Monthly State Let Construction Report For Houston District As Of Jul 12, 2016 Page 9 Of 10

Last Update: Tuesday, July 12, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyHARRIS
Highway FM 1093
From 3.6 MILES WEST OF IH 610
To 0.25 MILES EAST OF SH 6
CSJ 1258-04-056
Proj ID CM 2013(790)
Work Type IMPLEMENTATION OF ACCESS MGMT
 
7.386 2561914.38 0.00 2826124.35 99.9
Work Order 11-04-13
Work Began 02-11-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 154
Addl Days Granted 0
Working Days Charged 151
Percent Time Used 98
Contractor(s)
ISI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1258-04-056
KOSSMAN CONTRACTING CO., INC.(0.45%)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.22%)
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC( 35.08%)
A TO Z PAVING(0.58%)
Contract # 07133031
Totals 2561914.38 0.00 2826124.35 99.9

CountyHARRIS
Highway FM 1093
From AT BW 8
To .
CSJ 1258-04-060
Proj ID STP 2015(163)HESG
Work Type IMPROVE TS
 
0.202 493967.08 0.00 584728.16 99.9
Work Order 10-10-14
Work Began 04-16-15
Work Completed  
Time Computed 04-08-15
Contract Working Days 79
Addl Days Granted 0
Working Days Charged 75
Percent Time Used 94
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1258-04-060
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09143025
Totals 493967.08 0.00 584728.16 99.9

CountyMONTGOMERY
Highway FM 1097
From IH 45
To SH 75
CSJ 1259-01-036
Proj ID STP 1502(201)
Work Type WIDEN FOR CLTL & 2" OVERLAY
 
0.820 5567522.75 2000.00 4000.00 0.0
Work Order 11-12-15
Work Began 00-00-00
Work Completed  
Time Computed 03-11-16
Contract Working Days 155
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1259-01-036
J & M CONTRACTING, COMPANY ( 50.28%)
WILLOW CITY SIGN & RAIL, INC.(0.26%)
STRIPE LINES, INC. (1.02%)
THIRD COAST SERVICES LLC ( 11.67%)
Contract # 08153057
Totals 5567522.75 2000.00 4000.00 0.0

CountyMONTGOMERY
Highway FM 1097
From 3.693 MI EAST OF FM 149
To 4.361 MI EAST OF FM 149
CSJ 1259-01-041
Proj ID STP 2016(812)HES
Work Type INSTALL LED FLASHING CHEVRONS
 
4.111 238826.40 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-10-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 22
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1259-01-041
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163228
Totals 238826.40 0.00 0.00 0.0

CountyMONTGOMERY
Highway FM 1774
From 0.045 MI S OF W. LOST CREEK BLVD
To FM 149
CSJ 1400-04-011
Proj ID STP 1402(182)
Work Type GR, STRS, BS & CONC PAV
 
2.831 18070204.05 0.00 504399.20 2.7
Work Order 11-03-14
Work Began 00-00-00
Work Completed  
Time Computed 11-19-14
Contract Working Days 360
Addl Days Granted 0
Working Days Charged 4
Percent Time Used 1
Contractor(s)
JAMES CONSTRUCTION GROUP, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 1400-04-011
WILLOW CITY SIGN & RAIL, INC.(0.62%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.92%)
SCMU (2.06%)
INDUS CONSTRUCTION, L.P. (0.92%)
TEX OP CONSTRUCTION, LP(0.89%)
ANGEL BROTHERS ENTERPRISES, LTD. (6.34%)
CURB PLANET INC. (0.01%)
THIRD COAST SERVICES LLC (1.71%)
EUBANK EXCAVATION, L.L.C.(0.54%)
CPAVE, INC.(0.31%)
PROFESSIONAL TRAFFIC CONTROL, LLC(1.21%)
Contract # 08143203
Totals 18070204.05 0.00 504399.20 2.7

