Letting Schedule for April, 2001 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
April, 2001 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0748-05-030 Atascosa/
San Antonio
FM 140 Actual $3,338,733 4F RECONSTRUCT & WIDEN EXISTING ROADWAY
1740-03-012 Atascosa/
San Antonio
FM 1333 Actual $354,460 8A REHAB & WIDEN NARROW PAVEMENT & SHOULDER
0114-04-056 Bastrop/
Austin
US 290 Actual $1,018,430 11 ADD CONTINUOUS LEFT TURN LANE
0322-01-037 Bastrop/
Austin
SH 95 Actual $1,051,579 11 REMOVE CONCRETE MEDIANS & ADD LT BAYS
2686-01-010 Bastrop/
Austin
FM 2571 Actual $51,000 16B REPAIR FLOOD DAMAGE
0184-04-036 Bell/
Waco
LP 363 Actual $429,882 11 REALIGN WESTBOUND FRONTAGE ROAD AND REALIGN RAMP
0291-09-024 Bexar/
San Antonio
SH 16 Actual $2,906,900 7 SEAL COAT & PAVEMENT MARKINGS
0849-01-035 Bexar/
San Antonio
FM 471 Actual $592,790 11 DRAINAGE REVISIONS
0915-00-090 Bexar/
San Antonio
VA Actual $412,961 10A UPGRADING ROADSIDE FLASHING BEACONS
0915-12-347 Bexar/
San Antonio
CS Actual $528,836 13D RESTORING EXISTING STREET (INCLUDES UTILITIES)
1437-01-033 Bexar/
San Antonio
FM 1346 Actual $617,648 7 ADDING 2' SHOULDERS, LEVEL-UP & SEAL COAT
2255-01-028 Bexar/
San Antonio
FM 1937 Actual $1,709,310 7 SEAL COAT & PAVEMENT MARKINGS
0253-02-023 Blanco/
Austin
US 281 Actual $87,760 4A IMPROVE GUARDRAIL AND ADD LEFT TURN LANE
0912-31-081 Brazoria/
Houston
CS Actual $3,787,513 6B REPLACE BRIDGE
0251-07-018 Burnet/
Austin
US 281 Actual $512,480 4A SAFETY TREAT DRAINAGE STRUCTURES
0029-03-051 Caldwell/
Austin
US 90 Actual $127,800 16B REPAIR FLOOD DAMAGE
0286-02-023 Caldwell/
Austin
SH 80 Actual $186,875 4F CONSTRUCT LEFT TURN LANE
0575-01-007 Caldwell/
Austin
FM 20 Actual $50,700 16B REPAIR FLOOD DAMAGE
0515-03-037 Calhoun/
Yoakum
FM 1090 Actual $918,105 14 RESTORE ROADWAY
0275-02-054 Carson/
Amarillo
IH 40 Actual $15,998,849 2 CONCRETE UPGRADE
0191-04-005 Cherokee/
Tyler
FM 2493 Actual $323,017 10A INSTALL TURN LANE AT HIGH SCHOOL ENTRANCE
0069-05-024 Coke/
San Angelo
US 87 Actual $1,895,000 4B RECONSTRUCTION OF SAFETY REST AREA
0008-08-065 Dallas/
Dallas
SH 180 Actual $1,159,675 7 REPAIR OF EXISTING CONCRETE PAVEMENT
0009-03-040 Dallas/
Dallas
SH 66 Actual $301,978 16S LANDSCAPE DEVELOPMENT
0918-45-459 Dallas/
Dallas
VA Actual $3,009,680 4C CONSTRUCT TRANSIT CENTER PEDESTRIAN CONNECTION
0918-45-488 Dallas/
Dallas
CS Actual $40,455 13D RECONSTRUCT CITY STREET
0918-45-489 Dallas/
Dallas
CS Actual $60,000 13D RECONSTRUCT CITY STREET
0918-45-490 Dallas/
Dallas
CS Actual $52,000 13D RECONSTRUCT CITY STREET
0918-45-559 Dallas/
Dallas
VA Actual $1,103,750 5 PUBLIC FLEET ALTERNATIVE FUELS PROGRAM
2374-01-069 Dallas/
Dallas
IH 635 Actual 260,900,383 3A CONSTRUCTION OF INTERCHANGE
0143-08-080 Dewitt/
Yoakum
US 87 Actual $5,049,137 7 ASPHALTIC CONCRETE PAVEMENT
0913-00-057 Dewitt/
Yoakum
VA Actual $159,120 10A TRAFFIC CONTROL DEVICES
0913-00-058 Dewitt/
Yoakum
VA Actual $678,710 10A TRAFFIC CONTROL DEVICES
0007-03-075 Eastland/
Brownwood
IH 20 Actual $1,187,753 2 BASE OVERLAY, CURB & GUTTER, SURFACE, SAFETY TRT STRUCTURES
