Detail Letting Schedule for Bowie County (FY 2010)
Detail Letting Schedule for Bowie County (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
Bowie County (FY 2010) |
CCSJ: 0010-12-063 | |||
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | BR 2010(956) | CSJ: | 0010-12-063 |
Description: | REHABILITATE BRIDGES AND APPROACHES | Handling Code: |
|
Limits From: | AT BIG CREEK & AT CANEY CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,243,605 |
Length: | 1.1 Miles | Actual: | $2,285,063 |
Back... |
Totals for 0010-12-063 | ||
---|---|---|---|
Length: | 1.1 Miles | ||
Estimate: | $2,243,605 | ||
Actual: | $2,285,063 | ||
CCSJ: 0010-13-084 | |||
District: | Atlanta | Let Date: | JAN 2010 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2010(236)HES | CSJ: | 0010-13-084 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT INTERSECTION OF US 82 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $167,094 |
Length: | 0.0 Miles | Actual: | $141,280 |
District: | Atlanta | Let Date: | JAN 2010 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2010(236)HES | CSJ: | 0063-04-054 |
Description: | INSTALL NEW TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 699 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $314,195 |
Length: | 0.0 Miles | Actual: | $295,009 |
District: | Atlanta | Let Date: | JAN 2010 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | STP 2010(237)HRR | CSJ: | 0247-02-044 |
Description: | INSTALL NEW TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 31 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $151,985 |
Length: | 0.0 Miles | Actual: | $132,249 |
District: | Atlanta | Let Date: | JAN 2010 |
Highway: | LP 281 | Let Status: | Actual |
Project ID: | STP 2010(236)HES | CSJ: | 2642-02-021 |
Description: | INSTALL NEW TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT INTERSECTION OF PAGE ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $145,725 |
Length: | 0.0 Miles | Actual: | $145,101 |
Back... |
Totals for 0010-13-084 | ||
Length: | 0.0 Miles | ||
Estimate: | $778,999 | ||
Actual: | $713,639 | ||
CCSJ: 0046-03-036 | |||
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0010-12-065 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | ELLIOT CREEK | Fund Cat: | 1 |
Limits To: | 0.3 MI W OF FM 3098 | Estimate: | $117,046 |
Length: | 2.3 Miles | Actual: | $102,419 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0010-13-086 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 989 | Fund Cat: | 1 |
Limits To: | ELLIOT CREEK | Estimate: | $352,003 |
Length: | 6.7 Miles | Actual: | $308,143 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | NH 2010(120) | CSJ: | 0046-03-036 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | RED RIVER C/L | Fund Cat: | 1 |
Limits To: | 0.2 MI W OF US 259 | Estimate: | $735,101 |
Length: | 6.5 Miles | Actual: | $499,815 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0062-03-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 995 | Fund Cat: | 1 |
Limits To: | SH 11 | Estimate: | $384,754 |
Length: | 7.9 Miles | Actual: | $337,285 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0083-07-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WOOD C/L | Fund Cat: | 1 |
Limits To: | FM 1519 | Estimate: | $191,827 |
Length: | 5.2 Miles | Actual: | $168,150 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0083-08-046 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 1.2 MI E OF US 271 | Fund Cat: | 1 |
Limits To: | TITUS C/L | Estimate: | $189,897 |
Length: | 3.6 Miles | Actual: | $166,234 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0096-03-069 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.2 MI W OF SH 155 S | Fund Cat: | 1 |
Limits To: | 0.1 MI W OF SH 155 N | Estimate: | $65,608 |
Length: | 0.9 Miles | Actual: | $57,536 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 2612 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0218-08-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 250 | Fund Cat: | 1 |
Limits To: | SH 49 | Estimate: | $93,773 |
Length: | 2.2 Miles | Actual: | $82,179 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | NH 2010(120) | CSJ: | 0221-05-081 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1896 | Fund Cat: | 1 |
Limits To: | 1.2 MI N OF US 271 E | Estimate: | $257,809 |
Length: | 6.7 Miles | Actual: | $225,489 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0222-03-055 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | L & A RR OVERPASS | Fund Cat: | 1 |
Limits To: | CASS C/L | Estimate: | $137,019 |
Length: | 1.5 Miles | Actual: | $120,952 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0222-04-054 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MORRIS C/L | Fund Cat: | 1 |
Limits To: | 0.2 MI E OF MORRIS C/L | Estimate: | $14,906 |
Length: | 0.2 Miles | Actual: | $13,124 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0222-04-055 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 155 | Fund Cat: | 1 |
Limits To: | MARION C/L | Estimate: | $54,303 |
Length: | 1.4 Miles | Actual: | $47,561 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0222-05-045 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CASS C/L | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $648,726 |
Length: | 14.0 Miles | Actual: | $567,162 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 1840 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0330-01-029 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 98 | Fund Cat: | 1 |
Limits To: | SH 8 | Estimate: | $168,327 |
Length: | 3.5 Miles | Actual: | $147,388 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0392-01-066 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 250 | Fund Cat: | 1 |
Limits To: | UPSHUR C/L | Estimate: | $240,895 |
Length: | 2.5 Miles | Actual: | $212,162 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0392-01-067 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 1.5 MI N OF FM 144 S | Fund Cat: | 1 |
Limits To: | 1.5 MI N OF FM 250 | Estimate: | $267,650 |
Length: | 2.8 Miles | Actual: | $236,695 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0392-02-081 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MORRIS C/L | Fund Cat: | 1 |
Limits To: | 0.3 MI S OF FM 557 | Estimate: | $123,293 |
Length: | 1.3 Miles | Actual: | $108,385 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0569-03-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 805 | Fund Cat: | 1 |
Limits To: | HARRISON C/L | Estimate: | $157,996 |
Length: | 3.2 Miles | Actual: | $137,872 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0569-04-019 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MARION C/L | Fund Cat: | 1 |
Limits To: | SS 449 | Estimate: | $192,077 |
Length: | 3.1 Miles | Actual: | $166,381 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 21 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0633-02-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FRANKLIN C/L | Fund Cat: | 1 |
Limits To: | CAMP C/L | Estimate: | $128,172 |
Length: | 4.4 Miles | Actual: | $111,430 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0640-02-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 79 | Fund Cat: | 1 |
Limits To: | FM 123 | Estimate: | $147,252 |
Length: | 4.8 Miles | Actual: | $128,633 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0640-02-026 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HARRISON C/L | Fund Cat: | 1 |
Limits To: | US 79 | Estimate: | $132,167 |
Length: | 4.6 Miles | Actual: | $115,617 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 1397 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 0945-01-035 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 5.4 MI N OF FM 2240 | Fund Cat: | 1 |
Limits To: | 0.3 MI N OF FM 2240 | Estimate: | $188,153 |
Length: | 5.8 Miles | Actual: | $164,516 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 989 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1231-01-057 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $232,244 |
Length: | 3.8 Miles | Actual: | $203,128 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 1649 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1382-04-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 555 | Fund Cat: | 1 |
Limits To: | US 259 | Estimate: | $294,805 |
Length: | 10.7 Miles | Actual: | $256,878 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 2328 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1572-02-008 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 77 | Fund Cat: | 1 |
Limits To: | FM 995 | Estimate: | $27,560 |
Length: | 1.0 Miles | Actual: | $23,933 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 2328 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1572-02-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 995 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $26,739 |
Length: | 1.0 Miles | Actual: | $23,219 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 2328 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1572-03-006 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | SH 43 | Estimate: | $96,474 |
Length: | 3.7 Miles | Actual: | $83,589 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 968 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1575-02-030 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3251 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $75,469 |
Length: | 2.6 Miles | Actual: | $65,574 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 1794 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 1760-01-024 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 1 |
Limits To: | FM 959 | Estimate: | $132,619 |
Length: | 4.3 Miles | Actual: | $115,319 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | SH 98 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 2526-01-008 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 1 |
Limits To: | FM 1840 | Estimate: | $72,127 |
Length: | 2.5 Miles | Actual: | $62,284 |
District: | Atlanta | Let Date: | OCT 2009 |
Highway: | FM 2517 | Let Status: | Actual |
Project ID: | STP 2010(121) | CSJ: | 3151-01-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3359 | Fund Cat: | 1 |
Limits To: | LOUISIANA SL | Estimate: | $204,215 |
Length: | 6.7 Miles | Actual: | $177,404 |
Back... |
Totals for 0046-03-036 | ||
Length: | 131.4 Miles | ||
Estimate: | $6,151,006 | ||
Actual: | $5,236,456 | ||
CCSJ: 0046-06-073 | |||
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | STP 2009(694)ES | CSJ: | 0046-06-073 |
Description: | UPGRADE EXISTING TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT 14TH STREET IN TEXARKANA | Fund Cat: | 3 |
Limits To: | . | Estimate: | $105,925 |
Length: | 0.0 Miles | Actual: | $84,165 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | LP 14 | Let Status: | Actual |
Project ID: | STP 2009(695)ES | CSJ: | 0046-08-014 |
Description: | UPGRADE EXISTING TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT COLLEGE DRIVE IN TEXARKANA | Fund Cat: | 3 |
Limits To: | . | Estimate: | $101,863 |
Length: | 0.0 Miles | Actual: | $96,876 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 2240 | Let Status: | Actual |
Project ID: | STP 2009(691)ES | CSJ: | 2879-02-010 |
Description: | INSTALL NEW TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT ROBIN LANE IN TEXARKANA | Fund Cat: | 3 |
Limits To: | . | Estimate: | $34,097 |
Length: | 0.0 Miles | Actual: | $31,345 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 2240 | Let Status: | Actual |
Project ID: | STP 2009(692)ES | CSJ: | 2879-02-011 |
Description: | INSTALL NEW TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT COOKS LANE IN TEXARKANA | Fund Cat: | 3 |
Limits To: | . | Estimate: | $34,997 |
Length: | 0.0 Miles | Actual: | $31,643 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 2240 | Let Status: | Actual |
Project ID: | STP 2009(693)ES | CSJ: | 2879-02-012 |
Description: | UPGRADE EXISTING TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT COWHORN CREEK ROAD IN TEXARKANA | Fund Cat: | 3 |
Limits To: | . | Estimate: | $68,518 |
Length: | 0.0 Miles | Actual: | $59,415 |
Back... |
Totals for 0046-06-073 | ||
Length: | 0.0 Miles | ||
Estimate: | $345,400 | ||
Actual: | $303,444 | ||
CCSJ: 0046-06-074 | |||
District: | Atlanta | Let Date: | FEB 2010 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | STP 2010(569)ES | CSJ: | 0046-06-074 |
Description: | RESURFACE EXISTING HIGHWAY | Handling Code: |
|
Limits From: | COWHORN CREEK | Fund Cat: | 11 |
Limits To: | 0.2 MI W OF US 59 | Estimate: | $451,743 |
Length: | 1.6 Miles | Actual: | $416,235 |
District: | Atlanta | Let Date: | FEB 2010 |
Highway: | FM 2878 | Let Status: | Actual |
Project ID: | STP 2010(569)ES | CSJ: | 2878-01-013 |
Description: | RESURFACE EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 0.1 MI SOUTH OF FM 989 | Fund Cat: | 11 |
Limits To: | 0.1 MI WEST OF FM 1297 | Estimate: | $190,584 |
Length: | 1.4 Miles | Actual: | $158,821 |
District: | Atlanta | Let Date: | FEB 2010 |
Highway: | FM 1297 | Let Status: | Actual |
Project ID: | STP 2010(569)ES | CSJ: | 2879-01-009 |
Description: | RESURFACE EXISTING HIGHWAY | Handling Code: |
|
Limits From: | FM 2878 | Fund Cat: | 11 |
Limits To: | 0.2 MI. EAST OF FM 2878 | Estimate: | $57,075 |
Length: | 0.3 Miles | Actual: | $50,689 |
Back... |
Totals for 0046-06-074 | ||
Length: | 3.3 Miles | ||
Estimate: | $699,402 | ||
Actual: | $625,745 | ||
CCSJ: 0061-01-022 | |||
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2011(308) | CSJ: | 0060-02-030 |
Description: | RESURFACE EXISTING 4 - LANE HIGHWAY WITH ASPHALTIC CONCRETE | Handling Code: |
|
Limits From: | IH 30 S.F.R. IN NEW BOSTON | Fund Cat: | 1 |
Limits To: | 0.3 MI NORTH OF US 82 | Estimate: | $278,095 |
Length: | 0.6 Miles | Actual: | $257,150 |
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2011(308) | CSJ: | 0061-01-022 |
Description: | RESURFACE EXISTING 2 - LANE HIGHWAY WITH ASPHALTIC CONCRETE | Handling Code: |
|
Limits From: | 0.2 MI. SOUTH OF US 82 | Fund Cat: | 1 |
Limits To: | FM 1840 | Estimate: | $288,350 |
Length: | 1.1 Miles | Actual: | $234,431 |
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2011(308) | CSJ: | 0061-02-029 |
Description: | RESURFACE EXISTING 2 - LANE HIGHWAY WITH ASPHALTIC CONCRETE | Handling Code: |
|
Limits From: | FM 1840 | Fund Cat: | 1 |
Limits To: | US 67 AT CORLEY | Estimate: | $1,582,110 |
Length: | 8.3 Miles | Actual: | $1,549,638 |
Bid Tabulations Back... |
Totals for 0061-01-022 | ||
Length: | 10.0 Miles | ||
Estimate: | $2,148,555 | ||
Actual: | $2,041,219 | ||
CCSJ: 0062-01-037 | |||
District: | Atlanta | Let Date: | MAR 2010 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2010(604)SB | CSJ: | 0062-01-037 |
Description: | INSTALL LEFT TURN LANE | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 2624 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $393,111 |
Length: | 0.3 Miles | Actual: | $314,162 |
District: | Atlanta | Let Date: | MAR 2010 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2010(604)SB | CSJ: | 0569-01-049 |
Description: | INSTALL LEFT TURN LANE | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 125 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $302,835 |
Length: | 0.4 Miles | Actual: | $254,939 |
District: | Atlanta | Let Date: | MAR 2010 |
Highway: | SL 390 | Let Status: | Actual |
Project ID: | STP 2010(604)SB | CSJ: | 1575-04-013 |
Description: | INSTALL LEFT TURN LANE | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 1997 (N & S) | Fund Cat: | 8 |
Limits To: | . | Estimate: | $1,059,714 |
Length: | 1.0 Miles | Actual: | $1,113,876 |
Back... |
Totals for 0062-01-037 | ||
Length: | 1.7 Miles | ||
Estimate: | $1,755,660 | ||
Actual: | $1,682,977 | ||
CCSJ: 0218-01-070 | |||
District: | Atlanta | Let Date: | SEP 2009 |
Highway: | SH 93 | Let Status: | Actual |
Project ID: | HP 2009(921)ES | CSJ: | 0218-01-070 |
Description: | CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE AND APPROACHES | Handling Code: |
|
Limits From: | AT UNION PACIFIC RR OVERPASS | Fund Cat: | 3 |
Limits To: | . | Estimate: | $5,431,299 |
Length: | 0.5 Miles | Actual: | $4,668,869 |
Back... |
Totals for 0218-01-070 | ||
Length: | 0.5 Miles | ||
Estimate: | $5,431,299 | ||
Actual: | $4,668,869 | ||
CCSJ: 0330-01-030 | |||
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 1840 | Let Status: | Actual |
Project ID: | STP 2010(959)HRR | CSJ: | 0330-01-030 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | 0.8 MI W OF SH 8 | Fund Cat: | 8 |
Limits To: | SH 98 | Estimate: | $244,062 |
Length: | 2.7 Miles | Actual: | $185,469 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 1840 | Let Status: | Actual |
Project ID: | STP 2010(959)HRR | CSJ: | 1215-02-014 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SH 98 | Fund Cat: | 8 |
Limits To: | US 82 | Estimate: | $256,375 |
Length: | 10.3 Miles | Actual: | $228,962 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 995 | Let Status: | Actual |
Project ID: | STP 2010(959)HRR | CSJ: | 1216-03-016 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SH 8 | Fund Cat: | 8 |
Limits To: | 1.1 MI W OF SH 77 | Estimate: | $328,593 |
Length: | 9.9 Miles | Actual: | $332,188 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 114 | Let Status: | Actual |
Project ID: | STP 2010(959)HRR | CSJ: | 1570-02-020 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 259 | Fund Cat: | 8 |
Limits To: | FM 1326 | Estimate: | $92,960 |
Length: | 2.6 Miles | Actual: | $82,910 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 2152 | Let Status: | Actual |
Project ID: | STP 2010(960)HES | CSJ: | 1988-01-022 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | BU 271 | Fund Cat: | 8 |
Limits To: | 8.4 MI N OF BU 271 | Estimate: | $386,832 |
Length: | 8.4 Miles | Actual: | $382,651 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 2148 | Let Status: | Actual |
Project ID: | STP 2010(960)HES | CSJ: | 2050-01-020 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | FM 2253 | Fund Cat: | 8 |
Limits To: | US 67 | Estimate: | $279,570 |
Length: | 7.5 Miles | Actual: | $251,379 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 2327 | Let Status: | Actual |
Project ID: | STP 2010(960)HES | CSJ: | 2241-01-016 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 59 N | Fund Cat: | 8 |
Limits To: | US 59 S | Estimate: | $198,200 |
Length: | 6.1 Miles | Actual: | $155,159 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 2516 | Let Status: | Actual |
Project ID: | STP 2010(959)HRR | CSJ: | 2422-01-009 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 8 |
Limits To: | FM 558 | Estimate: | $172,144 |
Length: | 6.6 Miles | Actual: | $157,111 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | FM 2148 | Let Status: | Actual |
Project ID: | STP 2010(960)HES | CSJ: | 2925-02-011 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 67 | Fund Cat: | 8 |
Limits To: | US 59 | Estimate: | $200,037 |
Length: | 4.3 Miles | Actual: | $152,999 |
Back... |
Totals for 0330-01-030 | ||
Length: | 58.4 Miles | ||
Estimate: | $2,158,773 | ||
Actual: | $1,928,828 | ||
CCSJ: 0610-06-076 | |||
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2011(104) | CSJ: | 0610-06-076 |
Description: | CONSTRUCT INTERCHANGE AT WEST HOOKS COUNTY ROAD & CONSTRUCT | Handling Code: |
|
Limits From: | SPUR 86 | Fund Cat: | 11 |
Limits To: | FM 560 | Estimate: | $13,464,869 |
Length: | 2.7 Miles | Actual: | $14,014,158 |
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | SP 594 | Let Status: | Actual |
Project ID: | STP 2011(105) | CSJ: | 0610-10-002 |
Description: | RECONSTRUCT EXISTING W. 22ND STREET IN HOOKS TO A 2 - LANE | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 11 |
Limits To: | US 82 IN HOOKS | Estimate: | $1,685,968 |
Length: | 0.4 Miles | Actual: | $1,806,964 |
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | SP 594 | Let Status: | Actual |
Project ID: | RW 610-10-3 | CSJ: | 0610-10-003 |
Description: | RIGHT OF WAY ACQUISITION RELOCATION ASSISTANCE & UTILITY ADJ | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 12 |
Limits To: | US 82 IN HOOKS | Estimate: | |
Length: | 0.4 Miles | Actual: | $173,378 |
Bid Tabulations Back... |
Totals for 0610-06-076 | ||
Length: | 3.5 Miles | ||
Estimate: | $15,150,837 | ||
Actual: | $15,994,500 | ||
CCSJ: 0919-19-051 | |||
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(236) | CSJ: | 0919-19-051 |
Description: | REPLACE BRIDGE AND APPROACHES_ON CR 4319 AT ANDERSON CREEK | Handling Code: |
|
Limits From: | ON CR 4319 AT ANDERSON CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $488,327 |
Length: | 0.1 Miles | Actual: | $351,211 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(237) | CSJ: | 0919-19-052 |
Description: | REPLACE BRIDGE AND APPROACHES_ON CR 4320 AT ANDERSON CREEK | Handling Code: |
|
Limits From: | ON CR 4320 AT ANDERSON CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $231,157 |
Length: | 0.1 Miles | Actual: | $192,668 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(238) | CSJ: | 0919-19-053 |
Description: | REPLACE BRIDGE AND APPROACHES_ON CR 3202 AT MUD CREEK | Handling Code: |
|
Limits From: | ON CR 3202 AT MUD CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $181,593 |
Length: | 0.1 Miles | Actual: | $166,970 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(239) | CSJ: | 0919-19-054 |
Description: | REPLACE BRIDGE AND APPROACHES_ON CR 4116 AT ANDERSON CREEK | Handling Code: |
|
Limits From: | ON CR 4116 AT ANDERSON CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $234,974 |
Length: | 0.1 Miles | Actual: | $180,414 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(240) | CSJ: | 0919-19-055 |
Description: | REPLACE BRIDGES AND APPROACHES_ON CR 4230 AT ANDERSON CREEK | Handling Code: |
|
Limits From: | ON CR 4230 AT ANDERSON CREEK AND | Fund Cat: | 6 |
Limits To: | ANDERSON CREEK RELIEF | Estimate: | $530,373 |
Length: | 0.1 Miles | Actual: | $421,376 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(241) | CSJ: | 0919-19-056 |
Description: | REPLACE BRIDGE AND APPROACHES_AT CR 4203 AT WEAVER CREEK | Handling Code: |
|
Limits From: | AT CR 4203 AT WEAVER CK TRIBUTARY | Fund Cat: | 6 |
Limits To: | . | Estimate: | $113,996 |
Length: | 0.0 Miles | Actual: | $99,902 |
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(242) | CSJ: | 0919-19-057 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | ON CR 4302 AT ANDERSON CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $264,934 |
Length: | 0.1 Miles | Actual: | $210,191 |
Back... |
Totals for 0919-19-051 | ||
Length: | 0.6 Miles | ||
Estimate: | $2,045,354 | ||
Actual: | $1,622,732 | ||
CCSJ: 0919-19-060 | |||
District: | Atlanta | Let Date: | JUL 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2006(534) | CSJ: | 0919-19-060 |
Description: | REPLACE BRIDGE AND APPROACHES_ON 4TH STREET AT SWAMPOODLE | Handling Code: |
|
Limits From: | ON 4TH STREET AT SWAMPOODLE CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $419,267 |
Length: | 0.1 Miles | Actual: | $342,513 |
Back... |
Totals for 0919-19-060 | ||
Length: | 0.1 Miles | ||
Estimate: | $419,267 | ||
Actual: | $342,513 | ||
CCSJ: 0919-19-061 | |||
District: | Atlanta | Let Date: | SEP 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2006(535) | CSJ: | 0919-19-061 |
Description: | REPLACE BRIDGE AND APPROACHES_ON DAY STREET AT NIX CREEK | Handling Code: |
|
Limits From: | ON DAY STREET AT NIX CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $302,534 |
Length: | 0.0 Miles | Actual: | $254,303 |
Back... |
Totals for 0919-19-061 | ||
Length: | 0.0 Miles | ||
Estimate: | $302,534 | ||
Actual: | $254,303 | ||
CCSJ: 0945-01-036 | |||
District: | Atlanta | Let Date: | SEP 2009 |
Highway: | SH 93 | Let Status: | Actual |
Project ID: | STP 2010(009)ES | CSJ: | 0945-01-036 |
Description: | UPGRADE EXISTING TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT 40TH/KENNEDY LANE IN TEXARKANA | Fund Cat: | 11 |
Limits To: | . | Estimate: | $155,711 |
Length: | 0.1 Miles | Actual: | $134,751 |
Back... |
Totals for 0945-01-036 | ||
Length: | 0.1 Miles | ||
Estimate: | $155,711 | ||
Actual: | $134,751 | ||
CCSJ: 0945-01-037 | |||
District: | Atlanta | Let Date: | AUG 2010 |
Highway: | FM 1397 | Let Status: | Actual |
Project ID: | STP 2011(106)ES | CSJ: | 0945-01-037 |
Description: | UPGRADE EXISTING TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 2240 | Fund Cat: | 11 |
Limits To: | . | Estimate: | $123,414 |
Length: | 0.1 Miles | Actual: | $118,433 |
Bid Tabulations Back... |
Totals for 0945-01-037 | ||
Length: | 0.1 Miles | ||
Estimate: | $123,414 | ||
Actual: | $118,433 | ||
CCSJ: 1214-01-017 | |||
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 992 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 1214-01-017 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | CR 3108 | Fund Cat: | 8 |
Limits To: | IH 30 | Estimate: | $503,101 |
Length: | 5.6 Miles | Actual: | $448,629 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 992 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 1215-01-021 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | CR 3218 | Fund Cat: | 8 |
Limits To: | 0.1 MI N OF US 82 | Estimate: | $907,828 |
Length: | 7.7 Miles | Actual: | $787,932 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 161 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 1574-02-020 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | 0.7 MI N OF SH 11 | Fund Cat: | 8 |
Limits To: | FM 130 | Estimate: | $381,475 |
Length: | 3.9 Miles | Actual: | $301,714 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 1701 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 1620-03-011 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | RED RIVER COUNTY LINE | Fund Cat: | 8 |
Limits To: | US 259 | Estimate: | $909,073 |
Length: | 6.6 Miles | Actual: | $802,407 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 2327 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 2241-01-015 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | US 59 N | Fund Cat: | 8 |
Limits To: | US 59 S | Estimate: | $699,184 |
Length: | 6.1 Miles | Actual: | $518,792 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 2516 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 2422-01-008 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | FM 3244 | Fund Cat: | 8 |
Limits To: | FM 558 | Estimate: | $685,407 |
Length: | 5.0 Miles | Actual: | $598,157 |
District: | Atlanta | Let Date: | DEC 2009 |
Highway: | FM 1841 | Let Status: | Actual |
Project ID: | STP 2010(490)SB | CSJ: | 2576-01-012 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 8 |
Limits To: | 4.773 MI E OF US 59 (CAMP CREEK) | Estimate: | $537,036 |
Length: | 4.8 Miles | Actual: | $392,058 |
Back... |
Totals for 1214-01-017 | ||
Length: | 39.7 Miles | ||
Estimate: | $4,623,104 | ||
Actual: | $3,849,689 |
|
|