Letting Schedule for September, 2006 (FY 2007)

 
 
Last Update: Monday, July 30, 2007
September, 2006 (FY 2007) (see Links)
SEP 2006 | OCT 2006 | NOV 2006 | DEC 2006 | JAN 2007 | FEB 2007 | MAR 2007 | APR 2007 | MAY 2007 | JUN 2007 | JUL 2007 | AUG 2007
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0231-03-119 Bell/
Waco
US 190 Actual $2,789,525 11 ADD RIGHT TURN LANES, RELOCATE RAMPS AND ADD AUXILIARY LANES
0046-04-054 Bowie/
Atlanta
US 82 Actual $1,233,065 1 UPGRADE EXISTING TRAFFIC SIGNALS
0917-29-094 Brazos/
Bryan
CR Actual $598,130 6 REPLACE EXISTING OFF - SYSTEM BRIDGE
2016-01-009 Calhoun/
Yoakum
FM 2143 Actual $3,284,331 1 RESTORE ROADWAY
0908-34-020 Callahan/
Abilene
VA Actual $1,069,897 9 REHABILITATION OF HISTORICAL TRANSPORTATION BUILDING
0331-04-058 Cameron/
Pharr
PR 100 Actual $4,722,796 10 CONSTRUCT HIGHWAY MEDIANS, PEDESTRIAN WALKWAYS FOR THE CITY
0872-04-023 Cameron/
Pharr
FM 506 Actual $3,378,834 11 WIDEN TO 4 LANE DIVIDED
2356-01-014 Cameron/
Pharr
FM 2520 Actual $3,916,001 1 WIDEN TO 4 LANES
0222-04-048 Cass/
Atlanta
SH 11 Actual $393,051 9 REHAB SIDEWALKS, PEDESTRIAN LIGHTING, LANDSCAPING
0508-02-085 Chambers/
Beaumont
IH 10 Actual $62,634,257 1 REPLACE EXISTING BRIDGE WITH TWIN BRIDGES AND
0925-00-054 Childress/
Childress
VA Actual $1,359,921 10 DISTRICTWIDE CURB RAMP PROJECT
0233-05-032 Culberson/
El Paso
SH 54 Actual $1,262,395 1 PAVING AND SEAL COAT
0009-02-057 Dallas/
Dallas
SH 78 Actual $949,650 1 FULL - DEPTH CONCRETE REPAIR
0009-11-212 Dallas/
Dallas
IH 30 Actual $518,137 10 LANDSCAPE DEVELOPMENT
0261-02-061 Dallas/
Dallas
US 67 Actual $1,617,178 1 REPLACE BRIDGE AND APPROACHES
0353-05-099 Dallas/
Dallas
SP 244 Actual $906,640 5 ADD NORTHBOUND & EASTBOUND RIGHT TURN ONLY LANES & CONVERT
0918-00-123 Dallas/
Dallas
VA Actual $5,998,686 1 PAVEMENT MARKINGS
2374-03-070 Dallas/
Dallas
IH 20 Actual $10,979,645 1 OVERLAY AND PAVEMENT REPAIR
0081-13-045 Denton/
Dallas
IH 35W Actual $5,931,080 1 SEALCOAT SHOULDERS
0816-02-065 Denton/
Dallas
FM 455 Actual $1,108,160 1 BASE REPAIR OF VARIOUS LOCATIONS ON FM 455
0042-06-062 Donley/
Childress
US 287 Actual $11,900,318 11 DISTRICTWIDE SEAL COAT
0237-05-031 Duval/
Laredo
SH 44 Actual $6,952,573 4 WIDEN TO SUPER TWO HIGHWAY_ (PHASE 1)
0048-03-079 Ellis/
Dallas
SH 342 Actual $6,791,010 1 SEALCOAT
1048-02-028 Ellis/
Dallas
FM 660 Actual $5,069,016 1 ADD 3 FOOT PAVED SHOULDERS
0902-49-054 Erath/
Fort Worth
CR Actual $831,599 6 REPLACE BRIDGE AND APPROACHES
1325-03-018 Freestone/
Bryan
FM 489 Actual $2,035,483 1 RESTORATION OF EXISTING ROAD CONSISTING OF SUBGRADE WIDENING
