Letting Schedule for April, 2007 (FY 2007)
Letting Schedule for April, 2007 (FY 2007) | ||||
Last Update: Monday, July 30, 2007 |
April, 2007 (FY 2007) | (see Links) |
SEP 2006 | OCT 2006 | NOV 2006 | DEC 2006 | JAN 2007 | FEB 2007 | MAR 2007 | APR 2007 | MAY 2007 | JUN 2007 | JUL 2007 | AUG 2007 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0914-18-068 | Bastrop/ Austin |
CR | Actual | $767,653 | 6 | REPLACE BRIDGE AND APPROACHES |
0016-07-112 | Bexar/ San Antonio |
IH 35 | Actual | $1,196,491 | 11 | ADD NB RAMP SOUTH OF EVANS ROAD |
0016-08-030 | Bexar/ San Antonio |
LP 368 | Actual | $2,236,783 | 1 | REPLACE NARROW BRIDGE & APPROACHES |
0025-02-141 | Bexar/ San Antonio |
IH 10 | Actual | $5,992,596 | 11 | WIDEN NARROW BRIDGE & APPROACHES |
0072-08-119 | Bexar/ San Antonio |
IH 10 | Actual | $34,312,934 | ROW | OPERATIONAL IMPROVEMENTS AND GRADE SEPARATION AT CAMP BULLIS |
0073-02-052 | Bexar/ San Antonio |
US 281 | Actual | $4,748,758 | 6 | WIDEN NARROW BRIDGE & APPROACHES |
0521-04-269 | Bexar/ San Antonio |
IH 410 | Actual | $697,954 | 10 | CONSTRUCT LANDSCAPING AND IRRIGATION SYSTEMS |
0915-12-416 | Bexar/ San Antonio |
CS | Actual | $506,014 | 9 | IMPROVING LANDSCAPING, SIDEWALKS AND SPECIALIZED |
0915-12-441 | Bexar/ San Antonio |
VA | Actual | $2,480,000 | 10 | CONSTRUCT PARKING FACILITY AT UNIVERSITY OF INCARNATE WORD |
2050-01-019 | Bowie/ Atlanta |
FM 2148 | Actual | $423,714 | 11 | WIDEN EXISTING 2 - LANE ROAD TO PROVIDE TURN LANE IN FRONT OF |
2879-01-007 | Bowie/ Atlanta |
FM 1297 | Actual | $507,029 | 11 | WIDEN EXISTING 2 - LANE URBAN ROAD TO PROVIDE LEFT TURN LANE |
0917-30-043 | Burleson/ Bryan |
CR | Actual | $671,640 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0006-07-068 | Callahan/ Abilene |
IH 20 | Actual | $5,520,444 | 8 | PLANE ASPHALT CONRETE PAVEMENT, UNDERSEAL, ASPHALT CONCRETE |
0006-07-071 | Callahan/ Abilene |
IH 20 | Actual | $1,864,305 | 1 | MICROSURFACING |
2218-01-020 | Carson/ Amarillo |
FM 2373 | Actual | $23,252,071 | 6 | CONSTRUCT RAILROAD GRADE SEPARATION AND APPROACHES |
0910-36-118 | Cherokee/ Tyler |
CR | Actual | $784,884 | 6 | REPLACE BRIDGE AND APPROACHES |
0047-09-029 | Collin/ Dallas |
SH 5 | Actual | $6,227,505 | 7 | WIDEN FROM 2 LANE UNDIVIDED TO 6 LANE DIVIDED |
0091-04-053 | Collin/ Dallas |
SH 289 | Actual | $3,663,150 | 1 | BASE REPAIR AND LEVEL - UP |
0918-24-139 | Collin/ Dallas |
CR | Actual | $352,000 | 7 | IMPROVE GRADE APPROACH |
0918-24-140 | Collin/ Dallas |
VA | Actual | $637,065 | 1 | FULL DEPTH REPAIR OF CONCRETE PAVEMENT |
0040-03-043 | Dallam/ Amarillo |
US 87 | Actual | $16,767,756 | 4 | RECONSTRUCT AND ADD 2 LANES |
0196-03-242 | Dallas/ Dallas |
IH 35E | Actual | $367,138 | 1 | SIGN REFURBISHING |
0001-03-054 | El Paso/ El Paso |
SH 20 | Actual | $1,549,584 | 8 | IMPROVE TRAFFIC SIGNAL |
0374-02-083 | El Paso/ El Paso |
US 62 | Actual | $407,922 | 8 | SAFETY LIGHTING |
0924-00-059 | El Paso/ El Paso |
VA | Actual | $1,198,693 | 1 | SIGNING UPGRADE |
0924-06-243 | El Paso/ El Paso |
VA | Actual | $749,910 | 10 | MEDIAN IMPROVEMENTS, PHASE I |
0924-06-288 | El Paso/ El Paso |
VA | Actual | $225,000 | 5 | HEAVY DUTY ALTERNATIVE FUELS |
0924-06-289 | El Paso/ El Paso |
CS | Actual | $725,000 | 5 | ITS INTEGRATION, DEMAND REPSONSE HYDRAULIC LAUNCH ASSIST VEH |
0924-06-290 | El Paso/ El Paso |
VA | Actual | $480,292 | 1 | 2007 STRIPING |
2121-04-067 | El Paso/ El Paso |
IH 10 | Actual | $21,999,274 | 2 | RECONSTRUCT INTERCHANGE |
0048-04-081 | Ellis/ Dallas |
IH 35E | Actual | $608,153 | 7 | INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM |
0172-13-002 | Ellis/ Dallas |
US 287 | Actual | $309,252 | 10 | IRRIGATION FOR PERMANENT PLANTINGS |
0250-03-040 | Erath/ Fort Worth |
US 281 | Actual | $84,300 | 1 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0334-08-031 | Fayette/ Yoakum |
FM 154 | Actual | $4,382,491 | 1 | REHABILITATE ROADWAY |
0912-34-135 | Fort Bend/ Houston |
VA | Actual | $551,095 | 1 | PIPELINER (CROSS CULVERTS) |
0189-05-043 | Franklin/ Paris |
SH 37 | Actual | $395,992 | 1 | MICROSURFACING |
0367-09-003 | Galveston/ Houston |
SH 168 | Actual | $307,439 | 1 | SEAL COAT, ASPHALT OVERLAY AND PAVEMENT MARKINGS |
0976-07-010 | Galveston/ Houston |
SH 96 | Actual | $236,738 | 1 | DRAINAGE IMPROVEMENTS TO ELIMINATE FLOODING CONDITIONS DUE |
0112-03-027 | Gillespie/ Austin |
US 290 | Actual | $4,416,065 | 6 | REPLACE BRIDGE AND APPROACHES |
2192-01-016 | Grayson/ Paris |
SH 11 | Actual | $57,079 | 8 | INSTALL FLASHING BEACON |
0392-03-037 | Gregg/ Tyler |
US 259 | Actual | $1,489,276 | 1 | RESURFACE ROADWAY WITH ASPHALTIC CONCRETE OVERLAY |
0909-29-033 | Hamilton/ Waco |
CS | Actual | $843,741 | 9 | REPLACE BRIDGE AND APPROACHES |
0097-02-034 | Hardeman/ Childress |
SH 6 | Actual | $2,218,950 | 1 | REPLACE BRIDGE AND APPROACHES |
0027-13-195 | Harris/ Houston |
US 59 | Actual | $1,022,257 | 1 | INSTALL HIGH MAST LIGHTING, ELECTRICL SERVICES AND REMOVE |
0912-00-332 | Harris/ Houston |
VA | Actual | $646,571 | 1 | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
0912-72-114 | Harris/ Houston |
CS | Actual | $922,632 | 10 | PEDESTRIAN / TRANSIT ACCESS IMPROVEMENTS (SIDEWALKS, SIGNAGE |
0912-72-119 | Harris/ Houston |
VA | Actual | $523,376 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
2941-01-018 | Harris/ Houston |
FM 2920 | Actual | $347,777 | 1 | INSTALL ADVANCE WARNING SIGNS AND SIGNAL AND ADD LEFT TURN |
0471-02-053 | Hays/ Austin |
SH 21 | Actual | $499,946 | 1 | ADD LTL |
0108-03-029 | Henderson/ Tyler |
SH 19 | Actual | $7,268,903 | 1 | ADD SHOULDERS, OVERLAY EXISTING PAVEMENT & ADD SAFETY |
0621-01-093 | Hidalgo/ Pharr |
SH 336 | Actual | $794,854 | 8 | IMPROVE TRAFFIC SIGNAL |
0863-01-044 | Hidalgo/ Pharr |
FM 493 | Actual | $3,232,856 | 11 | WIDEN TO 4 LANE |
0931-02-016 | Houston/ Lufkin |
FM 1280 | Actual | $4,068,148 | 8 | REPLACE BRIDGES AND APPROACHES |
0307-01-140 | Jefferson/ Beaumont |
SH 87 | Actual | $534,864 | 10 | WIDEN PAVEMENT AND CONSTRUCT TURN LANES AT 2 LOCATIONS |
1447-01-018 | Jim Wells/ Corpus Christi |
