Letting Schedule for September, 2006 (FY 2007)
Letting Schedule for September, 2006 (FY 2007) | ||||
Last Update: Monday, July 30, 2007 |
September, 2006 (FY 2007) | (see Links) |
SEP 2006 | OCT 2006 | NOV 2006 | DEC 2006 | JAN 2007 | FEB 2007 | MAR 2007 | APR 2007 | MAY 2007 | JUN 2007 | JUL 2007 | AUG 2007 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0231-03-119 | Bell/ Waco |
US 190 | Actual | $2,789,525 | 11 | ADD RIGHT TURN LANES, RELOCATE RAMPS AND ADD AUXILIARY LANES |
0046-04-054 | Bowie/ Atlanta |
US 82 | Actual | $1,233,065 | 1 | UPGRADE EXISTING TRAFFIC SIGNALS |
0917-29-094 | Brazos/ Bryan |
CR | Actual | $598,130 | 6 | REPLACE EXISTING OFF - SYSTEM BRIDGE |
2016-01-009 | Calhoun/ Yoakum |
FM 2143 | Actual | $3,284,331 | 1 | RESTORE ROADWAY |
0908-34-020 | Callahan/ Abilene |
VA | Actual | $1,069,897 | 9 | REHABILITATION OF HISTORICAL TRANSPORTATION BUILDING |
0331-04-058 | Cameron/ Pharr |
PR 100 | Actual | $4,722,796 | 10 | CONSTRUCT HIGHWAY MEDIANS, PEDESTRIAN WALKWAYS FOR THE CITY |
0872-04-023 | Cameron/ Pharr |
FM 506 | Actual | $3,378,834 | 11 | WIDEN TO 4 LANE DIVIDED |
2356-01-014 | Cameron/ Pharr |
FM 2520 | Actual | $3,916,001 | 1 | WIDEN TO 4 LANES |
0222-04-048 | Cass/ Atlanta |
SH 11 | Actual | $393,051 | 9 | REHAB SIDEWALKS, PEDESTRIAN LIGHTING, LANDSCAPING |
0508-02-085 | Chambers/ Beaumont |
IH 10 | Actual | $62,634,257 | 1 | REPLACE EXISTING BRIDGE WITH TWIN BRIDGES AND |
0925-00-054 | Childress/ Childress |
VA | Actual | $1,359,921 | 10 | DISTRICTWIDE CURB RAMP PROJECT |
0233-05-032 | Culberson/ El Paso |
SH 54 | Actual | $1,262,395 | 1 | PAVING AND SEAL COAT |
0009-02-057 | Dallas/ Dallas |
SH 78 | Actual | $949,650 | 1 | FULL - DEPTH CONCRETE REPAIR |
0009-11-212 | Dallas/ Dallas |
IH 30 | Actual | $518,137 | 10 | LANDSCAPE DEVELOPMENT |
0261-02-061 | Dallas/ Dallas |
US 67 | Actual | $1,617,178 | 1 | REPLACE BRIDGE AND APPROACHES |
0353-05-099 | Dallas/ Dallas |
SP 244 | Actual | $906,640 | 5 | ADD NORTHBOUND & EASTBOUND RIGHT TURN ONLY LANES & CONVERT |
0918-00-123 | Dallas/ Dallas |
VA | Actual | $5,998,686 | 1 | PAVEMENT MARKINGS |
2374-03-070 | Dallas/ Dallas |
IH 20 | Actual | $10,979,645 | 1 | OVERLAY AND PAVEMENT REPAIR |
0081-13-045 | Denton/ Dallas |
IH 35W | Actual | $5,931,080 | 1 | SEALCOAT SHOULDERS |
0816-02-065 | Denton/ Dallas |
FM 455 | Actual | $1,108,160 | 1 | BASE REPAIR OF VARIOUS LOCATIONS ON FM 455 |
0042-06-062 | Donley/ Childress |
US 287 | Actual | $11,900,318 | 11 | DISTRICTWIDE SEAL COAT |
0237-05-031 | Duval/ Laredo |
SH 44 | Actual | $6,952,573 | 4 | WIDEN TO SUPER TWO HIGHWAY_ (PHASE 1) |
0048-03-079 | Ellis/ Dallas |
SH 342 | Actual | $6,791,010 | 1 | SEALCOAT |
1048-02-028 | Ellis/ Dallas |
FM 660 | Actual | $5,069,016 | 1 | ADD 3 FOOT PAVED SHOULDERS |
0902-49-054 | Erath/ Fort Worth |
CR | Actual | $831,599 | 6 | REPLACE BRIDGE AND APPROACHES |
1325-03-018 | Freestone/ Bryan |