0051-03-050 Galveston/
Houston
SH 3 Actual $23,932,976 2 WIDEN TO 4 - LANE DIVIDED URBAN SECTION
0979-01-024 Galveston/
Houston
FM 519 Actual $835,593 6 REPLACE BRIDGE AND APPROACHES
0045-19-039 Grayson/
Paris
US 82 Actual $321,778 10 SLOPE REPAIR
0047-18-061 Grayson/
Paris
US 75 Actual $992,042 10 REVERSE EXISTING RAMP CONFIGURATION
0393-01-083 Gregg/
Tyler
SH 149 Actual $124,232 10 REMOVE EXISTING SIGN BRIDGE AND CONSTRUCT NEW OVERHEAD SIGN
0910-07-055 Gregg/
Tyler
VA Actual $263,565 LC LANDSCAPE COST SHARE WITH THE CITY OF LONGVIEW
0643-05-039 Grimes/
Bryan
FM 3090 Actual $630,422 8 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED
0720-01-035 Grimes/
Bryan
FM 149 Actual $1,296,312 8 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED
0944-01-017 Grimes/
Bryan
FM 362 Actual $2,254,557 1 RESTORATION OF EXISTING ROAD CONSISTION OF FLEXIBLE BASE, A
0915-46-024 Guadalupe/
San Antonio
CS Actual $1,977,473 11 RECONSTRUCT AND WIDEN EXISTING STREET
0027-13-194 Harris/
Houston
US 59 Actual $351,000 10 LANDSCAPE DEVELOPMENT
0271-17-152 Harris/
Houston
IH 610 Actual $1,456,000 10 LANDSCAPE DEVELOPMENT
0508-01-166 Harris/
Houston
IH 10 Actual $44,622,238 2 WIDEN FROM 6 TO 8 M.L. & COMPLETE IH 10 - IH 610 - US 90 I / C
0720-03-095 Harris/
Houston
SH 249 Actual $2,269,906 5 INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM
3256-01-083 Harris/
Houston
BW 8 Actual $4,949,227 1 RAMP REVERSAL, SHOULDERS TO STANDARD, IMPROVEMENTS AND
0919-03-030 Harrison/
Atlanta
VA Actual $1,337,916 9 RENOVATION OF SIDEWALKS, BRICK STREETS, AND UTILITY
0982-02-017 Haskell/
Abilene
FM 617 Actual $4,707,207 1 WIDENING, OVERLAY, PAVEMENT MARKINGS
0471-02-036 Hays/
Austin
SH 21 Actual $434,402 6 REHABILITATE BRIDGE & APPROACHES
0030-05-058 Hemphill/
Amarillo
US 83 Actual $4,435,337 8 HAZARD ELIMINATION
0697-02-028 Henderson/
Tyler
SH 334 Actual $12,584,713 11 WIDEN TO 4 LANE DIVIDED URBAN SECTION (FLUSH MEDIAN)
0121-02-052 Hill/
Waco
SH 22 Actual $1,394,299 8 SAFETY TREAT FIXED OBJECTS
0010-02-085 Hopkins/
Paris
IH 30 Actual $172,274 10 LANDSCAPE AND SCENIC ENHANCEMENT
0005-05-097 Howard/
Abilene
IH 20 Actual $1,127,858 1 REPLACE METAL BEAM GUARD FENCE
0005-06-107 Howard/
Abilene
IH 20 Actual $13,955,021 1 PLANING, FLEX BASE REPAIR, UNDERSEAL, ASPHALT CONCRETE
0005-06-108 Howard/
Abilene
IH 20 Actual $7,350,612 1 PLANNING, FLEX BASE REPAIR, UNDERSEAL, ASPHALTIC CONCRETE
0009-13-139 Hunt/
Paris
IH 30 Actual $6,430,748 8 MEDIAN TRAFFIC BARRIER
0920-38-161 Jefferson/
Beaumont
