - UP & OVERLAY WITH VIVDS CAMERA INSTALLATION |
0188-09-041 | FM 723 | Actual | DEC 2004 | $585,191 | 1 | ACP OVERLAY WITH VEHICLE IMAGING VEHICLE DETECTING SYSTEM |
0188-10-011 | FM 1463 | Actual | SEP 2004 | $125,409 | 10 | LANDSCAPE DEVELOPMENT |
0527-06-017 | FM 360 | Actual | SEP 2004 | $964,749 | 1 | MILL, BASE REPAIR AND OVERLAY |
0543-02-053 | FM 359 | Actual | MAR 2005 | $300,000 | 7 | PRELIMINARILY ENGINEERING AND ENVIRONMENTAL ANALYSIS |
0543-03-056 | FM 762 | Actual | MAR 2005 | $290,000 | 7 | PRELIMINARILY ENGINEERING AND ENVIRONMENTAL ANALYSIS |
0912-34-106 | CS | Actual | JUN 2005 | $367,828 | 6 | REPLACE BRIDGE |
0912-34-109 | CS | Actual | MAR 2005 | $340,000 | 7 | PRELIMINARILY ENGINEERING AND ENVIRONMENTAL ANALYSIS |
1415-02-035 | FM 1464 | Actual | NOV 2004 | $1,504,534 | 1 | INTERSECTION IMPROVEMENTS |
1415-02-036 | FM 1464 | Actual | SEP 2004 | $318,233 | 1 | WIDEN SUBGRADE, TRAFFIC SIGNAL, ACP OVERLAY, SIGNING AND |
1415-02-039 | FM 1464 | Actual | MAY 2005 | $788,596 | 11 | BASE REPAIR, ACP OVERLAY AND PAVEMENT MARKINGS |
1418-03-015 | FM 1489 | Actual | JUN 2005 | $588,980 | 1 | SLOPE STABILIZATION |
1965-02-006 | FM 1994 | Actual | OCT 2004 | $3,342,029 | 6 | BASE REPAIR, ADD SHOULDER AND OVERLAY |
3420-01-011 | FM 3345 | Actual | JUN 2005 | $2,111,784 | 1 | TURN LANE MODIFICATIONS |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0192-04-095 | SH 6 | Actual | FEB 2005 | $496,328 | 1 | REGRADE, RELINE DITCHS, INSTALL INLETS AND RCP |
0192-04-097 | SH 6 | Actual | AUG 2005 | $212,825 | 1 | SAFETY LIGHTING |
0367-04-077 | SH 87 | Actual | JUN 2005 | $7,354,353 | 1 | BASE REPAIR, ONE COURSE SURFACE TREATMENT & STRIPING |
0389-06-093 | SH 146 | Actual | MAR 2005 | $5,188,724 | 1 | BASE REPAIR, OVERLAY AND SHOULDER LEVELUP |
0389-07-032 | SH 146 | Actual | MAR 2005 | $1,043,632 | 1 | BASE REPAIR, OVERLAY AND SHOULDER LEVELUP |
0500-01-128 | IH 45 | Actual | SEP 2004 | $497,953 | 11 | REHABILITATION OF EXISTING ROADWAY |
0500-01-130 | IH 45 | Actual | JUN 2005 | $3,357,967 | 1 | SPALL REPAIR, FULL DEPTH CONCRETE REPAIR AND ASPHALT OVERLAY |
0500-01-131 | IH 45 | Actual | MAR 2005 | $1,189,174 | 1 | PAINTING, JOINT REPAIRS AND OVERLAY OF SANTA FE RAILROAD |
0686-01-043 | FM 1765 | Actual | DEC 2004 | $732,160 | 1 | MILLING, DETECTOR LOOPS, SEAL COAT, A.C.P. OVERLAY, AND |
0912-73-084 | CS | Actual | FEB 2005 | $531,193 | 9 | RESTORATION OF GH & H RAILROAD DEPOT |
0976-03-049 | FM 518 | Actual | JUN 2005 | $21,243,826 | 2 | WIDEN TO 4 - LANE DIVIDED CURB & GUTTER |
0978-02-055 | FM 517 | Actual | MAY 2005 | $879,654 | 1 | BASE REPAIR AND ACP OVERLAY |
1002-02-010 | FM 517 | Actual | NOV 2004 | $258,028 | 1 | INSTALL LEFT TURN LANE |
