| 0115-04-041 | FM 20 | Actual | FEB 2010 | $4,792,710 | 1 | WIDEN, REHAB, ADD TURN LANE & OVERLAY | 
| 0321-03-017 | SH 95 | Actual | DEC 2009 | $691,000 | 8 | INSTALL LEFT TURN LANE | 
| 0322-01-042 | SH 95 | Actual | DEC 2009 | $972,724 | 8 | CONSTRUCT CONTINUOUS TURN LANE | 
| 0807-02-013 | FM 153 | Actual | MAY 2010 | $294,278 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS | 
| 0914-18-074 | CR | Actual | AUG 2010 | $462,904 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0914-18-080 | CR | Actual | SEP 2009 | $182,623 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1149-02-023 | FM 812 | Actual | AUG 2010 | $3,787,648 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
| 2098-01-008 | FM 2239 | Actual | MAY 2010 | $975,484 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
Blanco County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0113-05-045 | US 290 | Actual | FEB 2010 | $70,365 | 8 | INSTALL ADVANCE WARNING SIGNALS | 
| 0113-06-027 | US 290 | Actual | MAR 2010 | $1,859,351 | 1 | SEAL COAT | 
| 0252-03-049 | US 281 | Actual | JUL 2010 | $1,471,794 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS | 
| 0253-01-049 | US 281 | Actual | APR 2010 | $614,598 | 8 | INSTALL LEFT TURN LANE | 
| 0511-01-016 | RM 32 | Actual | JUL 2010 | $390,112 | 1 | RESURFACE TO IMPROVE SKID RESISTANCE | 
Burnet County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0151-02-021 | SH 29 | Actual | APR 2010 | $344,448 | 8 | INSTALL LEFT TURN LANE | 
| 0251-07-023 | US 281 | Actual | JUL 2010 | $2,352,405 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS | 
| 0252-01-069 | US 281 | Actual | AUG 2010 | $4,671,558 | 1 | REHAB RDWY | 
| 0252-01-070 | US 281 | Actual | SEP 2009 | $4,658,026 | 11 | WIDEN TO ADD CLTL AND SHOULDERS | 
| 0252-02-046 | US 281 | Actual | MAY 2010 | $28,647,845 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0252-02-052 | US 281 | Actual | JUN 2010 | $522,870 | 6 | REHABILITATE BRIDGE | 
| 0273-02-021 | US 183 | Actual | JAN 2010 | $1,052,661 | 8 | TEXTURIZE SHLDRS & CENTERLINE TEXTURE | 
| 1198-01-019 | RM 963 | Actual | MAY 2010 | $3,689,642 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
Caldwell County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0152-03-054 | US 183 | Actual | AUG 2010 | $256,546 | 1 | CENTERLINE RUMBLE STRIPS | 
| 0384-01-020 | SH 142 | Actual | NOV 2009 | $921,349 | 11 | MILL, SEAL, PAV. REPAIR & OVERLAY | 
| 0535-03-021 | IH 10 | Actual | JUN 2010 | $182,085 | 8 | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | 
| 0571-02-033 | FM 86 | Actual | JUN 2010 | $2,793,599 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
| 0805-03-019 | FM 713 | Actual | JUL 2010 | $2,318,284 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
| 0914-22-049 | CR | Actual | APR 2010 | $558,571 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0914-22-050 | CR | Actual | AUG 2010 | $261,621 | 6 | REPLACE BRIDGE AND APPROACHES | 
Gillespie County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0113-01-039 | US 290 | Actual | JUL 2010 | $1,693,149 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS | 
| 0113-02-048 | US 290 | Actual | MAR 2010 | $3,857,325 | 6 | REPLACE BRIDGE AND APPROACHES | 
Hays County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0016-02-120 | IH 35 | Actual | MAR 2010 | $5,848,033 | 10 | CONST OVERPASS & RECONST FRT RDS | 
| 0016-02-122 | IH 35 | Actual | AUG 2010 | $866,875 | 11 | IH 35 RIVER RIDGE ENTRANCE & EXIT RAMP PROJECT WILL CONST | 
| 0016-16-025 | RM 967 | Actual | MAY 2010 | $710,131 | 1 | SPOT REPAIR 10 IN WITH 5% CEMENT, SEAL COAT AND 2 HMAC | 
| 0285-03-048 | RM 12 | Actual | FEB 2010 | $998,761 | 7 | ADD CENTER TURN LANE | 
| 0366-01-064 | LP 82 | Actual | MAR 2010 | $420,946 | 1 | SPOT FULL DEPTH REPAIR | 
| 0366-01-067 | SH 123 | Actual | NOV 2009 | $173,236 | 1 | OVERLAY | 
| 0471-02-061 | SH 21 | Actual | FEB 2010 | $694,868 | 10 | ADD LEFT TURN LANE & SHOULDERS | 
| 0471-02-062 | SH 21 | Actual | AUG 2010 | $671,309 | 7 | ADD LEFT TURN LANE & SHOULDERS | 
| 0683-03-030 | RM 12 | Actual | JAN 2010 | $63,093 | 1 | LANDSCAPE WORK | 
| 0914-33-026 | PW | Actual | APR 2010 | $551,790 | 10 | PAVE VARIOUS LEVEE, ACCESS, SECTION ROADS, SERVICE YARD | 
| 0914-33-054 | CS | Actual | AUG 2010 | $367,417 | 7 | CONST BIKE / PED TRAIL | 
| 0914-33-059 | CS | Actual | MAY 2010 | $28,215 | 7 | RESTRIPE TO INCLUDE CTL, PARKING LANE, BICYCLE LANE, & X - WALK | 
| 0987-03-009 | FM 621 | Actual | NOV 2009 | $450,264 | 1 | SEAL COAT AND OVERLAY | 
| 1776-01-029 | RM 967 | Actual | MAY 2010 | $628,043 | 10 | ADD CENTER TURN LN, RIGHT TURN LN & SHOULDERS | 
| 1776-02-014 | FM 2001 | Actual | OCT 2009 | $492,050 | 10 | WIDEN EXISTING ROADWAY | 
Lee County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0211-04-019 | US 77 | Actual | JUL 2010 | $3,937,736 | 1 | LEVEL - UP & SEALCOAT, MILL, OVERLAY IN CITY | 
| 0334-05-027 | FM 141 | Actual | DEC 2009 | $2,079,747 | 1 | LEVEL - UP & SEALCOAT | 
| 0334-05-028 | FM 141 | Actual | JUL 2010 | $2,954,808 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
| 1073-02-023 | FM 696 | Actual | OCT 2009 | $2,075,715 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1073-02-030 | FM 696 | Actual | MAY 2010 | $1,654,180 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
Llano County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0150-04-042 | SH 29 | Actual | AUG 2010 | $661,749 | 8 | CENTERLINE RUMBLE STRIPS | 
| 0700-04-040 | SH 71 | Actual | JUL 2010 | $2,237,430 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS | 
| 3101-01-006 | RM 2900 | Actual | NOV 2009 | $862,585 | 1 | REHAB RDWY | 
Mason County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 1538-01-005 | RM 1723 | Actual | APR 2010 | $1,305,699 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
Travis County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0015-11-060 | LP 275 | Actual | MAR 2010 | $885,199 | 1 | MILL, DEPTH REPAIR, UNDERSEAL & OV | 
| 0015-13-356 | IH 35 | Actual | JUL 2010 | $387,600 | 1 | WIDEN SB FRONTAGE RD & ADD SHOULDERS | 
| 0016-01-107 | LP 275 | Actual | JUN 2010 | $205,435 | 1 | SEAL COAT & MICROSURFACE | 
| 0113-08-071 | US 290 | Actual | MAR 2010 | $349,729 | 1 | OVERLAY | 
| 0113-08-074 | US 290 | Actual | MAY 2010 | $426,776 | 1 | MICROSURFACE | 
| 0113-09-052 | US 290 | Actual | JUN 2010 | $8,418,679 | 12 | PHASE IV: CONSTRUCT 2 REMAINING DIRECT CONNECTIONS | 
| 0113-09-067 | US 290 | Actual | FEB 2010 | $169,971 | 11 | INSTALL SIDEWALKS & PED SIGNALS | 
| 0113-13-106 | US 290 | Actual | FEB 2010 | $25,630,378 | 11 | CONST 4 REMAINING DIRECT CONNECTORS | 
| 0113-13-148 | SH 71 | Actual | AUG 2010 | $519,515 | 10 | TREE / SHRUB PLANTING AND IRRIGATION | 
| 0114-01-051 | US 290 | Actual | MAR 2010 | $1,777,742 | 1 | MILL, SEAL & THIN OVERLAY | 
| 0114-02-090 | US 290 | Actual | JAN 2010 | $52,575,546 | 2 | CONSTRUCT 4 DIRECT CONNECTORS | 
| 0151-06-133 | US 183 | Actual | NOV 2009 | $463,163 | 1 | MILL SEAL AND THIN OVERLAY (FRTG RD) | 
| 0440-06-009 | SH 130 | Actual | AUG 2010 | $1,469,668 | 1 | ADD NB EXIT RAMP & SB ENTRANCE RAMP | 
| 0440-06-012 | SH 130 | Actual | AUG 2010 | $2,296,000 | 1 | TOLL INTEGRATION | 
| 0700-03-014 | SH 71 | Actual | FEB 2010 | $8,080,390 | 10 | INSTALL 14' CONTINUOUS LEFT TURN LANE AND 10' SHOULDERS | 
| 0700-03-105 | SH 71 | Actual | JAN 2010 | $7,817,347 | 8 | CONVERT TO 4 - LN DIV RD & ADD SHLDRS | 
| 0700-03-107 | SH 71 | Actual | DEC 2009 | $1,465,032 | 7 | ADD TRAFFIC SIGNAL, LEFT TURN LN, RIGHT TURN LN & SHOULDERS | 
| 0700-03-110 | SH 71 | Actual | MAR 2010 | $622,029 | 1 | OVERLAY | 
| 0914-00-013 | VA | Actual | FEB 2010 | $200,100 | 10 | COMMUNICATION DEVICES | 
| 0914-00-014 | VA | Actual | FEB 2010 | $300,100 | 10 | COMMUNICATION DEVICES | 
| 0914-00-252 | VA | Actual | SEP 2009 | $139,600 | 7 | CONGESTION MANAGEMENT PROCESS | 
| 0914-00-294 | VA | Actual | APR 2010 | $718,588 | 1 | FY 2010 NON - SITE SPECIFIC SIGNALS | 
| 0914-00-295 | VA | Actual | AUG 2010 | $140,874 | 1 | FY 2010 SIGNING | 
| 0914-00-302 | VA | Actual | APR 2010 | $236,910 | 7 | INSTALL SIGNALS | 
| 0914-00-303 | VA | Actual | APR 2010 | $1,254,172 | 7 | ASPHALT OVERLAY PROJECTS CITYWIDE | 
| 0914-00-304 | VA | Actual | APR 2010 | $568,397 | 7 | MILL AND OVERLAY | 
| 0914-00-305 | VA | Actual | JAN 2010 | $1,408,205 | 7 | PROVIDE ROADSIDE ASSISTANCE | 
| 0914-00-306 | VA | Actual | APR 2010 | $261,350 | 7 | INSTALL SIGNALS | 
| 0914-00-307 | VA | Actual | AUG 2010 | $623,579 | 1 | FURNISH & INSTALL DYNAMIC MESSAGE SIGN | 
| 0914-00-309 | VA | Actual | APR 2010 | $732,637 | 7 | INSTALL SIGNALS | 
| 0914-00-325 | VA | Actual | AUG 2010 | $1,433,000 | 7 | INSTL UNINTERUPTED PWR SUPPLY AT 300 INTERSECTIONS | 
| 0914-04-183 | VA | Actual | MAY 2010 | $154,664 | 7 | DESIGN AND CONSTRUCT SIDEWALK | 
| 0914-04-191 | VA | Actual | OCT 2009 | $3,044,285 | 9 | CONSTRUCT TRAIL | 
| 0914-04-200 | VA | Actual | OCT 2009 | $350,652 | 7 | CONSTRUCT TRAIL SYSTEM | 
| 0914-04-203 | CR | Actual | NOV 2009 | $1,076,048 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0914-04-217 | CS | Actual | APR 2010 | $6,479,080 | 10 | EAST 7TH STREET CORRIDOR IMPROVEMENTS | 
| 0914-04-250 | CR | Actual | JUL 2010 | $95,556 | 6 | REHABILITATE BRIDGE AND APPROACHES | 
| 0914-04-253 | VA | Actual | AUG 2010 | $354,550 | 8 | SIDEWALKS & CROSSWALK | 
| 0914-04-258 | CS | Actual | APR 2010 | $4,501,486 | 10 | EAST 7TH ST CORRIDOR IMPROVEMENTS | 
| 0914-04-261 | CR | Actual | FEB 2010 | $117,650 | 6 | REHAB BRIDGE | 
| 1186-01-080 | FM 969 | Actual | JUN 2010 | $399,151 | 10 | INSTALL CENTER TURN LANE | 
