Letting Schedule for Austin District (FY 2010)
Letting Schedule for Austin District (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
Austin District (FY 2010) |
Bastrop | Blanco | Burnet | Caldwell | Gillespie | Hays | Lee | Llano | Mason | Travis | Williamson | ||||||
Bastrop County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0115-04-041 | FM 20 | Actual | FEB 2010 | $4,792,710 | 1 | WIDEN, REHAB, ADD TURN LANE & OVERLAY |
0321-03-017 | SH 95 | Actual | DEC 2009 | $691,000 | 8 | INSTALL LEFT TURN LANE |
0322-01-042 | SH 95 | Actual | DEC 2009 | $972,724 | 8 | CONSTRUCT CONTINUOUS TURN LANE |
0807-02-013 | FM 153 | Actual | MAY 2010 | $294,278 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0914-18-074 | CR | Actual | AUG 2010 | $462,904 | 6 | REPLACE BRIDGE AND APPROACHES |
0914-18-080 | CR | Actual | SEP 2009 | $182,623 | 6 | REPLACE BRIDGE AND APPROACHES |
1149-02-023 | FM 812 | Actual | AUG 2010 | $3,787,648 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
2098-01-008 | FM 2239 | Actual | MAY 2010 | $975,484 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
Blanco County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0113-05-045 | US 290 | Actual | FEB 2010 | $70,365 | 8 | INSTALL ADVANCE WARNING SIGNALS |
0113-06-027 | US 290 | Actual | MAR 2010 | $1,859,351 | 1 | SEAL COAT |
0252-03-049 | US 281 | Actual | JUL 2010 | $1,471,794 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0253-01-049 | US 281 | Actual | APR 2010 | $614,598 | 8 | INSTALL LEFT TURN LANE |
0511-01-016 | RM 32 | Actual | JUL 2010 | $390,112 | 1 | RESURFACE TO IMPROVE SKID RESISTANCE |
Burnet County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0151-02-021 | SH 29 | Actual | APR 2010 | $344,448 | 8 | INSTALL LEFT TURN LANE |
0251-07-023 | US 281 | Actual | JUL 2010 | $2,352,405 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0252-01-069 | US 281 | Actual | AUG 2010 | $4,671,558 | 1 | REHAB RDWY |
0252-01-070 | US 281 | Actual | SEP 2009 | $4,658,026 | 11 | WIDEN TO ADD CLTL AND SHOULDERS |
0252-02-046 | US 281 | Actual | MAY 2010 | $28,647,845 | 6 | REPLACE BRIDGE AND APPROACHES |
0252-02-052 | US 281 | Actual | JUN 2010 | $522,870 | 6 | REHABILITATE BRIDGE |
0273-02-021 | US 183 | Actual | JAN 2010 | $1,052,661 | 8 | TEXTURIZE SHLDRS & CENTERLINE TEXTURE |
1198-01-019 | RM 963 | Actual | MAY 2010 | $3,689,642 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
Caldwell County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0152-03-054 | US 183 | Actual | AUG 2010 | $256,546 | 1 | CENTERLINE RUMBLE STRIPS |
0384-01-020 | SH 142 | Actual | NOV 2009 | $921,349 | 11 | MILL, SEAL, PAV. REPAIR & OVERLAY |
0535-03-021 | IH 10 | Actual | JUN 2010 | $182,085 | 8 | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) |
0571-02-033 | FM 86 | Actual | JUN 2010 | $2,793,599 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0805-03-019 | FM 713 | Actual | JUL 2010 | $2,318,284 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0914-22-049 | CR | Actual | APR 2010 | $558,571 | 6 | REPLACE BRIDGE AND APPROACHES |
0914-22-050 | CR | Actual | AUG 2010 | $261,621 | 6 | REPLACE BRIDGE AND APPROACHES |
Gillespie County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0113-01-039 | US 290 | Actual | JUL 2010 | $1,693,149 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0113-02-048 | US 290 | Actual | MAR 2010 | $3,857,325 | 6 | REPLACE BRIDGE AND APPROACHES |
Hays County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0016-02-120 | IH 35 | Actual | MAR 2010 | $5,848,033 | 10 | CONST OVERPASS & RECONST FRT RDS |
0016-02-122 | IH 35 | Actual | AUG 2010 | $866,875 | 11 | IH 35 RIVER RIDGE ENTRANCE & EXIT RAMP PROJECT WILL CONST |
0016-16-025 | RM 967 | Actual | MAY 2010 | $710,131 | 1 | SPOT REPAIR 10 IN WITH 5% CEMENT, SEAL COAT AND 2 HMAC |
0285-03-048 | RM 12 | Actual | FEB 2010 | $998,761 | 7 | ADD CENTER TURN LANE |
0366-01-064 | LP 82 | Actual | MAR 2010 | $420,946 | 1 | SPOT FULL DEPTH REPAIR |
0366-01-067 | SH 123 | Actual | NOV 2009 | $173,236 | 1 | OVERLAY |
0471-02-061 | SH 21 | Actual | FEB 2010 | $694,868 | 10 | ADD LEFT TURN LANE & SHOULDERS |
0471-02-062 | SH 21 | Actual | AUG 2010 | $671,309 | 7 | ADD LEFT TURN LANE & SHOULDERS |
0683-03-030 | RM 12 | Actual | JAN 2010 | $63,093 | 1 | LANDSCAPE WORK |
0914-33-026 | PW | Actual | APR 2010 | $551,790 | 10 | PAVE VARIOUS LEVEE, ACCESS, SECTION ROADS, SERVICE YARD |
0914-33-054 | CS | Actual | AUG 2010 | $367,417 | 7 | CONST BIKE / PED TRAIL |
0914-33-059 | CS | Actual | MAY 2010 | $28,215 | 7 | RESTRIPE TO INCLUDE CTL, PARKING LANE, BICYCLE LANE, & X - WALK |
0987-03-009 | FM 621 | Actual | NOV 2009 | $450,264 | 1 | SEAL COAT AND OVERLAY |
1776-01-029 | RM 967 | Actual | MAY 2010 | $628,043 | 10 | ADD CENTER TURN LN, RIGHT TURN LN & SHOULDERS |
1776-02-014 | FM 2001 | Actual | OCT 2009 | $492,050 | 10 | WIDEN EXISTING ROADWAY |
Lee County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0211-04-019 | US 77 | Actual | JUL 2010 | $3,937,736 | 1 | LEVEL - UP & SEALCOAT, MILL, OVERLAY IN CITY |
0334-05-027 | FM 141 | Actual | DEC 2009 | $2,079,747 | 1 | LEVEL - UP & SEALCOAT |
0334-05-028 | FM 141 | Actual | JUL 2010 | $2,954,808 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
1073-02-023 | FM 696 | Actual | OCT 2009 | $2,075,715 | 6 | REPLACE BRIDGE AND APPROACHES |
1073-02-030 | FM 696 | Actual | MAY 2010 | $1,654,180 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
Llano County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0150-04-042 | SH 29 | Actual | AUG 2010 | $661,749 | 8 | CENTERLINE RUMBLE STRIPS |
0700-04-040 | SH 71 | Actual | JUL 2010 | $2,237,430 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
3101-01-006 | RM 2900 | Actual | NOV 2009 | $862,585 | 1 | REHAB RDWY |
Mason County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
1538-01-005 | RM 1723 | Actual | APR 2010 | $1,305,699 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
Travis County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0015-11-060 | LP 275 | Actual | MAR 2010 | $885,199 | 1 | MILL, DEPTH REPAIR, UNDERSEAL & OV |
0015-13-356 | IH 35 | Actual | JUL 2010 | $387,600 | 1 | WIDEN SB FRONTAGE RD & ADD SHOULDERS |
0016-01-107 | LP 275 | Actual | JUN 2010 | $205,435 | 1 | SEAL COAT & MICROSURFACE |
0113-08-071 | US 290 | Actual | MAR 2010 | $349,729 | 1 | OVERLAY |
0113-08-074 | US 290 | Actual | MAY 2010 | $426,776 | 1 | MICROSURFACE |
0113-09-052 | US 290 | Actual | JUN 2010 | $8,418,679 | 12 | PHASE IV: CONSTRUCT 2 REMAINING DIRECT CONNECTIONS |
0113-09-067 | US 290 | Actual | FEB 2010 | $169,971 | 11 | INSTALL SIDEWALKS & PED SIGNALS |
0113-13-106 | US 290 | Actual | FEB 2010 | $25,630,378 | 11 | CONST 4 REMAINING DIRECT CONNECTORS |
0113-13-148 | SH 71 | Actual | AUG 2010 | $519,515 | 10 | TREE / SHRUB PLANTING AND IRRIGATION |
0114-01-051 | US 290 | Actual | MAR 2010 | $1,777,742 | 1 | MILL, SEAL & THIN OVERLAY |
0114-02-090 | US 290 | Actual | JAN 2010 | $52,575,546 | 2 | CONSTRUCT 4 DIRECT CONNECTORS |
0151-06-133 | US 183 | Actual | NOV 2009 | $463,163 | 1 | MILL SEAL AND THIN OVERLAY (FRTG RD) |
0440-06-009 | SH 130 | Actual | AUG 2010 | $1,469,668 | 1 | ADD NB EXIT RAMP & SB ENTRANCE RAMP |
0440-06-012 | SH 130 | Actual | AUG 2010 | $2,296,000 | 1 | TOLL INTEGRATION |
0700-03-014 | SH 71 | Actual | FEB 2010 | $8,080,390 | 10 | INSTALL 14' CONTINUOUS LEFT TURN LANE AND 10' SHOULDERS |
0700-03-105 | SH 71 | Actual | JAN 2010 | $7,817,347 | 8 | CONVERT TO 4 - LN DIV RD & ADD SHLDRS |
0700-03-107 | SH 71 | Actual | DEC 2009 | $1,465,032 | 7 | ADD TRAFFIC SIGNAL, LEFT TURN LN, RIGHT TURN LN & SHOULDERS |
0700-03-110 | SH 71 | Actual | MAR 2010 | $622,029 | 1 | OVERLAY |
0914-00-013 | VA | Actual | FEB 2010 | $200,100 | 10 | COMMUNICATION DEVICES |
0914-00-014 | VA | Actual | FEB 2010 | $300,100 | 10 | COMMUNICATION DEVICES |
0914-00-252 | VA | Actual | SEP 2009 | $139,600 | 7 | CONGESTION MANAGEMENT PROCESS |
0914-00-294 | VA | Actual | APR 2010 | $718,588 | 1 | FY 2010 NON - SITE SPECIFIC SIGNALS |
0914-00-295 | VA | Actual | AUG 2010 | $140,874 | 1 | FY 2010 SIGNING |
0914-00-302 | VA | Actual | APR 2010 | $236,910 | 7 | INSTALL SIGNALS |
0914-00-303 | VA | Actual | APR 2010 | $1,254,172 | 7 | ASPHALT OVERLAY PROJECTS CITYWIDE |
0914-00-304 | VA | Actual | APR 2010 | $568,397 | 7 | MILL AND OVERLAY |
0914-00-305 | VA | Actual | JAN 2010 | $1,408,205 | 7 | PROVIDE ROADSIDE ASSISTANCE |
0914-00-306 | VA | Actual | APR 2010 | $261,350 | 7 | INSTALL SIGNALS |
0914-00-307 | VA | Actual | AUG 2010 | $623,579 | 1 | FURNISH & INSTALL DYNAMIC MESSAGE SIGN |
0914-00-309 | VA | Actual | APR 2010 | $732,637 | 7 | INSTALL SIGNALS |
0914-00-325 | VA | Actual | AUG 2010 | $1,433,000 | 7 | INSTL UNINTERUPTED PWR SUPPLY AT 300 INTERSECTIONS |
0914-04-183 | VA | Actual | MAY 2010 | $154,664 | 7 | DESIGN AND CONSTRUCT SIDEWALK |
0914-04-191 | VA | Actual | OCT 2009 | $3,044,285 | 9 | CONSTRUCT TRAIL |
0914-04-200 | VA | Actual | OCT 2009 | $350,652 | 7 | CONSTRUCT TRAIL SYSTEM |
0914-04-203 | CR | Actual | NOV 2009 | $1,076,048 | 6 | REPLACE BRIDGE AND APPROACHES |
0914-04-217 | CS | Actual | APR 2010 | $6,479,080 | 10 | EAST 7TH STREET CORRIDOR IMPROVEMENTS |
0914-04-250 | CR | Actual | JUL 2010 | $95,556 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0914-04-253 | VA | Actual | AUG 2010 | $354,550 | 8 | SIDEWALKS & CROSSWALK |
0914-04-258 | CS | Actual | APR 2010 | $4,501,486 | 10 | EAST 7TH ST CORRIDOR IMPROVEMENTS |
0914-04-261 | CR | Actual | FEB 2010 | $117,650 | 6 | REHAB BRIDGE |