CountyMONTGOMERY
Highway FM 1375
From FM 149
To WALKER C/L
CSJ 1402-03-011
Proj ID STP 2016(732)
Work Type OCST AND PAVEMENT MARKINGS
 
24.594 1297509.45 111921.30 121171.30 9.3
Work Order 03-01-16
Work Began 00-00-00
Work Completed  
Time Computed 03-16-16
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1402-03-011
INTERSTATE BARRICADES & MARKINGS, INC. ( 18.76%)
Contract # 01163242
Totals 1297509.45 111921.30 121171.30 9.3

CountyBRAZORIA
Highway SH 332
From FM 521
To FM 2004
CSJ 1524-01-078
Proj ID STP 1502(016)
Work Type PV REP, MILL, BS REP, O / L, PV MKS
 
12.109 3739396.99 44247.84 3732147.36 99.8
Work Order 05-19-15
Work Began 09-14-15
Work Completed  
Time Computed 07-19-15
Contract Working Days 140
Addl Days Granted 0
Working Days Charged 116
Percent Time Used 82
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-078
INTERSTATE BARRICADES & MARKINGS, INC. (5.32%)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.(3.25%)
THIRD COAST SERVICES LLC (0.39%)
RICE ENVIRONMENTAL SERVICES(0.81%)
Contract # 04153207
Totals 3739396.99 44247.84 3732147.36 99.8

CountyHARRIS
Highway FM 1960
From IH 45
To 6.5 MI E OF IH 45 (HUMBLE BYPASS)
CSJ 1685-02-049
Proj ID NH 2013(064)
Work Type PAVEMENT MARKINGS
 
14.553 546380.10 0.00 390018.83 80.6
Work Order 10-18-12
Work Began 11-18-12
Work Completed  
Time Computed 11-03-12
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 203
Percent Time Used 169
Contractor(s)
BATTERSON, LLP
SUBCONTRACTOR(S) FOR CCSJ: 1685-02-049
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09123024
Totals 546380.10 0.00 390018.83 80.6

CountyHARRIS
Highway FM 1960
From LEE RD
To MCKAY BRIDGE
CSJ 1685-03-088
Proj ID STP 2016(731)
Work Type MILL & ACP OVERLAY
 
9.860 6636000.51 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-02-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 78
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 1685-03-088
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02163237
Totals 6636000.51 0.00 0.00 0.0

CountyHARRIS
Highway FM 1960
From AT LEE ROAD
To .
CSJ 1685-03-092
Proj ID STP 2014(585)HES
Work Type IMPROVE TS
 
0.606 732234.51 0.00 722835.04 98.7
Work Order 06-05-14
Work Began 03-03-15
Work Completed  
Time Computed 12-02-14
Contract Working Days 128
Addl Days Granted 0
Working Days Charged 119
Percent Time Used 92
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1685-03-092
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143011
Totals 732234.51 0.00 722835.04 98.7

CountyHARRIS
Highway FM 1960
From 0.120 MILES E ATASCOCITA SHORES DR
To LIBERTY C/L
CSJ 1685-03-096
Proj ID STP 2016(474)
Work Type PAVEMENT MARKINGS
 
6.003 191207.77 91687.79 155915.10 81.5
Work Order 03-07-16
Work Began 05-23-16
Work Completed  
Time Computed 05-06-16
Contract Working Days 42
Addl Days Granted 0
Working Days Charged 18
Percent Time Used 42
Contractor(s)
PROFESSIONAL TRAFFIC CONTROL LLC
SUBCONTRACTOR(S) FOR CCSJ: 1685-03-096
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163024
Totals 191207.77 91687.79 155915.10 81.5

CountyHARRIS
Highway BF1960A
From FM 1960 W OF LEE RD
To FM 1960 E OF HUMBLE
CSJ 1685-07-005
Proj ID C 1685-7-5
Work Type IMPLEMENT ACCESS MANAGEMENT
 
3.920 6976168.04 182067.95 4685084.11 67.1
CountyHARRIS
Highway BF1960A
From LEE ROAD
To FM 1960(E)
CSJ 1685-07-019
Proj ID STP 2013(994)
Work Type BS REP, MILL, SC INTERLAYER, OL, ETC
 
4.200 6317731.97 445696.10 2507435.44 39.6
Work Order 09-30-14
Work Began 11-10-14
Work Completed  
Time Computed 11-10-14
Contract Working Days 270
Addl Days Granted 0
Working Days Charged 196
Percent Time Used 72
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 1685-07-019
ANGEL BROTHERS ENTERPRISES, LTD. ( 27.60%)
KOSSMAN CONTRACTING CO., INC.(1.14%)
REGIONAL TRAFFIC SERVICES LLC(0.84%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.49%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. ( 12.57%)
H & E AGGREGATE, LLC (3.50%)
SCMU (3.02%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.48%)
AGGREGATE TECHNOLOGIES, INC. (0.39%)
Contract # 08133014
Totals 13293900.01 627764.05 7192519.55 54.1

CountyHARRIS
Highway FM 1876
From S OF BELLAIRE
To S OF OLD RICHMOND
CSJ 1743-01-009
Proj ID STP 2016(270)
Work Type PLANING, SEAL COAT, OL & PV MKS
 
1.936 1214435.35 0.00 96300.00 7.9
Work Order 01-29-16
Work Began 00-00-00
Work Completed  
Time Computed 06-27-16
Contract Working Days 28
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 1743-01-009
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.(4.10%)
INTERSTATE BARRICADES & MARKINGS, INC. (7.20%)
ISI INFRASTRUCTURE, INC. (1.48%)
THIRD COAST SERVICES LLC ( 11.79%)
Contract # 11153218
Totals 1214435.35 0.00 96300.00 7.9

CountyHARRIS
Highway FM 1942
From AT N MAIN STREET
To .
CSJ 1812-01-021
Proj ID STP 2015(542)
Work Type CONSTRUCT LEFT TURN LANE
 
0.532 948590.00 0.00 1014744.63 99.9
Work Order 03-20-15
Work Began 08-10-15
Work Completed  
Time Computed 05-19-15
Contract Working Days 45
Addl Days Granted 30
Working Days Charged 42
Percent Time Used 56
Contractor(s)
MAIN LANE INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1812-01-021
WILLOW CITY SIGN & RAIL, INC.(1.34%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (8.93%)
REPUBLIC TRAFFIC SAFETY, INC.(1.74%)
KOSSMAN CONTRACTING CO., INC.(2.15%)
Contract # 01153212
Totals 948590.00 0.00 1014744.63 99.9

CountyMONTGOMERY
Highway FM 1314
From 0.135 MILES NORTH OF SH 242
To 1.088 MILES SOUTH OF SH 242
CSJ 1986-01-044
Proj ID C 1986-1-44
Work Type RESTRIPE ROADWAY FROM 2 TO 4 LANES
 
1.222 1385318.82 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-20-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 43
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 1986-01-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05163019
Totals 1385318.82 0.00 0.00 0.0

CountyFORT BEND
Highway FM 2234
From FORT BEND PARKWAY
To FM 521
CSJ 2105-01-020
Proj ID STP 1402(122)
Work Type GR, STRS, BS & SURF
 
4.068 31094829.55 0.00 435407.21 1.4
Work Order 06-19-15
Work Began 00-00-00
Work Completed  
Time Computed 07-05-15
Contract Working Days 506
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 2105-01-020
WILLOW CITY SIGN & RAIL, INC.(0.31%)
STRIPE-A-LINE, INC.(0.71%)
CREACOM, INC.(3.43%)
MESA ROD BUSTERS, INC. (6.42%)
ROADWAY CONSTRUCTION, LLC(2.94%)
EROSION PREVENTION PRODUCTS(0.22%)
QUALITY TURF FARMS, LC (2.30%)
Contract # 05153204
Totals 31094829.55 0.00 435407.21 1.4

CountyFORT BEND
Highway FM 2234
From FM 3345
To FORT BEND TOLL ROAD
CSJ 2105-01-046
Proj ID C 2105-1-46
Work Type GR, STRS, BS & SURF
 
1.458 8068060.38 300.28 8604205.11 99.9
Work Order 10-30-13
Work Began 01-21-14
Work Completed  
Time Computed 12-29-13
Contract Working Days 215
Addl Days Granted 9
Working Days Charged 211
Percent Time Used 94
Contractor(s)
JAMES CONSTRUCTION GROUP, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 2105-01-046
B & D MAINTENANCE(1.89%)
CPAVE, INC.(0.31%)
SCOTT DERR PAINTING CO, LLC(0.13%)
DUSTROL, INC.(1.65%)
THIRD COAST SERVICES LLC (8.64%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(1.89%)
BATTERSON,LLP(2.16%)
A-1 EROSION CONTROL, LLC (2.12%)
BREDA COMPANY, INC.(0.79%)
H & E AGGREGATE, LLC (7.21%)
SILVA CONSTRUCTION, INC. (3.85%)
WILLOW CITY SIGN & RAIL, INC.(0.06%)
CURB PLANET INC. (0.09%)
Contract # 07133218
Totals 8068060.38 300.28 8604205.11 99.9

CountyHARRIS
Highway FM 2920
From AT ROBERTS CEMETERY, LOBLOLLY,
To BINFORD & MUESCHKE
CSJ 2941-01-021
Proj ID STP 2013(462)
Work Type INTERSECTION IMPROVEMENTS
 
10.795 3074858.55 2094.75 3168752.43 99.9
Work Order 08-30-13
Work Began 11-11-13
Work Completed  
Time Computed 10-29-13
Contract Working Days 167
Addl Days Granted 0
Working Days Charged 166
Percent Time Used 99
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 2941-01-021
BATTERSON,LLP(0.95%)
EROSION CONTROL, INC.(3.00%)
INTERSTATE BARRICADES & MARKINGS, INC. (2.07%)
JMHP, INC. (3.79%)
THIRD COAST SERVICES LLC (6.87%)
Contract # 07133021
Totals 3074858.55 2094.75 3168752.43 99.9

CountyHARRIS
Highway FM 2920
From BUS 249
To HOWARD ST
CSJ 2941-02-050
Proj ID STP 1502(020)
Work Type BS REP, MILL, CR SL, TOM, RADAR, ETC
 
3.188 2999793.89 392250.52 845700.52 28.1
Work Order 08-24-15
Work Began 04-29-16
Work Completed  
Time Computed 10-23-15
Contract Working Days 75
Addl Days Granted 0
Working Days Charged 16
Percent Time Used 21
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 2941-02-050
REPUBLIC TRAFFIC SAFETY, INC.(6.09%)
DUSTROL, INC.(6.38%)
SOUTHWEST SIGNAL SUPPLY, INC.( 12.48%)
BATTERSON,LLP(0.25%)
Contract # 07153040
Totals 2999793.89 392250.52 845700.52 28.1

CountyMONTGOMERY
Highway FM 2978
From FM 1488
To S OF DRY CREEK
CSJ 3050-02-024
Proj ID STP 2016(119)MM
Work Type GR, STRS, BASE AND PAVE
 
4.070 15788778.29 0.00 0.00 0.0
Work Order 04-19-16
Work Began 00-00-00
Work Completed  
Time Computed 06-18-16
Contract Working Days 457
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
J.D. ABRAMS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 3050-02-024
MESA ROD BUSTERS, INC. (0.00%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.00%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (3.10%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.26%)
WILLOW CITY SIGN & RAIL, INC.(0.86%)
Contract # 02163202
Totals 15788778.29 0.00 0.00 0.0