| 1186-01-082 | FM 969 | Actual | MAR 2010 | $538,976 | 1 | INSTALL LEFT TURN LANE | 
| 1200-03-050 | FM 973 | Actual | AUG 2010 | $312,197 | 8 | CENTERLINE RUMBLE STRIPS | 
| 1200-06-008 | SH 45 | Actual | SEP 2009 | $271,088 | 11 | INSTALL U - TURN | 
| 1377-01-017 | FM 1327 | Actual | MAR 2010 | $771,265 | 8 | INSTALL LEFT TURN LANE | 
| 1378-01-029 | RM 1431 | Actual | MAR 2010 | $937,222 | 10 | CONST LTL, DECEL LN, & SHLDRS | 
| 1378-01-034 | RM 1431 | Actual | JUL 2010 | $423,619 | 8 | INSTALL LEFT TURN LANE | 
| 2689-01-025 | FM 2304 | Actual | JUN 2010 | $999,620 | 1 | MILL, SEAL & THICK INLAY | 
| 2718-01-009 | RM 2769 | Actual | APR 2010 | $4,093,286 | 11 | RECONST TO 4 - LANE DIVIDED | 
| 3136-01-167 | LP 1 | Actual | FEB 2010 | $3,569,639 | 1 | MILL, SEAL & THIN OVERLAY | 
Williamson County  | ||||||
| CCSJ | Highway | Let Status | Letting Date  | 
Contract Cost  | 
Fund Cat  | 
Description | 
| 0015-08-131 | IH 35 | Actual | JUL 2010 | $3,334,369 | 11 | UNDERSEAL AND OVERLAY | 
| 0015-16-019 | BI 35-L | Actual | AUG 2010 | $1,990,487 | 1 | MILL, SEAL & THIN OVERLAY | 
| 0151-04-063 | US 183 | Actual | OCT 2009 | $14,677,727 | 6 | CONSTRUCT 4 LN DIVIDED RDWY | 
| 0204-02-027 | US 79 | Actual | AUG 2010 | $11,500,548 | 12 | UPGRADE TO 4 - LANE DIVIDED ROADWAY | 
| 0204-04-046 | BU 79-B | Actual | MAR 2010 | $995,565 | 1 | OVERLAY | 
| 0273-04-031 | US 183 | Actual | MAY 2010 | $574,307 | 8 | INSTALL LEFT TURN LANE | 
| 0320-04-022 | FM 397 | Actual | NOV 2009 | $320,275 | 8 | SIDEWALKS & CROSSWALKS | 
| 0320-04-023 | US 79 | Actual | MAY 2010 | $94,970 | 8 | INSTALL FLASHING BEACON | 
| 0334-01-041 | FM 112 | Actual | JUN 2010 | $1,638,168 | 8 | ADDITIONAL PAVED SURFACE WIDTH | 
| 0337-01-033 | SH 29 | Actual | NOV 2009 | $486,273 | 1 | SPOT FULL DEPTH REPAIR | 
| 0683-01-083 | RM 620 | Actual | MAR 2010 | $886,631 | 1 | FULL DEPTH REPAIR, UNDERSEAL & OV | 
| 0914-05-111 | VA | Actual | NOV 2009 | $346,334 | 7 | CONSTRUCT SIDEWALK | 
| 0914-05-122 | VA | Actual | SEP 2009 | $419,723 | 9 | CONSTRUCT TRAIL | 
| 0914-05-141 | CR | Actual | AUG 2010 | $2,247,003 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0914-05-147 | CS | Actual | AUG 2010 | $7,556,013 | 7 | WIDEN TO MAD 4 W / CONTINUOUS TURN LANE | 
| 0914-05-158 | VA | Actual | MAY 2010 | $455,171 | 10 | INSTALL CURB RAMP IMPROVEMENTS | 
| 0914-05-162 | VA | Actual | OCT 2009 | $5,000,000 | 7 | DEVELOP AUSTIN - SAN ANTONIO PASSENGER RAIL | 
| 0914-05-163 | VA | Actual | OCT 2009 | $5,000,000 | 7 | DEVELOP AUSTIN - SAN ANTONIO PASSENGER RAIL | 
| 0914-05-168 | VA | Actual | FEB 2010 | $2,000,000 | 7 | TRANSIT TERMINAL SITE IMPROVEMENT | 
| 0914-05-169 | VA | Actual | JAN 2010 | $630,000 | 1 | GEORGETOWN SIGNAL UPGRADES | 
| 0986-01-041 | FM 619 | Actual | JUL 2010 | $336,849 | 6 | REHABILITATE BRIDGE AND APPROACHES | 
| 1200-04-013 | FM 1466 | Actual | JUL 2010 | $528,020 | 1 | DEPTH REPAIR, UNDERSEAL & THIN OV | 
| 1378-02-034 | RM 1431 | Actual | DEC 2009 | $5,538,788 | 10 | WIDEN TO 4 - LANE DIVIDED ROADWAY | 
| 2211-01-023 | RM 2338 | Actual | APR 2010 | $8,700,199 | 12 | WIDEN ROADWAY TO 5 - LN | 
| 9001-14-013 | 183A | Actual | JUN 2010 | $2,065,109 | 7 | CONST SHARED - USE SIDEWALK / BIKEPATH | 
  | 
|   |