Monthly State Let Construction Report For Houston District As Of Jul 14, 2017 Page 3 Of 10

Last Update: Monday, July 17, 2017
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyWALLER
HighwayIH 10
FromBRAZOS RIVER
ToFM 359
CSJ0271-04-071
Proj IDNH 1702(007)
Work TypeCONST 1 MORE ML EACH DIRECTION
 
5.820141496478.120.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-06-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days1,391
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-04-071
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06173201
Totals141496478.120.000.000.0

CountyFORT BEND
HighwayIH 10
FromAT PIN OAK RD
To.
CSJ0271-05-040
Proj IDNH 2014(950)
Work TypeLANDSCAPE DEVELOPMENT
 
0.0041897990.522068274.5699.9
Work Order07-29-14
Work Began09-02-14
Work Completed
Time Computed09-01-14
Contract Working Days105
Addl Days Granted44
Working Days Charged145
Percent Time Used97
Contractor(s)
BOYER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-05-040
CONROE WOOD PRODUCTS INC. (0.00)
Contract #06143059
Totals1897990.526851.002068274.5699.9

CountyFORT BEND
HighwayIH 10
FromCANE ISLAND PARKWAY
ToFM 1463
CSJ0271-05-042
Proj IDCC 271-5-42
Work TypeRAMP RELOC, EXTEND FRTG RD, ETC.
 
0.9342297994.991714584.3674.6
Work Order01-17-17
Work Began02-08-17
Work Completed
Time Computed02-08-17
Contract Working Days151
Addl Days Granted0
Working Days Charged118
Percent Time Used78
Contractor(s)
ISI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-05-042
LONESTAR TRAFFIC SAFETY, LLC (0.24)
PROFFESSIONAL TRAFFIC CONTROL, LLC. (0.94)
TRAF-TEX, INC. (3.14)
DURWOOD GREENE CONSTRUCTION CO. (15.30)
CHERRY CONCRETE REMOVAL (0.31)
SPECIALTY DRILLING, LTD. (1.07)
MESA ROD BUSTERS, INC. (0.53)
MAIN LANE INDUSTRIES LTD. (0.36)
JASSO"S SAWING & SEALING (0.11)
Contract #12163017
Totals2297994.99446142.611714584.3674.6

CountyFORT BEND
HighwayIH 10
FromAT FM 1463
To.
CSJ0271-05-043
Proj IDNH 2017(487)
Work TypeCONSTRUCT INTERSECTION IMPROVEMENTS
 
0.1181107205.6066409.455.9
Work Order03-08-17
Work Began06-05-17
Work Completed
Time Computed05-07-17
Contract Working Days81
Addl Days Granted0
Working Days Charged15
Percent Time Used18
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0271-05-043
NBG CONSTRUCTORS, INC. (37.33)
INTERSTATE BARRICADES & MARKINGS, INC. (1.04)
BATTERSON,LLP (3.44)
THIRD COAST SERVICES LLC (9.11)
QUALITY TURF FARMS, LC (1.00)
Contract #01173240
Totals1107205.6066409.4566409.455.9

CountyHARRIS
HighwayIH 10
FromBARKER CYPRESS
ToSH 6
CSJ0271-06-121
Proj IDSTP 2014(139)TE
Work TypeCONSTRUCT INTERSECTION ENHANCEMENTS
 
0.3611856137.551539330.5082.9
Work Order09-19-16
Work Began11-08-16
Work Completed
Time Computed11-18-16
Contract Working Days90
Addl Days Granted0
Working Days Charged35
Percent Time Used38
Contractor(s)
ARANDA BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-06-121
BATTERSON,LLP (2.54)
FLORIDA TRAFFIC CONTROL DEVICES, INC. (12.26)
BOYER, INC. (4.75)
Contract #06163214
Totals1856137.55156431.641539330.5082.9

CountyHARRIS
HighwayIH 10
FromBW 8
ToWEST OF SH 6
CSJ0271-07-305
Proj IDSTP 1502(445)MM
Work TypePV MKS FOR OPER IMPRVMTS
 
