Detail Letting Schedule for Harris County (FY 2006)
Detail Letting Schedule for Harris County (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
Harris County (FY 2006) |
CCSJ: 0028-01-087 | |||
District: | Houston | Let Date: | FEB 2006 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 28-1-87 | CSJ: | 0028-01-087 |
Description: | BASE REPAIR, MILL, ASPHALT OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 610 EAST | Fund Cat: | 1 |
Limits To: | 0.157 MILES EAST OF MESA DRIVE | Estimate: | $1,303,111 |
Length: | 1.2 Miles | Actual: | $853,444 |
Back... |
Totals for 0028-01-087 | ||
---|---|---|---|
Length: | 1.2 Miles | ||
Estimate: | $1,303,111 | ||
Actual: | $853,444 | ||
CCSJ: 0028-02-044 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | HP 2006(708) | CSJ: | 0028-02-044 |
Description: | CONSTRUCT INTERIM GRADE SEPARATION (PHASE 2) ON NEW LOCATION | Handling Code: |
|
Limits From: | 0.40 MILES WEST OF NORMANDY ST. | Fund Cat: | 10 |
Limits To: | 0.48 MILES EAST OF NORMANDY ST. | Estimate: | $20,945,878 |
Length: | 0.9 Miles | Actual: | $19,324,590 |
District: | Houston | Let Date: | JUL 2006 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | DMO 2006(709) | CSJ: | 0028-02-070 |
Description: | CONSTRUCT TWO 3 - LANE FRONTAGE ROADS (PHASE 1) | Handling Code: |
|
Limits From: | 0.590 MI E. OF WALLISVILLE | Fund Cat: | 10 |
Limits To: | 0.170 MI W OF UVALDE ROAD | Estimate: | $21,323,566 |
Length: | 2.3 Miles | Actual: | $26,519,859 |
Bid Tabulations Back... |
Totals for 0028-02-044 | ||
Length: | 3.2 Miles | ||
Estimate: | $42,269,444 | ||
Actual: | $45,844,449 | ||
CCSJ: 0028-02-054 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | HP 2006(669) | CSJ: | 0028-02-054 |
Description: | CONSTRUCT 6 MAIN LANES | Handling Code: |
|
Limits From: | 0.62 MI E OF HUNTING BAYOU | Fund Cat: | 10 |
Limits To: | 0.590 MI. E. OF WALLISVILLE | Estimate: | $51,487,090 |
Length: | 2.2 Miles | Actual: | $52,720,636 |
District: | Houston | Let Date: | JUL 2006 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | HP 2006(556) | CSJ: | 0028-02-055 |
Description: | CONSTRUCT 4 - LANE FREEWAY W / GRADE SEPERATION AT MERCURY | Handling Code: |
|
Limits From: | 0.290 MI W OF MERCURY DRIVE | Fund Cat: | 10 |
Limits To: | 0.62 MI E OF HUNTING BAYOU | Estimate: | $13,426,067 |
Length: | 0.5 Miles | Actual: | $14,578,532 |
Bid Tabulations Back... |
Totals for 0028-02-054 | ||
Length: | 2.7 Miles | ||
Estimate: | $64,913,157 | ||
Actual: | $67,299,168 | ||
CCSJ: 0028-02-080 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 28-2-80 | CSJ: | 0028-02-080 |
Description: | DITCH CLEARING | Handling Code: |
|
Limits From: | ADLONG DITCH AT US 90 | Fund Cat: | 1 |
Limits To: | CEDAR BAYOU | Estimate: | $328,250 |
Length: | 2.8 Miles | Actual: | $289,150 |
Back... |
Totals for 0028-02-080 | ||
Length: | 2.8 Miles | ||
Estimate: | $328,250 | ||
Actual: | $289,150 | ||
CCSJ: 0050-06-066 | |||
District: | Houston | Let Date: | NOV 2005 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | STP 2006(022)MM | CSJ: | 0050-06-066 |
Description: | DETENTION PONDS #2 AND #3 | Handling Code: |
|
Limits From: | E OF BECKER AND E OF BAUER | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,342,206 |
Length: | 1.9 Miles | Actual: | $1,235,808 |
Back... |
Totals for 0050-06-066 | ||
Length: | 1.9 Miles | ||
Estimate: | $1,342,206 | ||
Actual: | $1,235,808 | ||
CCSJ: 0050-09-072 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | C 50-8-84 | CSJ: | 0050-08-084 |
Description: | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER AND INSTALL | Handling Code: |
|
Limits From: | JONES ROAD | Fund Cat: | 1 |
Limits To: | FM 529 | Estimate: | $100,568 |
Length: | 1.1 Miles | Actual: | $47,929 |
District: | Houston | Let Date: | JUL 2006 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | C 50-9-72 | CSJ: | 0050-09-072 |
Description: | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER AND INSTALL | Handling Code: |
|
Limits From: | FM 529 | Fund Cat: | 1 |
Limits To: | IH 610 | Estimate: | $670,580 |
Length: | 9.5 Miles | Actual: | $412,083 |
Bid Tabulations Back... |
Totals for 0050-09-072 | ||
Length: | 10.6 Miles | ||
Estimate: | $771,148 | ||
Actual: | $460,012 | ||
CCSJ: 0051-02-087 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | SH 3 | Let Status: | Actual |
Project ID: | NH 2006(579) | CSJ: | 0051-02-087 |
Description: | CULVERT REPLACEMENT | Handling Code: |
|
Limits From: | N OF FM 2351 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $536,846 |
Length: | 0.8 Miles | Actual: | $540,988 |
Bid Tabulations Back... |
Totals for 0051-02-087 | ||
Length: | 0.8 Miles | ||
Estimate: | $536,846 | ||
Actual: | $540,988 | ||
CCSJ: 0051-02-095 | |||
District: | Houston | Let Date: | AUG 2006 |
Highway: | SH 3 | Let Status: | Actual |
Project ID: | SFT 51-2-95 | CSJ: | 0051-02-095 |
Description: | CONTINUOUS TURN LANE | Handling Code: |
|
Limits From: | BRANTLEY | Fund Cat: | 8 |
Limits To: | NASA 1 | Estimate: | $1,261,587 |
Length: | 4.9 Miles | Actual: | $1,445,034 |
Bid Tabulations Award Status Back... |
Totals for 0051-02-095 | ||
Length: | 4.9 Miles | ||
Estimate: | $1,261,587 | ||
Actual: | $1,445,034 | ||
CCSJ: 0051-02-096 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | SH 3 | Let Status: | Actual |
Project ID: | STP 2006(153)SFT | CSJ: | 0051-02-096 |
Description: | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) | Handling Code: |
|
Limits From: | AT KANSAS STREET | Fund Cat: | 8 |
Limits To: | . | Estimate: | $95,756 |
Length: | 0.1 Miles | Actual: | $86,057 |