1607-02-016 | FM 1764 | Actual | OCT 2004 | $14,617,697 | 1 | WIDENING FROM 2 LANES TO 4 LANES |
1844-02-018 | FM 2351 | Actual | NOV 2004 | $15,000 | 11 | CONTROLLED FLIGHT TO SUPPORT DRAINAGE STUDY |
1911-01-017 | FM 2004 | Actual | MAY 2005 | $761,638 | 1 | BASE REPAIR AND OVERLAY |
2523-01-020 | FM 2004 | Actual | NOV 2004 | $487,780 | 1 | CTWLTL AND RIGHT TURN LANE |
2523-03-007 | FM 646 | Actual | MAY 2005 | $612,418 | 1 | BASE REPAIR, OVERLAY AND SHOULDER LEVELUP |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-09-096 | US 90A | Actual | JUN 2005 | $7,292,716 | 1 | MILL, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0027-13-188 | US 59 | Actual | SEP 2004 | $1,234,465 | 1 | REPLACE PAVEMENT MARKINGS WITH WARRANTED PAVEMENT MARKINGS |
0028-01-082 | BU 90-U | Actual | APR 2005 | $1,667,904 | 1 | REPLACE BRIDGE |
0028-02-079 | US 90 | Actual | DEC 2004 | $1,665,023 | 1 | BASE REPAIR, PLANING, ACP REHABILITATION, O / L, SIGNING & PAV |
0050-06-068 | US 290 | Actual | JUL 2005 | $33,961,204 | 1 | CONSTRUCT 4 MAINLANES AND 2 - 2 LANE FRONTAGE ROADS |
0050-08-082 | US 290 | Actual | JUN 2005 | $661,484 | 1 | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER & INSTALL RAISED |
0050-09-062 | US 290 | Actual | SEP 2004 | $369,847 | 1 | LONGITUDINAL CRACK REPAIR AND PAVEMENT MARKINGS |
0051-06-015 | SH 3 | Actual | SEP 2004 | $408,229 | 1 | FULL DEPTH REPAIR AND JOINT / CRACK SEAL |
0110-05-108 | IH 45 | Actual | JUN 2005 | $1,287,358 | 1 | UPGRADE GUARD FENCE TO CONCRETE TRAFFIC BARRIER |
0110-05-113 | IH 45 | Actual | AUG 2005 | $1,652,103 | 10 | LANDSCAPE DEVELOPMENT |
0177-06-064 | US 59 | Actual | AUG 2005 | $1,009,945 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0271-07-245 | IH 10 | Actual | FEB 2005 | 158,240,148 | ROW | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO |
0271-07-247 | IH 10 | Actual | JAN 2005 | 204,268,148 | ROW | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO |
0271-07-249 | IH 10 | Actual | MAR 2005 | 152,535,376 | 11 | RECONSTRUCT & WIDEN TO 8 MAINLANES, 4 MANAGED LANES & TWO |
0271-07-254 | IH 10 | Actual | DEC 2004 | $87,378,460 | 2 | WIDENING OF A FREEWAY FACILITY |
0271-07-290 | IH 10 | Actual | JUL 2005 | $506,468 | 10 | LANDSCAPE DEVELOPMENT (HOV CONNECTOR AT TAYLOR MEDIAN) |
0271-14-196 | IH 610 | Actual | APR 2005 | $34,584,672 | 1 | BONDED CONCRETE OVERLAY AND RECONSTRUCTION OF BRIDGE SLABS, |
0271-14-203 | IH 610 | Actual | APR 2005 | $3,270,437 | 1 | MILL EXISTING ASPHALT PAVEMENT AND REPLACE WITH 2" TY D |
0271-16-121 | IH 610 | Actual | FEB 2005 | $11,511,686 | 1 | RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS WITH FAST TRACK |