0906-00-064 Ector/
Odessa
VA Actual $863,942 7 PREVENTIVE MAINTENANCE
0906-00-074 Ector/
Odessa
VA Actual $339,454 10A FLASHING BEACONS
0001-04-077 El Paso/
El Paso
US 62 Actual $7,767,070 7 OVERLAY
0815-08-022 Ellis/
Dallas
FM 663 Actual $2,994,748 14 RECONSTRUCT AND WIDEN ROADWAY
0202-03-032 Fannin/
Paris
US 69 Actual $2,086,648 7 PLANING, SEAL AND HMAC OVERLAY
0192-04-092 Galveston/
Houston
SH 6 Actual $203,760 7 JOINT CRACK SEAL AND SPOT BASE REPAIR
0367-04-069 Galveston/
Houston
SH 87 Actual $705,497 11 INSTALL LIGHTING
0389-06-086 Galveston/
Houston
SH 146 Actual $583,951 11 INSTALL MARINE FENDER SYSTEM
2523-03-005 Galveston/
Houston
FM 646 Actual $88,860 7 JOINT CRACK SEAL AND SPOT REPAIR
0275-11-069 Gray/
Amarillo
IH 40 Actual $16,848,488 4B RECONSTRUCT SAFETY REST AREA
0909-29-021 Hamilton/
Waco
CR Actual $427,956 6B REPLACE BRIDGES AND APPROACHES
0028-02-073 Harris/
Houston
US 90 Actual $9,147,140 4E GRADE SEPARATION
0500-03-497 Harris/
Houston
IH 45 Actual $218,487 7 JOINT SEPARATION REPAIR
0912-71-536 Harris/
Houston
CS Actual $1,999,994 6B REPLACE BRIDGE
0912-71-733 Harris/
Houston
VA Actual $2,168,835 11 CR /PM-FULL DEPTH REPAIR OF LONGITUDINAL JOINT SEPARATION,
1685-05-080 Harris/
Houston
SH 6 Actual $192,343 7 2" PLANING, 2" ACP OVERLAY AND PAVEMENT MARKINGS
1575-02-025 Harrison/
Atlanta
FM 968 Actual $648,733 8A REHABILITATE EXISTING 2-LANE RURAL HIGHWAY
2340-02-017 Harrison/
Atlanta
FM 9 Actual $2,401,190 4F REHABILITATE EXISTING 2-LANE RURAL HIGHWAY
0921-00-050 Hidalgo/
Pharr
VA Actual $1,522,908 11 NON-SITE SPECIFIC TRAFFIC SIGNALS
1429-01-026 Hidalgo/
Pharr
FM 2557 Actual $1,833,563 4F WIDEN TO 4 LANE
1490-03-013 Hidalgo/
Pharr
FM 490 Actual $1,294,361 8A RESTORE AND ADD SHOULDERS
0902-51-011 Hood/
Fort Worth
CR Actual $296,626 6B REPLACE BRIDGE AND APPROACHES
0901-22-030 Hunt/
Paris
PW Actual $1,369,317 9 MISC CONST
0739-02-123 Jefferson/
Beaumont
IH 10 Actual $9,021,536 12 CONSTRUCT FRONTAGE ROADS AND RAMPS
0019-01-121 Johnson/
Fort Worth
SH 174 Actual $116,000 16C TRAFFIC SIGNAL INSTALLATION (NEW SIGNAL)
1094-03-011 Johnson/
Fort Worth
FM 731 Actual $5,134,274 14 REALIGN EXISTING FM ROADWAY AND WIDEN FROM 2 TO 4 LANE
0033-04-057 Jones/
Abilene
US 83 Actual $1,329,290 3C EXCAVATION, STORM SEWER, CURB & GUTTER, SIDEWALK, FLEX
1278-01-008 Kleberg/
Corpus Christi
FM 1118 Actual $516,152 11 REAHBILITATE ROADWAY
0922-20-009 La Salle/
Laredo
CS Actual $125,795 6B FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING
1032-01-024 Lampasas/
Brownwood
FM 580 Actual $2,728,434 4E RECONSTRUCT ROADWAY
0643-01-042 Leon/
Bryan
FM 39 Actual $36,848 4A MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF A
0542-06-036 Live Oak/
Corpus Christi
US 59 Actual $1,679,007 14 REPAIR PAVEMENT FAILURE: TWO COURSE UNDERSEAL & 2" TY'C' OVERLA
1378-05-023 Llano/
Austin
RM 1431 Actual $170,743 4A INSTALL INTERSECTION FLASHING BEACON
0905-06-048 Lubbock/
Lubbock
VA Actual $219,268 2 MISCELLANEOUS CONSTRUCTION
0905-06-054 Lubbock/
Lubbock
CS Actual $1,294,528 4E WIDEN NON-FREEWAY
0014-10-054 McLennan/
Waco
BU 77-L Actual $84,399 16S LANDSCAPE DEVELOPMENT CONSISTING OF AN IRRIGATION SYSTEM
0909-00-037 McLennan/
Waco
VA Actual $1,344,759 10A DISTRICTWIDE GUIDE SIGNS
0024-06-057 Medina/
San Antonio
US 90 Actual $2,197,158 7 OVERLAY
0110-03-046 Montgomery/
Houston
SH 75 Actual $735,161 14 ADD LEFT TURN LANE AND TRAFFIC SIGNAL
0338-03-084 Montgomery/
Houston
SH 105 Actual $2,391,853 7 BASE AND ASPHALT REPAIR, ONE COURSE SURFACE TREATMENT AND
0523-10-024 Montgomery/
Houston
FM 1488 Actual $455,160 10A WIDEN PAVEMENT FOR LEFT AND RIGHT TURN CHANNELIZATION AND
0911-04-032 Polk/
Lufkin
CR Actual $157,750 6B REPLACE BRIDGE AND APPROACHES
0041-05-042 Potter/
Amarillo
US 87 Actual $4,720,464 7 OVERLAY
0904-00-076 Potter/
Amarillo
VA Actual $174,700 11 PAVEMENT MARKERS
0203-04-026 Rains/
Paris
US 69 Actual $86,845 4A INSTALL FLASHING BEACON W /ILL
0371-02-062 Refugio/
Corpus Christi
US 77 Actual $8,256,236 3C REHABILITATE ROADWAY
0907-13-005 Runnels/
San Angelo
VA Actual $724,081 11 TRANSPORTATION ENHANCEMENT -- HUTCHINS AVENUE PEDESTRIAN IMP
0738-03-024 San Patricio/
Corpus Christi
FM 3284 Actual $617,422 6A REPLACE BRIDGE AND APPROACHES
0259-03-046 Somervell/
Fort Worth
US 67 Actual $581,739 7 OVERLAY
0106-06-029 Stonewall/
Abilene
SH 283 Actual $1,528,545 14 EXCAVATION, EMBANKMENT, EXTEND AND SAFETY TREAT CULVERTS,
0159-06-021 Sutton/
San Angelo
US 277 Actual $2,696,705 14 REHABILITATE EXISTING ROADWAY
0008-13-198 Tarrant/
Fort Worth
IH 20 Actual $1,450,648 2 PAVEMENT REPAIR, FABRIC UNDERSEAL, OVERLAY, PAVEMENT MARKINGS
0902-48-455 Tarrant/
Fort Worth
CS Actual $4,000 5 RIGHT OF WAY ACQUISITION
2266-02-107 Tarrant/
Fort Worth
SH 360 Actual $175,600 10A TRAFFIC SIGNALS
0113-13-127 Travis/
Austin
LP 360 Actual $2,079,533 7 1-CST, LEVEL-UP, OV
3136-01-121 Travis/
Austin
LP 1 Actual $92,054 11 ADD RIGHT TURN LANE
0200-05-037 Tyler/
Beaumont
US 69 Actual $462,496 7 ROTOMILL EXISTING ASPHALT AND OVERLAY
2563-01-007 Uvalde/
San Antonio
FM 1023 Actual $1,195,392 8A REHAB PAVEMENT & SHOULDERS (SDWLKS)
0088-05-078 Victoria/
Yoakum
US 59 Actual $4,433,660 7 ASPHALTIC CONCRETE PAVEMENT
2350-01-026 Victoria/
Yoakum
LP 463 Actual $21,022,609 16C CONSTRUCT GRADE SEPARATION INTERCHANGES, MAIN LANES AND
0114-11-073 Waller/
Houston
US 290 Actual $1,938,969 7 BS RP, PLN, ASPH REHAB O /L, SHLDR TX, PM
0523-02-024 Waller/
Houston
FM 362 Actual $1,089,239 4F PAVE SHOULDER AND ACP OVERLAY
0922-33-042 Webb/
Laredo
VA Actual $895,913 13C ITS DEPLOYMENT
0137-03-036 Wichita/
Wichita Falls
SH 25 Actual $1,173,857 7 HMAC OVERLAY
0903-03-059 Wichita/
Wichita Falls
CS Actual $618,261 4D REHABILITATION OF EXISTING ROAD
0043-06-068 Wilbarger/
Wichita Falls
US 287 Actual $4,117,781 14 REHABILITATION OF EXISTING ROAD
0320-03-079 Williamson/
Austin
SH 95 Actual $116,685 16B LANDSCAPING DEVELOPMENT
0922-48-001 Zavala/
Laredo
VA Actual $174,440 4B FOR THE CONSTRUCTION OF A HIKE AND BIKE TRAIL ON ABANDONED


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract