Letting Schedule for September, 2009 (FY 2010)
| Letting Schedule for September, 2009 (FY 2010) | ||||
| Last Update: Tuesday, November 2, 2010 | 
| September, 2009 (FY 2010) | (see Links) | 
| SEP 2009 | OCT 2009 | NOV 2009 | DEC 2009 | JAN 2010 | FEB 2010 | MAR 2010 | APR 2010 | MAY 2010 | JUN 2010 | JUL 2010 | AUG 2010 | ||||||
| CCSJ | County/ District  | 
Highway | Let Status | Contract Cost  | 
Fund Cat  | 
Description | 
|---|---|---|---|---|---|---|
| 0205-07-071 | Anderson/ Tyler  | 
US 79 | Actual | $1,582,437 | 1 | PLANE & RESURFACE ROADWAY | 
| 0520-09-031 | Anderson/ Tyler  | 
LP 256 | Actual | $7,615,570 | 1 | RECONSTRUCT AS 4 - LANE DIVIDED RURAL WITH FLUSH MEDIAN | 
| 0180-05-058 | Aransas/ Corpus Christi  | 
BS 35-L | Actual | $782,350 | 1 | MILL, SEAL AND OVERLAY | 
| 0613-02-055 | Atascosa/ San Antonio  | 
SH 16 | Actual | $107,235 | 10 | LANDSCAPE PLANTING & IRRIGATION SYSTEM | 
| 0914-18-080 | Bastrop/ Austin  | 
CR | Actual | $182,623 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0017-10-225 | Bexar/ San Antonio  | 
IH 35 | Actual | $566,926 | 1 | BRIDGE DECK REPAIR | 
| 0291-10-097 | Bexar/ San Antonio  | 
SH 16 | Actual | $239,457 | 10 | LANDSCAPE PLANTING, IRRIGATION SYSTEM, & SPECIALIZED PAVING | 
| 0521-04-261 | Bexar/ San Antonio  | 
IH 410 | Actual | $962,118 | 10 | LANDSCAPE DEVELOPMENT | 
| 1437-01-035 | Bexar/ San Antonio  | 
FM 1346 | Actual | $1,062,205 | 1 | SEAL COAT, OVERLAY & PAVEMENT MARKINGS | 
| 0558-03-023 | Borden/ Abilene  | 
FM 669 | Actual | $39,859 | 8 | INSTALL FLASHING BEACONS | 
| 2396-01-006 | Bosque/ Waco  | 
FM 2490 | Actual | $3,691,226 | 11 | REHABILITATE AND WIDEN PAVEMENT TO ADD SHOULDERS, UPGRADE | 
| 0218-01-070 | Bowie/ Atlanta  | 
SH 93 | Actual | $4,668,869 | 3 | CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE AND APPROACHES | 
| 0919-19-061 | Bowie/ Atlanta  | 
CS | Actual | $254,303 | 6 | REPLACE BRIDGE AND APPROACHES_ON DAY STREET AT NIX CREEK | 
| 0945-01-036 | Bowie/ Atlanta  | 
SH 93 | Actual | $134,751 | 11 | UPGRADE EXISTING TRAFFIC SIGNALS | 
| 0178-03-140 | Brazoria/ Houston  | 
SH 35 | Actual | $187,275 | 11 | STABILIZED BASE REPAIR, ASPHALT CONCRETE PAVEMENT, SIGNALS, | 
| 0252-01-070 | Burnet/ Austin  | 
US 281 | Actual | $4,658,026 | 11 | WIDEN TO ADD CLTL AND SHOULDERS | 
| 0180-01-074 | Calhoun/ Yoakum  | 
SH 35 | Actual | $1,813,198 | 11 | ASPHALTIC CONCRETE PAVEMENT | 
| 0872-04-025 | Cameron/ Pharr  | 
FM 506 | Actual | $864,254 | 1 | UPGRADE DRAINAGE CULVERT AND RAISE ROAD | 
| 1057-02-023 | Cameron/ Pharr  | 
FM 732 | Actual | $2,021,583 | 11 | CONSTRUCT 4 LANE URBAN | 
| 0919-00-064 | Cass/ Atlanta  | 
VA | Actual | $399,252 | 11 | INSTALLATION AND UPGRADE OF TRAFFIC CONTROL DEVICES | 
| 1573-01-016 | Cass/ Atlanta  | 
FM 130 | Actual | $1,331,671 | 8 | WIDEN LANES ON EXISTING ROADWAY | 
| 0264-04-046 | Coke/ San Angelo  | 
US 277 | Actual | $387,886 | 1 | CONCRETE PAVEMENT AT INTERSECTION | 
| 0135-04-028 | Collin/ Dallas  | 
US 380 | Actual | $19,981,329 | 10 | WIDEN EXISTING RURAL 2 LANE HIGHWAY TO 4 LANE DIVIDED | 
| 0387-05-019 | Collin/ Dallas  | 
FM 982 | Actual | $4,887,963 | 1 | RECONSTRUCT RURAL 2 LANE HIGHWAY TO 2 LANE URBAN WITH | 
| 0918-24-151 | Collin/ Dallas  | 
VA | Actual | $1,481,250 | 5 | CONSTRUCT 709 SPACE PARK - AND - RIDE STATION IN THE RICHARDSON / | 
| 0453-04-021 | Crosby/ Lubbock  | 
SH 207 | Actual | $1,022,626 | 1 | SEAL COAT | 
| 0196-07-021 | Dallas/ Dallas  | 
SP 366 | Actual | $618,646 | 7 | INTERSECTION IMPROVEMENTS | 
| 0261-02-065 | Dallas/ Dallas  | 
US 67 | Actual | $3,894,738 | 10 | PROVIDE AUXILIARY LANE NB AND SB | 
| 0918-00-156 | Dallas/ Dallas  | 
VA | Actual | $690,175 | 1 | ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER | 
| 0918-45-366 | Dallas/ Dallas  | 
CS | Actual | $3,268,012 | 7 | WIDEN 2 - LANE FACILITY TO 4 - LANE DIVIDED FACILITY | 
| 2374-02-124 | Dallas/ Dallas  | 
IH 635 | Actual | $7,718,650 | 10 | CONSTRUCT NB FRONTAGE ROAD IN CITY OF GARLAND | 
| 2964-01-041 | Dallas/ Dallas  | 
SH 161 | Actual | $597,056 | 1 | BRIDGE REPAIR | 
| 0924-00-067 | El Paso/ El Paso  | 
VA | Actual | $635,030 | 1 | UPGRADING OVERHEAD AND LARGE GROUND MOUNTED SIGNS | 
| 2326-01-021 | El Paso/ El Paso  | 
FM 2529 | Actual | $410,298 | 1 | OVERLAY | 
| 0089-09-072 | Fort Bend/ Houston  | 
US 59 | Actual | $1,999,760 | 6 | REPLACE 2 BRIDGES (TURKEY CRK NBI#12080008909047) & (SNAKE | 
| 0543-03-059 | Fort Bend/ Houston  | 
FM 762 | Actual | $1,790,504 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0912-34-148 | Fort Bend/ Houston  | 
VA | Actual | $232,762 | 10 | LANDSCAPE DEVELOPMENT | 
| 0426-02-018 | Freestone/ Bryan  | 
FM 489 | Actual | $1,317,884 | 1 | RESTORE EXISTING ROAD CONSISTING OF GRADING, FLEXIBLE BASE, | 
| 0917-20-028 | Freestone/ Bryan  | 
CR | Actual | $231,036 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0748-01-028 | Frio/ San Antonio  | 
FM 140 | Actual | $3,097,967 | 1 | REHAB AND WIDEN NARROW ROADWAY | 
| 0051-03-097 | Galveston/ Houston  | 
SH 3 | Actual | $234,443 | 1 | REMOVE AND REPLACE TRAFFIC RAIL, RAIL FOUNDATION AND REPAIR | 
| 0051-09-023 | Galveston/ Houston  | 
FM 3005 | Actual | $3,866,867 | 1 | RAISE ROADWAY AND BASE REPAIRS (PHASE 1) | 
| 0912-73-115 | Galveston/ Houston  | 
VA | Actual | $628,620 | 2 | 3 DETENTION PONDS | 
| 0045-19-045 | Grayson/ Paris  | 
US 82 | Actual | $2,943,936 | 1 | OVERLAY EXISTING 2 LANE ROADWAY | 
| 0212-04-032 | Grimes/ Bryan  | 
SH 30 | Actual | $1,849,902 | 1 | OVERLAY CONSISTING OF HMA LEVEL - UP, HMA OVERLAY AND PAVEMENT | 
| 0915-46-036 | Guadalupe/ San Antonio  | 
VA | Actual | $614,743 | 10 | LANDSCAPE PLANTING AND IRRIGATION | 
| 0905-12-036 | Hale/ Lubbock  | 
CS | Actual | $365,085 | 8 | CONSTRUCT SIDEWALKS - SAFE ROUTES TO SCHOOL PROJECT | 
| 0027-13-198 | Harris/ Houston  | 
US 59 | Actual | $305,748 | 10 | LANDSCAPE DEVELOPMENT | 
| 0028-02-084 | Harris/ Houston  | 
US 90 | Actual | $498,721 | 1 | FULL DEPTH CONCRETE REPAIR AND REPAIR OF SPALLING IN | 
| 0110-05-115 | Harris/ Houston  | 
IH 45 | Actual | $157,165 | 1 | PAVEMENT MARKINGS | 
| 0110-05-116 | Harris/ Houston  | 
IH 45 | Actual | $324,478 | 1 | PAVEMENT MARKINGS | 
| 0912-00-335 | Harris/ Houston  | 
VA | Actual | $898,350 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS | 
| 0912-00-383 | Harris/ Houston  | 
VA | Actual | $946,871 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS | 
| 0912-72-076 | Harris/ Houston  | 
VA | Actual | $3,000,000 | 7 | SIGNATURE BUS EXPRESS SERVICE ROUTES INCLUDING SHELTERS AND | 
| 0912-72-177 | Harris/ Houston  | 
VA | Actual | $296,999 | 1 | ATM - US 290 UPGRADE | 
| 0912-72-181 | Harris/ Houston  | 
VA | Actual | $1,348,545 | 1 | BRIDGE MAINTENANCE - REPAIRING STEEL MEMBERS, SEALING ACCESS | 
| 0912-72-191 | Harris/ Houston  | 
VA | Actual | $10,781,250 | 5 | SIGNATURE BUS / SHELTER / SIGNAGE | 
| 0981-01-102 | Harris/ Houston  | 
NASA 1 | Actual | $3,356,950 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM | 
| 3256-01-094 | Harris/ Houston  | 
BW 8 | Actual | $106,336 | 1 | RESHAPE AND STABILIZE EROSION | 
| 3256-02-080 | Harris/ Houston  | 
BW 8 | Actual | $236,778 | 1 | PAVEMENT MARKINGS | 
| 3256-03-072 | Harris/ Houston  | 
BW 8 | Actual | $2,349,189 | 5 | TURN RADIUS IMPROVEMENTS AT VARIOUS LOCATIONS | 
| 0342-01-080 | Hidalgo/ Pharr  | 
SH 107 | Actual | $1,603,329 | 1 | OVERLAY | 
| 1939-01-049 | Hidalgo/ Pharr  | 
FM 2061 | Actual | $1,094,027 | 1 | REHAB SB OUTSIDE LANE & OVERLAY FULL ROADWAY WIDTH | 
| 0080-08-024 | Hood/ Fort Worth  | 
FM 167 | Actual | $385,832 | 1 | MILL AND HMAC OVERLAY | 
| 0901-28-055 | Hopkins/ Paris  | 
CR | Actual | $281,167 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1854-01-039 | Houston/ Lufkin  | 
LP 304 | Actual | $371,041 | 1 | INSTALLATION OF TRAFFIC SIGNALS | 
| 0913-18-019 | Jackson/ Yoakum  | 
CR | Actual | $418,054 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0306-03-118 | Jefferson/ Beaumont  | 
SH 73 | Actual | $408,557 | 11 | RAISE ROADWAY ELEVATION | 
| 0086-11-041 | Jim Wells/ Corpus Christi  | 
SH 44 | Actual | $3,776,702 | 1 | REHAB. EXISTING ROADWAY | 
| 0019-01-136 | Johnson/ Fort Worth  | 
SH 174 | Actual | $2,086,653 | 1 | HOTMIX OVERLAY | 
| 0019-02-031 | Johnson/ Fort Worth  | 
SH 171 | Actual | $1,009,579 | 1 | SEAL COAT | 
| 0033-04-061 | Jones/ Abilene  | 
US 83 | Actual | $88,650 | 11 | LANDSCAPE IMPROVEMENTS | 
| 1360-01-022 | Jones/ Abilene  | 
FM 1226 | Actual | $1,322,846 | 1 | WIDEN, BASE, 2 CST, PVMNT MKGS | 
| 0017-08-070 | La Salle/ Laredo  | 
IH 35 | Actual | $1,574,217 | 1 | RECONSTRUCTION OF NORTH BOUND MAINLANES, RAMPS | 
| 0913-29-030 | Lavaca/ Yoakum  | 
CR | Actual | $529,196 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1146-01-027 | Liberty/ Beaumont  | 
FM 834 | Actual | $994,797 | 1 | RESTORE EXISTING ROADWAY | 
| 0053-01-090 | Lubbock/ Lubbock  | 
US 82 | Actual | $47,756,837 | 11 | CONVERT NON - FREEWAY TO FREEWAY | 
| 0632-01-028 | Marion/ Atlanta  | 
FM 134 | Actual | $267,595 | 11 | RESTORE SECTION AND RESURFACE 2 LANE HIGHWAY | 
| 1229-01-051 | Maverick/ Laredo  | 
FM 1021 | Actual | $434,531 | 6 | FOR THE CONSTRUCTION OF AN EXISTING BRIDGE AND APPROACHES | 
| 0056-01-032 | McLennan/ Waco  | 
US 84 | Actual | $6,535,078 | 1 | REPAIR AND RESURFACE WITH ASPHALT PAVEMENT | 
| 0909-22-151 | McLennan/ Waco  | 
CR | Actual | $340,876 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0906-32-045 | Midland/ Odessa  | 
CS | Actual | $649,159 | 8 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS & SIGNS | 
| 0204-08-053 | Milam/ Bryan  | 
US 79 | Actual | $766,187 | 1 | OVERLAY CONSISTING OF MILLING, HMA OVERLAY, SURFACE | 
| 0912-37-194 | Montgomery/ Houston  | 
VA | Actual | $1,937,500 | 5 | ADA ENHANCEMENTS | 
| 1986-01-059 | Montgomery/ Houston  | 
FM 1314 | Actual | $367,820 | 1 | DRAINAGE IMPROVEMENTS | 
| 0007-08-026 | Palo Pinto/ Fort Worth  | 
SH 16 | Actual | $1,473,365 | 1 | CEMENT TREAT EXISTING BASE ON NB LANE AND SHOULDER, SEAL | 
| 3516-01-014 | Parker/ Fort Worth  | 
FM 3325 | Actual | $587,643 | 1 | REHAB EXISTING ROADWAY WITH PAVEMENT REPAIRS AND OVERLAY | 
| 0904-02-033 | Potter/ Amarillo  | 
VA | Actual | $231,678 | 3 | OVERLAY | 
| 0020-10-017 | Presidio/ El Paso  | 
US 67 | Actual | $1,241,893 | 1 | OVERLAY | 
| 0957-09-015 | Presidio/ El Paso  | 
FM 170 | Actual | $95,715 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS; INSTALL PROTECTION | 
| 0168-09-153 | Randall/ Amarillo  | 
IH 27 | Actual | $94,101 | 1 | CURB RAMPS AND CONCRETE MEDIAN | 
| 0904-11-022 | Randall/ Amarillo  | 
VA | Actual | $2,097,204 | 3 | WIDEN TO A 4 LANE ARTERIAL | 
| 0049-14-009 | Robertson/ Bryan  | 
FM 46 | Actual | $7,359,392 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT AND | 
| 0917-18-029 | Robertson/ Bryan  | 
CR | Actual | $212,667 | 6 | REPLACEMENT OF EXISTING BRIDGE FACILITY CONSISTING OF | 
| 0177-02-085 | San Jacinto/ Lufkin  | 
US 59 | Actual | $1,275,636 | 1 | MICROSURFACING | 
| 0371-04-056 | San Patricio/ Corpus Christi  | 
US 77 | Actual | $2,224,861 | 1 | OVERLAY AND SEAL EXISTING LANES | 
| 0191-03-021 | Smith/ Tyler  | 
FM 2493 | Actual | $736,484 | 1 | PLANE & RESURFACE ROADWAY | 
| 0910-00-089 | Smith/ Tyler  | 
VA | Actual | $155,495 | 1 | DISTRICT - WIDE THERMO PLASTIC PAVEMENT MARKINGS PROGRAM | 
| 0259-02-045 | Somervell/ Fort Worth  | 
US 67 | Actual | $1,138,715 | 1 | SEAL COATS | 
| 0921-26-010 | Starr/ Pharr  | 
CS | Actual | $1,250,440 | 11 | CONSTRUCT 4 LANE CITY STREET | 
| 0257-01-038 | Stephens/ Brownwood  | 
US 183 | Actual | $1,715,848 | 1 | FLEX BASE AND SEAL COAT | 
| 0172-02-067 | Tarrant/ Fort Worth  | 
BU 287P | Actual | $1,267,998 | 1 | REPAIR FAILURES, MILL, 2" HMAC OVERLAY, PAVEMENT MARKINGS & | 
| 0407-05-023 | Taylor/ Abilene  | 
US 277 | Actual | $38,149 | 8 | SAFETY LIGHTING AND FLASHING BEACON | 
| 0077-06-085 | Tom Green/ San Angelo  | 
US 67 | Actual | $1,054,167 | 11 | ADD SUPER 2 PASSING LANES | 
| 0914-00-252 | Travis/ Austin  | 
VA | Actual | $139,600 | 7 | CONGESTION MANAGEMENT PROCESS | 
| 1200-06-008 | Travis/ Austin  | 
SH 45 | Actual | $271,088 | 11 | INSTALL U - TURN | 
| 0392-02-080 | Upshur/ Atlanta  | 
US 259 | Actual | $928,367 | 11 | REPAIR PAVEMENT ON EXISTING 4 LANE HIGHWAY | 
| 0369-03-028 | Uvalde/ San Antonio  | 
RM 187 | Actual | $1,290,590 | 1 | REHAB EXISTING ROADWAY & ADD SHOULDERS | 
| 0543-01-059 | Waller/ Houston  | 
FM 359 | Actual | $2,085,808 | 1 | SEAL COAT, OVERLAY AND PAVEMENT MARKINGS | 
| 1418-01-010 | Waller/ Houston  | 
FM 1489 | Actual | $882,610 | 1 | SEAL COAT, OVERLAY AND PAVEMENT MARKINGS | 
| 0018-04-047 | Webb/ Laredo  | 
IH 35 | Actual | $1,284,379 | 1 | RESURFACE OF EXISTING HIGHWAY | 
| 0922-00-046 | Webb/ Laredo  | 
VA | Actual | $296,504 | 1 | THERMOPLASTIC RE - STRIPING | 
| 0089-07-140 | Wharton/ Yoakum  | 
US 59 | Actual | $4,409,900 | 1 | PAVEMENT REPAIR & ACP SURFACING | 
| 0124-03-059 | Wilbarger/ Wichita Falls  | 
US 183 | Actual | $605,867 | 1 | PLANING AND NOVACHIP OVERLAY | 
| 0914-05-122 | Williamson/ Austin  | 
VA | Actual | $419,723 | 9 | CONSTRUCT TRAIL | 
| 0463-06-024 | Winkler/ Odessa  | 
SH 302 | Actual | $1,773,715 | 1 | ROADWAY REHABILITATION | 
| 0013-08-115 | Wise/ Fort Worth  | 
US 81 | Actual | $837,947 | 1 | 2 INCH OVERLAY | 
| 0038-04-048 | Zapata/ Pharr  | 
US 83 | Actual | $6,720,528 | 1 | WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED | 
  | 
|   |