District: | Houston | Let Date: | JAN 2006 |
Highway: | SH 3 | Let Status: | Actual |
Project ID: | STP 2006(153)SFT | CSJ: | 0051-02-098 |
Description: | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) | Handling Code: |
|
Limits From: | AT LANDOLT | Fund Cat: | 1 |
Limits To: | . | Estimate: | $664,050 |
Length: | 0.4 Miles | Actual: | $579,696 |
District: | Houston | Let Date: | JAN 2006 |
Highway: | SH 3 | Let Status: | Actual |
Project ID: | STP 2006(290) | CSJ: | 0051-06-016 |
Description: | ADD LEFT TURN LANES | Handling Code: |
|
Limits From: | AT WINKLER STREET | Fund Cat: | 1 |
Limits To: | . | Estimate: | $50,240 |
Length: | 0.1 Miles | Actual: | $45,583 |
District: | Houston | Let Date: | JAN 2006 |
Highway: | FM 521 | Let Status: | Actual |
Project ID: | STP 2006(153)SFT | CSJ: | 0111-01-087 |
Description: | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) | Handling Code: |
|
Limits From: | AT W OREM | Fund Cat: | 8 |
Limits To: | . | Estimate: | $130,146 |
Length: | 0.1 Miles | Actual: | $114,891 |
Back... |
Totals for 0051-02-096 | ||
Length: | 0.7 Miles | ||
Estimate: | $940,192 | ||
Actual: | $826,227 | ||
CCSJ: 0110-05-105 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(328) | CSJ: | 0110-05-105 |
Description: | WIDEN NORTHBOUND MAINLANES TO CONSTRUCT AUXILIARY LANE | Handling Code: |
|
Limits From: | ENTRANCE RAMP NORTH OF RICHEY RD | Fund Cat: | 1 |
Limits To: | EXIT RAMP SOUTH OF FM 1960 | Estimate: | $618,558 |
Length: | 0.4 Miles | Actual: | $641,514 |
District: | Houston | Let Date: | JAN 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(328) | CSJ: | 0110-05-106 |
Description: | INCREASE TURNING RADIUS AT UTURN, SUBGRADE WIDENING AND | Handling Code: |
|
Limits From: | AT SPRING STUEBNER TURN AROUND | Fund Cat: | 1 |
Limits To: | . | Estimate: | $62,530 |
Length: | 0.2 Miles | Actual: | $57,324 |
District: | Houston | Let Date: | JAN 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(328) | CSJ: | 0110-05-107 |
Description: | RIPRAP OUTFALL DITCH & PILOT CHANNEL OF EXISTING DETENTION | Handling Code: |
|
Limits From: | AT OUTFALL DITCH & DETENTION POND | Fund Cat: | 1 |
Limits To: | 0.5 MI N OF SPRING STUEBNER (EAST) | Estimate: | $69,410 |
Length: | 0.2 Miles | Actual: | $68,898 |
Back... |
Totals for 0110-05-105 | ||
Length: | 0.8 Miles | ||
Estimate: | $750,498 | ||
Actual: | $767,736 | ||
CCSJ: 0110-05-110 | |||
District: | Houston | Let Date: | NOV 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | C 110-5-110 | CSJ: | 0110-05-110 |
Description: | RESHAPE EXISTING CHANNEL & CONSTRUCT RIPRAP | Handling Code: |
|
Limits From: | NB FRNTG RD/M.L.'S AT SENGER GULLY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $158,891 |
Length: | 0.0 Miles | Actual: | $225,113 |
District: | Houston | Let Date: | NOV 2005 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | C 2941-2-44 | CSJ: | 2941-02-044 |
Description: | RESHAPE / SOD EXISTING DITCH & RIPRAP DITCH BOTTOM | Handling Code: |
|
Limits From: | AT DITCH AT SPRINGWEST DRIVE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $88,827 |
Length: | 0.1 Miles | Actual: | $130,276 |
Back... |
Totals for 0110-05-110 | ||
Length: | 0.1 Miles | ||
Estimate: | $247,718 | ||
Actual: | $355,389 | ||
CCSJ: 0110-05-112 | |||
District: | Houston | Let Date: | MAR 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(329) | CSJ: | 0110-05-111 |
Description: | CONSTRUCT RIPRAP UNDER BRIDGE | Handling Code: |
|
Limits From: | IH 45 UNDERPASS AT SPRING CROSSING | Fund Cat: | 1 |
Limits To: | . | Estimate: | $8,985 |
Length: | 0.0 Miles | Actual: | $17,311 |
District: | Houston | Let Date: | MAR 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(329) | CSJ: | 0110-05-112 |
Description: | CONSTRUCT LANDSCAPE MODULAR WALL & RIPRAP PILOT CHANNEL OF | Handling Code: |
|
Limits From: | AT DET POND AT SPRING STUEBNER WEST | Fund Cat: | 1 |
Limits To: | . | Estimate: | $317,533 |
Length: | 0.1 Miles | Actual: | $393,216 |
Back... |
Totals for 0110-05-112 | ||
Length: | 0.1 Miles | ||
Estimate: | $326,518 | ||
Actual: | $410,527 | ||
CCSJ: 0271-06-111 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-5-33 | CSJ: | 0271-05-033 |
Description: | LANDSCAPING | Handling Code: |
|
Limits From: | PIN OAK | Fund Cat: | 2 |
Limits To: | HARRIS/FORT BEND C/L | Estimate: | $121,436 |
Length: | 0.5 Miles | Actual: | $189,332 |
District: | Houston | Let Date: | JUL 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-6-111 | CSJ: | 0271-06-111 |
Description: | LANDSCAPING | Handling Code: |
|
Limits From: | FORT BEND/HARRIS C/L | Fund Cat: | 10 |
Limits To: | MASON CREEK | Estimate: | $1,583,749 |
Length: | 4.0 Miles | Actual: | $1,743,421 |
Bid Tabulations Back... |
Totals for 0271-06-111 | ||
Length: | 4.5 Miles | ||
Estimate: | $1,705,185 | ||
Actual: | $1,932,753 | ||
CCSJ: 0271-06-112 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-6-112 | CSJ: | 0271-06-112 |
Description: | LANDSCAPING | Handling Code: |
|
Limits From: | MASON CREEK | Fund Cat: | 10 |
Limits To: | E OF S GREENHOUSE | Estimate: | $741,952 |
Length: | 2.8 Miles | Actual: | $764,919 |
Bid Tabulations Back... |
Totals for 0271-06-112 | ||
Length: | 2.8 Miles | ||
Estimate: | $741,952 | ||
Actual: | $764,919 | ||
CCSJ: 0271-06-113 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-6-113 | CSJ: | 0271-06-113 |
Description: | LANDSCAPING | Handling Code: |
|
Limits From: | E OF S GREENHOUSE | Fund Cat: | 10 |
Limits To: | E OF MEMORIAL BROOK DRIVE | Estimate: | $965,504 |
Length: | 3.0 Miles | Actual: | $1,108,939 |
Bid Tabulations Back... |
Totals for 0271-06-113 | ||
Length: | 3.0 Miles | ||
Estimate: | $965,504 | ||
Actual: | $1,108,939 | ||
CCSJ: 0271-07-295 | |||
District: | Houston | Let Date: | MAY 2006 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-7-295 | CSJ: | 0271-07-295 |
Description: | LANDSCAPING FOR SPRING VALLEY GREEN SPACES_ (TOLL) | Handling Code: |
|
Limits From: | CAMPBELL RD | Fund Cat: | 2 |
Limits To: | OLD VOSS RD | Estimate: | $254,962 |
Length: | 0.6 Miles | Actual: | $204,600 |
Back... |
Totals for 0271-07-295 | ||
Length: | 0.6 Miles | ||
Estimate: | $254,962 | ||
Actual: | $204,600 | ||
CCSJ: 0271-14-197 | |||
District: | Houston | Let Date: | AUG 2006 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | BR 2006(785) | CSJ: | 0271-14-192 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | LOOP 137 UNDERPASS | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,094,845 |
Length: | 0.0 Miles | Actual: | $1,773,815 |
District: | Houston | Let Date: | AUG 2006 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 6107(410) | CSJ: | 0271-14-197 |
Description: | BONDED CONCRETE OVERLAY AND RECONSTRUCTION OF BRIDGE SLABS, | Handling Code: |
|
Limits From: | US 59 N | Fund Cat: | 1 |
Limits To: | 900' S OF GELLHORN | Estimate: | $67,632,897 |
Length: | 5.2 Miles | Actual: | $71,570,069 |
District: | Houston | Let Date: | AUG 2006 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | BR 2006(785) | CSJ: | 0271-14-200 |
Description: | REPLACE BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | AT HUNTING BAYOU EB FR (STR #116) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $737,210 |
Length: | 0.0 Miles | Actual: | $639,943 |
District: | Houston | Let Date: | AUG 2006 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | BR 2006(785) | CSJ: | 0271-14-207 |
Description: | REPLACE BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | AT HUNTING BAYOU WB FR (STR#115) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $742,537 |
Length: | 0.0 Miles | Actual: | $671,781 |
District: | Houston | Let Date: | AUG 2006 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | BR 2006(785) | CSJ: | 0271-14-208 |
Description: | REPLACE BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | IH 610 (SOUTHBOUND FRTG RD) | Fund Cat: | 1 |
Limits To: | AT HUNTING BAYOU (STR # 123) | Estimate: | $720,556 |
Length: | 0.0 Miles | Actual: | $665,346 |
District: | Houston | Let Date: | AUG 2006 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 6107(410) | CSJ: | 0271-15-082 |
Description: | BONDED CONCRETE OVERLAY AND RECONSTRUCTION OF BRIDGE SLABS, | Handling Code: |
|
Limits From: | 900' S OF GELLHORN | Fund Cat: | 1 |
Limits To: | 1400' S OF GELLHORN | Estimate: | $1,201,410 |
Length: | 0.1 Miles | Actual: | $1,163,686 |
Bid Tabulations Award Status Back... |
Totals for 0271-14-197 | ||
Length: | 5.3 Miles | ||
Estimate: | $73,129,455 | ||
Actual: | $76,484,640 | ||
CCSJ: 0271-15-075 | |||
District: | Houston | Let Date: | DEC 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 6107(401) | CSJ: | 0271-15-075 |
Description: | REPAIR FENDER SYSTEM | Handling Code: |
|
Limits From: | AT HOUSTON SHIP CHANNEL BRIDGE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,404,500 |
Length: | 0.0 Miles | Actual: | $1,324,100 |
Back... |
Totals for 0271-15-075 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,404,500 | ||
Actual: | $1,324,100 | ||
CCSJ: 0271-15-077 | |||
District: | Houston | Let Date: | DEC 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | NH 2005(719) | CSJ: | 0271-15-077 |
Description: | THRUST ASSEMBLY AND WALKWAY PLATFORM REPAIR; SMALL SIGN | Handling Code: |
|
Limits From: | HOUSTON SHIP CHANNEL BR FROM SH 225 | Fund Cat: | 1 |
Limits To: | IH 610 E NORTHBOUND | Estimate: | $1,021,141 |
Length: | 1.2 Miles | Actual: | $919,350 |
Back... |
Totals for 0271-15-077 | ||
Length: | 1.2 Miles | ||
Estimate: | $1,021,141 | ||
Actual: | $919,350 | ||
CCSJ: 0271-15-080 | |||
District: | Houston | Let Date: | NOV 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-15-80 | CSJ: | 0271-15-080 |
Description: | HIGH VESSEL DETECTION SYSTEM | Handling Code: |
XX |
Limits From: | E OF HOUSTON SHIP CHANNEL BRIDGE | Fund Cat: | 11 |
Limits To: | . | Estimate: | $85,820 |
Length: | 2.5 Miles | Actual: | $25,000 |
Back... |
Totals for 0271-15-080 | ||
Length: | 2.5 Miles | ||
Estimate: | $85,820 | ||
Actual: | $25,000 | ||
CCSJ: 0389-05-089 | |||
District: | Houston | Let Date: | SEP 2005 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | CM 2005(932) | CSJ: | 0389-05-089 |
Description: | ADD RIGHT TURN LANE | Handling Code: |
|
Limits From: | AT BS 146D (WHARTON WEEMS) | Fund Cat: | 5 |
Limits To: | . | Estimate: | $142,793 |
Length: | 0.1 Miles | Actual: | $130,281 |
District: | Houston | Let Date: | SEP 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | CM 2005(932) | CSJ: | 0500-03-542 |
Description: | INTERSECTION RADIUS IMPROVEMENTS | Handling Code: |
|
Limits From: | AT EL DORADO | Fund Cat: | 5 |
Limits To: | . | Estimate: | $50,735 |
Length: | 0.4 Miles | Actual: | $31,678 |
Back... |
Totals for 0389-05-089 | ||
Length: | 0.5 Miles | ||
Estimate: | $193,528 | ||
Actual: | $161,959 | ||
CCSJ: 0389-12-086 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | C 389-12-86 | CSJ: | 0389-12-086 |
Description: | BRIDGE PAINTING | Handling Code: |
|
Limits From: | AT FRED HARTMAN BRIDGE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $738,145 |
Length: | 2.0 Miles | Actual: | $947,947 |
Bid Tabulations Back... |
Totals for 0389-12-086 | ||
Length: | 2.0 Miles | ||
Estimate: | $738,145 | ||
Actual: | $947,947 | ||
CCSJ: 0500-03-475 | |||
District: | Houston | Let Date: | SEP 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2005(830) | CSJ: | 0500-03-475 |
Description: | CONSTR 3 - LEVEL INTRCHNG @ NASA 1 BYPASS, WDN FRONTAGE_ROADS | Handling Code: |
|
Limits From: | 0.031 MI S OF EXISTING NASA ROAD 1 | Fund Cat: | 2 |
Limits To: | 1.034 MI S OF EXISTING NASA ROAD 1 | Estimate: | $42,773,385 |
Length: | 1.0 Miles | Actual: | $54,378,056 |
District: | Houston | Let Date: | SEP 2005 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2001(775) | CSJ: | 0500-03-510 |
Description: | RIGHT OF WAY ACQUISITION, UTILITY ADJUSTMENTS AND RELOCATION | Handling Code: |
|
Limits From: | MEDICAL CENTER DRIVE | Fund Cat: | ROW |
Limits To: | 1.93 KM SOUTH OF NASA 1 | Estimate: | $65,575 |
Length: | 0.0 Miles | Actual: | $81,200 |
Back... |
Totals for 0500-03-475 | ||
Length: | 1.0 Miles | ||
Estimate: | $42,838,960 | ||
Actual: | $54,459,256 | ||
CCSJ: 0500-03-539 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | SH 35 | Let Status: | Actual |
Project ID: | NH 2006(580) | CSJ: | 0178-01-033 |
Description: | RECONSTRUCTION OF FRONTAGE ROADS | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | IH 610 | Estimate: | $576,607 |
Length: | 0.0 Miles | Actual: | $548,191 |
District: | Houston | Let Date: | JUN 2006 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(330) | CSJ: | 0500-03-539 |
Description: | RECONSTRUCTION OF FRONTAGE ROADS | Handling Code: |
|
Limits From: | LOCKWOOD TO GRIGGS STREET | Fund Cat: | 1 |
Limits To: | (IN SECTIONS) | Estimate: | $4,030,137 |
Length: | 0.9 Miles | Actual: | $3,592,329 |
Bid Tabulations Back... |
Totals for 0500-03-539 | ||
Length: | 0.9 Miles | ||
Estimate: | $4,606,744 | ||
Actual: | $4,140,520 | ||
CCSJ: 0502-01-202 | |||
District: | Houston | Let Date: | FEB 2006 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | CL 502-1-202 | CSJ: | 0502-01-202 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | 0.5 MILES WEST OF SENS RD | Fund Cat: | 10 |
Limits To: | 0.5 MILES EAST OF SENS RD | Estimate: | $146,923 |
Length: | 1.0 Miles | Actual: | $119,505 |
Back... |
Totals for 0502-01-202 | ||
Length: | 1.0 Miles | ||
Estimate: | $146,923 | ||
Actual: | $119,505 | ||
CCSJ: 0508-01-318 | |||
District: | Houston | Let Date: | NOV 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 10-7(404) | CSJ: | 0508-01-318 |
Description: | CONVERT 2 - WAY FRONTAGE ROAD TO TO A 1 - WAY | Handling Code: |
|
Limits From: | 0.05 MILES EAST OF SPUR 330 | Fund Cat: | 1 |
Limits To: | 0.6 MILES WEST OF JOHN MARTIN ROAD | Estimate: | $2,233,694 |
Length: | 2.6 Miles | Actual: | $2,599,195 |
Back... |
Totals for 0508-01-318 | ||
Length: | 2.6 Miles | ||
Estimate: | $2,233,694 | ||
Actual: | $2,599,195 | ||
CCSJ: 0508-07-280 | |||
District: | Houston | Let Date: | DEC 2005 |
Highway: | SP 330 | Let Status: | Actual |
Project ID: | C 508-7-280 | CSJ: | 0508-07-280 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 10 |
Limits To: | SH 146 | Estimate: | $397,622 |
Length: | 3.4 Miles | Actual: | $424,794 |
Back... |
Totals for 0508-07-280 | ||
Length: | 3.4 Miles | ||
Estimate: | $397,622 | ||
Actual: | $424,794 | ||
CCSJ: 0598-01-074 | |||
District: | Houston | Let Date: | DEC 2005 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | STP 2006(070) | CSJ: | 0598-01-074 |
Description: | CONSTRUCT NB FRONTAGE ROADS AND BRIDGES OVER CLEAR CREEK | Handling Code: |
|
Limits From: | BW 8 | Fund Cat: | 11 |
Limits To: | BRAZORIA COUNTY LINE | Estimate: | $763,139 |
Length: | 1.0 Miles | Actual: | $723,039 |
District: | Houston | Let Date: | DEC 2005 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | STP 2006(070) | CSJ: | 0598-01-082 |
Description: | CONSTRUCT SOUTHBOUND FRONTAGE ROADS AND BRIDGES OVER CLEAR | Handling Code: |
|
Limits From: | BW 8 | Fund Cat: | 11 |
Limits To: | BRAZORIA COUNTY LINE | Estimate: | $1,781,743 |
Length: | 0.7 Miles | Actual: | $1,882,303 |
District: | Houston | Let Date: | DEC 2005 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | STP 2006(070) | CSJ: | 0598-02-038 |
Description: | CONNECT EXISTING NB FRONTAGE ROADS | Handling Code: |
|
Limits From: | HARRIS COUNTY LINE | Fund Cat: | 11 |
Limits To: | FM 2234 (MCHARD ROAD) | Estimate: | $1,207,406 |
Length: | 0.5 Miles | Actual: | $1,297,509 |
District: | Houston | Let Date: | DEC 2005 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | STP 2006(070) | CSJ: | 0598-02-041 |
Description: | CONNECT EXISTING SOUTHBOUND FRONTAGE ROADS | Handling Code: |
|
Limits From: | HARRIS COUNTY LINE | Fund Cat: | 11 |
Limits To: | FM 2234 (MCHARD ROAD) | Estimate: | $799,216 |
Length: | 0.3 Miles | Actual: | $896,066 |
Back... |
Totals for 0598-01-074 | ||
Length: | 2.5 Miles | ||
Estimate: | $4,551,504 | ||
Actual: | $4,798,917 | ||
CCSJ: 0598-01-075 | |||
District: | Houston | Let Date: | MAR 2006 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | NH 2006(355) | CSJ: | 0598-01-075 |
Description: | ACP OVERLAY | Handling Code: |
|
Limits From: | HOLMES ROAD | Fund Cat: | 1 |
Limits To: | NORTH OF CLEAR CREEK | Estimate: | $8,487,964 |
Length: | 5.7 Miles | Actual: | $8,157,432 |
Back... |
Totals for 0598-01-075 | ||
Length: | 5.7 Miles | ||
Estimate: | $8,487,964 | ||
Actual: | $8,157,432 | ||
CCSJ: 0912-00-209 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-209 | CSJ: | 0912-00-209 |
Description: | FY 2001 FLOW SIGNAL SYSTEM MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $300,000 |
Length: | 0.0 Miles | Actual: | $300,000 |
Back... |
Totals for 0912-00-209 | ||
Length: | 0.0 Miles | ||
Estimate: | $300,000 | ||
Actual: | $300,000 | ||
CCSJ: 0912-00-214 | |||
District: | Houston | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-214 | CSJ: | 0912-00-214 |
Description: | PRODUCTION OF A DIGITIZED WETLANDS PHOTO - INTERPRETATION | Handling Code: |
XX |
Limits From: | DISTRICTWIDE | Fund Cat: | 11 |
Limits To: | . | Estimate: | $112,255 |
Length: | 0.0 Miles | Actual: | $112,255 |
Back... |
Totals for 0912-00-214 | ||
Length: | 0.0 Miles | ||
Estimate: | $112,255 | ||
Actual: | $112,255 | ||
CCSJ: 0912-00-246 | |||
District: | Houston | Let Date: | MAR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(356) | CSJ: | 0912-00-246 |
Description: | UPGRADE TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,087,446 |
Length: | 0.0 Miles | Actual: | $894,271 |
Back... |
Totals for 0912-00-246 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,087,446 | ||
Actual: | $894,271 | ||
CCSJ: 0912-00-279 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(159) | CSJ: | 0912-00-279 |
Description: | UPGRADE TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,087,250 |
Length: | 0.0 Miles | Actual: | $788,784 |
Back... |
Totals for 0912-00-279 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,087,250 | ||
Actual: | $788,784 | ||
CCSJ: 0912-00-290 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(847) | CSJ: | 0912-00-290 |
Description: | CTMS INTEGRATION TO TRANSTAR | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $800,000 |
Length: | 0.0 Miles | Actual: | $800,000 |
Back... |
Totals for 0912-00-290 | ||
Length: | 0.0 Miles | ||
Estimate: | $800,000 | ||
Actual: | $800,000 | ||
CCSJ: 0912-00-291 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(958) | CSJ: | 0912-00-291 |
Description: | DYNAMIC MESSAGE SIGN UPGRADES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,548,361 |
Length: | 0.0 Miles | Actual: | $1,436,838 |
Back... |
Totals for 0912-00-291 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,548,361 | ||
Actual: | $1,436,838 | ||
CCSJ: 0912-00-300 | |||
District: | Houston | Let Date: | SEP 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-0-300 | CSJ: | 0912-00-300 |
Description: | INSTALL HIGH MAST LIGHTING | Handling Code: |
|
Limits From: | VARIOUS LOCATION ON IH 610 & IH 45 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,013,479 |
Length: | 0.0 Miles | Actual: | $2,434,673 |
Back... |
Totals for 0912-00-300 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,013,479 | ||
Actual: | $2,434,673 | ||
CCSJ: 0912-00-303 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2006(830) | CSJ: | 0912-00-303 |
Description: | FY 2005 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $812,500 |
Length: | 0.0 Miles | Actual: | $814,938 |
Back... |
Totals for 0912-00-303 | ||
Length: | 0.0 Miles | ||
Estimate: | $812,500 | ||
Actual: | $814,938 | ||
CCSJ: 0912-00-304 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(106)MM | CSJ: | 0912-00-304 |
Description: | FY 2005 REGIONAL VANPOOL PROGRAM | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,755,250 |
Length: | 0.0 Miles | Actual: | $1,750,000 |
Back... |
Totals for 0912-00-304 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,755,250 | ||
Actual: | $1,750,000 | ||
CCSJ: 0912-00-306 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2006(105) | CSJ: | 0912-00-306 |
Description: | FY 2005 REGIONAL COMMUTE ALTERNATIVES PROGRAM - MARKETING | Handling Code: |
XX |
Limits From: | VARIOUS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,905,700 |
Length: | 0.0 Miles | Actual: | $1,905,700 |
Back... |
Totals for 0912-00-306 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,905,700 | ||
Actual: | $1,905,700 | ||
CCSJ: 0912-00-310 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(160) | CSJ: | 0912-00-310 |
Description: | NEW TRAFFIC SIGNALS (GENERIC 1) | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,900,277 |
Length: | 0.0 Miles | Actual: | $1,320,475 |
Back... |
Totals for 0912-00-310 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,900,277 | ||
Actual: | $1,320,475 | ||
CCSJ: 0912-00-315 | |||
District: | Houston | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-315 | CSJ: | 0912-00-315 |
Description: | REPLACE RAISED REFLECTIVE PAVEMENT MARKERS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $824,988 |
Length: | 0.0 Miles | Actual: | $637,375 |
Back... |
Totals for 0912-00-315 | ||
Length: | 0.0 Miles | ||
Estimate: | $824,988 | ||
Actual: | $637,375 | ||
CCSJ: 0912-00-316 | |||
District: | Houston | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-316 | CSJ: | 0912-00-316 |
Description: | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE | Handling Code: |
|
Limits From: | VAR LOCATIONS OUTSIDE HARRIS CNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,071,500 |
Length: | 0.0 Miles | Actual: | $851,776 |
Back... |
Totals for 0912-00-316 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,071,500 | ||
Actual: | $851,776 | ||
CCSJ: 0912-00-317 | |||
District: | Houston | Let Date: | MAY 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-317 | CSJ: | 0912-00-317 |
Description: | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE | Handling Code: |
|
Limits From: | VAR LOCATIONS OUTSIDE HARRIS CNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,097,121 |
Length: | 0.0 Miles | Actual: | $1,519,339 |
Back... |
Totals for 0912-00-317 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,097,121 | ||
Actual: | $1,519,339 | ||
CCSJ: 0912-00-318 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(581) | CSJ: | 0912-00-318 |
Description: | NEW TRAFFIC SIGNALS (GENERIC 2) | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,902,419 |
Length: | 0.0 Miles | Actual: | $1,588,849 |
Bid Tabulations Back... |
Totals for 0912-00-318 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,902,419 | ||
Actual: | $1,588,849 | ||
CCSJ: 0912-00-320 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2007(022)MM | CSJ: | 0912-00-320 |
Description: | REGIONALLY SIGNIFICANT PLANNING SUPPORT ACTIVITIES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 7 |
Limits To: | . | Estimate: | $3,610,750 |
Length: | 0.0 Miles | Actual: | $3,610,750 |
Back... |
Totals for 0912-00-320 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,610,750 | ||
Actual: | $3,610,750 | ||
CCSJ: 0912-00-321 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(799) | CSJ: | 0912-00-321 |
Description: | CTMS MAINTENANCE (INCLUDES FLOW SIGNALS) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $3,200,000 |
Length: | 0.0 Miles | Actual: | $3,200,000 |
Back... |
Totals for 0912-00-321 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,200,000 | ||
Actual: | $3,200,000 | ||
CCSJ: 0912-71-576 | |||
District: | Houston | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Tentative |
Project ID: | C 912-71-576 | CSJ: | 0912-71-576 |
Description: | IMPROVE TRANSTAR TO SATELLITE COMMUNICATIONS CONNECTIVITY | Handling Code: |
XX |
Limits From: | AT HOUSTON TRANSTAR | Fund Cat: | 1 |
Limits To: | . | Estimate: | $352,520 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0912-71-576 | ||
Length: | 0.0 Miles | ||
Estimate: | $352,520 | ||
Actual: | |||
CCSJ: 0912-71-620 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | HP 915(1) | CSJ: | 0912-71-620 |
Description: | HIKE AND BIKE TRAIL ALONG HALLS BAYOU | Handling Code: |
|
Limits From: | HALLS BAYOU HIKE & BIKE TRAIL | Fund Cat: | 2 |
Limits To: | FROM HIRSCH ROAD TO BRETSHIRE STREE | Estimate: | $7,062,846 |
Length: | 2.9 Miles | Actual: | $6,360,965 |
Back... |
Totals for 0912-71-620 | ||
Length: | 2.9 Miles | ||
Estimate: | $7,062,846 | ||
Actual: | $6,360,965 | ||
CCSJ: 0912-71-641 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 99(554)MM | CSJ: | 0912-71-641 |
Description: | RECONSTRUCT & REHABILITATE 4 - LANE ROADWAY | Handling Code: |
|
Limits From: | IN HOUSTON ON EDGEBROOK ST, IH 45 | Fund Cat: | 7 |
Limits To: | SH 3 | Estimate: | $10,116,024 |
Length: | 1.4 Miles | Actual: | $9,607,291 |
Bid Tabulations Back... |
Totals for 0912-71-641 | ||
Length: | 1.4 Miles | ||
Estimate: | $10,116,024 | ||
Actual: | $9,607,291 | ||
CCSJ: 0912-71-657 | |||
District: | Houston | Let Date: | FEB 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | HP 430(1) | CSJ: | 0912-71-657 |
Description: | CONSTRUCT RAILROAD GRADE SEPARATIONS OVER PTRA AND UPRR | Handling Code: |
|
Limits From: | CENTRAL STREET EXTENSION OVER MANCH | Fund Cat: | 2 |
Limits To: | TRAIN YARD | Estimate: | $15,687,331 |
Length: | 0.7 Miles | Actual: | $15,100,116 |
Back... |
Totals for 0912-71-657 | ||
Length: | 0.7 Miles | ||
Estimate: | $15,687,331 | ||
Actual: | $15,100,116 | ||
CCSJ: 0912-71-702 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(593)TE | CSJ: | 0912-71-702 |
Description: | CONSTRUCTION OF SOUTH MAYDE CREEK BICYCLE AND PEDESTRIAL | Handling Code: |
NC |
Limits From: | MAYDE CREEK PHASE 1: FM CULLEN PARK | Fund Cat: | 9 |
Limits To: | APPLETREE HILL LN | Estimate: | $842,704 |
Length: | 1.2 Miles | Actual: | $712,057 |
Bid Tabulations Back... |
Totals for 0912-71-702 | ||
Length: | 1.2 Miles | ||
Estimate: | $842,704 | ||
Actual: | $712,057 | ||
CCSJ: 0912-71-861 | |||
District: | Houston | Let Date: | FEB 2006 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2005(418) | CSJ: | 0912-71-861 |
Description: | GRADING, CONCRETE PAVEMENT, AND STRUCTURES | Handling Code: |
|
Limits From: | DAIRY ASHFORD AT TURKEY CREEK | Fund Cat: | 5 |
Limits To: | WEST TERMINUS OF CHATTERTON DRIVE | Estimate: | $2,563,658 |
Length: | 2.3 Miles | Actual: | $1,545,148 |
Back... |
Totals for 0912-71-861 | ||
Length: | 2.3 Miles | ||
Estimate: | $2,563,658 | ||
Actual: | $1,545,148 | ||
CCSJ: 0912-71-864 | |||
District: | Houston | Let Date: | AUG 2006 |
Highway: | VA | Let Status: | Tentative |
Project ID: | IVH 9248(001) | CSJ: | 0912-71-864 |
Description: | SMART COMMUTER INTELLIGENT VEHICLE HIGHWAY SYSTEMS OPERATION | Handling Code: |
XX |
Limits From: | IN HOUSTON AT VARIOUS LOCATIONS | Fund Cat: | 10 |
Limits To: | . | Estimate: | $784,722 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0912-71-864 | ||
Length: | 0.0 Miles | ||
Estimate: | $784,722 | ||
Actual: | |||
CCSJ: 0912-71-885 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2006(107) | CSJ: | 0912-71-885 |
Description: | COMMUTE SOLUTIONS (FY 2005) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $4,649,908 |
Length: | 0.0 Miles | Actual: | $4,649,908 |
Back... |
Totals for 0912-71-885 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,649,908 | ||
Actual: | $4,649,908 | ||
CCSJ: 0912-71-892 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(406) | CSJ: | 0271-14-211 |
Description: | FULL DEPTH REPAIR OF FRONTAGE ROADS | Handling Code: |
|
Limits From: | HEMPSTEAD ROAD | Fund Cat: | 1 |
Limits To: | 12 TH STREET | Estimate: | $63,980 |
Length: | 0.4 Miles | Actual: | $71,252 |
District: | Houston | Let Date: | OCT 2005 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 610-7(406) | CSJ: | 0271-16-126 |
Description: | FULL DEPTH REPAIRS | Handling Code: |
|
Limits From: | SH 288 | Fund Cat: | 1 |
Limits To: | IH 45 SOUTH | Estimate: | $60,432 |
Length: | 5.5 Miles | Actual: | $46,640 |
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2005(959) | CSJ: | 0912-71-892 |
Description: | SHOULDER EDGE REPAIR AND LONGITUDINAL JOINT REPAIR, JOINT | Handling Code: |
|
Limits From: | IH 610, US 59 & IH 45 | Fund Cat: | 1 |
Limits To: | IN CENTRAL HOUSTON MAINTENANCE AREA | Estimate: | $5,318,303 |
Length: | 12.4 Miles | Actual: | $5,775,423 |
Back... |
Totals for 0912-71-892 | ||
Length: | 18.3 Miles | ||
Estimate: | $5,442,715 | ||
Actual: | $5,893,315 | ||
CCSJ: 0912-72-012 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2006(108) | CSJ: | 0912-72-012 |
Description: | COMMUTE SOLUTIONS (FY 2006) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $3,080,213 |
Length: | 0.0 Miles | Actual: | $3,080,213 |
Back... |
Totals for 0912-72-012 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,080,213 | ||
Actual: | $3,080,213 | ||
CCSJ: 0912-72-026 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(006) | CSJ: | 0912-72-026 |
Description: | CONGESTION MITIGATION ANALYSIS BY HGAC FOR NEPA PROCESS | Handling Code: |
XX |
Limits From: | 20 HIGH PRIORITY PROJECTS | Fund Cat: | 11 |
Limits To: | DISTRICTWIDE | Estimate: | $80,000 |
Length: | 0.0 Miles | Actual: | $80,000 |
Back... |
Totals for 0912-72-026 | ||
Length: | 0.0 Miles | ||
Estimate: | $80,000 | ||
Actual: | $80,000 | ||
CCSJ: 0912-72-032 | |||
District: | Houston | Let Date: | MAR 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2006(545) | CSJ: | 0912-72-032 |
Description: | ADDRESS TRAFFIC MITIGATION AND COMMUTE ALTERNATIVE ISSUES IN | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $250,750 |
Length: | 0.0 Miles | Actual: | $250,750 |
Back... |
Totals for 0912-72-032 | ||
Length: | 0.0 Miles | ||
Estimate: | $250,750 | ||
Actual: | $250,750 | ||
CCSJ: 0912-72-035 | |||
District: | Houston | Let Date: | DEC 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2006(072) | CSJ: | 0912-72-035 |
Description: | INSTALL QUEUE DETECTION SYSTEM | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS (IN HARRIS CTY) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $180,406 |
Length: | 0.0 Miles | Actual: | $189,979 |
Back... |
Totals for 0912-72-035 | ||
Length: | 0.0 Miles | ||
Estimate: | $180,406 | ||
Actual: | $189,979 | ||
CCSJ: 0912-72-042 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | CL 912-72-42 | CSJ: | 0912-72-042 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 45, US 59 | Fund Cat: | 10 |
Limits To: | IH 10 & SP 528 | Estimate: | $1,225,618 |
Length: | 0.0 Miles | Actual: | $1,458,361 |
Bid Tabulations Back... |
Totals for 0912-72-042 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,225,618 | ||
Actual: | $1,458,361 | ||
CCSJ: 0912-72-060 | |||
District: | Houston | Let Date: | OCT 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | ITS 2004(809) | CSJ: | 0912-72-060 |
Description: | ITS DEVELOP HOT LANE NETWORK PLAN IN HARRIS COUNTY | Handling Code: |
XX |
Limits From: | 2 EXISTING HOT CORRIDORS AND ADD'L | Fund Cat: | 10 |
Limits To: | 4 TOLLING HOV CORRIDORS | Estimate: | $575,000 |
Length: | 0.0 Miles | Actual: | $575,000 |
Back... |
Totals for 0912-72-060 | ||
Length: | 0.0 Miles | ||
Estimate: | $575,000 | ||
Actual: | $575,000 | ||
CCSJ: 0912-72-080 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(573) | CSJ: | 0912-72-080 |
Description: | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,100,000 |
Length: | 0.0 Miles | Actual: | $728,857 |
Bid Tabulations Back... |
Totals for 0912-72-080 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,100,000 | ||
Actual: | $728,857 | ||
CCSJ: 0912-72-081 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2006(574) | CSJ: | 0912-72-081 |
Description: | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,097,400 |
Length: | 0.0 Miles | Actual: | $749,528 |
Bid Tabulations Back... |
Totals for 0912-72-081 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,097,400 | ||
Actual: | $749,528 | ||
CCSJ: 1062-04-052 | |||
District: | Houston | Let Date: | JUN 2006 |
Highway: | FM 521 | Let Status: | Actual |
Project ID: | C 111-1-86 | CSJ: | 0111-01-086 |
Description: | ADD LEFT TURN LANES | Handling Code: |
|
Limits From: | AT ALMEDA PLAZA | Fund Cat: | 1 |
Limits To: | . | Estimate: | $332,741 |
Length: | 0.3 Miles | Actual: | $295,462 |
District: | Houston | Let Date: | JUN 2006 |
Highway: | FM 2100 | Let Status: | Actual |
Project ID: | SFT 1062-4-52 | CSJ: | 1062-04-052 |
Description: | ADD LEFT TURN LANES | Handling Code: |
|
Limits From: | AT HARE ROAD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $491,248 |
Length: | 0.2 Miles | Actual: | $445,413 |
District: | Houston | Let Date: | JUN 2006 |
Highway: | FM 1942 | Let Status: | Actual |
Project ID: | SFT 1812-1-18 | CSJ: | 1812-01-018 |
Description: | ADD LEFT TURN LANES | Handling Code: |
|
Limits From: | AT GARTH ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $405,323 |
Length: | 0.2 Miles | Actual: | $227,558 |
Bid Tabulations Back... |
Totals for 1062-04-052 | ||
Length: | 0.7 Miles | ||
Estimate: | $1,229,312 | ||
Actual: | $968,433 | ||
CCSJ: 1685-01-087 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | C 720-3-119 | CSJ: | 0720-03-119 |
Description: | DUAL LEFT TURN LANES | Handling Code: |
|
Limits From: | AT FM 2920 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $144,310 |
Length: | 0.3 Miles | Actual: | $129,894 |
District: | Houston | Let Date: | JAN 2006 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2006(162)SFT | CSJ: | 1685-01-087 |
Description: | LENGTHEN LEFT TURN LANE | Handling Code: |
|
Limits From: | BRETON RIDGE | Fund Cat: | 1 |
Limits To: | WILLOW CENTRE | Estimate: | $92,457 |
Length: | 0.1 Miles | Actual: | $111,105 |
Back... |
Totals for 1685-01-087 | ||
Length: | 0.4 Miles | ||
Estimate: | $236,767 | ||
Actual: | $240,999 | ||
CCSJ: 1685-03-085 | |||
District: | Houston | Let Date: | APR 2006 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | C 1685-3-85 | CSJ: | 1685-03-085 |
Description: | CRACK SEAL, PAVEMENT REPAIR & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LEE ROAD | Fund Cat: | 1 |
Limits To: | 0.1 MILES EAST OF BF 1960A | Estimate: | $171,037 |
Length: | 3.6 Miles | Actual: | $143,201 |
Back... |
Totals for 1685-03-085 | ||
Length: | 3.6 Miles | ||
Estimate: | $171,037 | ||
Actual: | $143,201 | ||
CCSJ: 1685-05-086 | |||
District: | Houston | Let Date: | AUG 2006 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | NH 2006(786) | CSJ: | 1685-05-086 |
Description: | PLANING, SPALL REP, FULL DEP CONC REP, CONC BRDG DECK | Handling Code: |
|
Limits From: | ASPENGLEN DR. | Fund Cat: | 1 |
Limits To: | 1800' NORTH OF PARK ROW | Estimate: | $4,846,232 |
Length: | 3.2 Miles | Actual: | $5,236,514 |
Bid Tabulations Award Status Back... |
Totals for 1685-05-086 | ||
Length: | 3.2 Miles | ||
Estimate: | $4,846,232 | ||
Actual: | $5,236,514 | ||
CCSJ: 2941-01-019 | |||
District: | Houston | Let Date: | AUG 2006 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | STP 2006(787) | CSJ: | 2941-01-019 |
Description: | INSTALL LEFT TURN LANE, WIDEN SUB GRADE, ACP OVERLAY AND | Handling Code: |
|
Limits From: | AT ROBERTS CEMETERY RD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $399,560 |
Length: | 0.4 Miles | Actual: | $425,671 |
Bid Tabulations Award Status Back... |
Totals for 2941-01-019 | ||
Length: | 0.4 Miles | ||
Estimate: | $399,560 | ||
Actual: | $425,671 | ||
CCSJ: 3256-01-088 | |||
District: | Houston | Let Date: | APR 2006 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | CL 3256-1-88 | CSJ: | 3256-01-088 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
XX |
Limits From: | WEST PARK | Fund Cat: | 10 |
Limits To: | WESTHEIMER | Estimate: | $300,000 |
Length: | 0.9 Miles | Actual: | $300,000 |
Back... |
Totals for 3256-01-088 | ||
Length: | 0.9 Miles | ||
Estimate: | $300,000 | ||
Actual: | $300,000 | ||
CCSJ: 3256-02-064 | |||
District: | Houston | Let Date: | FEB 2006 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | STP 2006(241) | CSJ: | 3256-02-064 |
Description: | CHANNEL STABILIZATION FOR EROSION AND SCOUR REPAIR | Handling Code: |
|
Limits From: | AT GREENS BAYOU CHANNEL | Fund Cat: | 1 |
Limits To: | . | Estimate: | $579,488 |
Length: | 0.0 Miles | Actual: | $464,368 |
Back... |
Totals for 3256-02-064 | ||
Length: | 0.0 Miles | ||
Estimate: | $579,488 | ||
Actual: | $464,368 | ||
CCSJ: 3256-02-070 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | CM 2006(382) | CSJ: | 3256-02-070 |
Description: | ACQUISITION, UTILITIES AND RELOCATION | Handling Code: |
XX |
Limits From: | IH 45N | Fund Cat: | ROW |
Limits To: | HARDY TOLL ROAD | Estimate: | |
Length: | 1.6 Miles | Actual: | $1,890,000 |
Back... |
Totals for 3256-02-070 | ||
Length: | 1.6 Miles | ||
Estimate: | |||
Actual: | $1,890,000 | ||
CCSJ: 3256-02-075 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | C 3256-2-75 | CSJ: | 3256-02-075 |
Description: | REALIGN OLD NORTH BELT (SUBGRADE, BASE, ACP, RCP, DITCHES, | Handling Code: |
|
Limits From: | AT OLD NORTH BELT DR | Fund Cat: | 1 |
Limits To: | . | Estimate: | $168,406 |
Length: | 0.2 Miles | Actual: | $199,307 |
Bid Tabulations Back... |
Totals for 3256-02-075 | ||
Length: | 0.2 Miles | ||
Estimate: | $168,406 | ||
Actual: | $199,307 | ||
CCSJ: 3256-03-078 | |||
District: | Houston | Let Date: | JAN 2006 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | C 3256-3-78 | CSJ: | 3256-03-078 |
Description: | URETEK JACKING | Handling Code: |
XX |
Limits From: | NEAR IH 45 INTERCHANGE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $400,000 |
Length: | 0.0 Miles | Actual: | $400,000 |
Back... |
Totals for 3256-03-078 | ||
Length: | 0.0 Miles | ||
Estimate: | $400,000 | ||
Actual: | $400,000 | ||
CCSJ: 3510-05-013 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | C 3510-5-13 | CSJ: | 3510-05-013 |
Description: | LANDSCAPING | Handling Code: |
|
Limits From: | N OF KATY-FORT BEND ROAD | Fund Cat: | 10 |
Limits To: | S OF IH 10 | Estimate: | $358,705 |
Length: | 0.0 Miles | Actual: | $358,344 |
Bid Tabulations Back... |
Totals for 3510-05-013 | ||
Length: | 0.0 Miles | ||
Estimate: | $358,705 | ||
Actual: | $358,344 | ||
CCSJ: 8004-12-003 | |||
District: | Houston | Let Date: | JUL 2006 |
Highway: | MH | Let Status: | Actual |
Project ID: | C 8004-12-3 | CSJ: | 8004-12-003 |
Description: | CONSTRUCT 4 - LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY | Handling Code: |
|
Limits From: | IN HOUSTON ON LITTLE YORK RD FROM E | Fund Cat: | 2 |
Limits To: | HARDY RD TO US 59 | Estimate: | $13,583,451 |
Length: | 1.9 Miles | Actual: | $13,759,609 |
District: | Houston | Let Date: | JUL 2006 |
Highway: | MH | Let Status: | Actual |
Project ID: | CC 8004-12-5 | CSJ: | 8004-12-005 |
Description: | UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | IN HOUSTON ON LITTLE YORK RD FROM E | Fund Cat: | 10 |
Limits To: | HARDY RD TO US 59 | Estimate: | $2,435,588 |
Length: | 2.0 Miles | Actual: | $2,196,138 |
Bid Tabulations Back... |
Totals for 8004-12-003 | ||
Length: | 3.9 Miles | ||
Estimate: | $16,019,039 | ||
Actual: | $15,955,747 |
|
|