Letting Schedule for February, 2007 (FY 2007)
Letting Schedule for February, 2007 (FY 2007) | ||||
Last Update: Monday, July 30, 2007 |
February, 2007 (FY 2007) | (see Links) |
SEP 2006 | OCT 2006 | NOV 2006 | DEC 2006 | JAN 2007 | FEB 2007 | MAR 2007 | APR 2007 | MAY 2007 | JUN 2007 | JUL 2007 | AUG 2007 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0319-04-075 | Angelina/ Lufkin |
SH 94 | Actual | $231,273 | 10 | IMPROVE AESTHETICS, PLACE TREES BEHIND RETAINING WALL |
0328-04-039 | Atascosa/ San Antonio |
SH 97 | Actual | $1,161,575 | 1 | ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS |
0291-10-079 | Bexar/ San Antonio |
SP 421 | Actual | $74,385,215 | 2 | EXPAND ROADWAY TO 6 LANE URBAN DIVIDED W / CLTL |
0007-12-005 | Callahan/ Abilene |
BI 20-T | Actual | $55,001 | 10 | LANDSCAPE IMPROVEMENTS |
0083-08-043 | Camp/ Atlanta |
SH 11 | Actual | $3,366,537 | 6 | WIDEN BRIDGE AND APPROACHES |
0248-03-021 | Camp/ Atlanta |
US 271 | Actual | $2,269,669 | 8 | SAFETY TREAT FIXED OBJECTS, ETC. |
0016-04-107 | Comal/ San Antonio |
IH 35 | Actual | $2,236,993 | 1 | SEAL COAT AND PFC OVERLAY EXISTING SHOULDERS |
0055-04-028 | Coryell/ Waco |
US 84 | Actual | $1,635,469 | 1 | MICROSURFACING |
0009-03-041 | Dallas/ Dallas |
SH 66 | Actual | $135,000 | 5 | 8 INTERSECTIONS: UPGRADE SIGNAL CABINETS AND CONTROLLERS |
0261-02-064 | Dallas/ Dallas |
US 67 | Actual | $4,909,031 | 1 | LEVEL UP, OVERLAY |
0261-03-057 | Dallas/ Dallas |
US 67 | Actual | $246,977 | 1 | REMOVE AND INSTALL VEHICLE DETECTION SYSTEM |
0913-00-078 | Dewitt/ Yoakum |
VA | Actual | $76,439 | 10 | LANDSCAPE DEVELOPMENT |
0049-03-064 | Falls/ Waco |
SH 6 | Actual | $210,558 | 10 | INSTALLATION OF LANDSCAPE INCLUDING RETAINING WALLS AND |
0057-04-022 | Freestone/ Bryan |
US 84 | Actual | $5,616,562 | 1 | REHABILITATION OF EXISTING ROAD CONSISTING OF BASE REPAIR, |
0301-03-024 | Frio/ San Antonio |
SH 85 | Actual | $79,868 | 1 | UPGRADE DRAINAGE STRUCTURE UNDER SH 85 |
0389-06-056 | Galveston/ Houston |
SH 146 | Actual | $17,533,224 | 10 | CONSTRUCT 2 - LANE BRIDGE ON WEST SIDE |
1135-01-022 | Gillespie/ Austin |
RM 783 | Actual | $2,238,466 | 1 | RESURFACING |
1442-03-015 | Gonzales/ Yoakum |
FM 1680 | Actual | $1,029,950 | 6 | REPLACE BRIDGE AND APPROACHES |
0091-01-041 | Grayson/ Paris |
SH 289 | Actual | $3,193,482 | 1 | OVERLAY EXISTING PAVEMENT WITH HOT MIXED ASPHALTIC CONCRETE |
0389-05-103 | Harris/ Houston |
SH 146 | Actual | $2,228,396 | 1 | PLANING, ASPHALT OVERLAY, SIGNALS & PAVEMENT MARKINGS |
0502-01-200 | Harris/ Houston |
SH 225 | Actual | $1,171,270 | 1 | ADD ADDITIONAL TURN LANE STORAGE ON FRONTAGE ROADS |
0912-00-340 | Harris/ Houston |
VA | Actual | $250,000 | 7 | 2006 CONGESTION MITIGATION ANALYSIS BY H - GAC FOR NEPA |
0912-71-544 | Harris/ Houston |
VA | Actual | $2,665,859 | 9 | COLUMBIA TAP RAIL TO TRAIL BIKEWAY |
1685-05-085 | Harris/ Houston |
SH 6 | Actual | $4,749,547 | 1 | PLANNING, FULL DEPTH CONCRETE AND CRACK & SPALL REPAIR, ONE |
0039-17-148 | Hidalgo/ Pharr |
US 83 | Actual | $21,866,728 | 2 | RECONSTRUCT FRONTAGE ROADS & CONSTRUCT RAMPS |
0865-01-097 | Hidalgo/ Pharr |
SH 495 | Actual | $198,739 | 11 | SIDEWALKS, BICYCLE LANES, PEDESTRIAN HEADS, OVERHEAD SCHOOL |
1802-01-031 | Hidalgo/ Pharr |
FM 1924 | Actual | $14,756,773 | 1 | IMPROVE TRAFFIC SIGNAL, ADD THROUGH LANES AND INSTALL |
0083-03-047 | Hopkins/ Paris |
SH 11 | Actual | $4,243,620 | 1 | REHAB EXIST ROAD |
0065-08-161 | Jefferson/ Beaumont |
SP 380 | Actual | $1,406,681 | 1 | OVERLAY EXISTING ROADWAY |
0365-03-037 | Johnson/ Fort Worth |
SH 171 | Actual | $79,205 | 1 | INSTALLATION OF TRAFFIC SIGNAL |
1513-02-038 | Johnson/ Fort Worth |
FM 4 | Actual | $6,283,274 | 11 | ADD PAVED SURFACE, TREAT SUBGRADE, REHAB BASE AND ADD 2" |
0495-01-053 | Kaufman/ Dallas |
IH 20 | Actual | $4,428,732 | 1 | RESTORATION OF WESTBOUND TRAVEL LANES |
0382-03-027 | Limestone/ Waco |
SH 7 | Actual | $4,272,816 | 10 | GRADE SEPARATION FOR TXU HAUL ROAD / RAILROAD OVERPASS |
0254-01-129 | Live Oak/ Corpus Christi |
US 281 | Actual | $44,270 | 10 | LANDSCAPE |
0523-10-035 | Montgomery/ Houston |
FM 1488 | Actual | $578,954 | 12 | PREPARE ROW FOR WIDEN TO 4 LANES (PTF) |
0920-06-020 | Newton/ Beaumont |
CR | Actual | $1,486,527 | 6 | REPLACE BRIDGE AND APPROACHES |
0908-20-018 | Nolan/ Abilene |
CS | Actual | $384,894 | 6 | REHABILITATE BRIDGE AND APPROACHES |
2142-02-011 | Nueces/ Corpus Christi |
FM 2292 | Actual | $1,266,097 | 1 | REPLACE BRIDGE AND APPROACHES |
0314-03-049 | Palo Pinto/ Fort Worth |
IH 20 | Actual | $16,542,102 | 1 | REHABILITATION OF ROADWAY CONSISTING OF HOTMIX OVERLAY AND |
0314-01-073 | Parker/ Fort Worth |
IH 20 | Actual | $300,000 | 1 | ABATEMENT OF ASBESTOS IN THE PAINT FOR REHABILITATION |
0140-01-073 | Pecos/ Odessa |
IH 10 | Actual | $3,195,620 | 1 | PAVEMENT OVERLAY |
0140-01-074 | Pecos/ Odessa |
IH 10 | Actual | $2,158,343 | 1 | PAVEMENT OVERLAY |
0140-02-034 | Pecos/ Odessa |
IH 10 | Actual | $99,997 | 1 | SHOULDER TEXTURING |
0911-04-040 | Polk/ Lufkin |
CR | Actual | $540,874 | 6 | BRIDGE REPLACEMENT |
0904-00-122 | Potter/ Amarillo |
VA | Actual | $1,699,968 | 1 | THERMOPLASTIC STRIPING |
0904-00-123 | Potter/ Amarillo |
VA | Actual | $213,338 | 1 | PAVEMENT MARKINGS |
0451-01-045 | Rockwall/ Dallas |
SH 205 | Actual | $1,252,620 | 1 | MICROSURFACE AND PAVEMENT MARKINGS |
0138-03-137 | Rusk/ Tyler |
US 259 | Actual | $3,112,195 | 1 | RESURFACE ROADWAY |
0171-04-067 | Tarrant/ Fort Worth |
SH 199 | Actual | $31,788,019 | 11 | CONSTRUCT FRONTAGE ROADS |
0902-48-656 | Tarrant/ Fort Worth |
VA | Actual | $594,600 | 7 | SIGNAL IMPROVEMENTS ON SYSTEM VIA THOROUGFARE ASSESSMENT |
0902-48-664 | Tarrant/ Fort Worth |
VA | Actual | $184,236 | 5 | SIGNAL IMPROVEMENTS ON - SYSTEM VIA THE THOROUGHFARE |
0902-48-676 | Tarrant/ Fort Worth |
VA | Actual | $19,000 | 5 | SIGNAL IMPROVEMENTS OFF - SYSTEM VIA THE THOROUGHFARE |
2681-02-005 | Tarrant/ Fort Worth |
FM 2499 | Actual | $89,842 | 10 | INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
1200-03-042 | Travis/ Austin |
FM 973 | Actual | $2,042,378 | 1 | 1CST & 2" OVERLAY |
0086-14-045 | Webb/ Laredo |
LP 20 | Actual | $5,373,605 | 11 | CONSTRUCT AN AT GRADE INTERSECTION |
0397-02-034 | Wheeler/ Childress |
SH 152 | Actual | $1,103,602 | 1 | REPLACE BRIDGE AND APPROACHES |
|
|