0271-17-150 | IH 610 | Actual | MAR 2005 | $577,225 | 10 | LANDSCAPE DEVELOPMENT IN BELLAIRE |
0500-03-516 | IH 45 | Actual | DEC 2004 | $2,200,000 | 11 | LANDSCAPE ENHANCEMENTS FOR BUFFALO BAYOU MASTER PLAN |
0500-03-518 | IH 45 | Actual | APR 2005 | $9,156,218 | 1 | ACP MILL AND OVERLAY |
0502-01-183 | SH 225 | Actual | JUL 2005 | $501,320 | 1 | ADD TURNING LANES |
0502-01-192 | SH 225 | Actual | JAN 2005 | $1,312,440 | 1 | REPLACE SACRIFICIAL JOINTS WITH WIDE FLANGE TERMINAL ANCHORS |
0502-01-199 | SH 225 | Actual | JUN 2005 | $2,717,046 | 1 | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS |
0508-01-290 | IH 10 | Actual | SEP 2004 | $302,878 | 6 | REHABILITATE BRIDGE |
0508-01-296 | IH 10 | Actual | SEP 2004 | $5,841,897 | 1 | REHABILITATE AND OVERLAY FRONTAGE ROADS |
0508-07-027 | SP 330 | Actual | AUG 2005 | $2,482,495 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0598-01-079 | SH 288 | Actual | JUL 2005 | $519,806 | 11 | LANDSCAPE DEVELOPMENT (REFORESTATION) |
0598-01-080 | SH 288 | Actual | NOV 2004 | $204,345 | 10 | LANDSCAPE DEVELOPMENT |
0720-03-084 | SH 249 | Actual | JUN 2005 | $51,771,537 | 1 | CONSTRUCT 2 3 - LANE FTG ROADS W GS AND TSM AT FM 2920, 2 DET |
0720-03-115 | SH 249 | Actual | SEP 2004 | $233,048 | 1 | IMPROVE STORM SEWER DRAINAGE SYSTEM |
0912-00-076 | VA | Actual | MAR 2005 | $1,267,665 | 7 | FY 2005 CAPITAL UPGRADE (FUNDING FOR PURCHASE OF SOFTWARE / |
0912-00-202 | VA | Actual | OCT 2004 | $350,000 | 1 | FY 2001 AVI SYSTEM MAINTENANCE |
0912-00-203 | VA | Actual | OCT 2004 | $385,000 | 1 | FY 2002 AVI SYSTEM MAINTENANCE |
0912-00-204 | VA | Actual | OCT 2004 | $425,000 | 1 | FY 2003 AVI SYSTEM MAINTENANCE |
0912-00-211 | VA | Actual | OCT 2004 | $467,500 | 1 | FY 2004 AVI SYSTEM MAINTENANCE |
0912-00-276 | VA | Actual | OCT 2004 | $1,538,199 | 1 | INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC) |
0912-00-277 | VA | Actual | JAN 2005 | $196,453 | 1 | REHABILITATE ELECTRICAL SERVICES |
0912-00-278 | VA | Actual | FEB 2005 | $152,985 | 1 | REHABILITATE SERVICES AND LUMINAIRES |
0912-00-280 | VA | Actual | MAR 2005 | $646,971 | 1 | REPLACE RAISED REFLECTIVE PAVEMENT MARKERS |
0912-00-281 | VA | Actual | FEB 2005 | $1,265,476 | 1 | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT |
0912-00-282 | VA | Actual | OCT 2004 | $525,000 | 1 | AVI UPGRADES |
0912-00-284 | VA | Actual | OCT 2004 | $80,000 | 1 | TRANSTAR MAINTENANCE AND UPGRADES |
0912-00-285 | VA | Actual | OCT 2004 | $1,200,000 | 1 | RELOCATE EXISTING AVI EQUIPMENT |
0912-00-286 | VA | Actual | OCT 2004 | $184,000 | 1 | RELOCATE HAR, SYNCHRONIZATION AND INTEGRATION |
0912-00-287 | VA | Actual | JAN 2005 | $1,398,147 | 1 | INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC) |
0912-00-288 | VA | Actual | FEB 2005 | $728,485 | 1 | RETRACE PAVEMENT MARKINGS & INSTALL RAISED REFLECTIVE |
0912-00-293 | VA | Actual | FEB 2005 | $1,866,435 | 1 | BASE REPAIR, PLANING, ONE COURSE SURFACE TREATMENT, ACP OVER |
0912-00-301 | VA | Actual | MAR 2005 | $2,200,000 | 5 | FY 2005 CONTINUATION OF ALTERNATIVE FUEL PROGRAM |
0912-71-429 | VA | Actual | SEP 2004 | $1,626,058 | 5 | CONSTRUCT HIKE AND BIKE TRAIL |
0912-71-659 | CS | Actual | MAY 2005 | $5,330,942 | 10 | REHABILITATE STREET |
0912-71-696 | CS | Actual | MAY 2005 | $10,649,359 | 5 | CONSTRUCT GRADE SEPARATION |
0912-71-704 | CS | Actual | OCT 2004 | $328,815 | 9 | T - 38'S SCENIC / HISTORIC HIGHWAY DISPLAY |
0912-71-757 | VA | Actual | FEB 2005 | $5,263,150 | 5 | INSTALL TRANSMITTERS / ANTENNA AT 13 LOCATIONS IN HARRIS CO |
0912-71-811 | VA | Actual | JUL 2005 | $732,252 | 9 | MEDICAL CENTER / GREENWAY PLAZA / GALERIA PHASE 2 BIKEWAY |
0912-71-827 | VA | Actual | MAR 2005 | $1,500,000 | 11 | INTELLIGENCE TRANSPORTATION SYSTEM MAINTENANCE |
0912-71-854 | VA | Actual | FEB 2005 | $3,250,000 | 1 | AVI, CTMS, FLOW SIGNAL MAINTENANCE AND CTMS INTEGRATION |
0912-71-858 | VA | Actual | NOV 2004 | $5,929,290 | 1 | PAVEMENT REPAIR, JOINT REPAIR AND SMALL SIGN UPGRADE |
0912-71-859 | VA | Actual | DEC 2004 | $1,687,018 | 1 | REPAIR SLOPE FAILURE |
0912-71-861 | CS | Actual | JUL 2005 | $1,344,604 | 5 | GRADING, CONCRETE PAVEMENT, AND STRUCTURES |
0912-71-867 | VA | Actual | MAR 2005 | $689,307 | 1 | INSTALL SIDEWALK & SLOTTED CURB (SAFE ROUTES TO SCHOOLS) |
0912-71-880 | VA | Actual | SEP 2004 | $293,120 | 1 | CRACK SEALING |
0912-71-884 | VA | Actual | OCT 2004 | $15,000,000 | 5 | CLEAN VEHICLES (FY 2005) |
0912-71-885 | VA | Tentative | AUG 2005 | $4,636,000 | 5 | COMMUTE SOLUTIONS (FY 2005) |
0912-71-889 | VA | Actual | JAN 2005 | $1,652,208 | 1 | REPLACE VIA'S WITH REACT 350 |
0912-71-890 | VA | Actual | MAR 2005 | $1,070,097 | 1 | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT |
0912-71-891 | VA | Actual | MAY 2005 | $842,930 | 1 | REPLACE PAVEMENT MARKINGS & RAISED REFLECTIVE PAVEMENT |
0912-71-897 | VA | Actual | NOV 2004 | $15,000,000 | 5 | CLEAN VEHICLES (FY 2004 & FY 2005) |
0912-72-006 | VA | Actual | JUN 2005 | $1,000,000 | 10 | FREIGHT RAIL TRANSPORTATION CORRIDOR AND URBAN MOBILITY |
0912-72-009 | VA | Actual | JUL 2005 | $2,167,863 | 5 | CITY OF HOUSTON RCTSS / CMAQ PROGRAM PHASE 2 |
0912-72-012 | VA | Tentative | AUG 2005 | $3,071,000 | 5 | COMMUTE SOLUTIONS (FY 2006) |
0912-72-027 | VA | Tentative | AUG 2005 | $22,418,882 | 5 | FY 2005 NEW BUS SERVICE FOR METRO |
0912-72-049 | VA | Actual | JUL 2005 | $1,125,000 | 5 | METRO FY 2005 RCTSS |