VA Actual $772,929 9 CONSTRUCT A BOARDWALK, WALKWAYS AND PEDESTRIAN PATH
0173-03-036 Kaufman/
Dallas
SH 34 Actual $898,857 8 CONSTRUCT LEFT TURN LANE
0783-02-079 Lubbock/
Lubbock
LP 289 Actual $657,497 1 MISCELANEOUS CONSTRUCTION
0068-02-043 Lynn/
Lubbock
US 87 Actual $210,279 10 LANDSCAPE AND SCENIC ENHANCEMENT
0906-32-040 Midland/
Odessa
VA Actual $2,163,900 9 CONSTRUCT A TRANSPORTATION MUSEUM AT CAF
2383-01-018 Midland/
Odessa
FM 1379 Actual $2,825,945 11 FACILITY UPGRADES TO MEET NON - FREEWAY STANDARDS
0185-03-022 Milam/
Bryan
US 190 Actual $2,933,173 1 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF A LEFT
1416-03-014 Montgomery/
Houston
FM 1486 Actual $6,965,230 1 WIDEN SHOULDERS, ONE COURSE SURFACE TREATMENT & ASPHALT
0649-02-027 Parker/
Fort Worth
FM 1885 Actual $6,693,927 11 ADD PAVED SURFACE, CEMENT TREAT AND 2 CST
0904-00-105 Potter/
Amarillo
VA Actual $201,456 1 CRACK POURING
0904-00-121 Potter/
Amarillo
VA Actual $247,465 1 CRACK POURING
0168-09-149 Randall/
Amarillo
IH 27 Actual $321,293 11 CABLE BARRIER
0262-03-027 Robertson/
Bryan
FM 485 Actual $4,409,800 1 RESTORATION OF EXISTING ROAD CONSISTING OF GRADING,
0396-03-025 Schleicher/
San Angelo
US 190 Actual $4,309,377 1 RESTORATION OF EXISTING ROAD
0910-00-068 Smith/
Tyler
VA Actual $370,400 1 NON - SITE SPECIFIC SIGNAL PROGRAM
0910-00-070 Smith/
Tyler
VA Actual $379,415 1 THERMO PLASTIC PAVEMENT MARKINGS PROGRAM
0555-01-036 Tom Green/
San Angelo
FM 380 Actual $7,693,246 1 GRADING, BASE, SURFACING & WIDEN STRUCTURES
0914-00-234 Travis/
Austin
VA Actual $185,000 10 STUDY TO ENCOURAGE TRUCK TRAFFIC IN PEAK HOURS
2100-01-046 Travis/
Austin
RM 2222 Actual $595,149 8 INSTALL CONTINUOUS TURN LANE AND CONSTRUCT PAVED SHOULDERS
0920-13-004 Tyler/
Beaumont
VA Actual $317,450 9 CONSTRUCT HIKING TRAIL IN WOODVILLE
0271-04-079 Waller/
Houston
IH 10 Actual $2,295,292 11 CONSTRUCT INTERCHANGE
0018-05-066 Webb/
Laredo
IH 35 Actual $4,110,500 1 INSTALL RAISED BARRIER
0086-14-035 Webb/
Laredo
LP 20 Actual $2,726,640 11 INSTALL RAISED MEDIAN
0086-14-044 Webb/
Laredo
LP 20 Actual $917,312 11 RECONSTRUCTION OF AN EXISTING ACCESS ROADWAY DRIVEWAY
0542-01-066 Webb/
Laredo
US 59 Actual $8,160,842 4 WIDEN TO SUPER TWO HIGHWAY_ (PHASE 1)
0124-02-030 Wilbarger/
Wichita Falls
US 283 Actual $3,094,514 1 WIDEN PAVEMENT AND STRUCTURES
0015-17-019 Williamson/
Austin
BI 35M Actual $1,362,351 1 MILL, SEAL AND OVERLAY
0015-17-022 Williamson/
Austin
BI 35M Actual $1,160,866 8 INTERCONNECT TRAFFIC SIGNALS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract