Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | FORT BEND |
Highway | FM 1464 |
From | WEST AIRPORT BLVD. |
To | SH 99 |
CSJ | 1415-02-051 |
Proj ID | C 1415-2-51 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 3.220 | 1186118.88 | | 1264780.46 | 99.9 |
Work Order | 10-13-22 |
Work Began | 05-05-23 |
Work Completed | |
Time Computed | 01-11-23 |
Contract Working Days | 260 |
Addl Days Granted | 0 |
Working Days Charged | 202 |
Percent Time Used | 77 |
Contractor(s) |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1415-02-051 RICK & VIVIAN COMPANY LLC (17.89) KHONSU ENTERPRISE LLC (1.26)
|
Contract # | 09223014 |
| Totals | 1186118.88 | 47240.20 | 1264780.46 | 99.9 |
|
County | MONTGOMERY |
Highway | FM 1486 |
From | FM 1774 |
To | SH 105 |
CSJ | 1416-03-018 |
Proj ID | C 1416-3-18 |
Work Type | OVERLAY |
|
| 10.591 | 4541531.81 | | 5226628.43 | 99.9 |
Work Order | 06-28-23 |
Work Began | 08-28-23 |
Work Completed | |
Time Computed | 08-27-23 |
Contract Working Days | 107 |
Addl Days Granted | 0 |
Working Days Charged | 142 |
Percent Time Used | 132 |
Contractor(s) |
JAMES CONSTRUCTION GROUP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1416-03-018 BATTERSON, LLP (7.66) LONESTAR TRAFFIC SAFETY, LLC (0.23) THIRD COAST SERVICES LLC (1.56) WILLIAMS ROAD, LLC (2.15) WILLOW CITY SIGN & RAIL, INC. (1.69) VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC (0.88)
|
Contract # | 02233016 |
| Totals | 4541531.81 | 21986.50 | 5226628.43 | 99.9 |
|
County | MONTGOMERY |
Highway | FM 1484 |
From | AT MCRAE CREEK |
To | . |
CSJ | 1417-01-035 |
Proj ID | BR 2023(732) |
Work Type | BRIDGE REPLACEMENT |
|
| 0.076 | 2474861.63 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-31-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 146 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
C. E. BARKER, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1417-01-035 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243022 |
| Totals | 2474861.63 | 0.00 | 0.00 | 0.0 |
|
County | BRAZORIA |
Highway | SH 332 |
From | AT BRAZOS RIVER AND FM 521 |
To | . |
CSJ | 1524-01-076 |
Proj ID | BR 2022(664) |
Work Type | TRANSPORTATION NON-ROADWAY |
|
| 0.209 | 4549092.53 | | 3636969.18 | 80.0 |
Work Order | 07-18-22 |
Work Began | 02-13-23 |
Work Completed | |
Time Computed | 09-16-22 |
Contract Working Days | 270 |
Addl Days Granted | 0 |
Working Days Charged | 275 |
Percent Time Used | 101 |
Contractor(s) |
MP HEAVY CONSTRUCTION INC |
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-076 TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.13) MILSTEAD HIGHWAY SERVICES, LLC (0.18) J. R. (JOE) RAMON & SONS, INC. (20.70) BARRICADES UNLIMITED (0.08) 1 PRIORITY ENVIRONMENTAL SERVICES, LLC (0.20) SOUTHERN CONCRETE SAWING & CORING, LLC (0.34) STERETT CRANE AND RIGGING, LLC (6.61) REPUBLIC TRAFFIC SAFETY, INC. (0.10)
|
Contract # | 06223016 |
| Totals | 4549092.53 | 219132.49 | 3636969.18 | 80.0 |
|
County | BRAZORIA |
Highway | SH 288 |
From | AT SH 332 AND AT BS 288B |
To | . |
CSJ | 1524-01-082 |
Proj ID | NH 2018(419) |
Work Type | REMOV & REPL CONC PV |
|
| 1.640 | 13895724.75 | | 23871790.39 | 99.9 |
Work Order | 02-14-18 |
Work Began | 07-30-18 |
Work Completed | |
Time Computed | 04-15-18 |
Contract Working Days | 371 |
Addl Days Granted | 549 |
Working Days Charged | 832 |
Percent Time Used | 90 |
Contractor(s) |
ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-082 MESA ROD BUSTERS, INC. (1.63) NORWEST SERVICES, LLC (0.61) DURWOOD GREENE CONSTRUCTION CO. (4.34) ANTIGO CONSTRUCTION, INC. (0.71) A-1 EROSION CONTROL, LLC (0.91) RAY"S THREADING AND FAB SHOP (0.62) VERNOR MATERIAL & EQUIPMENT CO., INC. (6.06) ROMAR UNLIMITED, INC. (1.74) ROADSAFE TRAFFIC SYSTEMS, INC. (0.77) HAYDEN PAVING, INC. (2.03) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.38) TEX STAR CURBS, INC (0.06) SORRELL CONSTRUCTION, EQUIPMENT & MATERIALS, LLC (0.40) GMJ PAVING CO. (2.60) EPOXY DESIGN SYSTEMS, INC. (0.18) TOTAL HIGHWAY MAINTENANCE, LLC (0.77) BATTERSON, LLP (1.86) JASSO"S SAWING & SEALING (0.17)
|
Contract # | 01183204 |
| Totals | 13895724.75 | 1546691.00 | 23871790.39 | 99.9 |
|
County | GALVESTON |
Highway | FM 1764 |
From | W OF SH 3 |
To | 14TH STREET |
CSJ | 1607-01-055 |
Proj ID | C 1607-1-55 |
Work Type | OVERLAY |
|
| 4.400 | 15301980.32 | | 0.00 | 0.0 |
County | GALVESTON |
Highway | FM 1764 |
From | SH 146 |
To | 14TH STREET |
CSJ | 1607-01-057 |
Proj ID | F 2B24(352) |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 2211725.17 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-23-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-22-24 |
Contract Working Days | 339 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
JAMES CONSTRUCTION GROUP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1607-01-055 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243207 |
| Totals | 17513705.49 | 0.00 | 0.00 | 0.0 |
|
County | HARRIS |
Highway | FM 1960 |
From | SH 249 |
To | CUTTEN RD |
CSJ | 1685-01-090 |
Proj ID | CM 2021(643) |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| 0.874 | 26418938.98 | | 9002815.12 | 34.0 |
County | HARRIS |
Highway | FM 1960 |
From | SH 249 |
To | CUTTEN RD |
CSJ | 1685-01-105 |
Proj ID | ROW 1685-1-105 |
Work Type | RIGHT OF WAY |
|
| 0.874 | 879802.10 | | 593091.20 | 67.4 |
Work Order | 09-08-23 |
Work Began | 12-13-23 |
Work Completed | |
Time Computed | 12-07-23 |
Contract Working Days | 433 |
Addl Days Granted | 0 |
Working Days Charged | 197 |
Percent Time Used | 45 |
Contractor(s) |
SER CONSTRUCTION PARTNERS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1685-01-090 MONTALVO BRIDGE SYSTEMS, LLC (0.43) C & C TRAFFIC CONTROL (0.02) A. SANCHEZ TRUCKING (1.83) D. SOLIS TRUCKING, INC. (0.54) RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC (7.97) SEMARCK LANDSCAPE SERVICES, INC. (0.85) G & D DIRECCIONAL (0.10) P&Z LOGISTICS INC. (0.06) RANGELINE TAPPING SERVICES, INC. (0.03) STRIPE LINES, INC. (2.06) PAVE/LOCK/PLUS II, LLC (0.26) CURB PLANET INC. (0.04) PRV SERVICES, INC. (0.03)
|
Contract # | 08233207 |
| Totals | 27298741.08 | 2415983.95 | 9595906.32 | 35.1 |
|
County | HARRIS |
Highway | FM 1960 |
From | AT ELDRIDGE PARKWAY |
To | . |
CSJ | 1685-01-092 |
Proj ID | CM 2020(884) |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| 0.610 | 14685047.58 | | 12908243.93 | 88.0 |
Work Order | 05-03-22 |
Work Began | 08-01-22 |
Work Completed | |
Time Computed | 08-01-22 |
Contract Working Days | 337 |
Addl Days Granted | 160 |
Working Days Charged | 516 |
Percent Time Used | 103 |
Contractor(s) |
BRIZO CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1685-01-092 ALLSTATE SIGNAL & CONSTRUCTION, LLC (3.16) TRAFFIC SIGNS & LINES, LLC (1.29) DORAN STEEL, INC. (0.57) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.68) MARTIN MARIETTA MATERIALS, INC. (1.66) DNA TRUCKING (0.60) CURB PLANET INC. (0.07) GALVESTON PILING, LLC (0.30) GMJ PAVING COMPANY LLC (6.30) JB PINNACLE GROUP, LLC (4.54) TSTAR DRILLING & SAWING INC (0.15) YELLOWSTONE LANDSCAPE - CENTRAL, INC. (0.42) SK CONCRETE SERVICES LLC (0.00)