1062-04-050 | FM 2100 | Actual | JUL 2005 | $190,638 | 1 | ADD RIGHT TURN LANE |
1258-04-055 | FM 1093 | Actual | JUN 2005 | $427,018 | 10 | LANDSCAPE DEVELOPMENT |
2941-02-043 | FM 2920 | Actual | MAR 2005 | $1,424,096 | 1 | BASE REPAIR, PLANING, LEVEL - UP, ONE COURSE SURFACE TREATMENT |
3256-02-071 | BW 8 | Actual | MAY 2005 | $837,010 | 1 | RETROFIT BRIDGE RAIL, REPLACE ALL ARMOR JOINTS, REPLACE MBGF |
3256-02-072 | BW 8 | Actual | FEB 2005 | $298,281 | 1 | REHAB FRONTAGE RD SHOULDERS, PLANING, BASE REPAIR, ASPHALT |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0110-03-035 | SH 75 | Actual | MAR 2005 | $3,393,439 | 1 | WIDEN TO 4 - LANE DIVIDED WITH CURB AND GUTTER |
0110-04-177 | IH 45 | Actual | NOV 2004 | $117,500 | 11 | DOWNSTREAM EROSION PROTECTION (RIPRAP) |
0110-04-178 | IH 45 | Actual | FEB 2005 | $103,170 | 1 | STRUCTURAL REPAIR & REPLACE ELASTOMERIC BEARING PADS |
0110-04-179 | IH 45 | Actual | AUG 2005 | $1,498,328 | 10 | LANDSCAPE DEVELOPMENT |
0177-05-055 | US 59 | Actual | SEP 2004 | $58,583,584 | 1 | WIDEN TO 8 MAIN LANES |
0675-08-090 | IH 45 | Actual | FEB 2005 | $9,612,659 | 1 | BASE REPAIR, PLANING, THIN BONDED PERMEABLE FRICTION COURSE |
0912-37-169 | VA | Actual | SEP 2004 | $6,393,000 | 5 | CONSTRUCTION OF PARK AND RIDE FACILITY |
0912-37-170 | VA | Actual | SEP 2004 | $5,625,000 | 5 | PEDESTRIAN TRANSITWAY (PHASE 1) |
1986-01-015 | FM 1314 | Actual | JAN 2005 | $10,623,654 | 1 | WIDEN FROM 2 LANES TO 4 - LANE DIVIDED |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0050-04-025 | SH 6 | Actual | MAR 2005 | $3,142,056 | 1 | BASE REPAIR, PLANING, ONE COURSE SURFACE TREATMENT, |
0050-05-065 | BU 290H | Actual | APR 2005 | $1,171,971 | 1 | BASE REPAIR, PLANING, SEAL COAT, ACP OVERLAY AND PAVEMENT |
0050-05-066 | BU 290H | Actual | JUN 2005 | $459,531 | 1 | BASE REPAIR, SEAL COAT, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0114-11-065 | US 290 | Actual | JUN 2005 | $4,811,646 | 1 | BRIDGE REPLACEMENT AND APPROACHES |
0523-02-031 | FM 362 | Actual | MAY 2005 | $2,893,627 | 1 | ACP OVERLAY, BASE REPAIR AND WIDEN SHOULDERS |
0523-02-034 | FM 362 | Actual | JUL 2005 | $569,206 | 1 | PLANING, SEAL COAT, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0523-02-036 | FM 362 | Actual | JUN 2005 | $1,174,211 | 1 | BASE REPAIR, PLANING, PERMEABLE FRICTION COURSE, ONE COURSE |
1006-02-005 | FM 529 | Actual | SEP 2004 | $1,458,915 | 1 | WIDEN SUBGRADE, OCST, ACP OVERLAY, BASE REPAIR, PLANE, SET, AND |
1745-01-013 | FM 1887 | Actual | JUN 2005 | $944,557 | 6 | REPLACE BRIDGE |
1745-01-018 | FM 1887 | Actual | SEP 2004 | $2,036,867 | 1 | BASE REPAIR, PLANING, SEAL COAT, ACP OVERLAY AND PAVEMENT |
|
|