CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
1406-01-027 Angelina/
Lufkin
FM 1271 Actual $1,212,794 1 SAFETY TREAT FIXED OBJECTS
0903-29-014 Archer/
Wichita Falls
CR Actual $784,496 6 REPLACE BRIDGE AND APPROACHES
0903-29-021 Archer/
Wichita Falls
CR Actual $793,525 6 REPLACE BRIDGE AND APPROACHES
0017-13-009 Atascosa/
San Antonio
SH 132 Actual $2,687,591 1 SEAL COAT, PAVEMENT MARKINGS & ADA CURB RAMP
0265-10-027 Bastrop/
Austin
LP 150 Actual $262,000 LC REALIGN RAMPS & OV
0017-02-069 Bexar/
San Antonio
IH 35 Actual $4,058,998 11 PAVEMENT REPAIR, SEAL COAT, SMA OVERLAY & PAVEMENT MARKINGS
0915-12-354 Bexar/
San Antonio
CS Actual $3,790,343 7 REHAB & WIDEN NARROW PAVEMENT (CURBS, SDWK, DRAINAGE)
0914-23-006 Blanco/
Austin
VA Actual $478,298 9 CONSTRUCT TRAILS
1231-01-053 Bowie/
Atlanta
FM 989 Actual $788,824 1 SAFETY TREAT FIXED OBJECTS, ETC.
0054-06-087 Brown/
Brownwood
US 67 Actual $3,752,173 11 REHABILITATE EXISTING ROADWAY TO URBAN C & G SECTION
0252-01-060 Burnet/
Austin
US 281 Actual $522,241 10 ADD LEFT TURN LANE
1425-04-021 Cameron/
Pharr
FM 1479 Actual $1,877,571 1 REHABILITATE AND RESTORE PAVEMENT
0047-06-124 Collin/
Dallas
US 75 Actual $706,734 7 ADD LANE FOR DUAL EXIT FROM NORTHBOUND US 75
0387-01-012 Collin/
Dallas
FM 75 Actual $1,967,512 1 REMOVE EXISTING AND CONSTRUCT 2 - LANE URBAN SECTION
0026-05-020 Colorado/
Yoakum
US 90 Actual $3,878,809 1 SEAL COAT
1597-03-007 Comanche/
Brownwood
FM 1702 Actual $1,923,068 1 BASE OVERLAY, WIDEN AND SAFETY TREAT STRUCTURES
0044-07-063 Cooke/
Wichita Falls
US 82 Actual $81,193 10 LANDSCAPING
0044-08-059 Cooke/
Wichita Falls
US 82 Actual $56,646 10 LANDSCAPING
0197-02-096 Dallas/
Dallas
US 175 Actual $237,843 1 GUIDE SIGN REFURBISHING
0918-00-126 Dallas/
Dallas
VA Actual $1,157,767 1 NON - SITE SPECIFIC SIGN REPLACEMENT
0918-46-208 Denton/
Dallas
VA Actual $1,001,905 1 MICROSURFACING AND STRIPING
0346-11-007 Dewitt/
Yoakum
SH 111 Actual $2,141,448 11 REHABILITATE CONCRETE ROADWAY
0924-06-286 El Paso/
El Paso
VA Actual $1,000,000 5 OPERATION OF VANPOOL PROGRAM IN EL PASO COUNTY
0172-04-040 Ellis/
Dallas
US 287 Actual $671,225 1 GUIDE SIGN REFURBISHING
3510-04-025 Fort Bend/
Houston
SH 99 Actual $484,916 1 INSTALL SAFETY LIGHTING
0051-03-098 Galveston/
Houston
SH 3 Actual $1,598,548 1 MILL, ASPHALT OVERLAY AND PAVEMENT MARKINGS
0200-09-079 Hardin/
Beaumont
US 69 Actual $3,457,717 1 MILL AND OVERLAY EXISTING ROADWAY
0339-04-032 Hardin/
Beaumont
SH 105 Actual $3,787,549 1 OVERLAY EXISTING ROADWAY
0177-06-079 Harris/
Houston
US 59 Actual $272,020 1 REPLACEMENT OF EMBANKMENT AND CONSTRUCTION OF CONCRETE
0912-72-131 Harris/
Houston
VA Actual $1,731,562 10 LANDSCAPE IN SECTIONS
1685-05-092 Harris/
Houston
SH 6 Actual $867,535 1 SEAL COAT & 1 - 1 / 2" OVERLAY AND PAVEMENT MARKINGS
2941-02-047 Harris/
Houston
FM 2920 Actual $507,125 LC BOX CULVER AND DEEPEN DITCHES IN UPPER SEALS GULLY WATERSHED