|
Contract # | 03223004 |
| Totals | 14685047.58 | 604098.36 | 12908243.93 | 88.0 |
|
County | HARRIS |
Highway | FM 1960 |
From | MILLS RD |
To | SH 249 |
CSJ | 1685-01-107 |
Proj ID | STP 2023(752)TP |
Work Type | BICYCLE INFRASTRUCTURE IMPROVEMENTS |
|
| 0.490 | 1450429.42 | | 1346675.80 | 92.8 |
Work Order | 06-19-23 |
Work Began | 07-19-23 |
Work Completed | |
Time Computed | 08-03-23 |
Contract Working Days | 187 |
Addl Days Granted | 0 |
Working Days Charged | 184 |
Percent Time Used | 98 |
Contractor(s) |
TEXAS WALL & LANDSCAPE |
SUBCONTRACTOR(S) FOR CCSJ: 1685-01-107 HOUSTON SAWING & DRILLING (0.77) R. ORTIZ TRUCKING (0.87) CONARMET LLC (4.16) K4 ENVIRONMENTAL LLC (0.15) HIGHWAY 1 LLC (2.24)
|
Contract # | 05233041 |
| Totals | 1450429.42 | 0.00 | 1346675.80 | 92.8 |
|
County | HARRIS |
Highway | FM 1960 |
From | AT WUNDERLICH ROAD |
To | . |
CSJ | 1685-01-113 |
Proj ID | STP 2020(416)HES |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 0.724 | 729130.11 | | 465598.81 | 63.8 |
Work Order | 01-06-20 |
Work Began | 08-17-20 |
Work Completed | |
Time Computed | 05-05-20 |
Contract Working Days | 125 |
Addl Days Granted | 0 |
Working Days Charged | 104 |
Percent Time Used | 83 |
Contractor(s) |
STATEWIDE TRAFFIC SIGNAL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 1685-01-113 BADGER DAYLIGHTING CORP. (0.46)
|
Contract # | 12193224 |
| Totals | 729130.11 | 15133.01 | 465598.81 | 63.8 |
|
County | HARRIS |
Highway | FM 1960 |
From | EAST OF CUTTEN RD |
To | IH 45 |
CSJ | 1685-01-120 |
Proj ID | STP 2025(044)TP |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| 7.080 | 10487209.90 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 11-07-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 324 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
MBN ENTERPRISES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1685-01-120 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243003 |
| Totals | 10487209.90 | 0.00 | 0.00 | 0.0 |
|
County | HARRIS |
Highway | FM 1960 |
From | AT CYPRESSWOOD DR |
To | . |
CSJ | 1685-02-054 |
Proj ID | STP 2B24(353)VRU |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 0.400 | 848433.64 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-06-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 01-04-25 |
Contract Working Days | 158 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
STATEWIDE TRAFFIC SIGNAL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 1685-02-054 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08243035 |
| Totals | 848433.64 | 0.00 | 0.00 | 0.0 |
|
County | HARRIS |
Highway | FM 1960 |
From | AT ALDINE WESTFIELD ROAD |
To | . |
CSJ | 1685-02-055 |
Proj ID | STP 2023(594)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 0.010 | 377740.83 | | 402832.60 | 99.9 |
County | HARRIS |
Highway | FM 1960 |
From | 0.369 MI E OF IH 45 |
To | 0.179 MI W OF LEE RD |
CSJ | 1685-02-056 |
Proj ID | STP 2023(594)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 6.940 | 3726088.22 | | 3946407.61 | 99.9 |
County | HARRIS |
Highway | FM 1960 |
From | AT KENSWICK DRIVE |
To | . |
CSJ | 1685-03-109 |
Proj ID | STP 2023(594)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 0.010 | 286666.06 | | 238280.50 | 83.1 |
County | HARRIS |
Highway | FM 1960 |
From | 0.179 MILES WEST OF LEE ROAD |
To | WHITAKER DRIVE |
CSJ | 1685-03-110 |
Proj ID | STP 2023(594)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 2.142 | 737157.31 | | 609331.53 | 82.6 |
Work Order | 06-28-23 |
Work Began | 11-27-23 |
Work Completed | |
