Detail Letting Schedule for Lubbock County (FY 2001)
![]() |
![]() |
![]() |
![]() |
![]() |
Detail Letting Schedule for Lubbock County (FY 2001) | ||||
Last Update: Friday, August 31, 2001 | ||||
Updated from Design & Construction Information System (DCIS) on: August 31, 2001 |
Lubbock County (FY 2001) |
CCSJ: 0052-11-003 | |||
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | LP 388 | Let Status: | Actual |
Project ID: | CPM 52-11-3 | CSJ: | 0052-11-003 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 84 EAST | Fund Cat: | 7 |
Limits To: | US 84 WEST | Estimate: | $579,809 |
Length: | 2.3 Miles | Actual: | $286,686 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | CPM 53-1-97 | CSJ: | 0053-01-097 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WEST OF SLATON CITY LIMITS | Fund Cat: | 7 |
Limits To: | EAST OF FM 400 | Estimate: | $169,894 |
Length: | 4.0 Miles | Actual: | $163,886 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | LP 369 | Let Status: | Actual |
Project ID: | CPM 67-13-2 | CSJ: | 0067-13-002 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | IH 27 W FRONTAGE ROAD NORTH OF ABERNATHY | Fund Cat: | 7 |
Limits To: | LUBBOCK COUNTY LINE | Estimate: | $32,976 |
Length: | 0.8 Miles | Actual: | $32,548 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | LP 369 | Let Status: | Actual |
Project ID: | CPM 67-14-2 | CSJ: | 0067-14-002 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HALE COUTNY LINE | Fund Cat: | 7 |
Limits To: | IH 27 W FRONTAGE ROAD SOUTH OF ABERNATHY | Estimate: | $14,554 |
Length: | 0.6 Miles | Actual: | $14,239 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | CPM 130-2-19 | CSJ: | 0130-02-019 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | EAST CITY LIMITS OF MORTON | Fund Cat: | 7 |
Limits To: | WEST CITY LIMITS OF MORTON | Estimate: | $51,876 |
Length: | 1.3 Miles | Actual: | $48,459 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | CPM 130-3-18 | CSJ: | 0130-03-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | COCHRAN COUNTY LINE | Fund Cat: | 7 |
Limits To: | FM 1490 | Estimate: | $264,883 |
Length: | 11.7 Miles | Actual: | $251,433 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | BS 114B | Let Status: | Actual |
Project ID: | CPM 130-7-27 | CSJ: | 0130-07-027 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 114 | Fund Cat: | 7 |
Limits To: | US 385 | Estimate: | $61,244 |
Length: | 1.5 Miles | Actual: | $61,651 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 300 | Let Status: | Actual |
Project ID: | CPM 227-6-18 | CSJ: | 0227-06-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 385 | Fund Cat: | 7 |
Limits To: | BUS 114 | Estimate: | $51,589 |
Length: | 0.9 Miles | Actual: | $51,085 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 227-7-33 | CSJ: | 0227-07-033 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MEDOW | Fund Cat: | 7 |
Limits To: | BROWNFIELD | Estimate: | $557,600 |
Length: | 10.8 Miles | Actual: | $537,258 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | CPM 297-3-21 | CSJ: | 0297-03-021 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 137 | Fund Cat: | 7 |
Limits To: | YOAKUM COUNTY LINE | Estimate: | $406,774 |
Length: | 17.5 Miles | Actual: | $386,206 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 380-1-76 | CSJ: | 0380-01-076 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 19TH STREET | Fund Cat: | 7 |
Limits To: | NORTH UNIVERSITY AVE. | Estimate: | $87,410 |
Length: | 2.0 Miles | Actual: | $84,704 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 380-3-19 | CSJ: | 0380-03-019 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HOCKLEY COUNTY LINE | Fund Cat: | 7 |
Limits To: | MEDOW | Estimate: | $186,338 |
Length: | 3.6 Miles | Actual: | $179,610 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 453-2-14 | CSJ: | 0453-02-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 7 |
Limits To: | FLOYD COUNTY LINE | Estimate: | $250,484 |
Length: | 10.9 Miles | Actual: | $238,744 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | SH 214 | Let Status: | Actual |
Project ID: | CPM 461-2-17 | CSJ: | 0461-02-017 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | COCHRAN COUNTY LINE | Fund Cat: | 7 |
Limits To: | FM 298 IN NEEDMORE | Estimate: | $330,388 |
Length: | 14.6 Miles | Actual: | $314,158 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | SH 214 | Let Status: | Actual |
Project ID: | CPM 461-3-11 | CSJ: | 0461-03-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BAILEY COUNTY LINE | Fund Cat: | 7 |
Limits To: | SH 114 | Estimate: | $184,412 |
Length: | 6.8 Miles | Actual: | $174,253 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | SH 214 | Let Status: | Actual |
Project ID: | CPM 461-6-20 | CSJ: | 0461-06-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BS 214-A | Fund Cat: | 7 |
Limits To: | FM 145 | Estimate: | $426,253 |
Length: | 17.4 Miles | Actual: | $404,790 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 651 | Let Status: | Actual |
Project ID: | CPM 806-3-14 | CSJ: | 0806-03-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 7 |
Limits To: | FM 40 | Estimate: | $114,846 |
Length: | 6.9 Miles | Actual: | $109,740 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 168 | Let Status: | Actual |
Project ID: | CPM 874-3-11 | CSJ: | 0874-03-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SOUTH CITY LIMITS OF OLTON | Fund Cat: | 7 |
Limits To: | HART CAMP | Estimate: | $205,811 |
Length: | 10.3 Miles | Actual: | $196,013 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 168 | Let Status: | Actual |
Project ID: | CPM 874-6-6 | CSJ: | 0874-06-006 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LAMB COUNTY LINE | Fund Cat: | 7 |
Limits To: | US 84 | Estimate: | $32,843 |
Length: | 1.7 Miles | Actual: | $32,256 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 302 | Let Status: | Actual |
Project ID: | CPM 886-1-9 | CSJ: | 0886-01-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | COUNTY ROAD 30 | Fund Cat: | 7 |
Limits To: | US 70 | Estimate: | $74,793 |
Length: | 5.0 Miles | Actual: | $72,088 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 400 | Let Status: | Actual |
Project ID: | CPM 1041-2-32 | CSJ: | 1041-02-032 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 62 | Fund Cat: | 7 |
Limits To: | 5.7 MILES NORTH OF US 62 | Estimate: | $134,510 |
Length: | 5.7 Miles | Actual: | $127,828 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 168 | Let Status: | Actual |
Project ID: | CPM 1630-2-7 | CSJ: | 1630-02-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 114 | Fund Cat: | 7 |
Limits To: | FM 41 | Estimate: | $140,767 |
Length: | 12.2 Miles | Actual: | $134,330 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 168 | Let Status: | Actual |
Project ID: | CPM 1630-3-4 | CSJ: | 1630-03-004 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 41 | Fund Cat: | 7 |
Limits To: | TERRY COUNTY LINE | Estimate: | $19,327 |
Length: | 1.3 Miles | Actual: | $18,486 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 168 | Let Status: | Actual |
Project ID: | CPM 1866-4-4 | CSJ: | 1866-04-004 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1294 | Fund Cat: | 7 |
Limits To: | SH 114 | Estimate: | $86,237 |
Length: | 6.3 Miles | Actual: | $83,463 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 1264 | Let Status: | Actual |
Project ID: | CPM 1867-1-19 | CSJ: | 1867-01-019 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 289 NORTH | Fund Cat: | 7 |
Limits To: | NORTH CITY LIMITS OF LUBBOCK | Estimate: | $64,408 |
Length: | 1.4 Miles | Actual: | $60,842 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2053 | Let Status: | Actual |
Project ID: | CPM 1966-2-9 | CSJ: | 1966-02-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 87 WEST FRONTAGE ROAD | Fund Cat: | 7 |
Limits To: | FM 179 | Estimate: | $186,041 |
Length: | 11.5 Miles | Actual: | $179,708 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2053 | Let Status: | Actual |
Project ID: | CPM 1966-3-7 | CSJ: | 1966-03-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1054 | Fund Cat: | 7 |
Limits To: | US 87 EAST FRONTAGE ROAD | Estimate: | $100,242 |