4.9261166377.541035317.2289.2
Work Order05-02-16
Work Began10-24-16
Work Completed
Time Computed07-01-16
Contract Working Days67
Addl Days Granted0
Working Days Charged75
Percent Time Used111
Contractor(s)
MAIN LANE INDUSTRIES LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0271-07-305
TRAF-TEX, INC. (14.04)
SCR CIVIL CONSTRUCTION, LLC (4.58)
REPUBLIC TRAFFIC SAFETY, INC. (13.41)
HOLES INCORPORATED (0.77)
INTERSTATE BARRICADES & MARKINGS, INC. (33.92)
Contract #01163224
Totals1166377.540.001035317.2289.2

CountyHARRIS
HighwayIH 10
FromEAST OF GESSNER ROAD
ToNORTH POST OAK ROAD
CSJ0271-07-312
Proj IDNH 2016(414)
Work TypeDIAMOND GRIND AND GROOVE PAV SURF
 
4.77112293403.139622495.3078.2
Work Order11-16-16
Work Began02-13-17
Work Completed
Time Computed01-15-17
Contract Working Days170
Addl Days Granted0
Working Days Charged138
Percent Time Used81
Contractor(s)
PENHALL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0271-07-312
SIMPLEX CONSTRUCTION SUPPLIES, INC. (2.29)
BATTERSON,LLP (15.05)
Contract #08163007
Totals12293403.132202653.129622495.3078.2

CountyWALLER
HighwayUS 90
FromAT CANE ISLAND PARKWAY
To.
CSJ0271-09-022
Proj IDCC 271-9-22
Work TypeCONSTRUCT NEW INTERSECTION
 
0.3232321743.041431032.3861.6
Work Order09-14-16
Work Began11-28-16
Work Completed
Time Computed11-28-16
Contract Working Days163
Addl Days Granted0
Working Days Charged139
Percent Time Used85
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0271-09-022
TLC TRUCKING & CONTRACTING, INC. (0.23)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.88)
AAA ASPHALT PAVING, INC. (7.03)
JMHP, INC. (0.98)
TRAF-TEX, INC. (7.86)
BATTERSON,LLP (3.16)
FIRST KATY CONSTRUCTION (0.24)
CHERRY CRUSHED CONCRETE (0.12)
Contract #05163205
Totals2321743.04196300.561431032.3861.6

CountyHARRIS
HighwayIH 610
FromW OF W 34TH ST ON US 290 (SEG 3)
ToON IH 610
CSJ0271-14-213
Proj IDCM 2013(991)
Work TypeGR, STRS, BASE AND PAVE
 
0.198151543734.14105799209.5768.2
Work Order12-11-13
Work Began12-31-13
Work Completed
Time Computed07-07-14
Contract Working Days1,095
Addl Days Granted130
Working Days Charged626
Percent Time Used51
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-14-213
CPAVE, INC. (0.07)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.37)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (1.75)
SCOTT DERR PAINTING CO, LLC (0.21)
HOUSTON SAWING & DRILLING (0.07)
TEXAS ENVIRONMENTAL MANAGEMENT, INC (0.28)
ESSARY, HART & MACWILIAM,INC. (9.64)
BORTUNCO (0.53)
INTERSTATE BARRICADES & MARKINGS, INC. (0.57)
RAY"S THREADING AND FAB SHOP (0.39)
Contract #11133201
Totals151543734.143914103.84105799209.5768.2

CountyHARRIS
HighwayIH 610
FromTC JESTER TO N OF IH 10 ON IH 610
ToAND TO 34TH ST ON US 290
CSJ0271-14-217
Proj IDSTP 2011(998)MM
Work TypeGR, STRS, BASE AND PAVE
 
