Monthly State Let Construction Report For Houston District As Of Feb 11, 2016 Page 7 Of 15

Last Update: Thursday, February 11, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11 | page 12 | page 13 | page 14 | page 15

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyBRAZORIA
Highway SH 288
From CR 56
To .
CSJ 0598-02-106
Proj ID NH 2015(708)
Work Type CONST SB ON - RAMP & NB OFF - RAMP
 
2.908 9196617.23 1142090.84 2517144.56 27.3
Work Order 07-13-15
Work Began 11-30-15
Work Completed  
Time Computed 09-12-15
Contract Working Days 290
Addl Days Granted 0
Working Days Charged 40
Percent Time Used 13
Contractor(s)
J.D. ABRAMS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0598-02-106
WILLOW CITY SIGN & RAIL, INC.(2.03%)
TRAF-TEX, INC. (1.43%)
CPAVE, INC.(0.07%)
BATTERSON,LLP(0.92%)
WEBER-BALKE FOUNDATION COMPANY, INC(5.76%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.07%)
SOUTHERN CRUSHED CONCRETE LLC(0.38%)
DURWOOD GREENE CONSTRUCTION CO.(8.25%)
NORTHWEST MATERIALS(0.18%)
SCOTT DERR PAINTING CO (0.10%)
MESA ROD BUSTERS, INC. (0.73%)
RAY"S THREADING AND FAB SHOP (0.03%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.28%)
Contract # 03153206
Totals 9196617.23 1142090.84 2517144.56 27.3

CountyMONTGOMERY
Highway IH 45
From N OF CRIGHTON RD
To LEAGUE LINE ROAD
CSJ 0675-08-071
Proj ID CM 1102(305)
Work Type INST CTMS
 
6.889 1095536.50 0.00 1166135.72 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-14-11
Work Began 12-10-12
Work Completed 09-02-14
Time Computed 03-12-12
Contract Working Days 375
Addl Days Granted 0
Working Days Charged 374
Percent Time Used 99
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0675-08-071
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08113025
Totals 1095536.50 0.00 1166135.72 100.0

CountyMONTGOMERY
Highway IH 45
From NORTH OF CALVARY
To SOUTH OF FM 830
CSJ 0675-08-084
Proj ID STP 2010(629)ES
Work Type GR, STRS, BASE AND CONC PAVE
 
5.098 57435821.47 0.00 59471699.96 100.0
CountyMONTGOMERY
Highway IH 45
From FM 830
To WALKER COUNTY LINE
CSJ 0675-08-093
Proj ID RW 675-8-93
Work Type ROW ACQ.
 
8.208 181827.00 0.00 90429.63 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-07-10
Work Began 05-25-10
Work Completed 03-03-15
Time Computed 05-23-10
Contract Working Days 1,177
Addl Days Granted 30
Working Days Charged 1,204
Percent Time Used 99
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0675-08-084
JOE VALENCIK, INC. (0.94%)
SCOTT DERR PAINTING CO (0.15%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.38%)
INDUS CONSTRUCTION, L.P. ( 14.55%)
CREATIVE LANDSCAPES OF TEXAS (1.20%)
SMITH & COMPANY( 10.78%)
L.A. UTILITIES, INC. (5.04%)
JET UNDERGROUND UTILITIES(4.78%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.95%)
BORING & TUNNELING COMPANY OF AMERICA, INC.(0.17%)
VAQUERO CONSTRUCTION, INC. (0.38%)
D.L. CONDITT (0.35%)
BROOKLYN SWEEPS(0.09%)
HIGHWAY TECHNOLOGIES, INC. (0.01%)
CEN TEX HYDROSEED, INC.(0.01%)
Contract # 03103001
Totals 57617648.47 0.00 59562129.59 100.0

CountyMONTGOMERY
Highway IH 45
From SH 336 SOUTH LOOP
To NORTH LEAGUE LINE ROAD
CSJ 0675-08-107
Proj ID HP 2013(692)
Work Type LANDSCAPE DEVELOPMENT
 
6.300 745136.01 3916.67 665621.59 89.3
Work Order 08-26-13
Work Began 10-14-13
Work Completed  
Time Computed 10-14-13
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 90
Percent Time Used 100
Contractor(s)
BIO LANDSCAPE & MAINTENANCE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0675-08-107
CC TREE FARMS, L.L.C.(1.89%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.96%)
Contract # 05133027
Totals 745136.01 3916.67 665621.59 89.3

CountyGALVESTON
Highway FM 1765
From AT 33RD STREET S
To .
CSJ 0686-01-046
Proj ID STP 2015(315)HES
Work Type FLASHING BEACON AND TURN LANE
 
0.186 481773.82 0.00 514294.61 99.9
Work Order 01-02-15
Work Began 04-29-15
Work Completed  
Time Computed 03-03-15
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 43
Percent Time Used 95
Contractor(s)
FORDE CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0686-01-046
AQUALAWN HYDROMULCH & EROSION CONTROL(1.33%)
STRIPE-A-LINE, INC.(2.44%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. ( 14.21%)
TLC TRUCKING & CONTRACTING, INC. (5.98%)
Contract # 11143208
Totals 481773.82 0.00 514294.61 99.9

CountyMONTGOMERY
Highway FM 149
From FM 1488
To SS 149
CSJ 0720-02-083
Proj ID STP 2014(741)
Work Type INST LT TN LNS
 
2.466 3762255.55 195746.31 4173196.66 99.9
Work Order 08-29-14
Work Began 10-27-14
Work Completed  
Time Computed 10-27-14
Contract Working Days 220
Addl Days Granted 0
Working Days Charged 198
Percent Time Used 90
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0720-02-083
THIRD COAST SERVICES LLC (3.68%)
COWBELL TRAFFIC SERVICES, INC. (0.24%)
WILLOW CITY SIGN & RAIL, INC.(5.82%)
J & M CONTRACTING, COMPANY ( 11.50%)
EROSION CONTROL, INC.(3.95%)
ROADSAFE TRAFFIC SYSTEMS, INC. (2.06%)
TEXOP CONSTRUCTION (0.53%)
CEN TEX HYDROSEED, INC.(4.27%)
Contract # 06143030
Totals 3762255.55 195746.31 4173196.66 99.9

CountyMONTGOMERY
Highway FM 149
From FM 1097
To FM 1791
CSJ 0720-02-087
Proj ID STP 1502(606)HES
Work Type BS REPR, OCST, 1.5" OL & ADD SHLDR
 
10.170 10198541.18 589308.80 589308.80 5.7
Work Order 11-10-15
Work Began 01-11-16
Work Completed  
Time Computed 01-09-16
Contract Working Days 183
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0720-02-087
J & M CONTRACTING, COMPANY (5.60%)
ROADSAFE TRAFFIC SYSTEMS, INC. (2.13%)
TEXAS LAND CLEARING, INC.( 18.16%)
WATERS CONSTRUCTION CO., INC.(3.85%)
WILLOW CITY SIGN & RAIL, INC.(1.56%)
Contract # 08153044
Totals 10198541.18 589308.80 589308.80 5.7

CountyHARRIS
Highway SH 249
From AT VETERANS MEMORIAL DRIVE
To .
CSJ 0720-03-128
Proj ID STP 2014(743)HES
Work Type IMPROVE TS
 
0.404 254036.09 0.00 114013.86 44.8
Work Order 07-25-14
Work Began 02-10-15
Work Completed  
Time Computed 01-21-15
Contract Working Days 58
Addl Days Granted 0
Working Days Charged 14
Percent Time Used 24
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0720-03-128
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06143218
Totals 254036.09 0.00 114013.86 44.8

CountyFORT BEND
Highway FM 361
From FM 361
To AT FAIRCHILDS CREEK
CSJ 0838-03-023
Proj ID BR 1502(200)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.076 976506.40 180886.90 952980.62 97.5
Work Order 07-14-15
Work Began 09-14-15
Work Completed  
Time Computed 09-13-15
Contract Working Days 81
Addl Days Granted 0
Working Days Charged 78
Percent Time Used 96
Contractor(s)
LONE STAR ROAD CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0838-03-023
GMJ PAVING CO. (7.59%)
BATTERSON,LLP(0.64%)
SCOTT DERR PAINTING CO, LLC(0.08%)
WEBER-BALKE FOUNDATION COMPANY, INC(5.07%)
MESA ROD BUSTERS, INC. (0.59%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (3.19%)
Contract # 05153024
Totals 976506.40 180886.90 952980.62 97.5

CountyBRAZORIA
Highway FM 521
From MATAGORDA COUNTY LINE
To FM 524
CSJ 0847-02-015
Proj ID STP 2016(699)
Work Type PAVEMENT REP AND OVERLAY
 
7.228 1597257.65 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0847-02-015
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02163009
Totals 1597257.65 0.00 0.00 0.0

CountyBRAZORIA
Highway FM 521
From SH 35
To SH 332
CSJ 0847-03-035
Proj ID STP 2016(061)
Work Type SHOULDER REP AND OVERLAY
 
29.306 7645090.84 190069.01 190069.01 2.4
Work Order 11-13-15
Work Began 01-13-16
Work Completed  
Time Computed 12-14-15
Contract Working Days 191
Addl Days Granted 0
Working Days Charged 11
Percent Time Used 5
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0847-03-035
STRIPE A LINE(4.54%)
JMHP, INC. (4.90%)
THIRD COAST SERVICES LLC (1.18%)
Contract # 09153010
Totals 7645090.84 190069.01 190069.01 2.4

