Letting Schedule for May, 2010 (FY 2010)
Letting Schedule for May, 2010 (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
May, 2010 (FY 2010) | (see Links) |
SEP 2009 | OCT 2009 | NOV 2009 | DEC 2009 | JAN 2010 | FEB 2010 | MAR 2010 | APR 2010 | MAY 2010 | JUN 2010 | JUL 2010 | AUG 2010 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0855-04-029 | Bandera/ San Antonio |
RM 337 | Actual | $491,131 | 8 | WIDEN EXISTING ROADWAY TO ADD SHOULDERS |
0807-02-013 | Bastrop/ Austin |
FM 153 | Actual | $294,278 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
2098-01-008 | Bastrop/ Austin |
FM 2239 | Actual | $975,484 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0025-02-175 | Bexar/ San Antonio |
IH 10 | Actual | $440,483 | 10 | CONSTRUCT LANDSCAPE AND IRRIGATION SYSTEM |
0915-12-418 | Bexar/ San Antonio |
VA | Actual | $18,951,777 | 10 | EXTEND 36TH ST ALONG EXISTING FRANK LUKE RD - EXPAND TO_4 LN |
0915-12-465 | Bexar/ San Antonio |
CS | Actual | 7 | RIGHT OF WAY ACQUISITION | |
0915-12-466 | Bexar/ San Antonio |
CS | Actual | $617,584 | 7 | INSTALL WARNING DEVICES AT 7 LOW WATER CROSSINGS IN THE CITY |
0915-12-467 | Bexar/ San Antonio |
CS | Actual | $403,074 | 7 | EAGLELAND / RIVERWALK LINK TO MISSION TRAILS |
0912-31-261 | Brazoria/ Houston |
VA | Actual | $931,877 | 10 | REMOVAL AND DEPOSAL OF DEBRIS CLEARING ROADWAY AND DRAINAGE |
0912-31-262 | Brazoria/ Houston |
CS | Actual | $23,132 | 10 | REMOVE DEBRIS AFTER HURRICANE IKE |
0252-02-046 | Burnet/ Austin |
US 281 | Actual | $28,647,845 | 6 | REPLACE BRIDGE AND APPROACHES |
1198-01-019 | Burnet/ Austin |
RM 963 | Actual | $3,689,642 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
0331-04-062 | Cameron/ Pharr |
PR 100 | Actual | $410,857 | 11 | REMOVE & REPLACE LUMINAIRE POLES, FIXTURES, ELEC SERVICES |
0921-06-230 | Cameron/ Pharr |
VA | Actual | $10,237,378 | 10 | OLMITO SWITCH YARD IMPROVEMENTS - (MULTIPLE FUNDING CSJ'S |
1057-02-021 | Cameron/ Pharr |
FM 732 | Actual | $2,064,053 | 10 | CONSTRUCT 2 LANE W / SHOULDERS |
0367-01-064 | Chambers/ Beaumont |
SH 124 | Actual | $230,555 | 8 | MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT |
0907-14-007 | Coke/ San Angelo |
CR | Actual | $188,837 | 6 | REPLACE BRIDGE AND APPROACHES |
0047-14-065 | Collin/ Dallas |
US 75 | Actual | $24,888,311 | 10 | RECONSTRUCT AND WIDEN FROM 4 TO 8 LANES WITH 3 LANE |
1013-01-024 | Collin/ Dallas |
FM 546 | Actual | $2,609,837 | 10 | CONSTRUCT 2 LANE ROADWAY ON NEW ALIGNMENT |
0027-03-070 | Colorado/ Yoakum |
US 90A | Actual | $1,232,121 | 1 | ASPHALTIC CONCRETE PAVEMENT |
0782-01-031 | Cooke/ Wichita Falls |
FM 3164 | Actual | $2,476,229 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD SHOULDERS |