5.604151578391.02161497744.1099.9
Work Order06-15-11
Work Began06-20-11
Work Completed
Time Computed07-11-11
Contract Working Days1,124
Addl Days Granted106
Working Days Charged1,223
Percent Time Used99
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-14-217
INTERSTATE BARRICADES & MARKINGS, INC. (0.54)
FLORIDA TRAFFIC CONTROL DEVICES, INC. (5.43)
ESSARY, HART & MACWILIAM,INC. (11.06)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.21)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.19)
SCOTT DERR PAINTING CO (0.58)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.77)
BORTUNCO (0.29)
SPECIALTY DRILLING (0.39)
AMERICAN TRAFFIC CONTROL, INC. (0.01)
TREVCON, INC. (0.09)
BROOKLYN SWEEPS (0.24)
MAGNOLIA SERVICES INCORPORATED (0.04)
CHERRY DEMOLITION (0.07)
PENHALL COMPANY (1.25)
TURNER PAVING & CONSTRUCTION, INC. (0.85)
EROSION PREVENTION PRODUCTS (0.54)
Contract #05113015
Totals151578391.0217469.25161497744.1099.9

CountyHARRIS
HighwayIH 610
FromW OF W 34TH ST ON US 290 (SEG 3)
ToON IH 610
CSJ0271-14-225
Proj IDRW 271-14-225
Work TypeROW ACQ., UTL. ADJ.; RELOC ASSIST.
 
2.6401670105.951606100.4796.1
CountyHARRIS
HighwayIH 610
FromW OF W 34TH ST ON US 290 (SEG 3)
ToN AND S OF US 290 ON IH 610
CSJ0271-14-228
Proj IDSTP 2013(136)MM
Work TypeGR, STRS, BASE AND PAVE
 
1.661105376730.46105216556.9097.7
Work Order11-09-12
Work Began11-20-12
Work Completed
Time Computed02-04-13
Contract Working Days1,030
Addl Days Granted395
Working Days Charged1,192
Percent Time Used83
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-14-225
BATTERSON,LLP (0.69)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.35)
BORING & TUNNELING COMPANY OF AMERICA, INC. (0.17)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.16)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.36)
ESSARY, HART & MACWILIAM,INC. (9.54)
SCOTT DERR PAINTING CO, LLC (0.23)
MAGNOLIA SERVICES INCORPORATED (0.17)
CURB PLANET INC. (0.02)
EROSION PREVENTION PRODUCTS (0.15)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (4.74)
W. W. FOUNDATION DRILLING, LTD. (0.21)
TEJAS UNDERGROUND UTILITIES, LLC (0.00)
BROOKLYN SWEEPS (0.23)
PENHALL COMPANY (0.41)
Contract #10123001
Totals107046836.41482021.36106822657.3797.6

CountyHARRIS
HighwayIH 610
FromSHEPHERD DRIVE
ToEAST OF AIRLINE DRIVE
CSJ0271-14-231
Proj IDNH 1702(513)
Work TypeRECONSTRUCTION OF FRONTAGE ROADS
 
1.7947781945.150.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days330
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
MAIN LANE INDUSTRIES LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0271-14-231
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07173211
Totals7781945.150.000.000.0

CountyHARRIS
HighwayIH 610
FromUS 290
ToIH 45
CSJ0271-14-232
Proj IDHP 1502(446)
Work TypeLANDSCAPE DEVELOPMENT
 
6.020828677.47605647.8273.0
Work Order10-22-15
Work Began02-01-16
Work Completed
Time Computed01-20-16
Contract Working Days75
Addl Days Granted0
Working Days Charged71
Percent Time Used94
Contractor(s)
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0271-14-232
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07153240
Totals828677.474899.99605647.8273.0

CountyMONTGOMERY
HighwaySH 105
FromIH 45N
ToSH 75
CSJ0338-03-088
Proj IDSTP 2014(111)TE
Work TypeTE AND ACCESS MANAGEMENT
 
0.6063484120.941845271.2952.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-05-16
Work Began10-04-16
Work Completed
Time Computed09-05-16
Contract Working Days227
Addl Days Granted0
Working Days Charged108
Percent Time Used47
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0338-03-088
LANDPRO, INC. (14.39)
HASSELL CONSTRUCTION COMPANY, INC. (2.72)
THIRD COAST SERVICES LLC (26.71)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.80)
CURBS, LLC (0.10)
Contract #05163219
Totals3484120.940.001845271.2952.9

CountyHARRIS
HighwaySH 146
FromAT BNSF RR/PORT ROAD
To.
CSJ0389-05-119
Proj IDHP 2012(220)
Work TypeCONSTRUCT DIRECT CONNECTOR
 
0.54011747790.3612262235.8199.9
Work Order07-16-12
Work Began07-24-12
Work Completed
Time Computed07-24-12
Contract Working Days273
Addl Days Granted30
Working Days Charged301
Percent Time Used99
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0389-05-119
MESA ROD BUSTERS, INC. (7.06)
BATTERSON,LLP (0.23)
JMHP, INC. (0.47)
BASE CONSTRUCTION, L.L.P. (1.57)
ROADWAY CONSTRUCTION, INC. (7.22)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.08)
KOSSMAN CONTRACTING CO., INC. (0.31)
TRAF-TEX, INC. (1.10)
SCOTT DERR PAINTING CO, LLC (0.03)
Contract #06123227
Totals11747790.360.0012262235.8199.9

CountyHARRIS
HighwaySH 146
FromVARIOUS LOCATIONS
To.
CSJ0389-05-123
Proj IDNH 1502(604)
Work TypeLANDSCAPE DEVELOPMENT
 
10.1591376457.70619337.3644.9
Work Order00-00-00
Work Began05-02-16
Work Completed
Time Computed03-17-16
Contract Working Days75
Addl Days Granted0
Working Days Charged55
Percent Time Used73
Contractor(s)
BOYER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0389-05-123
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12153014
Totals1376457.70136499.48619337.3644.9

CountyGALVESTON
HighwaySH 146
FromNB SH 146 RAMP AT LP 197
To.
CSJ0389-06-105
Proj IDNH 2017(820)
Work TypeCONSTRUCT ACP RAMP
 
0.563318156.25121544.6338.2
Work Order04-24-17
Work Began06-05-17
Work Completed
Time Computed05-24-17
Contract Working Days45
Addl Days Granted0
Working Days Charged12
Percent Time Used26
Contractor(s)
MAIN LANE INDUSTRIES LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0389-06-105
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (2.88)
STRIPE LINES, INC. (2.63)
LONESTAR TRAFFIC SAFETY, LLC (0.84)
Contract #03173211
Totals318156.25121544.63121544.6338.2

CountyGALVESTON
HighwaySH 146
FromHARRIS C/L
ToFM 1764
CSJ0389-06-106
Proj IDNH 2017(122)
Work TypeBASE REP AND ACP O/L
 
10.6407195186.607022919.1297.6
Work Order10-25-16
Work Began11-28-16
Work Completed
Time Computed11-24-16
Contract Working Days120
Addl Days Granted0
Working Days Charged119
Percent Time Used99
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0389-06-106
ROADSAFE TRAFFIC SYSTEMS, INC. (4.37)
TRAF-TEX, INC. (1.92)
Contract #09163228
Totals7195186.60486756.577022919.1297.6

CountyHARRIS
HighwaySH 146
FromJ.B. LEFEBVRE ROAD
ToUP RR (TO INC SH 146/SPURINTERCHGE)
CSJ0389-13-059
Proj IDNH 1602(460)
Work TypeLANDSCAPE DEVELOPMENT
 
2.7801277107.801027559.0180.4
Work Order09-16-16
Work Began10-17-16
Work Completed
Time Computed10-16-16
Contract Working Days105
Addl Days Granted0
Working Days Charged105
Percent Time Used100
Contractor(s)
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0389-13-059
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08163243
Totals1277107.8019823.991027559.0180.4

CountyGALVESTON
HighwayIH 45
FromTIKI ISLAND
ToTEXAS CITY WYE
CSJ0500-01-150
Proj IDNH 1702(110)
Work TypeBS REPR, MILL, SC & TOM OVERLAY
 
2.0663322042.950.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-08-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days105
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0500-01-150
BATTERSON,LLP (3.43)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. (1.96)
INTERSTATE BARRICADES & MARKINGS, INC. (0.29)
ISI CONTRACTING, INC. (13.54)
TEXOP CONSTRUCTION (6.11)
Contract #05173224
Totals3322042.950.000.000.0