FM 1352 | Actual | $2,988,416 | 1 | INSTALL PROTECTION AND WIDEN LANES |
1181-04-040 | Johnson/ Fort Worth |
FM 917 | Actual | $8,264,467 | 8 | SAFETY TREAT FIXED OBJECTS AND CONSTRUCT PAVED SHOULDERS |
2465-01-015 | Johnson/ Fort Worth |
FM 2280 | Actual | $397,780 | 8 | SAFETY TREAT FIXED OBJECTS AND ADD LEFT TURN LANE |
0338-05-016 | Liberty/ Beaumont |
SH 105 | Actual | $3,521,530 | 6 | REPLACE BRIDGE AND APPROACHES |
1096-03-017 | Liberty/ Beaumont |
FM 770 | Actual | $2,895,936 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0783-01-090 | Lubbock/ Lubbock |
LP 289 | Actual | $1,006,426 | 1 | MISCELLANEOUS CONSTRUCTION |
0005-14-062 | Midland/ Odessa |
IH 20 | Actual | $5,808,894 | 10 | UPGRADE TO STANDARDS FREEWAY |
1718-07-032 | Midland/ Odessa |
SH 349 | Actual | $940,905 | 11 | FACILITY UPGRADES TO MEET NON - FREEWAY STANDARDS |
0903-28-038 | Montague/ Wichita Falls |
CR | Actual | $522,404 | 6 | REPLACE BRIDGE AND APPROACHES |
1810-02-019 | Nacogdoches/ Lufkin |
FM 225 | Actual | $1,255,098 | 8 | SAFETY TREAT FIXED OBJECTS |
0006-03-128 | Nolan/ Abilene |
IH 20 | Actual | $5,390,536 | 8 | SPOT BASE REPAIR, UNDERSEAL, AND WARRANTY MICROSURFACING |
0249-08-039 | Palo Pinto/ Fort Worth |
US 281 | Actual | $3,345,879 | 1 | FABRIC UNDERSEAL AND 2" HOT MIX OVERLAY |
0250-02-043 | Palo Pinto/ Fort Worth |
US 281 | Actual | $430,706 | 8 | ADD LEFT TURN LANE |
2839-02-013 | Palo Pinto/ Fort Worth |
SH 337 | Actual | $3,104,722 | 1 | RESTORE PAVEMENT STRUCTURE WITH FABRIC UNDERSEAL AND ADD |
0902-38-048 | Parker/ Fort Worth |
VA | Actual | $2,152,596 | 9 | RECONSTRUCT SIDEWALKS AND ADD LANDSCAPING IN DOWNTOWN |
0447-05-055 | Refugio/ Corpus Christi |
FM 774 | Actual | $2,416,168 | 1 | REPLACE BRIDGE AND REHAB ROADWAY |
0064-06-045 | Sabine/ Lufkin |
US 96 | Actual | $3,162,247 | 11 | MICROSURFACING |
0053-09-062 | Scurry/ Abilene |
US 84 | Actual | $6,964,042 | 6 | REPLACE BRIDGE AND APPROACHES |
1529-03-007 | Scurry/ Abilene |
FM 1605 | Actual | $1,112,772 | 11 | PLANING EXISTING ASPHALT ONE CRSE SURFACE TREAT, SPHMACP |
0495-05-044 | Smith/ Tyler |
IH 20 | Actual | $674,472 | 1 | CLEAN AND SEAL BRIDGE JOINTS |
2266-02-121 | Tarrant/ Fort Worth |
SH 360 | Actual | $76,051 | 1 | INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
0908-00-064 | Taylor/ Abilene |
VA | Actual | $1,041,887 | 1 | THERMOPLASTIC PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS |
0113-09-064 | Travis/ Austin |
US 290 | Actual | $186,255 | 1 | OVERLAY |
0151-09-135 | Travis/ Austin |
US 183 | Actual | $1,113,334 | 1 | OVERLAY_NB & SB US 183 |
0265-02-031 | Travis/ Austin |
SH 71 | Actual | $860,198 | 8 | INSTALL MEDIAN BARRIER |
0914-00-237 | Travis/ Austin |
VA | Actual | $959,982 | 1 | FY 2007 NON - SITE SPECIFIC SIGNAL |
0914-00-239 | Travis/ Austin |
VA | Actual | $10,000 | 7 | ENVIRONMENTAL JUSTICE STUDY |
1200-05-014 | Travis/ Austin |
SH 45 | Actual | 139,698,707 | ROW | CONSTRUCT 4 - LANE TURNPIKE FACILITY (TOLL) |
0086-01-065 | Webb/ Laredo |
US 83 | Actual | $651,925 | 11 | IMPROVE TRAFFIC SIGNAL |
|
|