Letting Schedule for July, 2010 (FY 2010)
Letting Schedule for July, 2010 (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
July, 2010 (FY 2010) | (see Links) |
SEP 2009 | OCT 2009 | NOV 2009 | DEC 2009 | JAN 2010 | FEB 2010 | MAR 2010 | APR 2010 | MAY 2010 | JUN 2010 | JUL 2010 | AUG 2010 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0109-02-024 | Anderson/ Tyler |
US 287 | Actual | $824,353 | 11 | REPAIR PAVEMENT & RESURFACE ROADWAY |
0915-47-005 | Bandera/ San Antonio |
PW | Actual | $475,450 | 10 | RECONSTRUCT EXISTING PARK ROADS AND PARKING PADS AND |
1042-03-012 | Bandera/ San Antonio |
SH 46 | Actual | $322,625 | 8 | INSTALL SIGNS, DELINEATION, OVERLAY AND PAVEMENT MARKINGS |
0025-02-186 | Bexar/ San Antonio |
IH 10 | Actual | $1,668,873 | 1 | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) |
0252-03-049 | Blanco/ Austin |
US 281 | Actual | $1,471,794 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0511-01-016 | Blanco/ Austin |
RM 32 | Actual | $390,112 | 1 | RESURFACE TO IMPROVE SKID RESISTANCE |
0010-12-063 | Bowie/ Atlanta |
US 67 | Actual | $2,285,063 | 6 | REHABILITATE BRIDGES AND APPROACHES |
0330-01-030 | Bowie/ Atlanta |
FM 1840 | Actual | $1,928,828 | 8 | SAFETY TREAT FIXED OBJECTS |
0919-19-051 | Bowie/ Atlanta |
CR | Actual | $1,622,732 | 6 | REPLACE BRIDGE AND APPROACHES_ON CR 4319 AT ANDERSON CREEK |
0919-19-060 | Bowie/ Atlanta |
CS | Actual | $342,513 | 6 | REPLACE BRIDGE AND APPROACHES_ON 4TH STREET AT SWAMPOODLE |
0111-09-040 | Brazoria/ Houston |
BS 288B | Actual | $1,298,886 | 1 | ACP OVERLAY |
0912-31-189 | Brazoria/ Houston |
CR | Actual | $389,925 | 6 | REPLACE BRIDGE AND APPROACHES_NBI# 12020AA2029001 |
0912-31-191 | Brazoria/ Houston |
PW | Actual | $963,415 | 10 | ACP OVERLAY, FLEXIBLE BASE, GRADING AND SHAPING OF ACCESS |
0212-03-049 | Brazos/ Bryan |
FM 158 | Actual | $436,573 | 1 | OVERLAY CONSISTING OF MILLING, AN HMA OVERLAY AND |
0917-29-104 | Brazos/ Bryan |
CR | Actual | $516,480 | 6 | REPLACEMENT OF EXISTING BRIDGE FACILITY CONSISTING OF |
0923-06-052 | Brown/ Brownwood |
CR | Actual | $3,642,406 | 6 | REHAB EXISTING BRIDGE AND APPROACHES |
0251-07-023 | Burnet/ Austin |
US 281 | Actual | $2,352,405 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0805-03-019 | Caldwell/ Austin |
FM 713 | Actual | $2,318,284 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0039-10-071 | Cameron/ Pharr |
SH 4 | Actual | $177,237 | 1 | OVERLAY ROADWAY |
2529-01-018 | Cameron/ Pharr |
FM 2556 | Actual | $6,065,902 | 1 | REHAB EXISTING ROADWAY |
1019-01-016 | Camp/ Atlanta |
FM 556 | Actual | $1,822,516 | 11 | REPLACE BRIDGE AND APPROACHES ON 2 LANE HIGHWAY |
0275-03-060 | Carson/ Amarillo |
IH 40 | Actual | $15,299,569 | 11 | CONCRETE UPGRADE (WBL) |
0919-14-021 | Cass/ Atlanta |
VA | Actual | $212,121 | 8 | SIDEWALKS & CROSSWALKS |
1812-02-021 | Chambers/ Beaumont |
FM 1942 | Actual | $810,567 | 1 | REHABILITATE EXISTING ROADWAY |
0047-06-144 | Collin/ Dallas |
US 75 | Actual | $508,606 | 10 | EXTEND EXISTING ITS NETWORK |
0135-05-023 | Collin/ Dallas |
US 380 | Actual | $16,564,930 | 10 | RECONSTRUCT EXISTING 2 LANES TO 4 LANES DIVIDED |
1013-01-029 | Collin/ Dallas |
FM 546 | Actual | $623,555 | 8 | INSTALL CENTERLINE RUMBLE STRIPS |
0845-03-052 | Cooke/ Wichita Falls |
FM 922 | Actual | $53,216 | 1 | LANDSCAPING |
1356-01-024 | Cooke/ Wichita Falls |
FM 1201 | Actual | $2,122,337 | 8 | ADD SHOULDERS |
0047-07-217 | Dallas/ Dallas |
US 75 | Actual | $821,488 | 10 | LANDSCAPE DEVELOPMENT INCLUDING SOIL AMENDMENTS |
0095-13-029 | Dallas/ Dallas |
IH 20 | Actual | $1,250,269 | 1 | FULL DEPTH PAVEMENT REPAIR |
0261-03-060 | Dallas/ Dallas |
US 67 | Actual | $126,344 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING |
0918-45-541 | Dallas/ Dallas |
CS | Actual | $866,143 | 5 | ONE OFF SYSTEM INTERSECTION IMPROVEMENT |
0918-45-861 | Dallas/ Dallas |
VA | Actual | $8,403,345 | 9 | MCKINNEY TROLLEY PHASE 2 - CONSTRUCT EXTENTION OF TROLLEY |
2374-03-075 | Dallas/ Dallas |
IH 20 | Actual | $195,000 | 1 | INSTALL CTB IN THE MEDIAN |
0749-05-009 | Delta/ Paris |
FM 3388 | Actual | $887,099 | 6 | REPLACE BRIDGE AND APPROACHES |
0718-01-049 | Denton/ Dallas |
FM 156 | Actual | $3,156,596 | 1 | ADD 10' SHOULDERS AND REHAB |
0918-46-201 | Denton/ Dallas |
CR | Actual | $1,329,151 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-202 | Denton/ Dallas |
CR | Actual | $539,035 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-218 | Denton/ Dallas |
CR | Actual | $186,459 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-223 | Denton/ Dallas |
CS | Actual | $318,858 | 8 | CONSTRUCT SIDEWALKS AND CROSSWALKS AT VARIOUS SCHOOLS |
1567-01-029 | Denton/ Dallas |
FM 720 | Actual | $54,321,264 | ROW | WIDEN TWO LANE RURAL ROADWAY TO SIX LANE DIVIDED URBAN |
2011-01-007 | Dickens/ Childress |
SH 208 | Actual | $839,551 | 6 | REPLACE BRIDGE AND APPROACHES |
0048-08-044 | Ellis/ Dallas |
IH 35E | Actual | $21,720,233 | 1 | REHABILITATE FREEWAY MAINLANES |
0267-03-024 | Fayette/ Yoakum |
FM 609 | Actual | $554,296 | 8 | SAFETY TREAT FIXED OBJECTS |
0389-06-098 | Galveston/ Houston |
SH 146 | Actual | $7,825,859 | 11 | CONSTRUCT SB GRADE SEPARATION |
0113-01-039 | Gillespie/ Austin |
US 290 | Actual | $1,693,149 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
1007-02-014 | Gonzales/ Yoakum |
FM 532 | Actual | $2,244,629 | 6 | REPLACE 5 BRIDGES AND APPROACHES |
0560-02-031 | Gray/ Amarillo |
SH 273 | Actual | $2,718,001 | 6 | REPLACE BRIDGE AND APPROACHES |
0081-10-038 | Grayson/ Paris |
US 377 | Actual | $1,009,814 | 8 | PLACEMENT OF CENTERLINE PROFILE MARKINGS |
0025-10-085 | Guadalupe/ San Antonio |
FM 78 | Actual | $526,626 | 8 | CENTERLINE RUMBLE STRIPS |
0271-07-094 | Harris/ Houston |
IH 10 | Actual | $1,560,410 | 10 | LANDSCAPING |
0271-07-095 | Harris/ Houston |
IH 10 | Actual | $684,827 | 10 | LANDSCAPING |
0912-00-361 | Harris/ Houston |
VA | Actual | $8,000,000 | 5 | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2010) |
0912-71-432 | Harris/ Houston |
VA | Actual | $7,458,029 | 9 | CONSTRUCT PEDESTRIAN / BIKE BRIDGES |
0912-72-041 | Harris/ Houston |
CR | Actual | $1,076,267 | 6 | REPLACE BRIDGE (NBI# 12102AA0223001) |
0912-72-168 | Harris/ Houston |
VA | Actual | $699,130 | 7 | CONSTRUCT TRANSTAR COMMUNICATIONS TOWER |
0912-72-271 | Harris/ Houston |
VA | Actual | $3,326,948 | 10 | REMOVAL AND DISPOSAL OF VEGETATIVE DEBRIS BY GRINDING CAUSED |
1062-04-047 | Harris/ Houston |
FM 2100 | Actual | $8,872,941 | 7 | CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE & APPROACHES |
0208-04-012 | Harrison/ Atlanta |
FM 2198 | Actual | $720,534 | 8 | SAFETY TREAT FIXED OBJECTS |
0030-06-052 | Hemphill/ Amarillo |
US 83 | Actual | $118,428 | 8 | CENTERLINE TEXTURING |
0904-03-014 | Hemphill/ Amarillo |
VA | Actual | $479,784 | 6 | REPLACE BRIDGE & APPROACHES |
0458-01-020 | Henderson/ Tyler |
FM 59 | Actual | $5,171,432 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1668-01-013 | Henderson/ Tyler |
SH 198 | Actual | $20,879,130 | 6 | REPLACE EXISTING STRUCTURE |
0220-01-028 | Hidalgo/ Pharr |
US 281 | Actual | $1,838,598 | 1 | REBUILD ROADWAY |
0220-02-025 | Hidalgo/ Pharr |
US 281 | Actual | $4,876,346 | 1 | FULL DEPTH REPAIR BOTH LANES |
0921-02-196 | Hidalgo/ Pharr |
VA | Actual | $290,709 | 8 | CROSSWALKS, SIDEWALKS AND SIGNS ALONG SCHOOL ROUTES |
0009-13-151 | Hunt/ Paris |
IH 30 | Actual | $9,874,593 | 1 | MILL, HOT MIX, AND TBPFC |
0173-07-051 | Hunt/ Paris |
SH 34 | Actual | $21,899 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0768-01-049 | Hunt/ Paris |
SH 24 | Actual | $107,216 | 10 | LANDSCAPE ENHANCEMENT |
0515-05-013 | Jackson/ Yoakum |
FM 822 | Actual | $1,350,926 | 6 | REPLACE BRIDGE AND APPROACHES |
0920-12-036 | Jasper/ Beaumont |
CR | Actual | $269,610 | 6 | REPLACE BRIDGE AND APPROACHES |
0920-12-041 | Jasper/ Beaumont |
CR | Actual | $46,798 | 10 | REHABILITATE EXISTING ROADWAY |
0368-02-042 | Jefferson/ Beaumont |
SH 124 | Actual | $276,997 | 8 | INSTALL CONTINUOUS LEFT TURN LANE |
0667-01-113 | Jefferson/ Beaumont |
SH 347 | Actual | $197,663 | 8 | SAFETY TREAT FIXED OBJECTS |
0086-06-029 | Jim Hogg/ Pharr |
SH 359 | Actual | $891,262 | 8 | SAFETY TREAT FIXED OBJECTS |
0517-06-028 | Jim Hogg/ Pharr |
SH 16 | Actual | $525,867 | 8 | INSTALL LEFT TURN LANE OR TWCTL ON RURAL CROSS SECTION |
0014-03-091 | Johnson/ Fort Worth |
IH 35W | Actual | $2,131,165 | 1 | RECONSTRUCT FRONTAGE ROADS |
0014-04-076 | Johnson/ Fort Worth |
IH 35W | Actual | $2,189,124 | 1 | CEMENT TREAT BASE AND TWO COURSE SURFACE TREATMENT ON NORTH |
0915-15-091 | Kerr/ San Antonio |
CS | Actual | $1,784,709 | 8 | CONSTRUCT SIDEWALKS |
0032-06-034 | King/ Childress |
US 83 | Actual | $704,772 | 6 | REPLACE BRIDGE AND APPROACHES |
0496-03-011 | King/ Childress |
SH 222 | Actual | $814,830 | 11 | REPLACE BRIDGE AND APPROACHES |
0925-16-006 | King/ Childress |
CR | Actual | $584,487 | 6 | REPLACE EXIST BRIDGE FACILITY |
0922-20-003 | La Salle/ Laredo |
CR | Actual | $141,267 | 6 | REPLACING BRIDGE AND APPROACHES |
0211-04-019 | Lee/ Austin |
US 77 | Actual | $3,937,736 | 1 | LEVEL - UP & SEALCOAT, MILL, OVERLAY IN CITY |
0334-05-028 | Lee/ Austin |
FM 141 | Actual | $2,954,808 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0920-02-070 | Liberty/ Beaumont |
CR | Actual | $321,704 | 6 | REPLACE BRIDGE AND APPROACHES |
0920-02-077 | Liberty/ Beaumont |
CR | Actual | $126,641 | 6 | REPLACE BRIDGE AND APPROACHES |
1067-01-023 | Liberty/ Beaumont |
FM 686 | Actual | $863,813 | 1 | REHABILITATE EXISTING ROADWAY |
0355-02-027 | Lipscomb/ Amarillo |
SH 15 | Actual | $1,399,231 | 11 | REHAB EXISTING ROADWAY |
0700-04-040 | Llano/ Austin |
SH 71 | Actual | $2,237,430 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0068-01-064 | Lubbock/ Lubbock |
US 87 | Actual | $567,295 | 8 | HAZARDOUS ELIMINATION AND SAFETY |
0130-05-069 | Lubbock/ Lubbock |
US 62 | Actual | $9,592,014 | 1 | REHABILITATION OF EXISTING ROAD |
0179-06-038 | Matagorda/ Yoakum |
SH 35 | Actual | $558,053 | 8 | ADD LEFT AND RIGHT TURN LANES |
0014-08-075 | McLennan/ Waco |
IH 35 | Actual | 166,787,859 | 4 | RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE |
0015-01-222 | McLennan/ Waco |
IH 35 | Actual | $3,478,479 | 1 | CONCRETE PAVEMENT REPAIR |
0909-22-142 | McLennan/ Waco |
CR | Actual | $411,508 | 6 | REPLACE BRIDGE AND APPROACHES |
1730-02-018 | Medina/ San Antonio |
FM 1283 | Actual | $161,924 | 8 | CONSTRUCT LEFT TURN LANE |
0396-05-018 | Menard/ San Angelo |
US 190 | Actual | $982,905 | 6 | REPLACE BRIDGE |
2580-01-007 | Montague/ Wichita Falls |
FM 2583 | Actual | $893,863 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD SHOULDERS |
0720-02-075 | Montgomery/ Houston |
FM 149 | Actual | $3,910,411 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0919-20-020 | Morris/ Atlanta |
CR | Actual | $376,568 | 6 | REPLACE BRIDGES AND APPROACHES_ON CR 2231 AT BIG CYPRESS |
0925-18-007 | Motley/ Childress |
CR | Actual | $847,545 | 6 | REPLACE BRIDGE AND APPROACHES |
0162-08-015 | Navarro/ Dallas |
FM 55 | Actual | $867,688 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1277-01-013 | Newton/ Beaumont |
FM 1012 | Actual | $1,742,073 | 8 | SAFETY TREAT FIXED OBJECTS |
2263-03-033 | Nueces/ Corpus Christi |
SH 361 | Actual | $109,765 | 8 | INSTALL TRAFFIC SIGNAL, SAFETY LIGHTING AT INTERSECTION |
0030-01-028 | Ochiltree/ Amarillo |
US 83 | Actual | $3,028,290 | 8 | HAZARD ELIMINATION |
0790-08-020 | Ochiltree/ Amarillo |
FM 377 | Actual | $579,080 | 6 | REPLACE BRIDGE & APPR |
0028-09-114 | Orange/ Beaumont |
IH 10 | Actual | $3,988,832 | 6 | RELOCATION OF COMMUNICATION FACILITIES |
0649-02-029 | Parker/ Fort Worth |
FM 52 | Actual | $615,747 | 6 | REPLACE WITH A WIDER BRIDGE |
0168-09-108 | Randall/ Amarillo |
IH 27 | Actual | $2,108,462 | 11 | REPLACE BRIDGE AND APPROACHES |
0168-09-152 | Randall/ Amarillo |
IH 27 | Actual | $4,012,177 | 1 | REHAB EXISTING ROADWAY |
3148-01-005 | Rockwall/ Dallas |
FM 3097 | Actual | $688,710 | 1 | BASE REPAIR, LEVEL UP AND OVERLAY |
0034-05-038 | Runnels/ San Angelo |
US 83 | Actual | $496,101 | 11 | ACP OVERLAY |
1208-01-017 | San Patricio/ Corpus Christi |
SH 188 | Actual | $11,497,909 | 1 | REHAB |
0059-05-041 | Shelby/ Lufkin |
SH 7 | Actual | $335,950 | 8 | CENTERLINE RUMBLE STRIPS |
0910-16-104 | Smith/ Tyler |
VA | Actual | $1,436,404 | 11 | BEAUTIFY 9 SIGNAL INTRSCTNS, CNST 2 RAISED ISLAND PLANT BEDS |
0910-16-111 | Smith/ Tyler |
PW | Actual | $164,437 | 10 | REHABILITATE CEDAR POINT CAMP LOOP RD & CAMPSITE PADS |
0039-01-068 | Starr/ Pharr |
US 83 | Actual | $470,925 | 11 | PEDESTRIAN PATH AND SIDEWALK IMPROVEMENTS ALONG US 83 IN RIO |
0363-01-111 | Tarrant/ Fort Worth |
SH 26 | Actual | $11,897,196 | 7 | RECONSTRUCT |
0747-04-061 | Tarrant/ Fort Worth |
FM 157 | Actual | $174,333 | 1 | REPAIR BASE FAILURES AND RESURFACE FOR IMPROVED SKID |
0902-48-767 | Tarrant/ Fort Worth |
VA | Actual | $4,308,575 | 5 | REGIONAL RAIL PROJECTS AS DEFINED BY RTC FY 09 FOR JOHNSON |
0054-01-029 | Taylor/ Abilene |
US 84 | Actual | $235,952 | 11 | CENTERLINE RUMBLE STRIPS |
3404-01-011 | Titus/ Atlanta |
FM 3417 | Actual | $789,872 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0070-08-009 | Tom Green/ San Angelo |
SS 126 | Actual | $1,047,632 | 11 | ACP OVERLAY |
0015-13-356 | Travis/ Austin |
IH 35 | Actual | $387,600 | 1 | WIDEN SB FRONTAGE RD & ADD SHOULDERS |
0914-04-250 | Travis/ Austin |
CR | Actual | $95,556 | 6 | REHABILITATE BRIDGE AND APPROACHES |
1378-01-034 | Travis/ Austin |
RM 1431 | Actual | $423,619 | 8 | INSTALL LEFT TURN LANE |
0402-02-027 | Upshur/ Atlanta |
SH 154 | Actual | $615,915 | 8 | SAFETY TREAT FIXED OBJECTS |
0095-06-065 | Van Zandt/ Tyler |
US 80 | Actual | $585,290 | 8 | INSTALL MILLED CENTERLINE RUMBLE STRIPS (SECTIONS) |
0038-01-065 | Webb/ Laredo |
US 83 | Actual | $421,861 | 8 | INSTALL TRAFFIC SIGNAL |
0089-07-141 | Wharton/ Yoakum |
US 59 | Actual | $887,666 | 8 | CONSTRUCT MEDIAN BARRIER |
0266-05-042 | Wharton/ Yoakum |
SH 71 | Actual | $469,826 | 8 | SAFETY TREAT FIXED OBJECTS |
1304-01-017 | Wharton/ Yoakum |
FM 1162 | Actual | $372,420 | 8 | SAFETY TREAT FIXED OBJECTS |
0156-04-106 | Wichita/ Wichita Falls |
US 82 | Actual | $225,406 | 1 | PAVEMENT MARKING AND MARKINGS |
0903-00-063 | Wichita/ Wichita Falls |
VA | Actual | $174,779 | 1 | PAVEMENT MARKINGS AND MARKERS |
0015-08-131 | Williamson/ Austin |
IH 35 | Actual | $3,334,369 | 11 | UNDERSEAL AND OVERLAY |
0986-01-041 | Williamson/ Austin |
FM 619 | Actual | $336,849 | 6 | REHABILITATE BRIDGE AND APPROACHES |
1200-04-013 | Williamson/ Austin |
FM 1466 | Actual | $528,020 | 1 | DEPTH REPAIR, UNDERSEAL & THIN OV |
0922-48-003 | Zavala/ Laredo |
CR | Actual | $196,604 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN OFF - SYSTEM |
|
|