Detail Letting Schedule for Dallas County (FY 2002)
![]() |
![]() |
![]() |
![]() |
![]() |
Detail Letting Schedule for Dallas County (FY 2002) | ||||
Last Update: Thursday, September 5, 2002 | ||||
Updated from Design & Construction Information System (DCIS) on: August 30, 2002 |
Dallas County (FY 2002) |
CCSJ: 0008-08-060 | |||
District: | Dallas | Let Date: | MAR 2002 |
Highway: | SH 180 | Let Status: | Actual |
Project ID: | CM 2001(79) | CSJ: | 0008-08-060 |
Description: | 4 INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | AT VARIOUS LOCATIONS IN DALLAS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,664,232 |
Length: | 1.3 Miles | Actual: | $992,618 |
Back... |
Totals for 0008-08-060 | ||
---|---|---|---|
Length: | 1.3 Miles | ||
Estimate: | $1,664,232 | ||
Actual: | $992,618 | ||
CCSJ: 0009-11-187 | |||
District: | Dallas | Let Date: | JUL 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 30-1(40) | CSJ: | 0009-11-187 |
Description: | REPLACE BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | AT CHAHA ROAD OVERPASS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $668,437 |
Length: | 0.0 Miles | Actual: | $766,252 |
Back... |
Totals for 0009-11-187 | ||
Length: | 0.0 Miles | ||
Estimate: | $668,437 | ||
Actual: | $766,252 | ||
CCSJ: 0009-11-189 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 30-5(70) | CSJ: | 0009-11-189 |
Description: | RECONSTRUCT INTERCHANGE | Handling Code: |
|
Limits From: | 0.4 MILE WEST OF DALROCK ROAD | Fund Cat: | 10 |
Limits To: | ROCKWALL COUNTY LINE | Estimate: | $1,891,963 |
Length: | 0.4 Miles | Actual: | $2,114,226 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 30-5(70) | CSJ: | 0009-12-068 |
Description: | RECONSTRUCT INTERCHANGE | Handling Code: |
|
Limits From: | DALLAS COUNTY LINE | Fund Cat: | 10 |
Limits To: | 0.4 MI EAST OF DALROCK ROAD | Estimate: | $448,627 |
Length: | 0.4 Miles | Actual: | $454,721 |
Bid Tabulations Award Status Back... |
Totals for 0009-11-189 | ||
Length: | 0.8 Miles | ||
Estimate: | $2,340,590 | ||
Actual: | $2,568,947 | ||
CCSJ: 0009-11-194 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 30-5(72) | CSJ: | 0009-11-194 |
Description: | REFURBISHING OF HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | AT LOOP 12 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $376,782 |
Length: | 0.0 Miles | Actual: | $327,535 |
District: | Dallas | Let Date: | JUN 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 30-5(72) | CSJ: | 2374-02-104 |
Description: | REFURBISHING OF HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | AT IH 20 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $215,145 |
Length: | 0.0 Miles | Actual: | $192,700 |
Back... |
Totals for 0009-11-194 | ||
Length: | 0.0 Miles | ||
Estimate: | $591,927 | ||
Actual: | $520,235 | ||
CCSJ: 0048-01-056 | |||
District: | Dallas | Let Date: | OCT 2001 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | C 48-1-56 | CSJ: | 0048-01-056 |
Description: | REHABILITATE TRINITY RIVER BRIDGE (PHASE I) | Handling Code: |
|
Limits From: | IN DALLAS ON CORINTH STREET (SH 342) | Fund Cat: | 2 |
Limits To: | FROM 8TH STREET TO INDUSTRIAL BOULEVARD | Estimate: | $380,157 |
Length: | 0.7 Miles | Actual: | $328,117 |
Back... |
Totals for 0048-01-056 | ||
Length: | 0.7 Miles | ||
Estimate: | $380,157 | ||
Actual: | $328,117 | ||
CCSJ: 0094-03-087 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | SP 482 | Let Status: | Actual |
Project ID: | CSR 94-3-86 | CSJ: | 0094-03-086 |
Description: | DRAINAGE IMPROVEMENTS | Handling Code: |
|
Limits From: | AT HARRY HINES BLVD | Fund Cat: | 1 |
Limits To: | ' | Estimate: | $353,572 |
Length: | 0.0 Miles | Actual: | $354,479 |
District: | Dallas | Let Date: | SEP 2001 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | CSR 94-3-87 | CSJ: | 0094-03-087 |
Description: | REHABILITATE EXISTING ROAD | Handling Code: |
|
Limits From: | VALLEY VIEW LANE | Fund Cat: | 1 |
Limits To: | EAST OF ESTERS ROAD | Estimate: | $4,222,262 |
Length: | 0.9 Miles | Actual: | $5,086,187 |
Back... |
Totals for 0094-03-087 | ||
Length: | 0.9 Miles | ||
Estimate: | $4,575,834 | ||
Actual: | $5,440,666 | ||
CCSJ: 0095-02-091 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | CPM 95-2-91 | CSJ: | 0095-02-091 |
Description: | MICROSURFACING AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.2 MILE EAST OF TOWN EAST BLVD | Fund Cat: | 1 |
Limits To: | SH 352 | Estimate: | $814,848 |
Length: | 4.4 Miles | Actual: | $709,800 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | CPM 95-10-44 | CSJ: | 0095-10-044 |
Description: | MILL, OVERLAY, MICROSURFACING AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 1 |
Limits To: | 0.2 MILE EAST OF TOWN EAST BLVD. | Estimate: | $416,681 |
Length: | 1.5 Miles | Actual: | $413,244 |
Bid Tabulations Award Status Back... |
Totals for 0095-02-091 | ||
Length: | 5.9 Miles | ||
Estimate: | $1,231,529 | ||
Actual: | $1,123,044 | ||
CCSJ: 0196-03-186 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 35E-6(365) | CSJ: | 0196-03-186 |
Description: | REHAB BRIDGE | Handling Code: |
|
Limits From: | AT BELTLINE RD ST & CRIP-ST L&SW RR (SB) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $78,351 |
Length: | 0.2 Miles | Actual: | $71,544 |
District: | Dallas | Let Date: | SEP 2001 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 35E-6(365) | CSJ: | 0196-03-187 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | AT CONTINENTAL AVENUE (SB) OVERPASS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $147,762 |
Length: | 0.0 Miles | Actual: | $144,897 |
District: | Dallas | Let Date: | SEP 2001 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 35E-6(365) | CSJ: | 0196-03-189 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | AT WALNUT HILL (SB) OVERPASS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $148,094 |
Length: | 0.0 Miles | Actual: | $162,324 |
District: | Dallas | Let Date: | SEP 2001 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 35E-6(365) | CSJ: | 0196-03-203 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | AT WALNUT HILL (NB) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $85,894 |
Length: | 0.0 Miles | Actual: | $54,936 |
Back... |
Totals for 0196-03-186 | ||
Length: | 0.2 Miles | ||
Estimate: | $460,101 | ||
Actual: | $433,701 | ||
CCSJ: 0197-02-092 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | CPM 197-2-92 | CSJ: | 0197-02-092 |
Description: | MILL AND OVERLAY EXISTING MAIN LANES AND SHOULDERS | Handling Code: |
|
Limits From: | WOODY ROAD | Fund Cat: | 1 |
Limits To: | NEAR SEAGOVILLE ROAD | Estimate: | $1,850,979 |
Length: | 2.7 Miles | Actual: | $1,497,414 |
Bid Tabulations Award Status Back... |
Totals for 0197-02-092 | ||
Length: | 2.7 Miles | ||
Estimate: | $1,850,979 | ||
Actual: | $1,497,414 | ||
CCSJ: 0261-02-055 | |||
District: | Dallas | Let Date: | DEC 2001 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | NH 2002(71) | CSJ: | 0261-02-055 |
Description: | SOUTHBOUND RAMP REVERSAL | Handling Code: |
|
Limits From: | FM 1382 | Fund Cat: | 1 |
Limits To: | PLEASANT RUN ROAD | Estimate: | $976,814 |
Length: | 0.8 Miles | Actual: | $1,041,783 |
Back... |
Totals for 0261-02-055 | ||
Length: | 0.8 Miles | ||
Estimate: | $976,814 | ||
Actual: | $1,041,783 | ||
CCSJ: 0281-03-040 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | C 281-3-40 | CSJ: | 0281-03-040 |
Description: | GUIDE SIGN REFURBISHING | Handling Code: |
|
Limits From: | INTERCHANGE WITH SH 190 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $26,474 |
Length: | 0.0 Miles | Actual: | $24,344 |
Back... |
Totals for 0281-03-040 | ||
Length: | 0.0 Miles | ||
Estimate: | $26,474 | ||
Actual: | $24,344 | ||
CCSJ: 0430-01-047 | |||
District: | Dallas | Let Date: | MAY 2002 |
Highway: | SH 352 | Let Status: | Actual |
Project ID: | STP 2001(113)HES | CSJ: | 0430-01-047 |
Description: | REMOVE TURN DOWNS & METAL BARRELS & INSTALL MBGF & SGT'S | Handling Code: |
|
Limits From: | SECOND AVENUE | Fund Cat: | 8 |
Limits To: | US 80 | Estimate: | $75,648 |
Length: | 11.9 Miles | Actual: | $47,960 |
Back... |
Totals for 0430-01-047 | ||
Length: | 11.9 Miles | ||
Estimate: | $75,648 | ||
Actual: | $47,960 | ||
CCSJ: 0442-02-130 | |||
District: | Dallas | Let Date: | FEB 2002 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | MG 2002(261) | CSJ: | 0261-03-044 |
Description: | GUIDE SIGN REFURBISHING | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | IH 35E | Estimate: | $42,388 |
Length: | 4.8 Miles | Actual: | $27,243 |
District: | Dallas | Let Date: | FEB 2002 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 35E-6(369) | CSJ: | 0442-02-130 |
Description: | GUIDE SIGN REFURBISHING | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $201,479 |
Length: | 4.7 Miles | Actual: | $202,933 |
Back... |
Totals for 0442-02-130 | ||
Length: | 9.5 Miles | ||
Estimate: | $243,867 | ||
Actual: | $230,176 | ||
CCSJ: 0581-01-116 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | STP 2001(116)HES | CSJ: | 0581-01-116 |
Description: | REMOVE TURN DOWNS & METAL BARRELS & INSTALL MBGF & SGT'S | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 8 |
Limits To: | IH 35E | Estimate: | $80,062 |
Length: | 19.6 Miles | Actual: | $42,256 |
Bid Tabulations Award Status Back... |
Totals for 0581-01-116 | ||
Length: | 19.6 Miles | ||
Estimate: | $80,062 | ||
Actual: | $42,256 | ||
CCSJ: 0581-01-118 | |||
District: | Dallas | Let Date: | JUL 2002 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | CM 2001(912) | CSJ: | 0581-01-118 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | BONNIEVIEW AT LEDBETTER (LOOP 12) | Fund Cat: | 5 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $252,000 |
Back... |
Totals for 0581-01-118 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $252,000 | ||
CCSJ: 0581-01-120 | |||
District: | Dallas | Let Date: | JUL 2002 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | CM 2002(864) | CSJ: | 0581-01-120 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | BRUTON ROAD AT BUCKNER BLVD. (LOOP 12) | Fund Cat: | 5 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $200,000 |
Back... |
Totals for 0581-01-120 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $200,000 | ||
CCSJ: 0918-00-056 | |||
District: | Dallas | Let Date: | OCT 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-00-56 | CSJ: | 0918-00-056 |
Description: | 5 TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN THE DALLAS DISTRICT | Fund Cat: | 1 |
Limits To: | . | Estimate: | $329,691 |
Length: | 0.0 Miles | Actual: | $298,400 |
Back... |
Totals for 0918-00-056 | ||
Length: | 0.0 Miles | ||
Estimate: | $329,691 | ||
Actual: | $298,400 | ||
CCSJ: 0918-00-057 | |||
District: | Dallas | Let Date: | DEC 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 918-00-57 | CSJ: | 0918-00-057 |
Description: | SEAL COAT AND STRIPING | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN THE DALLAS DISTRICT | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,409,494 |
Length: | 125.0 Miles | Actual: | $2,578,529 |
Back... |
Totals for 0918-00-057 | ||
Length: | 125.0 Miles | ||
Estimate: | $2,409,494 | ||
Actual: | $2,578,529 | ||
CCSJ: 0918-00-058 | |||
District: | Dallas | Let Date: | DEC 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 918-00-58 | CSJ: | 0918-00-058 |
Description: | SEAL COAT AND STRIPING | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN ELLIS, KAUFMAN, AND | Fund Cat: | 1 |
Limits To: | NAVARRO COUNTIES | Estimate: | $3,399,568 |
Length: | 219.8 Miles | Actual: | $3,552,518 |
Back... |
Totals for 0918-00-058 | ||
Length: | 219.8 Miles | ||
Estimate: | $3,399,568 | ||
Actual: | $3,552,518 | ||
CCSJ: 0918-00-059 | |||
District: | Dallas | Let Date: | MAR 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2001(806) | CSJ: | 0918-00-059 |
Description: | ALTERNATIVE FUELS | Handling Code: |
XX |
Limits From: | TXU-COCA COLA LNG CONVERSION | Fund Cat: | 5 |
Limits To: | HEAVY DUTY TRUCK | Estimate: | $4,375,000 |
Length: | 0.0 Miles | Actual: | $4,375,000 |
Back... |
Totals for 0918-00-059 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,375,000 | ||
Actual: | $4,375,000 | ||
CCSJ: 0918-00-060 | |||
District: | Dallas | Let Date: | APR 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 635-6(372) | CSJ: | 0918-00-060 |
Description: | ATTENUATOR UPGRADE | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN DALLAS DISTRICT | Fund Cat: | 1 |
Limits To: | (INTERSTATE HIGHWAYS) | Estimate: | $1,667,080 |
Length: | 0.0 Miles | Actual: | $1,269,460 |
Back... |
Totals for 0918-00-060 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,667,080 | ||
Actual: | $1,269,460 | ||
CCSJ: 0918-00-061 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-00-061 |
Description: | UPGRADE GUARDRAIL END TREATMENTS | Handling Code: |
|
Limits From: | DISTRICTWIDE ON IH 35E IN DALLAS | Fund Cat: | 1 |
Limits To: | AND DENTON COUNTY | Estimate: | $912,951 |
Length: | 0.0 Miles | Actual: | $598,296 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-00-063 |
Description: | UPGRADE GUARDRAIL END TREATMENT | Handling Code: |
|
Limits From: | DISTRICTWIDE ON IH 30 IN DALLAS AND | Fund Cat: | 1 |
Limits To: | ROCKWALL COUNTY | Estimate: | $424,421 |
Length: | 0.0 Miles | Actual: | $412,773 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-00-064 |
Description: | UPGRADE GUARDRAIL END TREATMENT | Handling Code: |
|
Limits From: | DISTRICTWIDE ON IH 20 IN DALLAS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $595,949 |
Length: | 0.0 Miles | Actual: | $400,135 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-45-615 |
Description: | UPGRADE GUARDRAIL END TREATMENTS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 45 IN DALLAS CO | Fund Cat: | 1 |
Limits To: | . | Estimate: | $406,788 |
Length: | 0.0 Miles | Actual: | $276,520 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-45-616 |
Description: | UPGRADE GUARDRAIL END TREATMENTS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON SP 635 IN DALLAS | Fund Cat: | 1 |
Limits To: | COUNTY | Estimate: | $44,751 |
Length: | 0.0 Miles | Actual: | $30,506 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-45-617 |
Description: | UPGRADE GUARDRAIL END TREATMENTS | Handling Code: |
|
Limits From: | VARIOUS LOCATION ON SP 345 IN DALLAS CO | Fund Cat: | 1 |
Limits To: | . | Estimate: | $37,989 |
Length: | 0.0 Miles | Actual: | $25,629 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35E-6(376) | CSJ: | 0918-46-138 |
Description: | UPGRADE GUARDRAIL END TREATMENTS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 35W IN DENTON | Fund Cat: | 1 |
Limits To: | COUNTY | Estimate: | $137,412 |
Length: | 0.0 Miles | Actual: | $105,318 |
Bid Tabulations Award Status Back... |
Totals for 0918-00-061 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,560,261 | ||
Actual: | $1,849,177 | ||
CCSJ: 0918-00-062 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(802)MM | CSJ: | 0918-00-062 |
Description: | PUBLIC EDUCATION AND INFORMATION | Handling Code: |
XX |
Limits From: | AIR QUALITY OUTREACH PROGRAM | Fund Cat: | 7 |
Limits To: | FUNDING FOR 2002-2003 | Estimate: | $208,334 |
Length: | 0.0 Miles | Actual: | $208,334 |
Back... |
Totals for 0918-00-062 | ||
Length: | 0.0 Miles | ||
Estimate: | $208,334 | ||
Actual: | $208,334 | ||
CCSJ: 0918-00-065 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(436) | CSJ: | 0918-00-065 |
Description: | ATMS | Handling Code: |
XX |
Limits From: | REGIONAL | Fund Cat: | 5 |
Limits To: | COMMUNICATION SYSTEM PART 1 & 2 | Estimate: | $332,500 |
Length: | 0.0 Miles | Actual: | $332,500 |
Back... |
Totals for 0918-00-065 | ||
Length: | 0.0 Miles | ||
Estimate: | $332,500 | ||
Actual: | $332,500 | ||
CCSJ: 0918-00-066 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(934) | CSJ: | 0918-00-066 |
Description: | SIP IMPLEMENTATION | Handling Code: |
XX |
Limits From: | TRAFFIC SIGNAL INTEGRATION AND | Fund Cat: | 5 |
Limits To: | MONITORING - PHASE 2.1-FOR FY 2002-2004 | Estimate: | $4,160,000 |
Length: | 0.0 Miles | Actual: | $4,160,000 |
Back... |
Totals for 0918-00-066 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,160,000 | ||
Actual: | $4,160,000 | ||
CCSJ: 0918-45-224 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 95(215)MM | CSJ: | 0918-45-224 |
Description: | WIDEN 2 - LANE FACILITY TO 6 - LANE FACILITY | Handling Code: |
|
Limits From: | ON DANIELDALE ROAD FROM COCKRELL HILL RD | Fund Cat: | 7 |
Limits To: | DUNCANVILLE EAST CITY LIMITS | Estimate: | $1,256,865 |
Length: | 0.4 Miles | Actual: | $1,239,227 |
Back... |
Totals for 0918-45-224 | ||
Length: | 0.4 Miles | ||
Estimate: | $1,256,865 | ||
Actual: | $1,239,227 | ||
CCSJ: 0918-45-306 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-306 | CSJ: | 0918-45-306 |
Description: | RECONSTRUCT CITY STREET | Handling Code: |
|
Limits From: | ON LEON ROAD FROM MCCREE RD | Fund Cat: | 13D |
Limits To: | IH 635 IN THE CITY OF GARLAND | Estimate: | $1,106,113 |
Length: | 0.4 Miles | Actual: | $949,200 |
Back... |
Totals for 0918-45-306 | ||
Length: | 0.4 Miles | ||
Estimate: | $1,106,113 | ||
Actual: | $949,200 | ||
CCSJ: 0918-45-307 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-307 | CSJ: | 0918-45-307 |
Description: | RECONSTRUCT CITY STREET | Handling Code: |
|
Limits From: | ON LA PRADA DR FROM NORTHWEST HWY | Fund Cat: | 13D |
Limits To: | TO O'BANION ROAD IN THE CITY OF GARLAND | Estimate: | $1,276,970 |
Length: | 0.5 Miles | Actual: | $1,048,330 |
Back... |
Totals for 0918-45-307 | ||
Length: | 0.5 Miles | ||
Estimate: | $1,276,970 | ||
Actual: | $1,048,330 | ||
CCSJ: 0918-45-371 | |||
District: | Dallas | Let Date: | FEB 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 97(437) | CSJ: | 0918-45-371 |
Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
XX |
Limits From: | ON GREENVILLE AVENUE AT PARK LANE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $80,000 |
Length: | 0.0 Miles | Actual: | $80,000 |
Back... |
Totals for 0918-45-371 | ||
Length: | 0.0 Miles | ||
Estimate: | $80,000 | ||
Actual: | $80,000 | ||
CCSJ: 0918-45-462 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | CS | Let Status: | Approved |
Project ID: | CM 2000(965) | CSJ: | 0918-45-462 |
Description: | 1 OFF SYSTEM INTERSECTION IMPROVEMENT | Handling Code: |
LC |
Limits From: | JEFFERSON AT IDLEWILD IN DALLAS COUNTY | Fund Cat: | 5 |
Limits To: | . | Estimate: | $391,630 |
Length: | 0.3 Miles | Actual: | |
Back... |
Totals for 0918-45-462 | ||
Length: | 0.3 Miles | ||
Estimate: | $391,630 | ||
Actual: | |||
CCSJ: 0918-45-555 | |||
District: | Dallas | Let Date: | APR 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2001(520) | CSJ: | 0918-45-555 |
Description: | PROVIDE UPDATED SIGNAL TIMING PLANS AND INCIDENT - RELATED | Handling Code: |
XX |
Limits From: | IH 635 & IH 35E - OFF SYSTEM LOCATIONS | Fund Cat: | 5 |
Limits To: | CORRIDOR VIDEO & COMMUNICATION | Estimate: | $444,000 |
Length: | 0.0 Miles | Actual: | $430,950 |
District: | Dallas | Let Date: | APR 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2001(521) | CSJ: | 0918-45-556 |
Description: | PROVIDE FOR UPDATED SIGNAL TIMING PLANS AND INCIDENT | Handling Code: |
XX |
Limits From: | IH 635 & IH 35E - ON-SYSTEM LOCATIONS | Fund Cat: | 5 |
Limits To: | CORRIDOR VIDEO AND COMMUNICATION | Estimate: | $111,000 |
Length: | 0.0 Miles | Actual: | $123,200 |
Back... |
Totals for 0918-45-555 | ||
Length: | 0.0 Miles | ||
Estimate: | $555,000 | ||
Actual: | $554,150 | ||
CCSJ: 0918-45-580 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2001(729)MM | CSJ: | 0918-45-580 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | AT BIGTOWN BLVD. (ITS TRAFFIC CENTER) | Fund Cat: | 7 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $2,170,000 |
Back... |
Totals for 0918-45-580 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $2,170,000 | ||
CCSJ: 0918-45-582 | |||
District: | Dallas | Let Date: | JUL 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(782)MM | CSJ: | 0918-45-582 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITIES | Handling Code: |
XX |
Limits From: | SH 183 | Fund Cat: | 7 |
Limits To: | VALLEY VIEW | Estimate: | |
Length: | 0.0 Miles | Actual: | $90,000 |
Back... |
Totals for 0918-45-582 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $90,000 | ||
CCSJ: 0918-45-601 | |||
District: | Dallas | Let Date: | JUL 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(872)MM | CSJ: | 0918-45-601 |
Description: | CONST OF TMC, UPGRAD TRAF SIG, CONST FIBER OPTIC COMM BACK | Handling Code: |
XX |
Limits From: | LP 12/SH 183/SH 114 AREAS | Fund Cat: | 7 |
Limits To: | CCTV, DMS SIGNALS & DETECTION ON SYSTEM | Estimate: | $1,200,000 |
Length: | 0.0 Miles | Actual: | $1,200,000 |
District: | Dallas | Let Date: | JUL 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(874)MM | CSJ: | 0918-45-602 |
Description: | UPGRAD TRAF SIG, CONST FIBER OPTIC COMM BACK | Handling Code: |
XX |
Limits From: | LP 12/SH 183/SH 114 AREAS | Fund Cat: | 7 |
Limits To: | CCTV, DMS SIGNALS & DETECTION OFF SYSTEM | Estimate: | $2,500,000 |
Length: | 0.0 Miles | Actual: | $2,500,000 |
Back... |
Totals for 0918-45-601 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,700,000 | ||
Actual: | $3,700,000 | ||
CCSJ: 0918-45-607 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(302)MM | CSJ: | 0918-45-607 |
Description: | TRANSPORTATION MANAGEMENT ASSOCIATION | Handling Code: |
XX |
Limits From: | EAST SIDE FARMERS | Fund Cat: | 7 |
Limits To: | BRANCH | Estimate: | $120,000 |
Length: | 0.0 Miles | Actual: | $111,250 |
Back... |
Totals for 0918-45-607 | ||
Length: | 0.0 Miles | ||
Estimate: | $120,000 | ||
Actual: | $111,250 | ||
CCSJ: 0918-45-608 | |||
District: | Dallas | Let Date: | DEC 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(303)MM | CSJ: | 0918-45-608 |
Description: | PRELIMINARY ENGINEERING FOR NEW LOCATION FACILITY | Handling Code: |
XX |
Limits From: | LAKE RIDGE PKWY. FROM IH 20 TO POLO ROAD | Fund Cat: | 7 |
Limits To: | . | Estimate: | $947,959 |
Length: | 1.4 Miles | Actual: | $947,959 |
Back... |
Totals for 0918-45-608 | ||
Length: | 1.4 Miles | ||
Estimate: | $947,959 | ||
Actual: | $947,959 | ||
CCSJ: 0918-45-611 | |||
District: | Dallas | Let Date: | JAN 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(930)RXH | CSJ: | 0918-45-611 |
Description: | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES | Handling Code: |
XX |
Limits From: | IN DALLAS ON CENTERVILLE RD @ KCS RR | Fund Cat: | 8 |
Limits To: | DOT NO 022056F | Estimate: | $200,000 |
Length: | 0.0 Miles | Actual: | $200,000 |
Back... |
Totals for 0918-45-611 | ||
Length: | 0.0 Miles | ||
Estimate: | $200,000 | ||
Actual: | $200,000 | ||
CCSJ: 0918-45-612 | |||
District: | Dallas | Let Date: | JAN 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(930)RXH | CSJ: | 0918-45-612 |
Description: | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES | Handling Code: |
XX |
Limits From: | IN GARLAND ON CASTLE DR @ KCS RAILROAD | Fund Cat: | 8 |
Limits To: | DOT NO 022076S | Estimate: | $200,000 |
Length: | 0.0 Miles | Actual: | $200,000 |
Back... |
Totals for 0918-45-612 | ||
Length: | 0.0 Miles | ||
Estimate: | $200,000 | ||
Actual: | $200,000 | ||
CCSJ: 0918-45-613 | |||
District: | Dallas | Let Date: | JAN 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(930)RXH | CSJ: | 0918-45-613 |
Description: | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES | Handling Code: |
XX |
Limits From: | IN SACHSE ON 3RD ST @ KCS RAILROAD | Fund Cat: | 8 |
Limits To: | DOT NO 022088L | Estimate: | $240,000 |
Length: | 0.0 Miles | Actual: | $240,000 |
Back... |
Totals for 0918-45-613 | ||
Length: | 0.0 Miles | ||
Estimate: | $240,000 | ||
Actual: | $240,000 | ||
CCSJ: 0918-45-614 | |||
District: | Dallas | Let Date: | JAN 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(930)RXH | CSJ: | 0918-45-614 |
Description: | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES | Handling Code: |
XX |
Limits From: | IN SACHSE ON PARK LANE @ KCS RAILROAD | Fund Cat: | 8 |
Limits To: | DOT NO 022356U | Estimate: | $160,000 |
Length: | 0.0 Miles | Actual: | $160,000 |
Back... |
Totals for 0918-45-614 | ||
Length: | 0.0 Miles | ||
Estimate: | $160,000 | ||
Actual: | $160,000 | ||
CCSJ: 0918-45-624 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2002(492) | CSJ: | 0918-45-624 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | ARAPAHO ROAD AT PLANO ROAD | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1 |
Length: | 0.0 Miles | Actual: | $79,901 |
Back... |
Totals for 0918-45-624 | ||
Length: | 0.0 Miles | ||
Estimate: | $1 | ||
Actual: | $79,901 | ||
CCSJ: 0918-45-632 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(801)MM | CSJ: | 0918-45-632 |
Description: | PROGRAM;TRANSIT FEASIBILITY AND LAND - USE IMPLEMENTATION | Handling Code: |
XX |
Limits From: | VARIOUS LOCATION DALLAS DISTRICT | Fund Cat: | 7 |
Limits To: | . | Estimate: | $500,000 |
Length: | 0.0 Miles | Actual: | $500,000 |
Back... |
Totals for 0918-45-632 | ||
Length: | 0.0 Miles | ||
Estimate: | $500,000 | ||
Actual: | $500,000 | ||
CCSJ: 0918-45-650 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(859) | CSJ: | 0918-45-650 |
Description: | INSTAL OF POCKET TRACK IN VICINITY OF CONVENTION CENTER TO | Handling Code: |
TR |
Limits From: | CONVENTION CENTER | Fund Cat: | 5 |
Limits To: | LIGHT RAIL POCKET TRACK | Estimate: | $2,312,000 |
Length: | 0.0 Miles | Actual: | $2,311,730 |
Back... |
Totals for 0918-45-650 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,312,000 | ||
Actual: | $2,311,730 | ||
CCSJ: 0918-45-651 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(860) | CSJ: | 0918-45-651 |
Description: | RAIL TRANSIT | Handling Code: |
TR |
Limits From: | TRE COMMUTER PLATFORM_AT AA ARENA | Fund Cat: | 5 |
Limits To: | (DAL 0094) | Estimate: | $7,019,152 |
Length: | 0.0 Miles | Actual: | $7,019,152 |
Back... |
Totals for 0918-45-651 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,019,152 | ||
Actual: | $7,019,152 | ||
CCSJ: 0918-45-652 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(861) | CSJ: | 0918-45-652 |
Description: | CONSTRUCT MISC DOUBLE TRACK SEGMENTS FOR THE TRINITY | Handling Code: |
TR |
Limits From: | CENTERPORT STATION | Fund Cat: | 5 |
Limits To: | UNION STATION | Estimate: | $18,979,786 |
Length: | 0.0 Miles | Actual: | $18,979,786 |
Back... |
Totals for 0918-45-652 | ||
Length: | 0.0 Miles | ||
Estimate: | $18,979,786 | ||
Actual: | $18,979,786 | ||
CCSJ: 1047-02-022 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | NH 2001(659) | CSJ: | 1047-02-022 |
Description: | RECONSTRUCT EXISTING 2 - LANE RURAL ROADWAY TO ULTIMATE 6 LANE | Handling Code: |
|
Limits From: | IN CEDAR HILL & DESOTO ON FM 1382 | Fund Cat: | 1 |
Limits To: | FROM HAMPTON ROAD W TO US 67 | Estimate: | $25,438,494 |
Length: | 5.0 Miles | Actual: | $25,972,014 |
Back... |
Totals for 1047-02-022 | ||
Length: | 5.0 Miles | ||
Estimate: | $25,438,494 | ||
Actual: | $25,972,014 | ||
CCSJ: 1047-03-056 | |||
District: | Dallas | Let Date: | OCT 2001 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | CM 2001(483) | CSJ: | 1047-03-056 |
Description: | ON - SYSTEM TRAFFIC MANAGEMENT COMMUNICATION SYSTEM | Handling Code: |
|
Limits From: | SH 303 (PIONEER PARKWAY) | Fund Cat: | 5 |
Limits To: | IH 20 | Estimate: | $362,698 |
Length: | 0.0 Miles | Actual: | $357,190 |
Back... |
Totals for 1047-03-056 | ||
Length: | 0.0 Miles | ||
Estimate: | $362,698 | ||
Actual: | $357,190 | ||
CCSJ: 1068-04-083 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2002(39) | CSJ: | 1068-04-083 |
Description: | WIDEN 6 TO 8 LANES AND ADD INTERCHANGES | Handling Code: |
|
Limits From: | EAST OF LOOP 12 | Fund Cat: | 7 |
Limits To: | EAST OF SYLVAN | Estimate: | $96,359,017 |
Length: | 4.7 Miles | Actual: | $95,155,576 |
District: | Dallas | Let Date: | AUG 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2002(827) | CSJ: | 1068-04-127 |
Description: | ADJUSTMENT OF UTILITIES | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | ROW |
Limits To: | IH 35E | Estimate: | $1,250,515 |
Length: | 0.0 Miles | Actual: | $1,686,042 |
Bid Tabulations Award Status Back... |
Totals for 1068-04-083 | ||
Length: | 4.7 Miles | ||
Estimate: | $97,609,532 | ||
Actual: | $96,841,618 | ||
CCSJ: 1068-04-110 | |||
District: | Dallas | Let Date: | AUG 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2001(431) | CSJ: | 1068-04-110 |
Description: | WDN 6 TO 10 LANES AND NOISE WALL | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 7 |
Limits To: | E OF NW 7TH STREET | Estimate: | $39,570,048 |
Length: | 1.8 Miles | Actual: | $35,540,701 |
Bid Tabulations Award Status Back... |
Totals for 1068-04-110 | ||
Length: | 1.8 Miles | ||
Estimate: | $39,570,048 | ||
Actual: | $35,540,701 | ||
CCSJ: 2208-02-015 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | SP 303 | Let Status: | Actual |
Project ID: | CD 2208-2-15 | CSJ: | 2208-02-015 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: |
|
Limits From: | SPUR 408 | Fund Cat: | 11 |
Limits To: | LEDBETTER DRIVE | Estimate: | $1,340,491 |
Length: | 0.4 Miles | Actual: | $1,288,944 |
Back... |
Totals for 2208-02-015 | ||
Length: | 0.4 Miles | ||
Estimate: | $1,340,491 | ||
Actual: | $1,288,944 | ||
CCSJ: 2374-01-125 | |||
District: | Dallas | Let Date: | MAR 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | STP 2002(340)MM | CSJ: | 2374-01-125 |
Description: | CONSTRUCT AUXILIARY LANE | Handling Code: |
|
Limits From: | EAST BOUND PLANO ENTRANCE RAMP | Fund Cat: | 7 |
Limits To: | EAST BOUND KINGSLEY EXIT RAMP | Estimate: | $473,560 |
Length: | 0.3 Miles | Actual: | $342,347 |
Back... |
Totals for 2374-01-125 | ||
Length: | 0.3 Miles | ||
Estimate: | $473,560 | ||
Actual: | $342,347 | ||
CCSJ: 2374-01-143 | |||
District: | Dallas | Let Date: | MAY 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 635-6(375) | CSJ: | 2374-01-143 |
Description: | FULL DEPTH CONC PAV REPAIR | Handling Code: |
|
Limits From: | KINGSLEY ROAD | Fund Cat: | 1 |
Limits To: | WEST ABUT. OF THE BNSF RR | Estimate: | $2,577,942 |
Length: | 14.0 Miles | Actual: | $1,715,606 |
District: | Dallas | Let Date: | MAY 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 635-6(375) | CSJ: | 2374-07-050 |
Description: | FULL DPETH CONC. REPAIR | Handling Code: |
|
Limits From: | WEST ABUT. OF THE BNSF RR | Fund Cat: | 1 |
Limits To: | TARRANT CO. LINE | Estimate: | $73,655 |
Length: | 8.1 Miles | Actual: | $85,595 |
Back... |
Totals for 2374-01-143 | ||
Length: | 22.1 Miles | ||
Estimate: | $2,651,597 | ||
Actual: | $1,801,201 | ||
CCSJ: 2374-02-103 | |||
District: | Dallas | Let Date: | JAN 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 635-6(366) | CSJ: | 2374-02-103 |
Description: | WIDEN EXISTING RAMP | Handling Code: |
|
Limits From: | SOUTHBOUND IH 635 BRUTON ROAD EXIT RAMP | Fund Cat: | 1 |
Limits To: | . | Estimate: | $638,418 |
Length: | 0.3 Miles | Actual: | $629,474 |
Back... |
Totals for 2374-02-103 | ||
Length: | 0.3 Miles | ||
Estimate: | $638,418 | ||
Actual: | $629,474 | ||
CCSJ: 2374-04-053 | |||
District: | Dallas | Let Date: | SEP 2001 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2001(721)HES | CSJ: | 2374-04-053 |
Description: | REHABILITATE MEDIAN WITH CTB | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 8 |
Limits To: | MOUNTAIN CREEK PARKWAY | Estimate: | $624,380 |
Length: | 3.9 Miles | Actual: | $586,956 |
Back... |
Totals for 2374-04-053 | ||
Length: | 3.9 Miles | ||
Estimate: | $624,380 | ||
Actual: | $586,956 | ||
CCSJ: 2374-07-047 | |||
District: | Dallas | Let Date: | OCT 2001 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CC 2374-7-47 | CSJ: | 2374-07-047 |
Description: | CONSTRUCT FRONTAGE ROAD | Handling Code: |
|
Limits From: | OLYMPUS BLVD. | Fund Cat: | 10 |
Limits To: | HOME DEPOT DRIVE | Estimate: | $523,358 |
Length: | 0.2 Miles | Actual: | $604,293 |
Back... |
Totals for 2374-07-047 | ||
Length: | 0.2 Miles | ||
Estimate: | $523,358 | ||
Actual: | $604,293 | ||
CCSJ: 2964-10-001 | |||
District: | Dallas | Let Date: | JUN 2002 |
Highway: | LP | Let Status: | Actual |
Project ID: | STP 2002(800)MM | CSJ: | 2964-10-001 |
Description: | MAJOR INVESTMENT STUDY | Handling Code: |
XX |
Limits From: | IH 20 | Fund Cat: | 7 |
Limits To: | DALLAS/TARRANT CO LINE | Estimate: | $823,000 |
Length: | 35.0 Miles | Actual: | $823,000 |
Back... |
Totals for 2964-10-001 | ||
Length: | 35.0 Miles | ||
Estimate: | $823,000 | ||
Actual: | $823,000 |