Length: | 9.5 Miles | Actual: | $94,702 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2150 | Let Status: | Actual |
Project ID: | CPM 2183-1-7 | CSJ: | 2183-01-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 84 EAST FRONTAGE ROAD | Fund Cat: | 7 |
Limits To: | CROSBY COUNTY LINE | Estimate: | $69,549 |
Length: | 4.6 Miles | Actual: | $68,142 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2150 | Let Status: | Actual |
Project ID: | CPM 2183-2-3 | CSJ: | 2183-02-003 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LUBBOCK COUNTY LINE | Fund Cat: | 7 |
Limits To: | END OF STATE MAINTENANCE | Estimate: | $16,671 |
Length: | 1.0 Miles | Actual: | $16,109 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 168 | Let Status: | Actual |
Project ID: | CPM 2334-1-8 | CSJ: | 2334-01-008 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 597 | Fund Cat: | 7 |
Limits To: | FM 1294 | Estimate: | $128,801 |
Length: | 9.1 Miles | Actual: | $124,035 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2641 | Let Status: | Actual |
Project ID: | CPM 2740-2-9 | CSJ: | 2740-02-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HOCKLEY COUNTY LINE | Fund Cat: | 7 |
Limits To: | IH 27 | Estimate: | $229,815 |
Length: | 14.3 Miles | Actual: | $222,621 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2641 | Let Status: | Actual |
Project ID: | CPM 2740-3-7 | CSJ: | 2740-03-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | IH 27 | Fund Cat: | 7 |
Limits To: | US 62 | Estimate: | $153,796 |
Length: | 5.0 Miles | Actual: | $145,009 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2901 | Let Status: | Actual |
Project ID: | CPM 2931-1-4 | CSJ: | 2931-01-004 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1055 | Fund Cat: | 7 |
Limits To: | US 385 | Estimate: | $87,767 |
Length: | 5.9 Miles | Actual: | $84,287 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 3112 | Let Status: | Actual |
Project ID: | CPM 3167-1-3 | CSJ: | 3167-01-003 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 380 | Fund Cat: | 7 |
Limits To: | FM 2053 | Estimate: | $176,492 |
Length: | 13.0 Miles | Actual: | $170,729 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2528 | Let Status: | Actual |
Project ID: | CPM 3320-1-3 | CSJ: | 3320-01-003 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 54 | Fund Cat: | 7 |
Limits To: | LUBBOCK COUNTY LINE | Estimate: | $51,739 |
Length: | 3.4 Miles | Actual: | $49,424 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | FM 2528 | Let Status: | Actual |
Project ID: | CPM 3320-2-2 | CSJ: | 3320-02-002 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HALE COUNTY LINE | Fund Cat: | 7 |
Limits To: | FM 597 | Estimate: | $420 |
Length: | 0.1 Miles | Actual: | $400 |
Back... |
Totals for 0052-11-003 | ||
---|---|---|---|
Length: | 234.9 Miles | ||
Estimate: | $5,731,359 | ||
Actual: | $5,219,922 | ||
CCSJ: 0067-07-077 | |||
District: | Lubbock | Let Date: | MAY 2001 |
Highway: | IH 27 | Let Status: | Actual |
Project ID: | IM 27-7(67) | CSJ: | 0067-07-077 |
Description: | REHABILITATION OF BRIDGE AND APPRROACHES | Handling Code: |
|
Limits From: | IH 27, THE INTERSECTION OF IH 27 | Fund Cat: | 2 |
Limits To: | WITH N LOOP 461 IN NEW DEAL | Estimate: | $1,358,317 |
Length: | 0.1 Miles | Actual: | $1,634,476 |
Back... |
Totals for 0067-07-077 | ||
Length: | 0.1 Miles | ||
Estimate: | $1,358,317 | ||
Actual: | $1,634,476 | ||
CCSJ: 0067-11-037 | |||
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | IH 27 | Let Status: | Actual |
Project ID: | IM 27-7(78) | CSJ: | 0067-11-037 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | 2500 FT SOUTH OF ERSKINE AVE | Fund Cat: | 2 |
Limits To: | 2000 FT NORTH OF ERSKINE AVE | Estimate: | $1,075,650 |
Length: | 0.8 Miles | Actual: | $745,108 |
Back... |
Totals for 0067-11-037 | ||
Length: | 0.8 Miles | ||
Estimate: | $1,075,650 | ||
Actual: | $745,108 | ||
CCSJ: 0783-01-086 | |||
District: | Lubbock | Let Date: | SEP 2000 |
Highway: | LP 289 | Let Status: | Actual |
Project ID: | CPM 783-1-86 | CSJ: | 0783-01-086 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 0.293 MILES WEST OF FM 1730 | Fund Cat: | 7 |
Limits To: | 0.337 MILES EAST OF UNIVERSITY AVE | Estimate: | $2,288,070 |
Length: | 3.7 Miles | Actual: | $2,226,964 |
Back... |
Totals for 0783-01-086 | ||
Length: | 3.7 Miles | ||
Estimate: | $2,288,070 | ||
Actual: | $2,226,964 | ||
CCSJ: 0905-00-024 | |||
District: | Lubbock | Let Date: | JAN 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 905-00-24 | CSJ: | 0905-00-024 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN | Fund Cat: | 10A |
Limits To: | THE LUBBOCK DISTRICT - FY 2001 | Estimate: | $1,015,227 |
Length: | 0.0 Miles | Actual: | $1,127,410 |
Back... |
Totals for 0905-00-024 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,015,227 | ||
Actual: | $1,127,410 | ||
CCSJ: 0905-00-025 | |||
District: | Lubbock | Let Date: | MAR 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 905-00-25 | CSJ: | 0905-00-025 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 7 |
Limits To: | IN LUBBOCK COUNTY | Estimate: | $206,758 |
Length: | 0.0 Miles | Actual: | $205,837 |
Back... |
Totals for 0905-00-025 | ||
Length: | 0.0 Miles | ||
Estimate: | $206,758 | ||
Actual: | $205,837 | ||
CCSJ: 0905-06-037 | |||
District: | Lubbock | Let Date: | FEB 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 97(233)TE | CSJ: | 0905-06-037 |
Description: | TRANSPORTATION ENHANCEMENT PROJECT | Handling Code: |
XX |
Limits From: | VARIOIUS LOCATIONS IN LUBBOCK | Fund Cat: | 4B |
Limits To: | . | Estimate: | $294,047 |
Length: | 0.0 Miles | Actual: | $326,392 |
Back... |
Totals for 0905-06-037 | ||
Length: | 0.0 Miles | ||
Estimate: | $294,047 | ||
Actual: | $326,392 | ||
CCSJ: 0905-06-048 | |||
District: | Lubbock | Let Date: | APR 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 27-7(79) | CSJ: | 0905-06-048 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | VARIOUS BRIDGES | Fund Cat: | 2 |
Limits To: | ON IH 27 | Estimate: | $182,730 |
Length: | 23.3 Miles | Actual: | $219,268 |
Back... |
Totals for 0905-06-048 | ||
Length: | 23.3 Miles | ||
Estimate: | $182,730 | ||
Actual: | $219,268 | ||
CCSJ: 0905-06-053 | |||
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 27-7(75) | CSJ: | 0905-06-053 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | SOUTH OF SOUTH LOOP 289 | Fund Cat: | 2 |
Limits To: | HALE COUNTY LINE | Estimate: | $1,975,744 |
Length: | 21.3 Miles | Actual: | $1,646,062 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 27-7(75) | CSJ: | 0905-12-015 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | LUBBOCK COUNTY LINE | Fund Cat: | 2 |
Limits To: | SWISHER COUNTY LINE | Estimate: | $1,037,473 |
Length: | 37.9 Miles | Actual: | $946,177 |
District: | Lubbock | Let Date: | NOV 2000 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 27-7(75) | CSJ: | 0905-17-007 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | HALE COUNTY LINE | Fund Cat: | 2 |
Limits To: | RANDALL COUNTY LINE | Estimate: | $772,575 |
Length: | 31.3 Miles | Actual: | $700,972 |
Back... |
Totals for 0905-06-053 | ||
Length: | 90.5 Miles | ||
Estimate: | $3,785,792 | ||
Actual: | $3,293,211 | ||
CCSJ: 0905-06-054 | |||
District: | Lubbock | Let Date: | APR 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(865)RM | CSJ: | 0905-06-054 |
Description: | WIDEN NON-FREEWAY | Handling Code: |
|
Limits From: | DONALD PRESTON DRIVE FROM F.M. 179 | Fund Cat: | 4E |
Limits To: | U.S. 62/82 | Estimate: | $1,336,964 |
Length: | 0.8 Miles | Actual: | $1,294,528 |
Back... |
Totals for 0905-06-054 | ||
Length: | 0.8 Miles | ||
Estimate: | $1,336,964 | ||
Actual: | $1,294,528 | ||
CCSJ: 0905-06-057 | |||
District: | Lubbock | Let Date: | AUG 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 905-6-57 | CSJ: | 0905-06-057 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 7 |
Limits To: | ON THE STATE SCHOOL CAMPUS (DEPT. 687) | Estimate: | $30,664 |
Length: | 0.0 Miles | Actual: | $35,989 |
Award Status Bid Tabulations Bid Tabulations Back... |
Totals for 0905-06-057 | ||
Length: | 0.0 Miles | ||
Estimate: | $30,664 | ||
Actual: | $35,989 |
Top... Back... Letting Schedule Doing Business with TxDOT |