1186-01-080 | FM 969 | Actual | JUN 2010 | $399,151 | 10 | INSTALL CENTER TURN LANE |
1186-01-082 | FM 969 | Actual | MAR 2010 | $538,976 | 1 | INSTALL LEFT TURN LANE |
1200-03-050 | FM 973 | Actual | AUG 2010 | $312,197 | 8 | CENTERLINE RUMBLE STRIPS |
1200-06-008 | SH 45 | Actual | SEP 2009 | $271,088 | 11 | INSTALL U - TURN |
1377-01-017 | FM 1327 | Actual | MAR 2010 | $771,265 | 8 | INSTALL LEFT TURN LANE |
1378-01-029 | RM 1431 | Actual | MAR 2010 | $937,222 | 10 | CONST LTL, DECEL LN, & SHLDRS |
1378-01-034 | RM 1431 | Actual | JUL 2010 | $423,619 | 8 | INSTALL LEFT TURN LANE |
2689-01-025 | FM 2304 | Actual | JUN 2010 | $999,620 | 1 | MILL, SEAL & THICK INLAY |
2718-01-009 | RM 2769 | Actual | APR 2010 | $4,093,286 | 11 | RECONST TO 4 - LANE DIVIDED |
3136-01-167 | LP 1 | Actual | FEB 2010 | $3,569,639 | 1 | MILL, SEAL & THIN OVERLAY |
Williamson County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0015-08-131 | IH 35 | Actual | JUL 2010 | $3,334,369 | 11 | UNDERSEAL AND OVERLAY |
0015-16-019 | BI 35-L | Actual | AUG 2010 | $1,990,487 | 1 | MILL, SEAL & THIN OVERLAY |
0151-04-063 | US 183 | Actual | OCT 2009 | $14,677,727 | 6 | CONSTRUCT 4 LN DIVIDED RDWY |
0204-02-027 | US 79 | Actual | AUG 2010 | $11,500,548 | 12 | UPGRADE TO 4 - LANE DIVIDED ROADWAY |
0204-04-046 | BU 79-B | Actual | MAR 2010 | $995,565 | 1 | OVERLAY |
0273-04-031 | US 183 | Actual | MAY 2010 | $574,307 | 8 | INSTALL LEFT TURN LANE |
0320-04-022 | FM 397 | Actual | NOV 2009 | $320,275 | 8 | SIDEWALKS & CROSSWALKS |
0320-04-023 | US 79 | Actual | MAY 2010 | $94,970 | 8 | INSTALL FLASHING BEACON |
0334-01-041 | FM 112 | Actual | JUN 2010 | $1,638,168 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0337-01-033 | SH 29 | Actual | NOV 2009 | $486,273 | 1 | SPOT FULL DEPTH REPAIR |
0683-01-083 | RM 620 | Actual | MAR 2010 | $886,631 | 1 | FULL DEPTH REPAIR, UNDERSEAL & OV |
0914-05-111 | VA | Actual | NOV 2009 | $346,334 | 7 | CONSTRUCT SIDEWALK |
0914-05-122 | VA | Actual | SEP 2009 | $419,723 | 9 | CONSTRUCT TRAIL |
0914-05-141 | CR | Actual | AUG 2010 | $2,247,003 | 6 | REPLACE BRIDGE AND APPROACHES |
0914-05-147 | CS | Actual | AUG 2010 | $7,556,013 | 7 | WIDEN TO MAD 4 W / CONTINUOUS TURN LANE |
0914-05-158 | VA | Actual | MAY 2010 | $455,171 | 10 | INSTALL CURB RAMP IMPROVEMENTS |
0914-05-162 | VA | Actual | OCT 2009 | $5,000,000 | 7 | DEVELOP AUSTIN - SAN ANTONIO PASSENGER RAIL |
0914-05-163 | VA | Actual | OCT 2009 | $5,000,000 | 7 | DEVELOP AUSTIN - SAN ANTONIO PASSENGER RAIL |
0914-05-168 | VA | Actual | FEB 2010 | $2,000,000 | 7 | TRANSIT TERMINAL SITE IMPROVEMENT |
0914-05-169 | VA | Actual | JAN 2010 | $630,000 | 1 | GEORGETOWN SIGNAL UPGRADES |
0986-01-041 | FM 619 | Actual | JUL 2010 | $336,849 | 6 | REHABILITATE BRIDGE AND APPROACHES |
1200-04-013 | FM 1466 | Actual | JUL 2010 | $528,020 | 1 | DEPTH REPAIR, UNDERSEAL & THIN OV |
1378-02-034 | RM 1431 | Actual | DEC 2009 | $5,538,788 | 10 | WIDEN TO 4 - LANE DIVIDED ROADWAY |
2211-01-023 | RM 2338 | Actual | APR 2010 | $8,700,199 | 12 | WIDEN ROADWAY TO 5 - LN |
9001-14-013 | 183A | Actual | JUN 2010 | $2,065,109 | 7 | CONST SHARED - USE SIDEWALK / BIKEPATH |
|
|