0336-05-057 Angelina/
Lufkin
SH 103 Actual $846,256 8 SAFETY TREAT FIXED OBJECTS
0073-10-045 Atascosa/
San Antonio
IH 37 Actual $3,684,661 1 MILL, BASE REPAIR, SEAL COAT, OVERLAY, SIGNS & PAVEMENT
0913-20-070 Austin/
Yoakum
CR Actual $276,148 6 REPLACE BRIDGE AND APPROACHES
0658-01-038 Bexar/
San Antonio
FM 1535 Actual $316,927 1 SEAL COAT, OVERLAY, & PAVEMENT MARKINGS
0915-12-322 Bexar/
San Antonio
CS Actual $3,297,539 7 EXPAND ROADWAY TO 4 LANES W / CURBS & SIDEWALKS
2452-03-103 Bexar/
San Antonio
LP 1604 Actual $6,631,043 7 EXPAND FROM 2 LANES TO 4 LANE DIVIDED
0295-02-025 Borden/
Abilene
US 180 Actual $43,395 11 INSTALL LEFT TURN BAY
0010-13-084 Bowie/
Atlanta
US 67 Actual $713,639 8 IMPROVE TRAFFIC SIGNAL
0912-31-190 Brazoria/
Houston
CR Actual $507,818 6 REPLACE BRIDGE (NBI# 12020AA0084001)
0273-02-021 Burnet/
Austin
US 183 Actual $1,052,661 8 TEXTURIZE SHLDRS & CENTERLINE TEXTURE
0215-01-039 Comal/
San Antonio
SH 46 Actual $521,339 8 CONSTRUCT LEFT TURN LANE
1609-01-025 Cooke/
Wichita Falls
FM 1630 Actual $908,297 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD SHOULDERS
1950-01-026 Denton/
Dallas
FM 407 Actual $5,419,912 10 WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN
0042-06-065 Donley/
Childress
US 287 Actual $2,078,858 1 OVERLAY
0237-05-032 Duval/
Laredo
US 59 Actual $1,109,648 1 REHABILITATION OF AN EXISTING ROADWAY
0007-03-083 Eastland/
Brownwood
IH 20 Actual $6,349,324 1 SEAL COAT
2121-04-065 El Paso/
El Paso
IH 10 Actual 145,991,880 3 INTERCHANGE IMPROVEMENTS INCLUDING THE CONSTRUCTION OF
3451-01-027 El Paso/
El Paso
FM 1281 Actual $769,413 1 OVERLAY
0752-04-026 Falls/
Waco
FM 935 Actual $1,277,415 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0535-07-046 Fayette/
Yoakum
IH 10 Actual $3,967,369 1 ASPHALTIC CONCRETE PAVEMENT
0912-34-155 Fort Bend/
Houston
VA Actual $194,676 1 CRACK SEAL
0413-05-027 Freestone/
Bryan
SH 164 Actual $142,533 10 MISCELLANEOUS CONSTRUCTION CONSISTING OF SUBGRADE WIDENING,
0912-73-150 Galveston/
Houston
VA Actual $1,115,628 10 REPLACE AND / OR REPAIR DAMAGED TRAFFIC SIGNALS CAUSED BY
0912-73-169 Galveston/
Houston
VA Actual $1,662,500 10 REMOVAL AND DISPOSAL OF DEBRIS FROM ROADS AFTER HURRICANE
0917-17-016 Grimes/
Bryan
CR Actual $412,074 6 REPLACEMENT OF EXISTING BRIDGE
0366-03-059 Guadalupe/
San Antonio
SH 123 Actual $233,582 8 CONSTRUCT LEFT TURN LANE
0915-46-037 Guadalupe/
San Antonio
CS Actual $404,738 8 CONSTRUCT SIDEWALKS
0050-09-074 Harris/
Houston
US 290 Actual $388,130 1 CRACK & SPALL REPAIR, FULL DEPTH CONCRETE REPAIR
0271-07-242 Harris/
Houston
IH 10 Actual $48,579,332 1 WIDEN AND RECONSTRUCT TO 2 3 - LANE FRONTAGE ROADS WITH
0912-00-439 Harris/
Houston
VA Actual $19,763 10 REPAIR AND REPLACE DAMAGED TRAFFIC SIGNALS AND WARNING
0683-03-030 Hays/
Austin
RM 12 Actual $63,093 1 LANDSCAPE WORK
0864-01-059 Hidalgo/
Pharr
FM 494 Actual $2,347,570 1 FY 2010 SEALCOAT PROGRAM
0909-37-040 Hill/
Waco
CR Actual $242,457 6 REPLACE BRIDGE AND APPROACHES
0109-03-031 Houston/
Lufkin
US 287 Actual $1,225,752 1 RESURFACE WITH SEAL COAT
0064-08-050 Jasper/
Beaumont
US 96 Actual $5,671,802 1 RUBBLIZE AND OVERLAY EXISTING ROADWAY
0920-38-235 Jefferson/
Beaumont
VA Actual $611,529 10 REPAIR AND REPLACE SIGNALS, LUMINAIRES, AND STREET LIGHTS
0920-38-236 Jefferson/
Beaumont
VA Actual $18,766 10 TRAFFIC SIGNAL SIGNAL REPAIR & REPLACEMENT DUE TO DAMAGES
0095-03-079 Kaufman/
Dallas
US 80 Actual $10,820,882 12 RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS
0901-00-050 Lamar/
Paris
VA Actual $823,834 10 CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE
0056-03-059 Limestone/
Waco
US 84 Actual $930,470 8 INSTALL LEFT TURN LANE OR TWO WAY CONTINUOUS TURN LANE
0909-40-054 Limestone/
Waco
CS Actual $128,122 8 CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0783-02-065 Lubbock/
Lubbock
LP 289 Actual $17,056,766 7 WIDEN FREEWAY TO 6 MAIN LANES
0905-00-048 Lubbock/
Lubbock
VA Actual $771,313 10 CONSTRUCTION CURB RAMPS
0380-18-006 Midland/
Odessa
SH 349 Actual $3,971,609 11 CONSTRUCT OVERPASS
0110-04-183 Montgomery/
Houston
IH 45 Actual $3,220,252 10 REVERSE RAMPS AND ILLUMINATION IN ADVANCE OF DCS AT
0118-06-063 Nacogdoches/
Lufkin
SH 21 Actual $1,431,585 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0101-06-105 Nueces/
Corpus Christi
US 181 Actual $23,165,710 6 CLEAN AND PAINT HARBOR BRIDGE
1557-01-036 Nueces/
Corpus Christi
FM 43 Actual $85,626 8 INSTALL TRAFFIC SIGNAL
0902-39-028 Palo Pinto/
Fort Worth
PW Actual $62,000 10 PURCHASE OF MATERIALS FOR HMAC OVERLAY BY MAINTENANCE FORCES
0928-01-010 Polk/
Lufkin
FM 350 Actual $1,565,225 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1408-01-019 Polk/
Lufkin
FM 1276 Actual $2,050,808 1 REPLACE BRIDGES AND APPROACHES
0907-13-008 Runnels/
San Angelo
VA Actual $2,729,326 10 CONSTRUCT RAIL BRIDGE
2637-01-023 San Augustine/
Lufkin
FM 83 Actual $876,460 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0053-10-041 Scurry/
Abilene
US 84 Actual $95,401 8 INSTALL FLASHING BEACON
0345-02-050 Smith/
Tyler
SH 110 Actual $65,238 10 CONSTRUCT STONE RETAINING WALL AND BENCHES, IRRIGATION
0257-01-039 Stephens/
Brownwood
US 183 Actual $1,095,977 11 FLEX BASE AND SEAL COAT
0006-04-068 Taylor/
Abilene
IH 20 Actual $1,191,750 8 INSTALL MEDIAN BARRIER
7107-09-004 Tom Green/
San Angelo
RL SO Actual $5,426,004 10 GRADE CROSSING AND RAILROAD REHABILITATION
0114-02-090 Travis/
Austin
US 290 Actual $52,575,546 2 CONSTRUCT 4 DIRECT CONNECTORS
0700-03-105 Travis/
Austin
SH 71 Actual $7,817,347 8 CONVERT TO 4 - LN DIV RD & ADD SHLDRS
0914-00-305 Travis/
Austin
VA Actual $1,408,205 7 PROVIDE ROADSIDE ASSISTANCE
0319-03-048 Trinity/
Lufkin
SH 94 Actual $10,888,820 6 REPLACE BRIDGES AND APPROACHES
0036-07-030 Uvalde/
San Antonio
US 83 Actual $72,564 8 INSTALL FLASHING BEACON, SAFETY LIGHTING & RUMBLE STRIP
0271-04-086 Waller/
Houston
IH 10 Actual $1,264,152 1 PLANING, SEAL COAT, 1.5" ACP OVERLAY, PAVEMENT MARKINGS
0086-01-052 Webb/
Laredo
US 83 Actual $10,840,013 11 CONSTRUCT RAILROAD GRADE SEPARATION STR AND APPROACHES
0043-09-105 Wichita/
Wichita Falls
US 287 Actual $1,330,005 11 SEAL AND HEAVY OVERLAY
0137-02-024 Wichita/
Wichita Falls
SH 25 Actual $439,802 6 REPLACE BRIDGE AND APPROACHES
1768-01-013 Wichita/
Wichita Falls
FM 1814 Actual $1,089,236 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD SHOULDERS
0914-05-169 Williamson/
Austin
VA Actual $630,000 1 GEORGETOWN SIGNAL UPGRADES