0009-11-219 | Dallas/ Dallas |
IH 30 | Actual | $828,000 | 1 | UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON IH 30 |
0261-03-059 | Dallas/ Dallas |
US 67 | Actual | $773,000 | 1 | UPGRADE TRAFFIC SINGAL HARDWARE AT 2 INTERSECTIONS ON US 67 |
0918-00-154 | Dallas/ Dallas |
VA | Actual | $549,207 | 1 | INSTALL UNINTERRUPTED POWER SUPPLY AT SIGNALIZED |
0918-45-354 | Dallas/ Dallas |
VA | Actual | $5,575,149 | 9 | SANTA FE TRESTLE HIKE AND BIKE TRAIL |
0918-45-642 | Dallas/ Dallas |
VA | Actual | $429,037 | 9 | PEDESTRIAN / BICYCLE LINK BETWEEN 2 TRAILS |
0918-45-859 | Dallas/ Dallas |
VA | Actual | $18,468,139 | 5 | NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS |
0918-45-891 | Dallas/ Dallas |
VA | Actual | $5,000,000 | 7 | EXPEDITE 408 PERMITS |
0002-14-033 | El Paso/ El Paso |
FM 258 | Actual | $149,070 | 1 | TRAFFIC SIGNAL INSTALLATION |
0924-06-304 | El Paso/ El Paso |
CS | Actual | $1,972,963 | 5 | INTELLIGENT TRANSPORTATION SYSTEM EXPANSION |
3139-01-010 | Fannin/ Paris |
FM 2990 | Actual | $162,482 | 6 | REHAB BRIDGE |
0913-28-046 | Fayette/ Yoakum |
CS | Actual | $88,690 | 9 | CONSTRUCT PEDESTRIAN WALKWAY |
0089-09-068 | Fort Bend/ Houston |
US 59 | Actual | $13,615,501 | 11 | CONSTRUCT GRADE SEPARATION |
0192-01-087 | Fort Bend/ Houston |
SH 6 | Actual | $82,621 | 8 | SAFTY LIGHTING |
0912-34-163 | Fort Bend/ Houston |
CS | Actual | $544,871 | 7 | 3' SHOULDER WIDENING WITH OVERLAY |
2093-01-009 | Fort Bend/ Houston |
FM 2218 | Actual | $14,284,407 | 7 | WIDEN 2 LANES TO 4 - LANE DIVIDED CURB AND GUTTER SECTION |
0912-73-173 | Galveston/ Houston |
VA | Actual | $97,348 | 10 | REMOVE VEGETATIVE DEBRIS AFTER HURRICANE IKE |
0912-73-174 | Galveston/ Houston |
VA | Actual | $627,284 | 10 | REPAIR WASHED OUT OR MISSING ASPHALT PAVEMENT ON ROADWAY AND |
0912-73-175 | Galveston/ Houston |
VA | Actual | $25,792 | 10 | REPAIR WASHED OUT OR MISSING ASPHALT PAVEMENT ON ROADWAY AND |
0424-02-040 | Gregg/ Tyler |
SH 31 | Actual | $980,721 | 11 | PLANE & RESURFACE ROADWAY |
0050-03-086 | Grimes/ Bryan |
SH 6 | Actual | $2,287,514 | 1 | OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, HMA |
0917-17-023 | Grimes/ Bryan |
CR | Actual | $257,332 | 6 | REPLACEMENT OF EXISTING BRIDGE |
0917-17-037 | Grimes/ Bryan |
CR | Actual | $331,217 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0178-01-034 | Harris/ Houston |
SH 35 | Actual | $2,044,954 | 1 | FULL DEPTH CONCRETE REPAIR, PLANING, LONGITUDINAL JOINT AND |
0912-70-016 | Harris/ Houston |
VA | Actual | $189,282 | 10 | LANDSCAPE DEVELOPMENT |
0912-70-022 | Harris/ Houston |
CS | Actual | $5,392,259 | 7 | BASE REPAIR |
0912-70-055 | Harris/ Houston |
