Letting Schedule for January, 2010 (FY 2010)
Letting Schedule for January, 2010 (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
January, 2010 (FY 2010) | (see Links) |
SEP 2009 | OCT 2009 | NOV 2009 | DEC 2009 | JAN 2010 | FEB 2010 | MAR 2010 | APR 2010 | MAY 2010 | JUN 2010 | JUL 2010 | AUG 2010 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0336-05-057 | Angelina/ Lufkin |
SH 103 | Actual | $846,256 | 8 | SAFETY TREAT FIXED OBJECTS |
0073-10-045 | Atascosa/ San Antonio |
IH 37 | Actual | $3,684,661 | 1 | MILL, BASE REPAIR, SEAL COAT, OVERLAY, SIGNS & PAVEMENT |
0913-20-070 | Austin/ Yoakum |
CR | Actual | $276,148 | 6 | REPLACE BRIDGE AND APPROACHES |
0658-01-038 | Bexar/ San Antonio |
FM 1535 | Actual | $316,927 | 1 | SEAL COAT, OVERLAY, & PAVEMENT MARKINGS |
0915-12-322 | Bexar/ San Antonio |
CS | Actual | $3,297,539 | 7 | EXPAND ROADWAY TO 4 LANES W / CURBS & SIDEWALKS |
2452-03-103 | Bexar/ San Antonio |
LP 1604 | Actual | $6,631,043 | 7 | EXPAND FROM 2 LANES TO 4 LANE DIVIDED |
0295-02-025 | Borden/ Abilene |
US 180 | Actual | $43,395 | 11 | INSTALL LEFT TURN BAY |
0010-13-084 | Bowie/ Atlanta |
US 67 | Actual | $713,639 | 8 | IMPROVE TRAFFIC SIGNAL |
0912-31-190 | Brazoria/ Houston |
CR | Actual | $507,818 | 6 | REPLACE BRIDGE (NBI# 12020AA0084001) |
0273-02-021 | Burnet/ Austin |
US 183 | Actual | $1,052,661 | 8 | TEXTURIZE SHLDRS & CENTERLINE TEXTURE |
0215-01-039 | Comal/ San Antonio |
SH 46 | Actual | $521,339 | 8 | CONSTRUCT LEFT TURN LANE |
1609-01-025 | Cooke/ Wichita Falls |
FM 1630 | Actual | $908,297 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD SHOULDERS |
1950-01-026 | Denton/ Dallas |
FM 407 | Actual | $5,419,912 | 10 | WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN |
0042-06-065 | Donley/ Childress |
US 287 | Actual | $2,078,858 | 1 | OVERLAY |
0237-05-032 | Duval/ Laredo |
US 59 | Actual | $1,109,648 | 1 | REHABILITATION OF AN EXISTING ROADWAY |
0007-03-083 | Eastland/ Brownwood |
IH 20 | Actual | $6,349,324 | 1 | SEAL COAT |
2121-04-065 | El Paso/ El Paso |
IH 10 | Actual | 145,991,880 | 3 | INTERCHANGE IMPROVEMENTS INCLUDING THE CONSTRUCTION OF |
3451-01-027 | El Paso/ El Paso |
FM 1281 | Actual | $769,413 | 1 | OVERLAY |
0752-04-026 | Falls/ Waco |
FM 935 | Actual | $1,277,415 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0535-07-046 | Fayette/ Yoakum |
IH 10 | Actual | $3,967,369 | 1 | ASPHALTIC CONCRETE PAVEMENT |
0912-34-155 | Fort Bend/ Houston |
VA | Actual | $194,676 | 1 | CRACK SEAL |
0413-05-027 | Freestone/ Bryan |
SH 164 | Actual | $142,533 | 10 | MISCELLANEOUS CONSTRUCTION CONSISTING OF SUBGRADE WIDENING, |
0912-73-150 | Galveston/ Houston |
VA | Actual | $1,115,628 | 10 | REPLACE AND / OR REPAIR DAMAGED TRAFFIC SIGNALS CAUSED BY |
0912-73-169 | Galveston/ Houston |
VA | Actual | $1,662,500 | 10 | REMOVAL AND DISPOSAL OF DEBRIS FROM ROADS AFTER HURRICANE |
0917-17-016 | Grimes/ Bryan |
CR | Actual | $412,074 | 6 | REPLACEMENT OF EXISTING BRIDGE |
0366-03-059 | Guadalupe/ San Antonio |
SH 123 | Actual | $233,582 | 8 | CONSTRUCT LEFT TURN LANE |
0915-46-037 | Guadalupe/ San Antonio |
CS | Actual | $404,738 | 8 | CONSTRUCT SIDEWALKS |
0050-09-074 | Harris/ Houston |
US 290 | Actual | $388,130 | 1 | CRACK & SPALL REPAIR, FULL DEPTH CONCRETE REPAIR |
0271-07-242 | Harris/ Houston |
IH 10 | Actual | $48,579,332 | 1 | WIDEN AND RECONSTRUCT TO 2 3 - LANE FRONTAGE ROADS WITH |
0912-00-439 | Harris/ Houston |
VA | Actual | $19,763 | 10 | REPAIR AND REPLACE DAMAGED TRAFFIC SIGNALS AND WARNING |
0683-03-030 | Hays/ Austin |
RM 12 | Actual | $63,093 | 1 | LANDSCAPE WORK |
0864-01-059 | Hidalgo/ Pharr |
FM 494 | Actual | $2,347,570 | 1 | FY 2010 SEALCOAT PROGRAM |
0909-37-040 | Hill/ Waco |
CR | Actual | $242,457 | 6 | REPLACE BRIDGE AND APPROACHES |
0109-03-031 | Houston/ Lufkin |
US 287 | Actual | $1,225,752 | 1 | RESURFACE WITH SEAL COAT |
0064-08-050 | Jasper/ Beaumont |
US 96 | Actual | $5,671,802 | 1 | RUBBLIZE AND OVERLAY EXISTING ROADWAY |
0920-38-235 | Jefferson/ Beaumont |
VA | Actual | $611,529 | 10 | REPAIR AND REPLACE SIGNALS, LUMINAIRES, AND STREET LIGHTS |
0920-38-236 | Jefferson/ Beaumont |
VA | Actual | $18,766 | 10 | TRAFFIC SIGNAL SIGNAL REPAIR & REPLACEMENT DUE TO DAMAGES |
0095-03-079 | Kaufman/ Dallas |
US 80 | Actual | $10,820,882 | 12 | RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS |
0901-00-050 | Lamar/ Paris |
VA | Actual | $823,834 | 10 | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE |
0056-03-059 | Limestone/ Waco |
US 84 | Actual | $930,470 | 8 | INSTALL LEFT TURN LANE OR TWO WAY CONTINUOUS TURN LANE |
0909-40-054 | Limestone/ Waco |
CS | Actual | $128,122 | 8 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF |
0783-02-065 | Lubbock/ Lubbock |
LP 289 | Actual | $17,056,766 | 7 | WIDEN FREEWAY TO 6 MAIN LANES |
0905-00-048 | Lubbock/ Lubbock |
VA | Actual | $771,313 | 10 | CONSTRUCTION CURB RAMPS |
0380-18-006 | Midland/ Odessa |
SH 349 | Actual | $3,971,609 | 11 | CONSTRUCT OVERPASS |
0110-04-183 | Montgomery/ Houston |
IH 45 | Actual | $3,220,252 | 10 | REVERSE RAMPS AND ILLUMINATION IN ADVANCE OF DCS AT |
0118-06-063 | Nacogdoches/ Lufkin |
SH 21 | Actual | $1,431,585 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0101-06-105 | Nueces/ Corpus Christi |
US 181 | Actual | $23,165,710 | 6 | CLEAN AND PAINT HARBOR BRIDGE |
1557-01-036 | Nueces/ Corpus Christi |
FM 43 | Actual | $85,626 | 8 | INSTALL TRAFFIC SIGNAL |
0902-39-028 | Palo Pinto/ Fort Worth |
PW | Actual | $62,000 | 10 | PURCHASE OF MATERIALS FOR HMAC OVERLAY BY MAINTENANCE FORCES |
0928-01-010 | Polk/ Lufkin |
FM 350 | Actual | $1,565,225 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1408-01-019 | Polk/ Lufkin |
FM 1276 | Actual | $2,050,808 | 1 | REPLACE BRIDGES AND APPROACHES |
0907-13-008 | Runnels/ San Angelo |
VA | Actual | $2,729,326 | 10 | CONSTRUCT RAIL BRIDGE |
2637-01-023 | San Augustine/ Lufkin |
FM 83 | Actual | $876,460 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0053-10-041 | Scurry/ Abilene |
US 84 | Actual | $95,401 | 8 | INSTALL FLASHING BEACON |
0345-02-050 | Smith/ Tyler |
SH 110 | Actual | $65,238 | 10 | CONSTRUCT STONE RETAINING WALL AND BENCHES, IRRIGATION |
0257-01-039 | Stephens/ Brownwood |
US 183 | Actual | $1,095,977 | 11 | FLEX BASE AND SEAL COAT |
0006-04-068 | Taylor/ Abilene |
IH 20 | Actual | $1,191,750 | 8 | INSTALL MEDIAN BARRIER |
7107-09-004 | Tom Green/ San Angelo |
RL SO | Actual | $5,426,004 | 10 | GRADE CROSSING AND RAILROAD REHABILITATION |
0114-02-090 | Travis/ Austin |
US 290 | Actual | $52,575,546 | 2 | CONSTRUCT 4 DIRECT CONNECTORS |
0700-03-105 | Travis/ Austin |
SH 71 | Actual | $7,817,347 | 8 | CONVERT TO 4 - LN DIV RD & ADD SHLDRS |
0914-00-305 | Travis/ Austin |
VA | Actual | $1,408,205 | 7 | PROVIDE ROADSIDE ASSISTANCE |
0319-03-048 | Trinity/ Lufkin |
SH 94 | Actual | $10,888,820 | 6 | REPLACE BRIDGES AND APPROACHES |
0036-07-030 | Uvalde/ San Antonio |
US 83 | Actual | $72,564 | 8 | INSTALL FLASHING BEACON, SAFETY LIGHTING & RUMBLE STRIP |
0271-04-086 | Waller/ Houston |
IH 10 | Actual | $1,264,152 | 1 | PLANING, SEAL COAT, 1.5" ACP OVERLAY, PAVEMENT MARKINGS |
0086-01-052 | Webb/ Laredo |
US 83 | Actual | $10,840,013 | 11 | CONSTRUCT RAILROAD GRADE SEPARATION STR AND APPROACHES |
0043-09-105 | Wichita/ Wichita Falls |
US 287 | Actual | $1,330,005 | 11 | SEAL AND HEAVY OVERLAY |
0137-02-024 | Wichita/ Wichita Falls |
SH 25 | Actual | $439,802 | 6 | REPLACE BRIDGE AND APPROACHES |
1768-01-013 | Wichita/ Wichita Falls |
FM 1814 | Actual | $1,089,236 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD SHOULDERS |
0914-05-169 | Williamson/ Austin |
VA | Actual | $630,000 | 1 | GEORGETOWN SIGNAL UPGRADES |
|
|