0843-02-021 Harrison/
Atlanta
FM 450 Actual $677,061 1 NOVACHIP OVERLAY
1463-01-004 Hunt/
Paris
FM 1532 Actual $311,291 6 REPLACE BRIDGE & APPROACHES
2276-01-014 Hunt/
Paris
FM 1570 Actual $96,200 1 INSTALL TRAFFIC SIGNAL
0028-13-124 Jefferson/
Beaumont
IH 10 Actual $9,794,826 1 REHABILITATE EXISTING ROADWAY
0200-16-012 Jefferson/
Beaumont
US 69 Actual $1,612,619 1 OVERLAY EXISTING ROADWAY
0508-04-137 Jefferson/
Beaumont
SH 73 Actual $1,420,927 6 REHABILITATE EXISTING FRONTAGE ROAD
0920-00-080 Jefferson/
Beaumont
VA Actual $725,003 1 RESTRIPING OF EXISTING ROADWAYS
0142-02-026 Kerr/
San Antonio
IH 10 Actual $3,893,677 8 INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM)
0856-02-009 Kerr/
San Antonio
FM 2771 Actual $1,311,368 1 WIDEN NARROW ROADWAY AND ADD SHOULDERS
0148-03-024 Kimble/
San Angelo
US 377 Actual $1,145,567 1 REHABILITATE STREAM CROSSING
0028-03-099 Liberty/
Beaumont
US 90 Actual $9,781,392 1 MILL AND OVERLAY EXISTING ROADWAY
0254-01-128 Live Oak/
Corpus Christi
US 281 Actual $1,898,656 1 FULL DEPTH SPOT PAVE, REPAIRS SBL & OVERLAY N & S BOUND LANES
0380-01-062 Lubbock/
Lubbock
US 62 Actual $37,300,942 10 CONVERT NON - FREEWAY TO FREEWAY
0905-00-043 Lubbock/
Lubbock
VA Actual $1,564,257 1 MISCELLANEOUS CONSTRUCTION
0919-22-023 Marion/
Atlanta
VA Actual $1,135,400 9 CREATE VISITORS CENTER AND MULTI - MODAL TRANSPORTATION
2896-01-007 Matagorda/
Yoakum
FM 2853 Actual $3,202,386 1 RESTORE ROADWAY
0299-04-059 Maverick/
Laredo
US 277 Actual $4,366,870 1 REHABILITATION OF AN EXISTING ROADWAY
0015-01-215 McLennan/
Waco
IH 35 Actual $3,616,168 1 PLANING, SEAL AND ACP OVERLAY
0162-01-089 McLennan/
Waco
US 84 Actual $609,675 1 ADDITION OF TURN LANES AND SIGNALS
0013-05-054 Montague/
Wichita Falls
US 81 Actual $805,098 11 MICROSURFACING
0177-05-091 Montgomery/
Houston
US 59 Actual $57,446,850 2 WIDEN TO 6 MAINLANES & CONSTRUCT SOUTHBOUND FRONTAGE ROAD,
0675-08-096 Montgomery/
Houston
IH 45 Actual $6,074,769 2 REPLACE FM 3083 BRIDGE OVER IH 45 AND APPROACHES
1986-01-058 Montgomery/
Houston
FM 1314 Actual $912,978 12 PREPARE ROW FOR WIDEN TO 4 LANES (PTF)
0093-01-083 Navarro/
Dallas
IH 45 Actual $574,104 10 LANDSCAPE DEVELOPMENT
0166-01-045 Navarro/
Dallas
IH 45 Actual $5,995,333 1 REHABILITATION OF EXISTING ROADWAY AND RAMPS
0028-11-192 Orange/
Beaumont
IH 10 Actual $4,906,289 1 OVERLAY EXISTING MAIN LANES
0306-01-058 Orange/
Beaumont
SH 73 Actual $2,701,124 1 REPAIR PAVEMENT AND OVERLAY EXISTING ROADWAY
1285-01-012 Orange/
Beaumont
FM 1136 Actual $1,171,634 1 RESTORE EXISTING ROADWAY
1388-02-008 Panola/
Atlanta
FM 1251 Actual $2,821,476 10 CONSTRUCT GRADE SEPARATION AT TXU LIGNITE HAUL ROAD
0773-02-015 Red River/
Paris
FM 1159 Actual $1,824,531 8 WIDEN EXISTING FROM 20 FT TO 24 FT
0738-06-008 Refugio/
Corpus Christi
FM 2441 Actual $1,007,299 6 REPLACE BRIDGE AND APPROACHES
0205-02-049 Robertson/
Bryan
US 79 Actual $655,143 1 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF A LEFT
0431-01-025 Sabine/
Lufkin
SH 184 Actual $5,182,014 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
3170-01-010 Sabine/
Lufkin
FM 3121 Actual $2,363,099 8 SAFETY TREAT FIXED OBJECTS
0101-03-080 San Patricio/
Corpus Christi
US 181 Actual $3,415,890 1 REHAB. OF ROADWAY (SIDEWALK / LANDSCAPE IMPROVEMENTS)
2075-02-055 Smith/
Tyler
LP 323 Actual $8,094,559 10 RESURF ROADWAY, IMPROVE SIGS & SAFETY, CONSTR SIDEWALKS
0008-14-105 Tarrant/
Fort Worth
IH 820 Actual $4,958,544 1 FULL DEPTH REPAIR AND HOT MIX OVERLAY OF 2"
0014-16-257 Tarrant/
Fort Worth
IH 35W Actual $4,527,494 1 FULL DEPTH REPAIR AND HOT MIX OVERLAY OF 2"
0902-48-681 Tarrant/
Fort Worth
VA Actual $3,967,856 10 CITY OF FORT WORTH CORRIDOR REDEVELOPMENT PROGRAM
0902-48-683 Tarrant/
Fort Worth
VA Actual $500,000 10 FORT WORTH URBAN VILLAGES AND COMMERCIAL CORRIDORS
2266-02-128 Tarrant/
Fort Worth
SH 360 Actual $181,481 1 DRAINAGE IMPROVEMENTS CONSISTING OF DRAINAGE STRUCTURES AND
2266-02-130 Tarrant/
Fort Worth
SH 360 Actual $2,859,379 1 REPAIR FAILURES, MILL AND HOT MIX OVERLAY OF 2 INCHES
0610-03-077 Titus/
Atlanta
IH 30 Actual $2,592,491 1 PVMT REPAIR, FOG SEAL, OCST & PVMT MARKING
0016-01-102 Travis/
Austin
LP 275 Actual $267,581 1 1CST & OVERLAY
0914-00-238 Travis/
Austin
VA Actual $614,966 1 VARIOUS PAVEMENT MARKINGS
0914-04-166 Travis/
Austin
VA Actual $1,222,843 9 CONSTRUCT BIKE TRAIL__ (AKA LANCE ARMSTRONG TRAIL)
0914-04-179 Travis/
Austin
VA Actual $278,726 7 COMPLETE GAPS IN SIDEWALK
1377-01-013 Travis/
Austin
FM 1327 Actual $2,411,226 1 IMPROVE GUARDRAIL
0213-07-051 Tyler/
Beaumont
US 190 Actual $891,848 1 MILL AND INLAY EXISTING ROADWAY
0495-02-057 Van Zandt/
Tyler
IH 20 Actual $9,732,424 1 REHABILITATE ROADWAY
0910-12-046 Van Zandt/
Tyler
VA Actual $986,338 9 CANTON / FIRST MONDAY TRADE DAYS STREETSCAPE PROJECT
0475-07-012 Walker/
Bryan
FM 230 Actual $2,382,137 1 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED
0186-06-067 Washington/
Bryan
US 290 Actual $33,064 8 SAFETY WORK CONSISTING OF TEXTURIZING SHOULDERS BY PLACING
0018-08-018 Webb/
Laredo
BI 35-A Actual $506,844 8 IMPROVE & INTERCONNECT TRAFFIC SIGNALS
0237-03-023 Webb/
Laredo
SH 44 Actual $7,592,404 1 RESTORATION OF AN EXISTING ROADWAY
0922-33-106 Webb/
Laredo
VA Actual $3,177,809 11 RECONSTRUCTION OF AN EXISTING ROAD (MANGANA - HEIN RD)
0089-06-076 Wharton/
Yoakum
US 59 Actual $14,005,326 1 ASPHALTIC CONCRETE PAVEMENT
0043-09-110 Wichita/
Wichita Falls
IH 44 Actual $9,221,314 1 REPLACE CONCRETE PAVEMENT
0903-03-077 Wichita/
Wichita Falls
CR Actual $857,524 6 REPLACE BRIDGE AND APPROACHES
0915-14-027 Wilson/
San Antonio
CR Actual $256,192 6 REPLACE NARROW BRIDGE & APPROACHES
0313-01-044 Wise/
Fort Worth
FM 51 Actual $107,500 1 INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0903-27-017 Young/
Wichita Falls
CR Actual $291,628 6 REPLACE BRIDGE AND APPROACHES