Time Computed | 10-26-23 |
Contract Working Days | 145 |
Addl Days Granted | 23 |
Working Days Charged | 202 |
Percent Time Used | 120 |
Contractor(s) |
BRIZO CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1685-02-055 GALVESTON PILING, LLC (26.63) TRAFFIC SYSTEMS CONSTRUCTION, INC. (11.08) TRAFFIC SIGNS & LINES, LLC (7.00) CURB PLANET INC. (6.28) PAVE/LOCK/PLUS II, LLC (2.67)
|
Contract # | 05233214 |
| Totals | 5127652.42 | 74008.48 | 5196852.24 | 99.9 |
|
County | HARRIS |
Highway | FM 1960 |
From | BF 1960A |
To | E. OF TWIGSWORTH LN |
CSJ | 1685-03-058 |
Proj ID | C 1685-3-58 |
Work Type | WIDEN NON-FREEWAY |
|
| 3.976 | 56096943.44 | | 54472733.19 | 96.5 |
County | HARRIS |
Highway | FM 1960 |
From | BF 1960A |
To | E. OF TWIGSWORTH LN |
CSJ | 1685-03-097 |
Proj ID | ROW 1685-3-97 |
Work Type | RIGHT OF WAY |
|
| 3.976 | 2102357.10 | | 2257414.03 | 99.9 |
Work Order | 08-20-20 |
Work Began | 06-21-21 |
Work Completed | |
Time Computed | 11-18-20 |
Contract Working Days | 1,126 |
Addl Days Granted | 0 |
Working Days Charged | 625 |
Percent Time Used | 55 |
Contractor(s) |
TEXAS MATERIALS GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1685-03-058 CPAVE, INC. (0.20) HIGHWAY 1 LLC (0.79) JMHP, INC. (0.10) CEN TEX HYDROSEED, INC. (1.52) THIRD COAST SERVICES LLC (3.81) THOMAS TRACTOR WORKS, INC. (0.44) NEW MASADA ENVIRONMENTAL, LLC (0.12) R & A ROAD BORING LLC (0.07) MESA ROD BUSTERS, INC. (1.04) M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.27) MESA ROD BUSTERS, INC. (0.01) TNT CRANE & RIGGING, INC. (0.01) TEXAS REEXCAVATION (0.03) AGGREGATE TECHNOLOGIES, INC. (0.02) ONCALL STAFFING INCORPORATED (1.02) LEOS STEEL (1.90) DUSTROL, INC. (0.34)
|
Contract # | 07203003 |
| Totals | 58199300.54 | 1411429.71 | 56730147.22 | 96.9 |
|
County | HARRIS |
Highway | FM 1960 |
From | E OF TWIGSWORTH LN |
To | W OF SAN JACINTO RIVER BRIDGE |
CSJ | 1685-03-098 |
Proj ID | C 1685-3-98 |
Work Type | WIDEN NON-FREEWAY |
|
| 2.841 | 67186566.63 | | 74152469.44 | 99.9 |
County | HARRIS |
Highway | FM 1960 |
From | E OF TWIGSWORTH LN |
To | W OF SAN JACINTO RIVER BRIDGE |
CSJ | 1685-03-101 |
Proj ID | ROW 1685-3-101 |
Work Type | RIGHT OF WAY |
|
| 2.841 | 2856159.74 | | 3465893.52 | 99.9 |
Work Order | 10-21-20 |
Work Began | 01-18-21 |
Work Completed | |
Time Computed | 01-19-21 |
Contract Working Days | 1,050 |
Addl Days Granted | 0 |
Working Days Charged | 920 |
Percent Time Used | 87 |
Contractor(s) |
WEBBER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1685-03-098 TRAF-TEX, INC. (4.71) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.67) BUYERS BARRICADES, INC. (0.17) WEBER-BALKE FOUNDATION COMPANY, INC (5.12) C&M PRECAST CONCRETE COMPANY (1.38) ROSALES LAND CLEARING (0.15) CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. (4.56) SCOTT DERR PAINTING CO, LLC (0.15) MESA ROD BUSTERS, INC. (1.24) JOSLIN CONSTRUCTION TEXAS, LLC (6.77) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.14) WILLOW CITY SIGN & RAIL, INC. (0.20) PROFESSIONAL TRAFFIC CONTROL LLC (0.86) AVILES CONSTRUCTION SERVICE, INC (2.22) E & R WELDING (0.43) HYDROMAX, LLC (0.03) BUYERS BARRICADES HOUSTON, LLC (0.17) ALPHA TESTING, INC. (0.32) MICKIE SERVICE, INC. (0.02) SOUTHERN CRUSHED CONCRETE, LLC (1.26) MARTIN MARIETTA MATERIALS, INC. (1.26) GMJ PAVING COMPANY LLC (0.36) GMJ PAVING CO. (0.36) SWEEPING CORPORATION OF AMERICA, INC. (0.01) DORAN STEEL, INC. (4.95) SK CONCRETE SERVICES LLC (0.12) LONG LEGACY ENTERPRISES, LLC (0.24) DTSG CONSTRUCTION (0.09) CHERRY MOVING COMPANY, INC. (0.08)
|