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-331
Proj ID CM 2008(055)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1482581.45 15430.12 1158771.31 78.1
Work Order 09-11-07
Work Began 04-04-08
Work Completed  
Time Computed 09-27-07
Contract Working Days 235
Addl Days Granted 0
Working Days Charged 170
Percent Time Used 72
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-331
BATTERSON, L.L.P.(1.04%)
SPRING CREEK CONSTRUCTION, INC.(4.49%)
Contract # 08073244
Totals 1482581.45 15430.12 1158771.31 78.1

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-336
Proj ID STP 2011(578)G
Work Type INSTALL VIVDS AND INSTALL LOOPS
 
0.003 439963.75 0.00 148701.44 33.7
Work Order 01-06-11
Work Began 04-09-12
Work Completed  
Time Computed 01-22-11
Contract Working Days 187
Addl Days Granted 0
Working Days Charged 115
Percent Time Used 61
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-336
CURB PLANET INC. (0.11%)
Contract # 12103011
Totals 439963.75 0.00 148701.44 33.7

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-350
Proj ID CM 2009(364)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1289999.25 67441.93 1338824.86 99.9
Work Order 06-02-09
Work Began 08-12-12
Work Completed  
Time Computed 06-18-09
Contract Working Days 225
Addl Days Granted 0
Working Days Charged 210
Percent Time Used 93
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-350
CREACOM, INC.(0.04%)
SPRING CREEK CONSTRUCTION, INC.(3.15%)
HIGHWAY TECHNOLOGIES, INC. (0.76%)
KAM CONSTRUCTION, INC. (0.86%)
WALLACE CONCRETE SAWING(0.14%)
REGIONAL TRAFFIC SERVICES LLC(0.00%)
VASQUEZ CONCRETE COMPANY (0.38%)
Contract # 04093209
Totals 1289999.25 67441.93 1338824.86 99.9

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-380
Proj ID STP 2012(020)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1515998.78 0.00 1600338.38 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-16-11
Work Began 02-13-12
Work Completed  
Time Computed 12-02-11
Contract Working Days 437
Addl Days Granted 0
Working Days Charged 274
Percent Time Used 62
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-380
BATTERSON,LLP(5.72%)
ISI CONTRACTING, INC.(6.40%)
VASQUEZ CONCRETE COMPANY (0.32%)
Contract # 09113211
Totals 1515998.78 0.00 1600338.38 99.9

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-381
Proj ID STP 2012(021)
Work Type UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
 
0.001 1787199.58 14575.00 1348835.98 75.4
Work Order 07-19-13
Work Began 10-14-14
Work Completed  
Time Computed 08-04-13
Contract Working Days 432
Addl Days Granted 0
Working Days Charged 260
Percent Time Used 60
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-381
AAA ASPHALT PAVING, INC. (3.02%)
PROFESSIONAL TRAFFIC CONTROL, LLC(2.54%)
Contract # 03133016
Totals 1787199.58 14575.00 1348835.98 75.4

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-385
Proj ID STP 2011(714)G
Work Type UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
 
0.001 911168.15 0.00 1196058.08 99.9
Work Order 02-10-11
Work Began 11-01-11
Work Completed  
Time Computed 02-26-11
Contract Working Days 270
Addl Days Granted 0
Working Days Charged 182
Percent Time Used 67
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-385
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12103230
Totals 911168.15 0.00 1196058.08 99.9

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-413
Proj ID STP 2013(542)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1456616.50 30639.25 1179205.60 80.9
Work Order 07-08-13
Work Began 11-06-13
Work Completed  
Time Computed 11-06-13
Contract Working Days 417
Addl Days Granted 0
Working Days Charged 102
Percent Time Used 24
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-413
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133222
Totals 1456616.50 30639.25 1179205.60 80.9

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-417
Proj ID STP 2012(462)
Work Type NEW / UPGRADE TO LED LIGHT ASSEMBLIES
 
0.001 859065.05 0.00 1105336.31 99.9
Work Order 05-09-12
Work Began 12-04-12
Work Completed  
Time Computed 05-25-12
Contract Working Days 220
Addl Days Granted 24
Working Days Charged 210
Percent Time Used 86
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-417
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04123026
Totals 859065.05 0.00 1105336.31 99.9

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-418
Proj ID STP 2013(321)
Work Type NEW SATELLITE BUILDING POWER SYS
 
0.001 598106.25 1554.14 592605.25 100.0
Work Order 03-22-13
Work Began 02-24-14
Work Completed 10-15-15
Time Computed 04-07-13
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 312
Percent Time Used 85
Contractor(s)
FLORIDA TRAFFIC CONTROL DEVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-418
GENERATORS OF HOUSTON, LP( 69.74%)
BEVCO COMPANY, INC.(3.17%)
Contract # 01133028
Totals 598106.25 1554.14 592605.25 100.0