Letting Schedule for Houston District (FY 2010)
Letting Schedule for Houston District (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
Houston District (FY 2010) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0111-09-040 | BS 288B | Actual | JUL 2010 | $1,298,886 | 1 | ACP OVERLAY |
0178-02-055 | SH 35 | Actual | DEC 2009 | $21,717,322 | 2 | WIDEN TO 6 - LANE DIVIDED WITH CURB AND GUTTER |
0178-03-140 | SH 35 | Actual | SEP 2009 | $187,275 | 11 | STABILIZED BASE REPAIR, ASPHALT CONCRETE PAVEMENT, SIGNALS, |
0188-06-053 | SH 36 | Actual | APR 2010 | $133,820 | 1 | REPAIR FENDER SYSTEM |
0587-01-059 | FM 1495 | Actual | DEC 2009 | $520,704 | 1 | MISC BRIDGE REPAIRS |
0598-02-049 | SH 288 | Actual | JUN 2010 | $451,199 | 8 | INSTALL MEDIAN BARRIER |
0598-02-050 | SH 288 | Actual | AUG 2010 | $5,828,815 | 1 | SEAL COAT & ACP OVERLAY |
0598-03-024 | SH 288 | Actual | AUG 2010 | $287,234 | 11 | INSTALL BOX CULVERT |
0912-31-130 | CS | Actual | AUG 2010 | $389,891 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-31-165 | CR | Actual | AUG 2010 | $974,312 | 6 | REPLACE BRIDGE |
0912-31-168 | CR | Actual | OCT 2009 | $253,436 | 6 | REPLACE BRIDGE (NBI# 12020AA0649001) |
0912-31-169 | CR | Actual | AUG 2010 | $1,076,463 | 6 | REPLACE BRIDGE (NBI# 12020AA0652002) |
0912-31-189 | CR | Actual | JUL 2010 | $389,925 | 6 | REPLACE BRIDGE AND APPROACHES_NBI# 12020AA2029001 |
0912-31-190 | CR | Actual | JAN 2010 | $507,818 | 6 | REPLACE BRIDGE (NBI# 12020AA0084001) |
0912-31-191 | PW | Actual | JUL 2010 | $963,415 | 10 | ACP OVERLAY, FLEXIBLE BASE, GRADING AND SHAPING OF ACCESS |
0912-31-193 | PW | Actual | AUG 2010 | $252,700 | 10 | PAVE LEVEES AROUND 36 ONE - ACRE PONDS |
0912-31-199 | CS | Actual | JUN 2010 | $282,154 | 6 | REPLACE BRIDGE (NBI# 12020M03025001) |
0912-31-219 | CR | Actual | NOV 2009 | $499,023 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 120200AA0739001) |
0912-31-225 | VA | Actual | FEB 2010 | $62,234 | 10 | LANDSCAPE DEVELOPMENT |
0912-31-226 | VA | Actual | OCT 2009 | $124,120 | 1 | LANDSCAPE DEVELOPMENT |
0912-31-235 | VA | Actual | AUG 2010 | $208,478 | 1 | STRUCTURAL REPAIR |
0912-31-246 | VA | Actual | DEC 2009 | $73,167 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-31-247 | VA | Actual | DEC 2009 | $48,393 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-31-254 | VA | Actual | DEC 2009 | $165,998 | 10 | ROMOVE DEBRIS FROM ROADWAY CAUSED BY HURRICANE IKE |
0912-31-255 | CR | Actual | MAR 2010 | $711,217 | 10 | REMOVAL AND DISPOSAL OF DEBRIS FROM ROADS AFTER HURRICANE |
0912-31-256 | CR | Actual | MAR 2010 | $2,466,079 | 10 | RECONSTRUCT ROADWAY AFTER HURRICANE IKE |
0912-31-257 | CR | Actual | MAR 2010 | $1,997,519 | 10 | RECONSTRUCT ROADWAY AFTER HURRICANE IKE |
0912-31-259 | VA | Actual | APR 2010 | $114,683 | 10 | REMOVE VEGETATIVE DEBRIS AFTER HURRICANE IKE |
0912-31-260 | VA | Actual | APR 2010 | $20,009 | 10 | REMOVE VEGETATIVE DEBRIS AFTER HURRICANE IKE |
0912-31-261 | VA | Actual | MAY 2010 | $931,877 | 10 | REMOVAL AND DEPOSAL OF DEBRIS CLEARING ROADWAY AND DRAINAGE |
0912-31-262 | CS | Actual | MAY 2010 | $23,132 | 10 | REMOVE DEBRIS AFTER HURRICANE IKE |