Contract # | 09203201 |
| Totals | 70042726.37 | 253053.01 | 77618362.96 | 99.9 |
|
County | HARRIS ETC |
Highway | SH 6 ETC |
From | AT YORKTOWN CROSSING PKWY |
To | . |
CSJ | 1685-05-126 |
Proj ID | STP 2021(261)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 1.471 | 882567.27 | | 917987.03 | 99.9 |
Work Order | 03-01-21 |
Work Began | 10-18-21 |
Work Completed | |
Time Computed | 06-29-21 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 167 |
Percent Time Used | 92 |
Contractor(s) |
CITYLYNX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1685-05-126 ALLY GENERAL SOLUTIONS, LLC (8.29) MLH CONCRETE (2.03) H&N CONTRACTORS (3.96) SEMPER STRIPING LLC (1.54)
|
Contract # | 01213219 |
| Totals | 882567.27 | 0.00 | 917987.03 | 99.9 |
|
County | HARRIS |
Highway | SH 6 |
From | WESTPARK ROAD |
To | HARRIS COUNTY LINE |
CSJ | 1685-05-127 |
Proj ID | STP 2021(330)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 1.723 | 1010336.87 | | 3326.40 | 0.3 |
County | FORT BEND |
Highway | SH 6 |
From | HARRIS COUNTY LINE |
To | VOSS ROAD |
CSJ | 1685-06-036 |
Proj ID | STP 2021(330)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 3.606 | 969485.25 | | 2859832.43 | 99.9 |
Work Order | 03-12-21 |
Work Began | 12-01-21 |
Work Completed | |
Time Computed | 07-19-21 |
Contract Working Days | 273 |
Addl Days Granted | 0 |
Working Days Charged | 184 |
Percent Time Used | 67 |
Contractor(s) |
ALLSTATE SIGNAL & CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1685-05-127 LONESTAR TRAFFIC SAFETY, LLC (0.84) WILLOW CITY SIGN & RAIL, INC. (29.30)
|
Contract # | 02213216 |
| Totals | 1979822.12 | 0.00 | 2863158.83 | 99.9 |
|
County | HARRIS |
Highway | SH 6 |
From | IH 10 WEST |
To | N OF WESTPARK TOLLWAY |
CSJ | 1685-05-132 |
Proj ID | F 2023(057) |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 4.365 | 289671.24 | | 238476.81 | 82.3 |
Work Order | 01-06-23 |
Work Began | 06-15-24 |
Work Completed | |
Time Computed | 02-05-23 |
Contract Working Days | 44 |
Addl Days Granted | 0 |
Working Days Charged | 31 |
Percent Time Used | 70 |
Contractor(s) |
BATTERSON, LLP |
SUBCONTRACTOR(S) FOR CCSJ: 1685-05-132 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12223228 |
| Totals | 289671.24 | 0.00 | 238476.81 | 82.3 |
|
County | HARRIS |
Highway | SH 6 |
From | AT LANGHAM CREEK |
To | . |
CSJ | 1685-05-137 |
Proj ID | C 1685-5-137 |
Work Type | TRANSPORTATION NON-ROADWAY |
|
| 0.034 | 223865.00 | | 197044.75 | 88.0 |
Work Order | 06-06-24 |
Work Began | 08-26-24 |
Work Completed | |
Time Computed | 07-06-24 |
Contract Working Days | 25 |
Addl Days Granted | 0 |
Working Days Charged | 24 |
Percent Time Used | 96 |
Contractor(s) |
GARRET SHIELDS INFRASTRUCTURE |
SUBCONTRACTOR(S) FOR CCSJ: 1685-05-137 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05243246 |
| Totals | 223865.00 | 7499.00 | 197044.75 | 88.0 |
|
County | FORT BEND |
Highway | SH 6 |
From | VOSS ROAD |
To | US 90A |
CSJ | 1685-06-045 |
Proj ID | C 1685-6-45 |
Work Type | LANDSCAPE & SCENIC ENHANCEMENT |
|
| 9.373 | 1459342.88 | | 1157479.82 | 79.3 |
Work Order | 07-26-23 |
Work Began | 01-09-24 |
Work Completed | |
Time Computed | 08-25-23 |
Contract Working Days | 105 |
Addl Days Granted | 0 |
Working Days Charged | 106 |
Percent Time Used | 100 |
Contractor(s) |
YELLOWSTONE LANDSCAPE - CENTRAL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1685-06-045 R & A DIRECTIONAL BORING (1.74) ALL ACCESS TRAFFIX LIMITED LIABILITY COMPANY (6.78)
|
Contract # | 06233444 |
| Totals | 1459342.88 | 16639.53 | 1157479.82 | 79.3 |
|