VA | Actual | $154,660 | 10 | REPAIR AND REPLACE DAMAGED SIGNAGE AFTER HURRICANE IKE |
0912-70-056 | Harris/ Houston |
CS | Actual | $544 | 10 | REPAIR AND REPLACE DAMAGED SIGNAGE AFTER HURRICANE IKE |
0912-70-057 | Harris/ Houston |
VA | Actual | $390,812 | 10 | REPAIR TOLL BOOTHS, TOLLING EQUIPMENT, ELEVATORS AND HVAC |
0912-70-058 | Harris/ Houston |
CS | Actual | $292,138 | 10 | REPAIR AND REPLACE DAMAGED LIGHTING AFTER HURRICANE IKE |
0912-70-059 | Harris/ Houston |
VA | Actual | $42,016 | 10 | REPAIR DAMAGED CAUSED BY PUMP STATION DEBRIS AFTER HURRICANE |
0912-70-060 | Harris/ Houston |
VA | Actual | $91,348 | 10 | REMOVAL AND DISPOSAL OF DEBRIS AFTER HURRICANE IKE |
0912-70-061 | Harris/ Houston |
VA | Actual | $37,696 | 10 | REPAIR DAMAGED SOUND WALLS AFTER HURRICANE IKE |
0912-71-505 | Harris/ Houston |
VA | Actual | $2,622,380 | 7 | HIKE AND BIKE TRAIL (HOUSTON HERITAGE CORRIDOR BAYOU TRAILS |
2941-02-049 | Harris/ Houston |
FM 2920 | Actual | $330,750 | 5 | INSTALL ETHERNET EQUIP TO INTERCONNECT TRAFFIC SIGNAL_VIDEO |
3256-02-088 | Harris/ Houston |
BW 8 | Actual | $29,768 | 10 | RE - GRADE SLOPE AND ADD STABILIZED MATERIAL AFTER HURRICANE |
0016-16-025 | Hays/ Austin |
RM 967 | Actual | $710,131 | 1 | SPOT REPAIR 10 IN WITH 5% CEMENT, SEAL COAT AND 2 HMAC |
0914-33-059 | Hays/ Austin |
CS | Actual | $28,215 | 7 | RESTRIPE TO INCLUDE CTL, PARKING LANE, BICYCLE LANE, & X - WALK |
1776-01-029 | Hays/ Austin |
RM 967 | Actual | $628,043 | 10 | ADD CENTER TURN LN, RIGHT TURN LN & SHOULDERS |
1854-01-031 | Houston/ Lufkin |
LP 304 | Actual | $3,879,003 | 1 | ADD CONTINUOUS TWO - WAY LEFT TURN LANE |
0089-04-074 | Jackson/ Yoakum |
US 59 | Actual | $7,250,791 | 11 | PAVEMENT REPAIR AND ACP SURFACING |
0916-37-025 | Jim Wells/ Corpus Christi |
CR | Actual | $687,033 | 6 | REPLACE BRIDGE AND APPROACHES |
2118-02-015 | Johnson/ Fort Worth |
FM 1902 | Actual | $76,000 | 8 | INSTALLATION OF TRAFFIC SIGNAL |
0908-24-047 | Jones/ Abilene |
CS | Actual | $526,790 | 6 | REPLACE BRIDGE AND APPROACHES |
0291-03-058 | Kerr/ San Antonio |
SH 16 | Actual | $231,609 | 8 | CONSTRUCT TWO WAY LEFT TURN LANE |
1452-01-013 | Lamar/ Paris |
FM 1507 | Actual | $722,532 | 8 | ADD CONTINUOUS TWO WAY LEFT TURN LANE |
1073-02-030 | Lee/ Austin |
FM 696 | Actual | $1,654,180 | 8 | ADDITIONAL PAVED SURFACE WIDTH |
1223-01-035 | Leon/ Bryan |
FM 1119 | Actual | $739,723 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0909-22-139 | McLennan/ Waco |
CR | Actual | $156,781 | 6 | REPLACE BRIDGE AND APPROACHES |
0305-05-040 | Newton/ Beaumont |
SH 87 | Actual | $305,078 | 8 | TEXTURIZE SHOULDERS & CENTERLINE TEXTURING |
1069-01-030 | Nueces/ Corpus Christi |