2105-02-003 | FM 2234 | Actual | JUN 2010 | $12,675,637 | 2 | RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-08-167 | US 90A | Actual | AUG 2010 | $204,937 | 11 | CONTINUOUS SAFETY LIGHTING |
0089-09-068 | US 59 | Actual | MAY 2010 | $13,615,501 | 11 | CONSTRUCT GRADE SEPARATION |
0089-09-072 | US 59 | Actual | SEP 2009 | $1,999,760 | 6 | REPLACE 2 BRIDGES (TURKEY CRK NBI#12080008909047) & (SNAKE |
0192-01-087 | SH 6 | Actual | MAY 2010 | $82,621 | 8 | SAFTY LIGHTING |
0543-02-047 | FM 359 | Actual | FEB 2010 | $11,784,812 | 7 | RECONSTRUCT 2 LANES TO 4 LANES |
0543-03-059 | FM 762 | Actual | SEP 2009 | $1,790,504 | 6 | REPLACE BRIDGE AND APPROACHES |
0543-03-066 | FM 762 | Actual | MAR 2010 | $387,706 | 1 | BASE REPAIR, OVERLAY, SIGNAL AND TURN LANE |
0912-34-120 | CS | Actual | AUG 2010 | $94,732 | 5 | INSTALL TRAFFIC SIGNALS AT INTERSECTION |
0912-34-126 | CS | Actual | MAR 2010 | $12,544,892 | 7 | WIDEN TO 4 LANES CURB & GUTTER |
0912-34-140 | CS | Actual | DEC 2009 | $381,586 | 8 | ADD LEFT TURN LANE (HAZARD ELIMINATION PROGRAM) |
0912-34-141 | CS | Actual | NOV 2009 | $1,596,100 | 5 | ITS CENTER |
0912-34-148 | VA | Actual | SEP 2009 | $232,762 | 10 | LANDSCAPE DEVELOPMENT |
0912-34-150 | VA | Actual | MAR 2010 | $2,778,095 | 5 | ITS: UPGRADE ALL TRAFFIC SIGNALS TO PROVIDE REGIONALIZED |
0912-34-155 | VA | Actual | JAN 2010 | $194,676 | 1 | CRACK SEAL |
0912-34-160 | VA | Actual | DEC 2009 | $241,936 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-34-161 | VA | Actual | DEC 2009 | $579,120 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-34-163 | CS | Actual | MAY 2010 | $544,871 | 7 | 3' SHOULDER WIDENING WITH OVERLAY |
0912-34-164 | CS | Actual | AUG 2010 | $596,183 | 7 | REHABILITATE ROAD |
0912-34-166 | VA | Actual | DEC 2009 | $6,533 | 10 | REPLACE AND REPAIR TRAFFIC SIGNALS AFTER HURRICANE IKE |
0912-34-167 | VA | Actual | DEC 2009 | $6,106 | 10 | REPLACE AND REPAIR TRAFFIC SIGNALS AFTER HURRICANE IKE |
1257-01-044 | FM 1092 | Actual | OCT 2009 | $2,691,529 | 10 | RECONFIGURE AND UPGRADE TRAFFIC SIGNAL SYSTEM AT |
1415-02-040 | FM 1464 | Actual | FEB 2010 | $13,611,377 | 7 | WIDEN 2 LANES TO 4 LANES DIVIDED |
2093-01-009 | FM 2218 | Actual | MAY 2010 | $14,284,407 | 7 | WIDEN 2 LANES TO 4 - LANE DIVIDED CURB AND GUTTER SECTION |
2093-01-024 | FM 2218 | Actual | NOV 2009 | $160,984 | 8 | INSTALL LEFT TURN LANE |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0051-03-097 | SH 3 | Actual | SEP 2009 | $234,443 | 1 | REMOVE AND REPLACE TRAFFIC RAIL, RAIL FOUNDATION AND REPAIR |
0051-04-060 | SH 87 | Actual | AUG 2010 | $2,959,684 | 1 | BASE REPAIR AND OVERLAY |
0051-09-023 | FM 3005 | Actual | SEP 2009 | $3,866,867 | 1 | RAISE ROADWAY AND BASE REPAIRS (PHASE 1) |
0051-09-026 | FM 3005 | Actual | DEC 2009 | $18,359 | 10 | REPAIR AND REPLACE DAMAGED GUARDRAIL, POST AND SGTS AFTER |
0367-02-076 | SH 87 | Actual | AUG 2010 | $6,850,974 | 1 | RAISE ROAD AND ASPHALT CONCRETE PAVEMENT OVERLAY |
0367-05-047 | SH 87 | Actual | DEC 2009 | $3,147,777 | 10 | REPAIR FERRY FENDER, DOLPHIN & MONOPOLE SYS AND DOCKS AFTER |
0367-05-049 | SH 87 | Actual | DEC 2009 | $1,163,837 | 10 | CONSTRUCT REVETMENT TO PROTECT ROADWAY AFTER HURRICANE IKE |
0389-06-098 | SH 146 | Actual | JUL 2010 | $7,825,859 | 11 | CONSTRUCT SB GRADE SEPARATION |
0389-06-099 | SH 146 | Actual | DEC 2009 | $40,490 | 10 | REPAIR AND REPLACE DAMAGED NAVIGATIONAL LIGHTING SYSTEM |
0500-01-133 | IH 45 | Actual | DEC 2009 | $68,582 | 10 | RE - GRADE DITCHES, SLOPES AND REMOVE DEBRIS FROM ROW AFTER |
0500-01-134 | IH 45 | Actual | DEC 2009 | $108,528 | 10 | REP / REPLC GUARDRAIL, END TREATMENTS & CLEAN SEWER SYS AFTER |
0500-01-135 | IH 45 | Actual | DEC 2009 | $26,080 | 10 | REP / REPLC GUARDRAIL, END TREATMENTS & CLEAN SEWER SYS AFTER |
0500-01-136 | IH 45 | Actual | DEC 2009 | $46,769 | 10 | REPAIR AND REPLACE DAMAGED CTMS AND CCTV SYSTEMS AFTER |
0500-01-137 | IH 45 | Actual | DEC 2009 | $417,271 | 10 | REPAIR & REPLACE ELECTRICAL SYSTEMS AND LIGHT FIXTURES AFTER |
0500-01-138 | IH 45 | Actual | DEC 2009 | $343,572 | 10 | REPAIR & REPLACE ELECTRICAL SYSTEMS AND LIGHT FIXTURES AFTER |
0500-01-139 | IH 45 | Actual | DEC 2009 | $13,900 | 10 | ASPHALT OVERLAY AFTER HURRICANE IKE (NBI 12 - 085 - 0500 - 01 - 374, |
0912-73-115 | VA | Actual | SEP 2009 | $628,620 | 2 | 3 DETENTION PONDS |
0912-73-121 | CS | Actual | AUG 2010 | $371,894 | 6 | REPLACE BRIDGE |
0912-73-131 | VA | Actual | OCT 2009 | $442,389 | 1 | COUNTYWIDE FULL DEPTH CONCRETE REPAIR |
0912-73-133 | VA | Actual | FEB 2010 | $918,004 | 1 | COUNTYWIDE ASPHALT PAVEMENT REPAIR |
0912-73-137 | VA | Actual | AUG 2010 | $633,856 | 5 | UPGRADE TRAFFIC SIGNALS & SYNCHRONIZATION (GALVESTON COUNTY) |
0912-73-150 | VA | Actual | JAN 2010 | $1,115,628 | 10 | REPLACE AND / OR REPAIR DAMAGED TRAFFIC SIGNALS CAUSED BY |
0912-73-155 | VA | Actual | DEC 2009 | $192,321 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-73-156 | CS | Actual | DEC 2009 | $3,142,808 | 10 | REPAIR DAMAGED CAUSEWAY BRIDGE CAUSED BY HURRICANE IKE |
0912-73-157 | VA | Actual | DEC 2009 | $695,827 | 10 | REPLACE DAMAGED GUARDRAIL AND OTHER MISCELLANEOUS REPAIRS |
0912-73-158 | VA | Actual | DEC 2009 | $72,205 | 10 | REMOVE DEBRIS BLOCKING ROADS AFTER HURRICANE IKE |
0912-73-169 | VA | Actual | JAN 2010 | $1,662,500 | 10 | REMOVAL AND DISPOSAL OF DEBRIS FROM ROADS AFTER HURRICANE |
0912-73-170 | CS | Actual | AUG 2010 | $385,396 | 10 | RESURFACE ROAD |
0912-73-173 | VA | Actual | MAY 2010 | $97,348 | 10 | REMOVE VEGETATIVE DEBRIS AFTER HURRICANE IKE |
0912-73-174 | VA | Actual | MAY 2010 | $627,284 | 10 | REPAIR WASHED OUT OR MISSING ASPHALT PAVEMENT ON ROADWAY AND |
0912-73-175 | VA | Actual | MAY 2010 | $25,792 | 10 | REPAIR WASHED OUT OR MISSING ASPHALT PAVEMENT ON ROADWAY AND |
0912-73-177 | VA | Actual | AUG 2010 | $88,486 | 10 | REMOVE DEBRIS FROM ROADWAY AFTER HURRICANE IKE |
0976-03-099 | FM 518 | Actual | DEC 2009 | $11,554 | 10 | REPLACE AND REPAIR DAMAGED SIGNALS, SIGNS, AND VEHICLE |
0978-01-024 | FM 646 | Actual | MAR 2010 | $17,495,119 | 12 | WIDEN FROM 2 LANES TO 4 - LANE DIVIDED (PTF) |
1607-01-029 | FM 1764 | Actual | OCT 2009 | $10,442,568 | 5 | CONSTRUCT GRADE SEPARATION |
3595-01-013 | SH 275 | Actual | AUG 2010 | $639,288 | 1 | BASE REPAIRS, MILLING & 1.5" ASPHALT OVERLAY |
