Letting Schedule for May, 2007 (FY 2007)

 
 
Last Update: Monday, July 30, 2007
May, 2007 (FY 2007) (see Links)
SEP 2006 | OCT 2006 | NOV 2006 | DEC 2006 | JAN 2007 | FEB 2007 | MAR 2007 | APR 2007 | MAY 2007 | JUN 2007 | JUL 2007 | AUG 2007
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0156-05-045 Archer/
Wichita Falls
US 277 Actual $16,490,614 4 UPGRADE TO 4 LANE DIVIDED FACILITY
0915-13-013 Atascosa/
San Antonio
CR Actual $397,515 10 REPLACE NARROW BRIDGE & APPROACHES
0322-01-041 Bastrop/
Austin
SH 95 Actual $3,417,129 1 MILL, PAVEMENT REPAIR, SEAL AND OVERLAY
0017-10-240 Bexar/
San Antonio
IH 35 Actual $9,529,059 2 RECONFIGURE NORTHBOUND RAMPS
0017-10-242 Bexar/
San Antonio
IH 35 Actual $468,654 10 LANDSCAPING AND IRRIGATION SYSTEMS
0025-02-155 Bexar/
San Antonio
IH 10 Actual $4,302,042 6 REPLACE NARROW BRODGE & APPROACHES
0252-03-043 Blanco/
Austin
US 281 Actual $515,228 1 ADD TWO - WAY LEFT TURN LANE
0724-02-023 Bosque/
Waco
FM 219 Actual $1,070,903 8 IMPROVE GUARDRAIL AND SAFETY TREAT FIXED OBJECTS
0919-19-046 Bowie/
Atlanta
VA Actual $330,815 9 RECONSTRUCT SIDEWALKS, ADD PEDESTRIAN FURNISHINGS, LIGHTING,
0021-04-021 Brewster/
El Paso
US 90 Actual $1,197,142 1 BUILD DETOUR AND REPLACE EXISTING CULVERT
0713-01-030 Burleson/
Bryan
FM 60 Actual $1,870,333 1 RESTORE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES
3171-01-008 Calhoun/
Yoakum
FM 3084 Actual $1,144,846 8 WIDEN ROADWAY
0277-02-042 Cass/
Atlanta
SH 77 Actual $1,486,429 8 SAFETY TREAT FIXED OBJECTS, ETC.
0047-14-062 Collin/
Dallas
US 75 Actual $967,990 10 CONSTRUCT WB BRIDGE
0091-04-052 Collin/
Dallas
SH 289 Actual $570,980 1 INSTALL SIGNAL AND RIGHT AND LEFT TURN LANES
0016-04-103 Comal/
San Antonio
IH 35 Actual $4,594,798 11 CORRIDOR TRAFFIC MANAGEMENT
0215-02-047 Comal/
San Antonio
BS 46-C Actual $353,244 11 REPLACE NARROW BRIDGE & APPROACHES
1541-01-011 Comal/
San Antonio
FM 311 Actual $929,990 11 REPLACE NARROW BRIDGE & APPROACHES
0009-11-217 Dallas/
Dallas
IH 30 Actual $2,400,357 1 FULL DEPTH CONCRETE REPAIR
0918-45-769 Dallas/
Dallas
VA Actual $1,191,693 5 SIP IMPLEMENTATION - ON - SYSTEM
0923-09-048 Eastland/
Brownwood
VA Actual $429,356 10 MULTI - REGION ADVANCED TRAVELER INFORMATION SYSTEM (ATIS) FOR
0906-00-122 Ector/
Odessa
VA Actual $381,144 1 BRIDGE REHABILITATION
0201-04-022 Edwards/
San Angelo
US 377 Actual $3,327,493 11 REHABILITATE EXISTING ROADWAY
0915-18-011 Frio/
San Antonio
CR Actual $967,455 6 REPLACE NARROW BRIDGE & APPROACHES
0976-03-093 Galveston/
Houston
FM 518 Actual $2,399,473 11 NOISE WALLS (IN SECTIONS)
0639-01-023 Grimes/
Bryan
FM 39 Actual $898,824 8 SAFTEY WORK CONSISTING OF GRADING, SUBGRADE WIDENING
1125-01-010 Guadalupe/
San Antonio
FM 775 Actual $6,368,924 11 REHAB AND WIDEN EXISTING ROADWAY, ADD SHOULDERS
0500-03-544 Harris/
Houston
IH 45 Actual $36,186,822 ROW WIDEN TO 10 MAIN LANES, 2 3 - LANE FRONTAGE ROADS AND 1 HOV
0912-71-639 Harris/
Houston
CS Actual $5,817,692 ROW WIDEN TO 4 LANE AND CONSTRUCT TRUCK QUEUING AREA
0805-01-014 Hays/
Austin
RM 150 Actual $700,173 1 MILL, OV, & FULL DEPTH REPAIR
1228-04-013 Hidalgo/
Pharr
FM 1015 Actual $6,032,343 1 WIDEN TO 4 LANE DIVIDED
0200-15-015 Jefferson/
Beaumont
US 69 Actual $2,081,666 5 INSTALLATION OF TURNAROUND LANES
0508-05-025 Jefferson/
Beaumont
SH 82 Actual $1,197,672 11 OVERLAY EXISTING ROADWAY
0254-07-002 Jim Wells/
Corpus Christi
US 281 Actual $2,321,437 1 MILL AND OVERLAY
0197-04-074 Kaufman/
Dallas
US 175 Actual $189,520 10 LANDSCAPE DEVELOPMENT
0923-10-015 Lampasas/
Brownwood
VA Actual $1,907,605 11 SAFETY END TREATMENT AND GUARDRAIL REPLACEMENT
3605-01-001 Lampasas/
Brownwood
FM 1715 Actual $6,245,968 4 CONSTRUCT NEW FM ROAD CONSISTING OF GRADING, BASE, STRUCTURE
0915-45-038 Medina/
San Antonio
CR Actual $1,244,531 6 REPLACE NARROW BRIDGE & APPROACHES
0915-45-039 Medina/
San Antonio
CR Actual $1,542,549 6 REPLACE NARROW BRIDGE & APPROACHES
0915-45-041 Medina/
San Antonio
CR Actual $617,889 6 REPLACE NARROW BRIDGE & APPROACHES
0523-10-015 Montgomery/
Houston
FM 1488 Actual $23,254,417 11 WIDEN 2 LANES TO 4 - LANE DIVIDED (PTF)
0059-01-049 Nacogdoches/
Lufkin
SH 7 Actual $9,610,603 8 REHAB EXISTING RDWY & ADD 10FT SHOULDERS
0102-01-096 Nueces/
Corpus Christi
SH 44 Actual $3,040,043 1 RUBBER SEAL & 2" OVERLAY
0063-11-051 Panola/
Atlanta
US 79 Actual $1,759,711 11 ADD TURNAROUNDS AND AUXILLIARY LANES TO A SECTION OF 4 - LANE
0275-01-150 Potter/
Amarillo
IH 40 Actual $3,583,482 11 REHAB EXISTING ROADWAY
0427-01-034 Red River/
Paris
FM 44 Actual $2,408,194 8 WIDEN EXISTING FROM 20 FT TO 24 FT
1017-02-010 Rockwall/
Dallas
FM 35 Actual $3,126,643 LC REPLACE BRIDGES AND APPROACHES
0747-03-075 Tarrant/
Fort Worth
FM 157 Actual $58,400 1 INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL
0902-00-101 Tarrant/
Fort Worth
VA Actual $1,569,138 10 STATEWIDE CURB RAMP PROGRAM
0902-48-693 Tarrant/
Fort Worth
VA Actual $1,996,000 10 ENGINEERING STUDY TO DETERMINE ALTERNATES RESOLUTION TO
0902-48-700 Tarrant/
Fort Worth
VA Actual $2,754,667 5 MOBILITY ASSISTANCE THROUGHOUT TARRANT COUNTY
2266-02-124 Tarrant/
Fort Worth
SH 360 Actual $106,750 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL
0908-33-072 Taylor/
Abilene
CR Actual $325,742 6 REPLACE BRIDGE AND APPROACHES
0125-02-028 Throckmorton/
Wichita Falls
US 183 Actual $7,677,739 1 ADD PAVED SHOULDERS, WIDEN STRUCTURES, AND SURFACING
0022-07-027 Val Verde/
Laredo
US 90 Actual $971,424 10 ADD LEFT TURN LANE
0237-03-024 Webb/
Laredo
SH 44 Actual $4,017,143 1 RESTORATION OF AN EXISTING ROADWAY
1412-03-033 Wharton/
Yoakum
FM 1301 Actual $1,466,296 1 WIDEN ROADWAY AND ADD TURN LANES
0366-09-025 Wilson/
San Antonio
FM 541 Actual $1,566,992 6 REPLACE NARROW BRIDGE & APPROACHES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract