Letting Schedule for Houston District (FY 2006)
Letting Schedule for Houston District (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
Houston District (FY 2006) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0111-04-033 | FM 521 | Actual | APR 2006 | $1,748,378 | 1 | ONE COURSE SURFACE TREATMENT, ASHPALT OVERLAY, SHOULDER |
0178-02-078 | SH 35 | Actual | APR 2006 | $849,925 | 8 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
0598-02-043 | SH 288 | Actual | MAY 2006 | $6,712,532 | 1 | ONE COURSE SURFACE TREATMENT, ASHPALT OVERLAY AND |
0912-31-115 | CR | Actual | JUL 2006 | $2,623,833 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-31-143 | VA | Actual | FEB 2006 | $892,354 | 5 | CONSTRUCT HIKE & BIKE TRAIL |
0912-31-158 | CR | Actual | MAY 2006 | $21,176,953 | 10 | WIDEN TO 4 LANES |
1412-02-017 | FM 1301 | Actual | APR 2006 | $789,768 | 1 | ASPHALT CONCRETE SURFACE REHABILITATION, ASPHALT / CONCRETE |
2523-02-057 | FM 2004 | Actual | SEP 2005 | $314,231 | 1 | REPAIR BOAT RAMP |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-08-143 | US 90A | Actual | APR 2006 | $39,255,617 | 10 | WIDEN TO 8 - LANE DIVIDED WITH CURB AND GUTTER |
0027-08-144 | US 90A | Actual | SEP 2005 | $21,881,454 | 10 | WIDEN TO 8 - LANE DIVIDED WITH DIAMOND INTERCHANGE AT DULLES / |
0027-12-121 | US 59 | Actual | JAN 2006 | $42,610,153 | 10 | CONSTRUCT INTERCHANGE FOR US 59 AND SH 99 |
0027-12-131 | US 59 | Actual | AUG 2006 | $2,759,712 | 1 | BASE REPAIR, SURFACE TREATMENT, OVERLAY AND JOINT REPAIR |
0187-05-055 | SH 36 | Actual | JUN 2006 | $5,580,857 | 1 | BASE REPAIR, SURFACE TRATMENT AND OVERLAY |
0912-34-128 | VA | Actual | DEC 2005 | $497,200 | 1 | CRACK SEAL |
2105-01-041 | FM 2234 | Actual | JAN 2006 | $835,582 | 1 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
3422-01-009 | PR 72 | Actual | FEB 2006 | $2,768,574 | 10 | BASE REPAIR, LEVEL - UP AND ACP SURFACE WITH PAVEMENT MARKINGS |
3422-01-010 | PR 72 | Actual | NOV 2005 | $813,788 | 10 | CROSS CULVERT REPAIR |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0051-04-058 | SH 87 | Actual | JUN 2006 | $232,930 | 11 | LEFT TURN LANES |
0051-07-004 | FM 188 | Actual | SEP 2005 | $167,897 | 1 | BASE REPAIR AND OVERLAY |
0051-08-016 | SP 342 | Actual | SEP 2005 | $1,111,388 | 1 | BASE REPAIR MILL AND OVERLAY |
0367-06-057 | SH 87 | Actual | SEP 2005 | $291,890 | 1 | BASE REPAIR AND OVERLAY |
0686-02-023 | FM 1765 | Actual | MAY 2006 | $872,389 | 1 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
0912-73-079 | CS | Actual | NOV 2005 | $699,659 | 6 | REPLACE BRIDGE |
0978-02-056 | FM 3436 | Actual | SEP 2005 | $1,328,068 | 1 | ROADWAY RECONSTRUCTION |
0978-02-063 | FM 517 | Actual | MAY 2006 | $389,977 | 1 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
1002-02-009 | FM 517 | Actual | SEP 2005 | $715,403 | 1 | ADD 10 FT SHOULDER BOTH SIDES |
1002-02-011 | FM 517 | Actual | JAN 2006 | $438,528 | 1 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
1607-01-048 | FM 1764 | Actual | MAY 2006 | $2,418,580 | 1 | OVERLAY FRONTAGE ROADS WITH CRUMB RUBBER SEAL COAT AND 1 1 / 2 |
1844-02-019 | FM 2351 | Actual | SEP 2005 | $297,349 | 1 | REINFORCED CONCRETE PIPE WITH INLETS, REMOVE SECTION OF |
1844-02-020 | FM 2351 | Actual | SEP 2005 | $296,548 | 1 | TRAFFIC SIGNAL IMPROVEMENTS AND LEFT TURN LANE |
3049-01-026 | FM 646 | Actual | APR 2006 | $2,388,916 | 1 | GRADE SEPARATION |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0028-01-087 | US 90 | Actual | FEB 2006 | $853,444 | 1 | BASE REPAIR, MILL, ASPHALT OVERLAY AND PAVEMENT MARKINGS |
0028-02-044 | US 90 | Actual | JUL 2006 | $45,844,449 | 10 | CONSTRUCT INTERIM GRADE SEPARATION (PHASE 2) ON NEW LOCATION |
0028-02-054 | US 90 | Actual | JUL 2006 | $67,299,168 | 10 | CONSTRUCT 6 MAIN LANES |
0028-02-080 | US 90 | Actual | JAN 2006 | $289,150 | 1 | DITCH CLEARING |
0050-06-066 | US 290 | Actual | NOV 2005 | $1,235,808 | 7 | DETENTION PONDS #2 AND #3 |
0050-09-072 | US 290 | Actual | JUL 2006 | $460,012 | 1 | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER AND INSTALL |
0051-02-087 | SH 3 | Actual | JUN 2006 | $540,988 | 1 | CULVERT REPLACEMENT |
0051-02-095 | SH 3 | Actual | AUG 2006 | $1,445,034 | 8 | CONTINUOUS TURN LANE |
0051-02-096 | SH 3 | Actual | JAN 2006 | $826,227 | 8 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
0110-05-105 | IH 45 | Actual | JAN 2006 | $767,736 | 1 | WIDEN NORTHBOUND MAINLANES TO CONSTRUCT AUXILIARY LANE |
0110-05-110 | IH 45 | Actual | NOV 2005 | $355,389 | 1 | RESHAPE EXISTING CHANNEL & CONSTRUCT RIPRAP |
0110-05-112 | IH 45 | Actual | MAR 2006 | $410,527 | 1 | CONSTRUCT LANDSCAPE MODULAR WALL & RIPRAP PILOT CHANNEL OF |
0271-06-111 | IH 10 | Actual | JUL 2006 | $1,932,753 | 2 | LANDSCAPING |
0271-06-112 | IH 10 | Actual | JUL 2006 | $764,919 | 10 | LANDSCAPING |
0271-06-113 | IH 10 | Actual | JUL 2006 | $1,108,939 | 10 | LANDSCAPING |
0271-07-295 | IH 10 | Actual | MAY 2006 | $204,600 | 2 | LANDSCAPING FOR SPRING VALLEY GREEN SPACES_ (TOLL) |
0271-14-197 | IH 610 | Actual | AUG 2006 | $76,484,640 | 1 | BONDED CONCRETE OVERLAY AND RECONSTRUCTION OF BRIDGE SLABS, |
0271-15-075 | IH 610 | Actual | DEC 2005 | $1,324,100 | 1 | REPAIR FENDER SYSTEM |
0271-15-077 | IH 610 | Actual | DEC 2005 | $919,350 | 1 | THRUST ASSEMBLY AND WALKWAY PLATFORM REPAIR; SMALL SIGN |
0271-15-080 | IH 610 | Actual | NOV 2005 | $25,000 | 11 | HIGH VESSEL DETECTION SYSTEM |
0389-05-089 | SH 146 | Actual | SEP 2005 | $161,959 | 5 | ADD RIGHT TURN LANE |
0389-12-086 | SH 146 | Actual | JUL 2006 | $947,947 | 1 | BRIDGE PAINTING |
0500-03-475 | IH 45 | Actual | SEP 2005 | $54,459,256 | ROW | CONSTR 3 - LEVEL INTRCHNG @ NASA 1 BYPASS, WDN FRONTAGE_ROADS |
0500-03-539 | IH 45 | Actual | JUN 2006 | $4,140,520 | 1 | RECONSTRUCTION OF FRONTAGE ROADS |
0502-01-202 | SH 225 | Actual | FEB 2006 | $119,505 | 10 | LANDSCAPE DEVELOPMENT |
0508-01-318 | IH 10 | Actual | NOV 2005 | $2,599,195 | 1 | CONVERT 2 - WAY FRONTAGE ROAD TO TO A 1 - WAY |
0508-07-280 | SP 330 | Actual | DEC 2005 | $424,794 | 10 | LANDSCAPE DEVELOPMENT |
0598-01-074 | SH 288 | Actual | DEC 2005 | $4,798,917 | 11 | CONSTRUCT NB FRONTAGE ROADS AND BRIDGES OVER CLEAR CREEK |
0598-01-075 | SH 288 | Actual | MAR 2006 | $8,157,432 | 1 | ACP OVERLAY |
0912-00-209 | VA | Actual | JUN 2006 | $300,000 | 1 | FY 2001 FLOW SIGNAL SYSTEM MAINTENANCE |
0912-00-214 | VA | Actual | MAY 2006 | $112,255 | 11 | PRODUCTION OF A DIGITIZED WETLANDS PHOTO - INTERPRETATION |
0912-00-246 | VA | Actual | MAR 2006 | $894,271 | 1 | UPGRADE TRAFFIC SIGNALS |
0912-00-279 | VA | Actual | JAN 2006 | $788,784 | 1 | UPGRADE TRAFFIC SIGNALS |
0912-00-290 | VA | Actual | JUL 2006 | $800,000 | 1 | CTMS INTEGRATION TO TRANSTAR |
0912-00-291 | VA | Actual | OCT 2005 | $1,436,838 | 1 | DYNAMIC MESSAGE SIGN UPGRADES |
0912-00-300 | VA | Actual | SEP 2005 | $2,434,673 | 1 | INSTALL HIGH MAST LIGHTING |
0912-00-303 | VA | Actual | JUL 2006 | $814,938 | 5 | FY 2005 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM |
0912-00-304 | VA | Actual | OCT 2005 | $1,750,000 | 7 | FY 2005 REGIONAL VANPOOL PROGRAM |
0912-00-306 | VA | Actual | OCT 2005 | $1,905,700 | 5 | FY 2005 REGIONAL COMMUTE ALTERNATIVES PROGRAM - MARKETING |
0912-00-310 | VA | Actual | JAN 2006 | $1,320,475 | 1 | NEW TRAFFIC SIGNALS (GENERIC 1) |
0912-00-315 | VA | Actual | MAY 2006 | $637,375 | 1 | REPLACE RAISED REFLECTIVE PAVEMENT MARKERS |
0912-00-316 | VA | Actual | MAY 2006 | $851,776 | 1 | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-00-317 | VA | Actual | MAY 2006 | $1,519,339 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-00-318 | VA | Actual | JUN 2006 | $1,588,849 | 1 | NEW TRAFFIC SIGNALS (GENERIC 2) |
0912-00-320 | VA | Actual | JUL 2006 | $3,610,750 | 7 | REGIONALLY SIGNIFICANT PLANNING SUPPORT ACTIVITIES |
0912-00-321 | VA | Actual | JUL 2006 | $3,200,000 | 1 | CTMS MAINTENANCE (INCLUDES FLOW SIGNALS) |
0912-71-576 | VA | Tentative | AUG 2006 | $352,520 | 1 | IMPROVE TRANSTAR TO SATELLITE COMMUNICATIONS CONNECTIVITY |
0912-71-620 | VA | Actual | JAN 2006 | $6,360,965 | 2 | HIKE AND BIKE TRAIL ALONG HALLS BAYOU |
0912-71-641 | CS | Actual | JUL 2006 | $9,607,291 | 7 | RECONSTRUCT & REHABILITATE 4 - LANE ROADWAY |
0912-71-657 | CS | Actual | FEB 2006 | $15,100,116 | 2 | CONSTRUCT RAILROAD GRADE SEPARATIONS OVER PTRA AND UPRR |
0912-71-702 | CS | Actual | JUN 2006 | $712,057 | 9 | CONSTRUCTION OF SOUTH MAYDE CREEK BICYCLE AND PEDESTRIAL |
0912-71-861 | CS | Actual | FEB 2006 | $1,545,148 | 5 | GRADING, CONCRETE PAVEMENT, AND STRUCTURES |
0912-71-864 | VA | Tentative | AUG 2006 | $784,722 | 10 | SMART COMMUTER INTELLIGENT VEHICLE HIGHWAY SYSTEMS OPERATION |
0912-71-885 | VA | Actual | OCT 2005 | $4,649,908 | 5 | COMMUTE SOLUTIONS (FY 2005) |
0912-71-892 | VA | Actual | OCT 2005 | $5,893,315 | 1 | SHOULDER EDGE REPAIR AND LONGITUDINAL JOINT REPAIR, JOINT |
0912-72-012 | VA | Actual | OCT 2005 | $3,080,213 | 5 | COMMUTE SOLUTIONS (FY 2006) |
0912-72-026 | VA | Actual | OCT 2005 | $80,000 | 11 | CONGESTION MITIGATION ANALYSIS BY HGAC FOR NEPA PROCESS |
0912-72-032 | VA | Actual | MAR 2006 | $250,750 | 5 | ADDRESS TRAFFIC MITIGATION AND COMMUTE ALTERNATIVE ISSUES IN |
0912-72-035 | VA | Actual | DEC 2005 | $189,979 | 1 | INSTALL QUEUE DETECTION SYSTEM |
0912-72-042 | VA | Actual | JUL 2006 | $1,458,361 | 10 | LANDSCAPE DEVELOPMENT |
0912-72-060 | VA | Actual | OCT 2005 | $575,000 | 10 | ITS DEVELOP HOT LANE NETWORK PLAN IN HARRIS COUNTY |
0912-72-080 | VA | Actual | JUN 2006 | $728,857 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-72-081 | VA | Actual | JUN 2006 | $749,528 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
1062-04-052 | FM 2100 | Actual | JUN 2006 | $968,433 | 8 | ADD LEFT TURN LANES |
1685-01-087 | FM 1960 | Actual | JAN 2006 | $240,999 | 1 | LENGTHEN LEFT TURN LANE |
1685-03-085 | FM 1960 | Actual | APR 2006 | $143,201 | 1 | CRACK SEAL, PAVEMENT REPAIR & PAVEMENT MARKINGS |
1685-05-086 | SH 6 | Actual | AUG 2006 | $5,236,514 | 1 | PLANING, SPALL REP, FULL DEP CONC REP, CONC BRDG DECK |
2941-01-019 | FM 2920 | Actual | AUG 2006 | $425,671 | 1 | INSTALL LEFT TURN LANE, WIDEN SUB GRADE, ACP OVERLAY AND |
3256-01-088 | BW 8 | Actual | APR 2006 | $300,000 | 10 | LANDSCAPE DEVELOPMENT |
3256-02-064 | BW 8 | Actual | FEB 2006 | $464,368 | 1 | CHANNEL STABILIZATION FOR EROSION AND SCOUR REPAIR |
3256-02-070 | BW 8 | Actual | JAN 2006 | $1,890,000 | ROW | ACQUISITION, UTILITIES AND RELOCATION |
3256-02-075 | BW 8 | Actual | JUL 2006 | $199,307 | 1 | REALIGN OLD NORTH BELT (SUBGRADE, BASE, ACP, RCP, DITCHES, |
3256-03-078 | BW 8 | Actual | JAN 2006 | $400,000 | 1 | URETEK JACKING |
3510-05-013 | SH 99 | Actual | JUL 2006 | $358,344 | 10 | LANDSCAPING |
8004-12-003 | MH | Actual | JUL 2006 | $15,955,747 | 10 | CONSTRUCT 4 - LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0110-02-020 | SH 75 | Actual | JUN 2006 | $3,515,318 | 8 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
0110-04-166 | IH 45 | Actual | JAN 2006 | $1,210,769 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0177-05-057 | US 59 | Actual | AUG 2006 | $90,129,876 | 11 | WIDEN TO 8 MAIN LANES AND TWO 3 - LANE FRONTAGE ROADS |
0177-05-090 | US 59 | Actual | JUN 2006 | $59,694,743 | 1 | WIDEN TO 8 MAIN LANES, WIDEN ROMAN FOREST OVERPASS, RECONSTR |
0675-08-094 | IH 45 | Actual | FEB 2006 | $7,978,285 | 1 | BASE REPAIR, OCST & PFC |
0912-37-111 | CR | Actual | APR 2006 | $1,562,581 | 6 | REPLACE BRIDGE |
0912-37-117 | CR | Actual | OCT 2005 | $1,717,340 | 6 | REPLACE BRIDGE |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0271-04-067 | IH 10 | Actual | SEP 2005 | $3,726,901 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0271-04-080 | IH 10 | Actual | SEP 2005 | $531,989 | 11 | CONCRETE PAVEMENT, CONCRETE TRAFFIC BARRIER AND PAVEMENT |
0271-04-081 | IH 10 | Actual | JUL 2006 | $1,595,507 | 1 | BASE REPAIR, PLANING, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0409-03-010 | FM 1488 | Actual | FEB 2006 | $273,796 | 11 | ADD LEFT AND RIGHT TURN LANE, SUBGRADE WIDENING, ASPHALT |
0523-02-037 | FM 362 | Actual | MAR 2006 | $1,081,176 | 8 | ADD LEFT TURN LANES (SAFETY BOND PROGRAM) |
|
|