3595-01-014 | SH 275 | Actual | AUG 2010 | $154,362 | 10 | 2004 ITS DEPLOYMENT PROGRAM (ITS EQUIPMENT AND ROUTE |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-10-064 | US 90A | Actual | AUG 2010 | $3,356,584 | 6 | REPLACE BRIDGE (NBI# 12102002710064 SB) |
0027-13-198 | US 59 | Actual | SEP 2009 | $305,748 | 10 | LANDSCAPE DEVELOPMENT |
0028-01-092 | US 90 | Actual | JUN 2010 | $2,070,839 | 1 | BASE REPAIR, ONE COURSE SURFACE TREATMENT, PAVEMENT, |
0028-02-084 | US 90 | Actual | SEP 2009 | $498,721 | 1 | FULL DEPTH CONCRETE REPAIR AND REPAIR OF SPALLING IN |
0050-09-059 | US 290 | Actual | OCT 2009 | $2,526,732 | 1 | TSM IMPROVEMENTS AT VARIOUS LOCATIONS ADD U - TNS & AUX LNS, |
0050-09-074 | US 290 | Actual | JAN 2010 | $388,130 | 1 | CRACK & SPALL REPAIR, FULL DEPTH CONCRETE REPAIR |
0110-05-115 | IH 45 | Actual | SEP 2009 | $157,165 | 1 | PAVEMENT MARKINGS |
0110-05-116 | IH 45 | Actual | SEP 2009 | $324,478 | 1 | PAVEMENT MARKINGS |
0178-01-034 | SH 35 | Actual | MAY 2010 | $2,044,954 | 1 | FULL DEPTH CONCRETE REPAIR, PLANING, LONGITUDINAL JOINT AND |
0271-06-110 | IH 10 | Actual | APR 2010 | $29,178,645 | 10 | CONSTRUCT 2 DIRECT CONNECTORS |
0271-07-094 | IH 10 | Actual | JUL 2010 | $1,560,410 | 10 | LANDSCAPING |
0271-07-095 | IH 10 | Actual | JUL 2010 | $684,827 | 10 | LANDSCAPING |
0271-07-242 | IH 10 | Actual | JAN 2010 | $48,579,332 | 1 | WIDEN AND RECONSTRUCT TO 2 3 - LANE FRONTAGE ROADS WITH |
0271-07-292 | IH 10 | Actual | AUG 2010 | $3,594,471 | 7 | CONSTRUCT DRAINAGE AND DETENTION FACILITIES |
0271-07-294 | IH 10 | Actual | AUG 2010 | $346,000 | 10 | LANDSCAPE DEVELOPMENT |
0271-17-155 | IH 610 | Actual | AUG 2010 | $354,224 | 1 | PAVEMENT MARKINGS |
0389-03-035 | BS 146E | Actual | APR 2010 | $2,543,255 | 6 | REPLACE BRIDGE (NBI# 12102038912035) |
0389-05-117 | SH 146 | Actual | DEC 2009 | $176,406 | 10 | REPAIR OR REPLACE ELECTRICAL SYSTEMS AND NAVIGATIONAL LIGHTS |
0389-13-052 | SH 146 | Actual | FEB 2010 | $4,118,845 | 1 | CONSTRUCT DIRECT CONNECTOR (RAMP E DC SB TO WB) |
0508-01-319 | IH 10 | Actual | DEC 2009 | $2,028,294 | 1 | ROADWAY / FLOODING IMPROVEMENTS (REHABILITATE PUMP STATION) |
0508-01-323 | IH 10 | Actual | AUG 2010 | $855,313 | 10 | LANDSCAPE DEVELOPMENT |
0508-01-324 | IH 10 | Actual | AUG 2010 | $650,522 | 10 | LANDSCAPE DEVELOPMENT |
0598-01-072 | SH 288 | Actual | MAR 2010 | $2,400 | 10 | RETAINING WALLS UNDER MAIN LANES_ (BY PERMIT) |
0912-00-329 | VA | Actual | OCT 2009 | $3,500,000 | 1 | ITS - MAINTENANCE (NON - LETTING) |
0912-00-335 | VA | Actual | SEP 2009 | $898,350 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS |
0912-00-361 | VA | Actual | JUL 2010 | $8,000,000 | 5 | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2010) |
0912-00-362 | VA | Actual | AUG 2010 | $10,000,000 | 5 | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2011) |
0912-00-365 | VA | Actual | AUG 2010 | $1,890,000 | 5 | HGAC STAFF MARKETING, PUBLIC OUTREACH AND CONSULTANT TECHNIC |
0912-00-367 | VA | Actual | AUG 2010 | $5,000,000 | 5 | COMMUTE SOLUTIONS PROGRAM (FY 2010) |
0912-00-372 | VA | Actual | AUG 2010 | $4,000,000 | 5 | REGIONAL VANPOOL PROGRAM (FY 2010) CMAQ |