FM 489 | Actual | $2,035,483 | 1 | RESTORATION OF EXISTING ROAD CONSISTING OF SUBGRADE WIDENING |
0051-03-050 | Galveston/ Houston |
SH 3 | Actual | $23,932,976 | 2 | WIDEN TO 4 - LANE DIVIDED URBAN SECTION |
0979-01-024 | Galveston/ Houston |
FM 519 | Actual | $835,593 | 6 | REPLACE BRIDGE AND APPROACHES |
0045-19-039 | Grayson/ Paris |
US 82 | Actual | $321,778 | 10 | SLOPE REPAIR |
0047-18-061 | Grayson/ Paris |
US 75 | Actual | $992,042 | 10 | REVERSE EXISTING RAMP CONFIGURATION |
0393-01-083 | Gregg/ Tyler |
SH 149 | Actual | $124,232 | 10 | REMOVE EXISTING SIGN BRIDGE AND CONSTRUCT NEW OVERHEAD SIGN |
0910-07-055 | Gregg/ Tyler |
VA | Actual | $263,565 | LC | LANDSCAPE COST SHARE WITH THE CITY OF LONGVIEW |
0643-05-039 | Grimes/ Bryan |
FM 3090 | Actual | $630,422 | 8 | SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED |
0720-01-035 | Grimes/ Bryan |
FM 149 | Actual | $1,296,312 | 8 | SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED |
0944-01-017 | Grimes/ Bryan |
FM 362 | Actual | $2,254,557 | 1 | RESTORATION OF EXISTING ROAD CONSISTION OF FLEXIBLE BASE, A |
0915-46-024 | Guadalupe/ San Antonio |
CS | Actual | $1,977,473 | 11 | RECONSTRUCT AND WIDEN EXISTING STREET |
0027-13-194 | Harris/ Houston |
US 59 | Actual | $351,000 | 10 | LANDSCAPE DEVELOPMENT |
0271-17-152 | Harris/ Houston |
IH 610 | Actual | $1,456,000 | 10 | LANDSCAPE DEVELOPMENT |
0508-01-166 | Harris/ Houston |
IH 10 | Actual | $44,622,238 | 2 | WIDEN FROM 6 TO 8 M.L. & COMPLETE IH 10 - IH 610 - US 90 I / C |
0720-03-095 | Harris/ Houston |
SH 249 | Actual | $2,269,906 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
3256-01-083 | Harris/ Houston |
BW 8 | Actual | $4,949,227 | 1 | RAMP REVERSAL, SHOULDERS TO STANDARD, IMPROVEMENTS AND |
0919-03-030 | Harrison/ Atlanta |
VA | Actual | $1,337,916 | 9 | RENOVATION OF SIDEWALKS, BRICK STREETS, AND UTILITY |
0982-02-017 | Haskell/ Abilene |
FM 617 | Actual | $4,707,207 | 1 | WIDENING, OVERLAY, PAVEMENT MARKINGS |
0471-02-036 | Hays/ Austin |
SH 21 | Actual | $434,402 | 6 | REHABILITATE BRIDGE & APPROACHES |
0030-05-058 | Hemphill/ Amarillo |
US 83 | Actual | $4,435,337 | 8 | HAZARD ELIMINATION |
0697-02-028 | Henderson/ Tyler |
SH 334 | Actual | $12,584,713 | 11 | WIDEN TO 4 LANE DIVIDED URBAN SECTION (FLUSH MEDIAN) |
0121-02-052 | Hill/ Waco |
SH 22 | Actual | $1,394,299 | 8 | SAFETY TREAT FIXED OBJECTS |
0010-02-085 | Hopkins/ Paris |
IH 30 | Actual | $172,274 | 10 | LANDSCAPE AND SCENIC ENHANCEMENT |
0005-05-097 | Howard/ Abilene |
IH 20 | Actual | $1,127,858 | 1 | REPLACE METAL BEAM GUARD FENCE |
0005-06-107 | Howard/ Abilene |
IH 20 | Actual | $13,955,021 | 1 | PLANING, FLEX BASE REPAIR, UNDERSEAL, ASPHALT CONCRETE |
0005-06-108 | Howard/ Abilene |
IH 20 | Actual | $7,350,612 | 1 | PLANNING, FLEX BASE REPAIR, UNDERSEAL, ASPHALTIC CONCRETE |
0009-13-139 | Hunt/ Paris |
IH 30 | Actual | $6,430,748 | 8 | MEDIAN TRAFFIC BARRIER |
0920-38-161 | Jefferson/ Beaumont |
VA | Actual | $772,929 | 9 | CONSTRUCT A BOARDWALK, WALKWAYS AND PEDESTRIAN PATH |
0173-03-036 | Kaufman/ Dallas |
SH 34 | Actual | $898,857 | 8 | CONSTRUCT LEFT TURN LANE |
0783-02-079 | Lubbock/ Lubbock |
LP 289 | Actual | $657,497 | 1 | MISCELANEOUS CONSTRUCTION |
0068-02-043 | Lynn/ Lubbock |
US 87 | Actual | $210,279 | 10 | LANDSCAPE AND SCENIC ENHANCEMENT |
0906-32-040 | Midland/ Odessa |
VA | Actual | $2,163,900 | 9 | CONSTRUCT A TRANSPORTATION MUSEUM AT CAF |
2383-01-018 | Midland/ Odessa |
FM 1379 | Actual | $2,825,945 | 11 | FACILITY UPGRADES TO MEET NON - FREEWAY STANDARDS |
0185-03-022 | Milam/ Bryan |
US 190 | Actual | $2,933,173 | 1 | SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF A LEFT |
1416-03-014 | Montgomery/ Houston |
FM 1486 | Actual | $6,965,230 | 1 | WIDEN SHOULDERS, ONE COURSE SURFACE TREATMENT & ASPHALT |
0649-02-027 | Parker/ Fort Worth |
FM 1885 | Actual | $6,693,927 | 11 | ADD PAVED SURFACE, CEMENT TREAT AND 2 CST |
0904-00-105 | Potter/ Amarillo |
VA | Actual | $201,456 | 1 | CRACK POURING |
0904-00-121 | Potter/ Amarillo |
VA | Actual | $247,465 | 1 | CRACK POURING |
0168-09-149 | Randall/ Amarillo |
IH 27 | Actual | $321,293 | 11 | CABLE BARRIER |
0262-03-027 | Robertson/ Bryan |
FM 485 | Actual | $4,409,800 | 1 | RESTORATION OF EXISTING ROAD CONSISTING OF GRADING, |
0396-03-025 | Schleicher/ San Angelo |
US 190 | Actual | $4,309,377 | 1 | RESTORATION OF EXISTING ROAD |
0910-00-068 | Smith/ Tyler |
VA | Actual | $370,400 | 1 | NON - SITE SPECIFIC SIGNAL PROGRAM |
0910-00-070 | Smith/ Tyler |
VA | Actual | $379,415 | 1 | THERMO PLASTIC PAVEMENT MARKINGS PROGRAM |
0555-01-036 | Tom Green/ San Angelo |
FM 380 | Actual | $7,693,246 | 1 | GRADING, BASE, SURFACING & WIDEN STRUCTURES |
0914-00-234 | Travis/ Austin |
VA | Actual | $185,000 | 10 | STUDY TO ENCOURAGE TRUCK TRAFFIC IN PEAK HOURS |
2100-01-046 | Travis/ Austin |
RM 2222 | Actual | $595,149 | 8 | INSTALL CONTINUOUS TURN LANE AND CONSTRUCT PAVED SHOULDERS |
0920-13-004 | Tyler/ Beaumont |
VA | Actual | $317,450 | 9 | CONSTRUCT HIKING TRAIL IN WOODVILLE |
0271-04-079 | Waller/ Houston |
IH 10 | Actual | $2,295,292 | 11 | CONSTRUCT INTERCHANGE |
0018-05-066 | Webb/ Laredo |
IH 35 | Actual | $4,110,500 | 1 | INSTALL RAISED BARRIER |
0086-14-035 | Webb/ Laredo |
LP 20 | Actual | $2,726,640 | 11 | INSTALL RAISED MEDIAN |
0086-14-044 | Webb/ Laredo |
LP 20 | Actual | $917,312 | 11 | RECONSTRUCTION OF AN EXISTING ACCESS ROADWAY DRIVEWAY |
0542-01-066 | Webb/ Laredo |
US 59 | Actual | $8,160,842 | 4 | WIDEN TO SUPER TWO HIGHWAY_ (PHASE 1) |
0124-02-030 | Wilbarger/ Wichita Falls |
US 283 | Actual | $3,094,514 | 1 | WIDEN PAVEMENT AND STRUCTURES |
0015-17-019 | Williamson/ Austin |
BI 35M | Actual | $1,362,351 | 1 | MILL, SEAL AND OVERLAY |
0015-17-022 | Williamson/ Austin |
BI 35M | Actual | $1,160,866 | 8 | INTERCONNECT TRAFFIC SIGNALS |
|
|