Monthly State Let Construction Report For Houston District As Of Jun 10, 2015 Page 7 Of 12

Last Update: Wednesday, June 10, 2015
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11 | page 12

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS WITHIN DISTRICT
To .
CSJ 0912-00-489
Proj ID NH 2014(744)
Work Type LANDSCAPE DEVELOPMENT
 
0.001 887550.77 43092.00 353966.05 39.8
Work Order 08-13-14
Work Began 09-22-14
Work Completed  
Time Computed 09-22-14
Contract Working Days 45
Addl Days Granted 9
Working Days Charged 18
Percent Time Used 33
Contractor(s)
BOYER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-489
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06143020
Totals 887550.77 43092.00 353966.05 39.8

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-509
Proj ID STP 2015(161)
Work Type REP BR APPROACH SLABS
 
0.001 3708936.00 281840.69 3618521.90 97.5
Work Order 10-17-14
Work Began 01-12-15
Work Completed  
Time Computed 12-16-14
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 80
Percent Time Used 88
Contractor(s)
NORTEX CONCRETE LIFT & STABILIZATION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-509
ROADSAFE TRAFFIC SYSTEMS, INC. ( 13.59%)
MAIN LANE INDUSTRIES, LTD. ( 13.09%)
SHADOWBOX, LLC (0.94%)
Contract # 09143233
Totals 3708936.00 281840.69 3618521.90 97.5

CountyBRAZORIA
Highway CS
From CR 149 AT MUSTANG BAYOU
To .
CSJ 0912-31-203
Proj ID BR 2008(059)
Work Type REPL BR & APPRS
 
0.288 2748072.00 126312.02 1904018.16 69.2
Work Order 09-17-12
Work Began 11-26-12
Work Completed  
Time Computed 11-16-12
Contract Working Days 270
Addl Days Granted 0
Working Days Charged 203
Percent Time Used 75
Contractor(s)
MENADE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-203
W. W. FOUNDATION DRILLING, LTD.(9.86%)
ENVIRONMENTAL ALLIES, L.P. (0.77%)
JUST GROOVING, LTD.(0.03%)
WILLOW CITY SIGN & RAIL, INC.(1.01%)
Contract # 07123007
Totals 2748072.00 126312.02 1904018.16 69.2

CountyBRAZORIA
Highway VA
From VARIOUS LOCATIONS
To .
CSJ 0912-31-211
Proj ID STP 2013(125)
Work Type MBGF UPGRADES
 
0.001 422144.20 0.00 408730.79 98.7
Work Order 07-31-13
Work Began 10-21-13
Work Completed  
Time Computed 09-29-13
Contract Working Days 35
Addl Days Granted 0
Working Days Charged 49
Percent Time Used 140
Contractor(s)
TI-ZACK CONCRETE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-211
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133207
Totals 422144.20 0.00 408730.79 98.7

CountyBRAZORIA
Highway CR
From CR 64 AT DRAINAGE DITCH
To .
CSJ 0912-31-222
Proj ID BR 2008(792)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.064 435258.40 12877.45 426132.02 97.9
Work Order 08-15-14
Work Began 01-20-15
Work Completed  
Time Computed 10-14-14
Contract Working Days 54
Addl Days Granted 0
Working Days Charged 53
Percent Time Used 98
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-222
LONESTAR TRAFFIC SAFETY, LLC (0.76%)
REGIONAL TRAFFIC SERVICES LLC(0.35%)
ENVIRONMENTAL ALLIES, L.P. (1.57%)
JMHP, INC. (4.72%)
GARNER PAVING & CONSTRUCTION, LTD. (1.03%)
Contract # 06143206
Totals 435258.40 12877.45 426132.02 97.9

CountyBRAZORIA
Highway CR
From CR 48, CR 894
To SH 6
CSJ 0912-31-224
Proj ID STP 2009(103)MM
Work Type GR, STRS, BASE AND PAVE
 
3.022 14518735.55 562908.60 8623558.04 59.3
Work Order 10-24-13
Work Began 01-06-14
Work Completed  
Time Computed 12-23-13
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 336
Percent Time Used 92
Contractor(s)
J.D. ABRAMS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-224
FLORIDA TRAFFIC CONTROL DEVICES, INC.(3.13%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.74%)
VAQUERO CONSTRUCTION, INC. (7.37%)
BREDA COMPANY, INC.(8.09%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.43%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(1.37%)
JAMES CONSTRUCTION GROUP, L.L.C. (7.58%)
EROSION CONTROL, INC.(0.78%)
JMHP, INC. (0.18%)
SCOTT DERR PAINTING CO (0.08%)
CPAVE, INC.(0.41%)
PEREZ CONSTRUCTION CO. (0.18%)
SPECIALTY DRILLING, LTD. (0.13%)
SCMU (0.27%)
Contract # 08133009
Totals 14518735.55 562908.60 8623558.04 59.3

CountyBRAZORIA
Highway CS
From NORTH 2ND STREET AT MUSTANG BAYOU
To .
CSJ 0912-31-237
Proj ID BR 2010(723)
Work Type REPLACE BRIDGE
 
0.126 766156.52 0.00 403426.71 52.6
Work Order 08-01-12
Work Began 09-17-12
Work Completed  
Time Computed 09-17-12
Contract Working Days 113
Addl Days Granted 0
Working Days Charged 65
Percent Time Used 57
Contractor(s)
TOM-MAC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-237
REPUBLIC TRAFFIC SAFETY, INC.(0.26%)
KOSSMAN CONTRACTING CO., INC.(2.07%)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.05%)
GMJ PAVING CO. (7.38%)
KATY CONSTRUCTION(2.34%)
Contract # 06123205
Totals 766156.52 0.00 403426.71 52.6

CountyBRAZORIA
Highway CS
From CR 51 AT AUSTIN BAYOU
To .
CSJ 0912-31-263
Proj ID BR 1102(111)
Work Type REPLACE BRIDGE
 
0.131 456579.24 29850.00 275840.87 60.8
Work Order 10-30-14
Work Began 01-05-15
Work Completed  
Time Computed 12-29-14
Contract Working Days 84
Addl Days Granted 0
Working Days Charged 87
Percent Time Used 103
Contractor(s)
TOM-MAC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-263
STRIPES & STOPS COMPANY, INC.(0.62%)
GMJ PAVING CO. (3.53%)
KOSSMAN CONTRACTING CO., INC.(3.77%)
LONE STAR HIGHWAY PRODUCTS, INC. (0.00%)
Contract # 08143012
Totals 456579.24 29850.00 275840.87 60.8

CountyBRAZORIA
Highway CR
From CR 210 AT DRAINAGE DITCH
To .
CSJ 0912-31-265
Proj ID BR 2011(708)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.069 448817.82 4020.00 398741.78 92.5
Work Order 01-17-14
Work Began 02-25-14
Work Completed  
Time Computed 02-25-14
Contract Working Days 70
Addl Days Granted 0
Working Days Charged 98
Percent Time Used 140
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-265
JMHP, INC. (3.35%)
LONE STAR TRAFFIC SERVICE, INC.(0.49%)
REGIONAL TRAFFIC SERVICES LLC(0.33%)
Contract # 10133205
Totals 448817.82 4020.00 398741.78 92.5

CountyBRAZORIA
Highway CS
From BISSELL RD AT DRAINAGE DITCH
To .
CSJ 0912-31-267
Proj ID BR 2012(495)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.266 1583872.56 176294.42 623770.13 39.3
Work Order 08-08-14
Work Began 02-09-15
Work Completed  
Time Computed 10-07-14
Contract Working Days 159
Addl Days Granted 0
Working Days Charged 60
Percent Time Used 37
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-267
REGIONAL TRAFFIC SERVICES LLC(2.50%)
LONESTAR TRAFFIC SAFETY, LLC (0.47%)
ODUM SERVICES, L.P.(1.83%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.25%)
Contract # 06143009
Totals 1583872.56 176294.42 623770.13 39.3

CountyBRAZORIA
Highway CS
From PEARLAND PKWY FROM W OF OILER DR
To DIXIE FARM RD
CSJ 0912-31-270
Proj ID C 912-31-270
Work Type CONSTRUCT 4 - LN DIVIDED ROADWAY
 
0.001 4837804.80 210578.87 4198259.00 86.7
Work Order 12-05-13
Work Began 03-17-14
Work Completed  
Time Computed 03-05-14
Contract Working Days 300
Addl Days Granted 0
Working Days Charged 300
Percent Time Used 100
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-270
CPAVE, INC.(0.47%)
FLORIDA TRAFFIC CONTROL DEVICES, INC.(6.13%)
DNA TRUCKING (1.44%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.94%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.56%)
JUST GROOVING, LTD.(0.07%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.23%)
RDI FOUNDATION DRILLING(2.46%)
PEREZ CONSTRUCTION (2.49%)
MESA ROD BUSTERS, INC. (1.22%)
KOSSMAN CONTRACTING CO., INC.(1.56%)
SPEEDY PAVING(1.67%)
JMHP, INC. (0.29%)
H & E AGGREGATE, LLC (0.26%)
CONTRACTORS PAVING SUPPLY, LLP (0.68%)
SPECIALTY DRILLING, LTD. (0.23%)
WEIMER CONSTRUCTION COMPANY(0.47%)
HYDROZONE LANDSCAPE CORPORATION(3.55%)
BATTERSON,LLP(0.21%)
Contract # 08133213
Totals 4837804.80 210578.87 4198259.00 86.7

CountyBRAZORIA
Highway CR
From COUNTY ROAD 220; SH 288
To FM 523
CSJ 0912-31-275
Proj ID STP 2012(711)
Work Type PVMT, GR & STRS
 
3.694 15980617.35 31500.00 15265792.38 100.0
Work Order 03-06-13
Work Began 03-19-13
Work Completed 05-11-15
Time Computed 03-22-13
Contract Working Days 270
Addl Days Granted 0
Working Days Charged 293
Percent Time Used 108
Contractor(s)
SER CONSTRUCTION PARTNERS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-275
LASER EARTH MOVING (0.43%)
SEMARCK LANDSCAPE SERVICES, INC. (0.06%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (1.03%)
DURWOOD GREENE CONSTRUCTION CO.(8.05%)
W. W. FOUNDATION DRILLING, LTD.(1.03%)
TEXAS CONCRETE ENTERPRISE READY MIX, INC.( 10.72%)
INDUS CONSTRUCTION, L.P. (0.94%)
PRV SERVICES, INC. (1.23%)
WILLOW CITY SIGN & RAIL, INC.(0.49%)
CPAVE, INC.(0.24%)
BUSSELL & SONS, L.L.C. (0.11%)
CURB PLANET INC. (0.01%)
BATTERSON,LLP(1.20%)
WEBBER BARRIER SERVICES, LLC.(0.62%)
Contract # 08123204
Totals 15980617.35 31500.00 15265792.38 100.0

CountyBRAZORIA
Highway VA ETC
From VAR LOCATIONS ON SH 288 & SH 332
To IN LAKE JACKSON
CSJ 0912-31-279
Proj ID STP 2012(516)
Work Type LANDSCAPE DEVELOPMENT
 
0.006 2131009.80 125827.67 873130.17 40.9
Work Order 09-30-14
Work Began 02-24-15
Work Completed  
Time Computed 11-29-14
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 55
Percent Time Used 45
Contractor(s)
BIO LANDSCAPE & MAINTENANCE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-279
HOGGATT, LP(5.10%)
N-LINE TRAFFIC MAINTENANCE, L.P. (1.02%)
APACE SERVICES, INC. (4.11%)
SCOTT DERR PAINTING CO (0.59%)
Contract # 07143012
Totals 2131009.80 125827.67 873130.17 40.9

CountyBRAZORIA
Highway VA
From VARIOUS LOCATIONS BRAZORIA COUNTY
To .
CSJ 0912-31-281
Proj ID STP 2015(251)
Work Type SPALL REP
 
0.001 497361.00 140.00 515314.08 100.0
Work Order 11-19-14
Work Began 01-19-15
Work Completed 05-22-15
Time Computed 01-18-15
Contract Working Days 45
Addl Days Granted 26
Working Days Charged 69
Percent Time Used 97
Contractor(s)
ISI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-281
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10143003
Totals 497361.00 140.00 515314.08 100.0

CountyBRAZORIA
Highway CR
From CR 227; AT CHOC BYU WA CO CAN.
To .
CSJ 0912-31-282
Proj ID BR 2013(574)
Work Type REPL BR & APPR
 
0.204 1423278.90 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 84
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONE STAR ROAD CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-282
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153061
Totals 1423278.90 0.00 0.00 0.0

CountyBRAZORIA
Highway CR
From CR 48, BROADWAY (FM 518)
To CR 894
CSJ 0912-31-294
Proj ID STP 2015(612)MM
Work Type WIDEN FROM 2 TO 4 - LANE DIVIDED
 
1.944 12154201.39 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-10-15
Work Began 06-09-15
Work Completed  
Time Computed 00-00-00
Contract Working Days 357
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-294
CPAVE, INC.(0.25%)
GEORGE MEEKS LANDPRO, INC. (0.89%)
GMJ PAVING CO. (3.06%)
MESA ROD BUSTERS, INC. (6.36%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.41%)
SCOTT DERR PAINTING CO (0.04%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.49%)
TEXAS CLEARING AND LEVELING(0.40%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.58%)
W. W. FOUNDATION DRILLING, LTD.(3.10%)
Contract # 02153002
Totals 12154201.39 0.00 0.00 0.0

CountyFORT BEND
Highway CS
From WEST AIRPORT - FROM US 59
To 800 FEET WEST OF KIRKWOOD DRIVE
CSJ 0912-34-130
Proj ID HP 2011(793)
Work Type RECONSTRUCTION OF WEST AIRPORT
 
0.695 4192145.17 189466.58 2237190.34 53.3
Work Order 03-12-14
Work Began 05-28-14
Work Completed  
Time Computed 05-10-14
Contract Working Days 213
Addl Days Granted 0
Working Days Charged 182
Percent Time Used 85
Contractor(s)
ARANDA BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-34-130
CHERRY CRUSHED CONCRETE(0.99%)
REGIONAL TRAFFIC SERVICES LLC(1.27%)
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC(6.68%)
ABLE PAVING(0.52%)
HODGES BROTHERS, INC.(0.81%)
DORAN STEEL, INC.(0.19%)
CURB PLANET INC. (0.15%)
JASSO"S SAWING & SEALING (0.10%)
KOSSMAN CONTRACTING CO., INC.(0.35%)
A-1 EROSION CONTROL, LLC (0.38%)
Contract # 01143211
Totals 4192145.17 189466.58 2237190.34 53.3

CountyFORT BEND
Highway CS
From TRAMMEL FRESNO RD, FORT BEND PKWY
To FM 521
CSJ 0912-34-144
Proj ID STP 2010(596)MM
Work Type GR, STR, BASE AND 0AVE
 
3.041 20864455.45 481962.60 4005985.50 19.2
Work Order 03-03-15
Work Began 03-24-15
Work Completed  
Time Computed 03-19-15
Contract Working Days 622
Addl Days Granted 0
Working Days Charged 27
Percent Time Used 4
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-34-144
STRIPE-A-LINE, INC.(0.72%)
RICE ENVIRONMENTAL SERVICES(0.24%)
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC(1.96%)
INDUS CONSTRUCTION, L.P. (3.85%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.17%)
BASE CONSTRUCTION, L.L.P.( 23.02%)
Contract # 12143003
Totals 20864455.45 481962.60 4005985.50 19.2

CountyFORT BEND
Highway CR
From FOSTER SCHOOL @ FAIRCHILDS CRK TRIB
To .
CSJ 0912-34-169
Proj ID BR 2011(989)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.130 978105.55 0.00 1013121.58 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-03-14
Work Began 05-09-14
Work Completed 04-02-15
Time Computed 05-02-14
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 120
Percent Time Used 100
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-34-169
REGIONAL TRAFFIC SERVICES LLC(1.90%)
LONESTAR TRAFFIC SAFETY, LLC (1.86%)
ODUM SERVICES, L.P.(4.16%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.38%)
ENVIRONMENTAL ALLIES, L.P. (0.49%)
GARNER CONSTRUCTION CO.(0.42%)
EROSION PREVENTION PRODUCTS(7.46%)
Contract # 01143222
Totals 978105.55 0.00 1013121.58 100.0

CountyFORT BEND
Highway CR ETC
From MEYER ROAD AT SNAKE CREEK TRIBUTARY
To .
CSJ 0912-34-176
Proj ID BR 2013(735)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.712 2828589.45 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 321
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-34-176
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153027
Totals 2828589.45 0.00 0.00 0.0