0912-00-374 | VA | Actual | AUG 2010 | $1,181,648 | 5 | SIGNAL IMPROVEMENTS AT INTERSECTIONS |
0912-00-383 | VA | Actual | SEP 2009 | $946,871 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS |
0912-00-384 | VA | Actual | APR 2010 | $783,352 | 1 | PAVEMENT MARKINGS (NON - SITE SPECIFIC) |
0912-00-389 | VA | Actual | FEB 2010 | $3,198,720 | 7 | REGIONAL VANPOOL PROGRAM (FY 2010) |
0912-00-395 | VA | Actual | AUG 2010 | $5,250,000 | 7 | ACCESS MANAGEMENT STUDIES ALONG SIGNIFICANT CORRIDORS IN THE |
0912-00-396 | VA | Actual | FEB 2010 | $2,000,000 | 7 | GCFRD - COMMUTER RAIL PE |
0912-00-397 | VA | Actual | MAR 2010 | $4,068,749 | 5 | REAL - TIME HWY PERFORMANCE MONITORING |
0912-00-398 | VA | Actual | OCT 2009 | $2,500,000 | 1 | IH 69 / HOUSTON TMA FREIGHT ANALYSIS |
0912-00-416 | VA | Actual | JUN 2010 | $200,000 | 1 | REHABILITATE 6 DYNAMIC MESSAGE SIGNS |
0912-00-421 | VA | Actual | MAR 2010 | $5,000,000 | 7 | CITY - WIDE WIMAX IMPLEMENTATION |
0912-00-425 | VA | Actual | DEC 2009 | $1,520,789 | 10 | REPAIR AND REPLACE SIGN PANELS, POSTS AND HARDWARE AFTER |
0912-00-426 | VA | Actual | DEC 2009 | $336,042 | 10 | REPAIR AND REPLACE SIGN PANELS, POSTS AND HARDWARE AFTER |
0912-00-427 | VA | Actual | DEC 2009 | $161,248 | 10 | REPAIR AND REPLACE SIGN PANELS, POSTS AND HARDWARE AFTER |
0912-00-428 | VA | Actual | DEC 2009 | $741,242 | 10 | REPAIR ERODED BASE, RIPRAP, GUARDRAIL, END TREATMENTS, |
0912-00-429 | VA | Actual | DEC 2009 | $1,549,903 | 10 | REMOVE SAND FROM DRAINAGE DITCHES, CLEAN CULVERTS, RESTORE |
0912-00-430 | VA | Actual | DEC 2009 | $2,084,226 | 10 | REMOVE SAND FROM DRAINAGE DITCHES, CLEAN CULVERTS, RESTORE |
0912-00-431 | VA | Actual | DEC 2009 | $420,185 | 10 | REPAIR AND REPLACE DAMAGED ILLUMINATION AND HIGH MAST |
0912-00-432 | VA | Actual | DEC 2009 | $608,852 | 10 | REPAIR AND REPLACE DAMAGED ILLUMINATION AND HIGH MAST |
0912-00-433 | VA | Actual | DEC 2009 | $79,853 | 10 | REPAIR AND REPLACE DAMAGED ILLUMINATION AND HIGH MAST |
0912-00-434 | VA | Actual | DEC 2009 | $166,354 | 10 | REPAIR AND REPLACE DAMAGED COMPUTERIZED TRANSPORTATION |
0912-00-435 | VA | Actual | DEC 2009 | $274,628 | 10 | REPAIR AND REPLACE DAMAGED COMPUTERIZED TRANSPORTATION |
0912-00-436 | VA | Actual | DEC 2009 | $15,255 | 10 | REPAIR AND REPLACE DAMAGED COMPUTERIZED TRANSPORTATION |
0912-00-437 | VA | Actual | DEC 2009 | $3,901,598 | 10 | REPAIR AND REPLACE DAMAGED TRAFFIC SIGNALS AND WARNING |
0912-00-438 | VA | Actual | DEC 2009 | $2,408,226 | 10 | REPAIR AND REPLACE DAMAGED TRAFFIC SIGNALS AND WARNING |
0912-00-439 | VA | Actual | JAN 2010 | $19,763 | 10 | REPAIR AND REPLACE DAMAGED TRAFFIC SIGNALS AND WARNING |
0912-00-449 | VA | Actual | AUG 2010 | $469,298 | 5 | VOLUNTARY MOBILE EMISSIONS REDUCTION ACTIVITIES (ADDING |
0912-00-450 | VA | Actual | AUG 2010 | $768,500 | 5 | CLEAN AIR ACTION PROGRAM FY 2009, FY 2010, FY 2011 (ADDING |
0912-70-002 | CS | Actual | AUG 2010 | $1,509,343 | 6 | REPLACE BRIDGE |
0912-70-016 | VA | Actual | MAY 2010 | $189,282 | 10 | LANDSCAPE DEVELOPMENT |
0912-70-020 | CS | Actual | AUG 2010 | $2,900,406 | 7 | REHAB AND OVERLAY |
0912-70-022 | CS | Actual | MAY 2010 | $5,392,259 | 7 | BASE REPAIR |
0912-70-029 | CS | Actual | MAR 2010 | $330,161 | 7 | ASPHALT OVERLAY |
0912-70-036 | CS | Actual | AUG 2010 | $928,362 | 7 | MILL AND ACP OVERLAY |
0912-70-040 | CS | Actual | AUG 2010 | $308,982 | 7 | ASPHALT OVERLAY |
0912-70-041 | CS | Actual | AUG 2010 | $712,114 | 7 | ASPHALT OVERLAY |
0912-70-045 | PW | Actual | AUG 2010 | $305,460 | 10 | CONSTRUCT PARKING LOT AND DRIVEWAY |
0912-70-046 | VA | Actual | MAR 2010 | $343,177 | 10 | REPLACE AND REPAIR FIBER COMMUNICATION NETWORK AND CAMERAS |
0912-70-047 | VA | Actual | MAR 2010 | $458,808 | 10 | REPLACE AND REPAIR TRAFFIC SIGNALS, POLES AND MAST ARMS |
0912-70-048 | VA | Actual | MAR 2010 | $10,000 | 10 | REFLOAT VESSELS; REPAIR DAMAGED PIPING, WINDOWS AND REPLACE |
0912-70-049 | VA | Actual | MAR 2010 | $35,112 | 10 | REPAIR DOCK RAMPS, PYLONS AND REPLACE WIND SOCKS AFTER |
0912-70-050 | VA | Actual | MAR 2010 | $100,000 | 10 | DEWATER TUNNEL, REPLC SERVICE POLE, CAMERA SYS, HOSE NOZZLES |
0912-70-051 | CS | Actual | MAR 2010 | $8,952 | 10 | REPLACE WIRING IN ELECTRICAL POWER CABLES FROM CONTROL PANEL |
0912-70-052 | VA | Actual | MAR 2010 | $547,135 | 10 | DEBRIS REMOVAL AND DISPOSAL; DEBRIS MONITORING AND |
0912-70-055 | VA | Actual | MAY 2010 | $154,660 | 10 | REPAIR AND REPLACE DAMAGED SIGNAGE AFTER HURRICANE IKE |
0912-70-056 | CS | Actual | MAY 2010 | $544 | 10 | REPAIR AND REPLACE DAMAGED SIGNAGE AFTER HURRICANE IKE |
0912-70-057 | VA | Actual | MAY 2010 | $390,812 | 10 | REPAIR TOLL BOOTHS, TOLLING EQUIPMENT, ELEVATORS AND HVAC |
0912-70-058 | CS | Actual | MAY 2010 | $292,138 | 10 | REPAIR AND REPLACE DAMAGED LIGHTING AFTER HURRICANE IKE |
0912-70-059 | VA | Actual | MAY 2010 | $42,016 | 10 | REPAIR DAMAGED CAUSED BY PUMP STATION DEBRIS AFTER HURRICANE |
0912-70-060 | VA | Actual | MAY 2010 | $91,348 | 10 | REMOVAL AND DISPOSAL OF DEBRIS AFTER HURRICANE IKE |
0912-70-061 | VA | Actual | MAY 2010 | $37,696 | 10 | REPAIR DAMAGED SOUND WALLS AFTER HURRICANE IKE |
0912-70-070 | VA | Actual | AUG 2010 | $2,147,808 | 5 | PURCHASE EQUIPMENT FOR SYSTEM INTEGRATION AND ACCOMPLISH |
0912-70-071 | VA | Actual | AUG 2010 | $1,665,294 | 5 | PURCHASE EQUIPMENT FOR SYSTEM INTEGRATION AND ACCOMPLISH |
0912-70-072 | VA | Actual | AUG 2010 | $2,049,020 | 5 | PURCHASE EQUIPMENT FOR SYSTEM INTEGRATION AND ACCOMPLISH |
0912-71-076 | CS | Actual | AUG 2010 | $1,160,230 | ROW | REPLACE BRIDGE AND APPROACHES |
0912-71-406 | CS | Actual | AUG 2010 | $409,320 | 6 | REPLACE BRIDGE |
0912-71-432 | VA | Actual | JUL 2010 | $7,458,029 | 9 | CONSTRUCT PEDESTRIAN / BIKE BRIDGES |
0912-71-505 | VA | Actual | MAY 2010 | $2,622,380 | 7 | HIKE AND BIKE TRAIL (HOUSTON HERITAGE CORRIDOR BAYOU TRAILS |
0912-71-545 | VA | Actual | APR 2010 | $3,252,815 | 9 | WEST WHITE OAK BAYOU TRAIL EXTENSION |
0912-71-562 | CR | Actual | JUN 2010 | $529,280 | 6 | REPLACE BRIDGE |
0912-71-634 | CS | Actual | NOV 2009 | $9,413,053 | 7 | WIDEN TO 4 LANE DIVIDED |
0912-71-637 | CS | Actual | MAR 2010 | $8,193,084 | 7 | WIDEN TO 4 LANE DIVIDED |
0912-71-793 | CS | Actual | AUG 2010 | $1,165,917 | 9 | VINCE BAYOU PEDESTRIAN AND BICYCLE TRAIL IN PASADENA |
0912-71-802 | VA | Actual | DEC 2009 | $548,677 | 9 | LANDSCAPE - OST / ALMEDA CORRIDORS REDEVELOPMENT AUTHORITY IN |
0912-71-822 | VA | Actual | NOV 2009 | $1,099,401 | 5 | HIKE AND BIKE TRAIL (HOUSTON HERITAGE CORRIDOR BAYOU TRAILS |
0912-72-001 | CS | Actual | AUG 2010 | $951,006 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-72-041 | CR | Actual | JUL 2010 | $1,076,267 | 6 | REPLACE BRIDGE (NBI# 12102AA0223001) |
0912-72-051 | CS | Actual | MAR 2010 | $1,653,286 | 10 | BRIDGE REPLACEMENT |
0912-72-076 | VA | Actual | SEP 2009 | $3,000,000 | 7 | SIGNATURE BUS EXPRESS SERVICE ROUTES INCLUDING SHELTERS AND |
0912-72-084 | VA | Actual | AUG 2010 | $1,924,707 | 5 | HARRIS COUNTY SIGNAL INTERCONNECT PHASE 2 |
0912-72-089 | VA | Actual | AUG 2010 | $4,497,941 | 5 | HARRIS COUNTY SIGNAL INTERCONNECT PHASE 2 |
0912-72-153 | VA | Actual | MAR 2010 | $984,861 | 5 | TRAFFIC SIGNAL SYNCHRONIZATION |
0912-72-168 | VA | Actual | JUL 2010 | $699,130 | 7 | CONSTRUCT TRANSTAR COMMUNICATIONS TOWER |
0912-72-177 | VA | Actual | SEP 2009 | $296,999 | 1 | ATM - US 290 UPGRADE |
0912-72-181 | VA | Actual | SEP 2009 | $1,348,545 | 1 | BRIDGE MAINTENANCE - REPAIRING STEEL MEMBERS, SEALING ACCESS |
0912-72-191 | VA | Actual | SEP 2009 | $10,781,250 | 5 | SIGNATURE BUS / SHELTER / SIGNAGE |
0912-72-192 | CS | Actual | APR 2010 | $864,000 | 5 | MCGOWAN PHASE PEDESTRIAN STREETSCAPE IMPROVEMENTS (RAMPS, |
0912-72-194 | VA | Actual | AUG 2010 | $2,315,250 | 5 | INSTALL TRAFFIC MANAGEMENT OPERATIONS EQUIPMENT PHASE 2 |
0912-72-207 | CS | Actual | FEB 2010 | $22,739,821 | 7 | PHASE 1 - 5 PEDESTRIAN / TRANSIT IMPROVEMENTS |
0912-72-211 | VA | Actual | APR 2010 | $797,955 | 1 | PAVEMENT MARKINGS (NON - STIE SPECIFIC) |
0912-72-215 | CS | Actual | DEC 2009 | $5,254,163 | 10 | RECONSTRUCTION OF STREETS AND DRAINAGE (PHASE 2) |
0912-72-237 | CS | Actual | FEB 2010 | $9,492,165 | 10 | PEDESTRIAN TRANSIT CONNECTION IMPROVEMENTS |
0912-72-239 | CS | Actual | FEB 2010 | $15,877,126 | 7 | PEDESTRIAN TRANSIT CONNECTION IMPROVEMENTS (GREATER EAST END |
0912-72-247 | VA | Actual | DEC 2009 | $931,779 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-72-248 | VA | Actual | DEC 2009 | $191,905 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-72-249 | VA | Actual | DEC 2009 | $44,957 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-72-250 | VA | Actual | DEC 2009 | $71,030 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-72-251 | VA | Actual | DEC 2009 | $322,457 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-72-260 | VA | Actual | DEC 2009 | $6,133 | 10 | REMOVAL AND DEPOSAL OF DEBRIS BLOCKING ROADWAY AFTER |
0912-72-261 | VA | Actual | DEC 2009 | $34,465 | 10 | REMOVE AND DISPOSED OF DEBRIS ON ROADS AFTER HURRICANE IKE |
0912-72-271 | VA | Actual | JUL 2010 | $3,326,948 | 10 | REMOVAL AND DISPOSAL OF VEGETATIVE DEBRIS BY GRINDING CAUSED |
0976-01-033 | FM 865 | Actual | DEC 2009 | $1,982,770 | 1 | PLANING, ASPHALT OVERLAY AND PAVEMENT MARKINGS |
0980-02-017 | FM 526 | Actual | FEB 2010 | $1,291,158 | 1 | FOR THE CONSTRUCTION OF ASPHALT CONCRETE PAVEMENT OVERLAY, |
0981-01-102 | NASA 1 | Actual | SEP 2009 | $3,356,950 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
1006-01-061 | FM 529 | Actual | AUG 2010 | $411,110 | 1 | 2 DETENTION PONDS |
1006-01-063 | FM 529 | Actual | MAR 2010 | $204,919 | 8 | ADD LEFT TURN LANE |
1062-04-047 | FM 2100 | Actual | JUL 2010 | $8,872,941 | 7 | CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE & APPROACHES |
1685-01-099 | FM 1960 | Actual | AUG 2010 | $2,933 | 10 | PROVIDE TEMPORARY POWER SOURCE FOR TRAFFIC SIGNALS AFTER |
2941-02-049 | FM 2920 | Actual | MAY 2010 | $330,750 | 5 | INSTALL ETHERNET EQUIP TO INTERCONNECT TRAFFIC SIGNAL_VIDEO |
3256-01-094 | BW 8 | Actual | SEP 2009 | $106,336 | 1 | RESHAPE AND STABILIZE EROSION |
3256-02-080 | BW 8 | Actual | SEP 2009 | $236,778 | 1 | PAVEMENT MARKINGS |
3256-02-088 | BW 8 | Actual | MAY 2010 | $29,768 | 10 | RE - GRADE SLOPE AND ADD STABILIZED MATERIAL AFTER HURRICANE |
3256-03-072 | BW 8 | Actual | SEP 2009 | $2,349,189 | 5 | TURN RADIUS IMPROVEMENTS AT VARIOUS LOCATIONS |
3256-03-090 | BW 8 | Actual | OCT 2009 | $64,000,000 | 10 | CONSTRUCT 6 MAIN LANES (SECTION 5) TOLL_ (HCTRA LETTING) |
3510-05-011 | SH 99 | Actual | AUG 2010 | $315,482 | 1 | NOISE WALL CONTRACT 1 |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0110-02-021 | SH 75 | Actual | OCT 2009 | $529,308 | 8 | INSTALL LEFT TURN LANE |
0110-04-183 | IH 45 | Actual | JAN 2010 | $3,220,252 | 10 | REVERSE RAMPS AND ILLUMINATION IN ADVANCE OF DCS AT |
0338-04-075 | SH 105 | Actual | AUG 2010 | $158,055 | 8 | SAFETY TREATMENT, FIX OBJECTS, INSTALL CONTINUOUS LEFT TURN |
0675-08-061 | IH 45 | Actual | FEB 2010 | $52,361,240 | 1 | WIDEN TO 8 MAIN LANES AND RECONSTRUCT 2 - LANE FRONTAGE ROADS |
0675-08-084 | IH 45 | Actual | MAR 2010 | $57,617,649 | 2 | WIDEN TO 6 MAIN LANES |
0675-08-103 | IH 45 | Actual | AUG 2010 | $24,972,837 | 7 | WIDEN TO 6 MAIN LANES, BRIDGE AND INTERSECTION AT SHEPHARD |
0720-02-075 | FM 149 | Actual | JUL 2010 | $3,910,411 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0912-37-184 | CR | Actual | AUG 2010 | $498,910 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-37-191 | CS | Actual | DEC 2009 | $3,876,595 | 7 | CONSTRUCT GRADE SEPARATION AT BNSFRR AND FM 2854 |
0912-37-194 | VA | Actual | SEP 2009 | $1,937,500 | 5 | ADA ENHANCEMENTS |
0912-37-210 | CS | Actual | AUG 2010 | $562,504 | 7 | FULL DEPTH REHABILITATION |
0912-37-211 | CS | Actual | AUG 2010 | $494,830 | 7 | FULL DEPTH REHABILITATION |
0912-37-213 | VA | Actual | DEC 2009 | $41,500 | 10 | REMOVAL AND DISPOSAL OF DEBRIS CLEARING ROADWAY AFTER |
1986-01-059 | FM 1314 | Actual | SEP 2009 | $367,820 | 1 | DRAINAGE IMPROVEMENTS |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0114-11-075 | US 290 | Actual | DEC 2009 | $3,139,387 | 1 | SEAL COAT, PFC OVERLAY AND PAVEMENT MARKINGS |
0271-04-086 | IH 10 | Actual | JAN 2010 | $1,264,152 | 1 | PLANING, SEAL COAT, 1.5" ACP OVERLAY, PAVEMENT MARKINGS |
0523-02-039 | FM 362 | Actual | DEC 2009 | $224,030 | 1 | PLANING, SEAL COAT, ACP OVERLAY AND PAVEMENT MARKINGS |
0543-01-059 | FM 359 | Actual | SEP 2009 | $2,085,808 | 1 | SEAL COAT, OVERLAY AND PAVEMENT MARKINGS |
1418-01-010 | FM 1489 | Actual | SEP 2009 | $882,610 | 1 | SEAL COAT, OVERLAY AND PAVEMENT MARKINGS |
|
|