SH 357 | Actual | $8,325,738 | 7 | CONSTR. MEDIAN, CONGEST. MGMT. & ADA IMPROVEMENTS |
0902-38-049 | Parker/ Fort Worth |
VA | Actual | $2,519,000 | 9 | CONSTRUCT HIKE AND BIKE TRAIL TO CONNECT DOWNTOWN WITH OTHER |
1408-01-023 | Polk/ Lufkin |
FM 1276 | Actual | $248,148 | 8 | SAFETY TREAT FIXED OBJECTS |
0924-07-009 | Presidio/ El Paso |
VA | Actual | $193,218 | 10 | SPOT GRADING AND STOCKPILING OF MATERIALS FOR FUTURE USE |
0003-05-046 | Reeves/ Odessa |
IH 20 | Actual | $2,284,464 | 11 | UPGRADE TO STANDARDS FREEWAY |
0049-08-060 | Robertson/ Bryan |
US 190 | Actual | $1,486,143 | 11 | OVERLAY CONSISTING OF A SURFACE TREATMENT, HMA OVERLAY AND |
0014-01-021 | Tarrant/ Fort Worth |
BU 287P | Actual | $2,822,849 | 6 | REHABILITATE THE HISTORIC BRIDGE |
0171-04-070 | Tarrant/ Fort Worth |
SH 199 | Actual | $8,121,287 | 7 | UPGRADE MAINLANES BETWEEN DENVER TRAIL AND HANGAR CUT - OFF TO |
0171-05-085 | Tarrant/ Fort Worth |
SH 199 | Actual | $1,198,848 | 1 | MILL, PAVEMENT REPAIR, OVERLAY |
0902-48-495 | Tarrant/ Fort Worth |
VA | Actual | $2,611,673 | 9 | CONSTRUCT PEDESTRIAN AND STREETSCAPE FOR "9TH STREET" |
0902-48-724 | Tarrant/ Fort Worth |
CS | Actual | $83,713 | 8 | 2007 SRTS INFRASTRUCTURE PROJECT; SIDEWALK IMPROVEMENTS |
0902-48-741 | Tarrant/ Fort Worth |
VA | Actual | $1,439,857 | 5 | CITYWIDE (ALL MAJOR ATERIALS) INSTALL ADAPTIVE SYSTEM INCL. |
1330-01-059 | Tarrant/ Fort Worth |
FM 1187 | Actual | $85,390 | 10 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0006-18-052 | Taylor/ Abilene |
BI 20-R | Actual | $595,110 | 1 | BASE REPAIR, RESURFACE, PVMNT MKGS |
0113-08-074 | Travis/ Austin |
US 290 | Actual | $426,776 | 1 | MICROSURFACE |
0914-04-183 | Travis/ Austin |
VA | Actual | $154,664 | 7 | DESIGN AND CONSTRUCT SIDEWALK |
0703-03-022 | Tyler/ Beaumont |
FM 256 | Actual | $2,655,214 | 8 | PROVIDE ADDITONAL PAVED SURFACE WIDTH |
0086-14-025 | Webb/ Laredo |
SL 20 | Actual | $17,948,005 | 3 | FOR THE CONSTRUCTION OF AN INTERCHANGE FACILITY |
0922-33-123 | Webb/ Laredo |
CR | Actual | $434,779 | 11 | RESURFACE OF EXISTING ROADWAY & |
0922-33-124 | Webb/ Laredo |
VA | Actual | $1,751,730 | 11 | RESURFACE OF EXISTING ROADWAY |
0156-04-103 | Wichita/ Wichita Falls |
US 82 | Actual | $169,223 | 1 | CONSTRUCTION OF RAILROAD AT GRADE CROSSING ON FRONTAGE ROAD |
0273-04-031 | Williamson/ Austin |
US 183 | Actual | $574,307 | 8 | INSTALL LEFT TURN LANE |
0320-04-023 | Williamson/ Austin |
US 79 | Actual | $94,970 | 8 | INSTALL FLASHING BEACON |
0914-05-158 | Williamson/ Austin |
VA | Actual | $455,171 | 10 | INSTALL CURB RAMP IMPROVEMENTS |
0921-28-007 | Zapata/ Pharr |
PW | Actual | $231,804 | 10 | CONSTRUCT TRAILER & SHELTER SITES |
|
|